CN101644356B - Cable bridge - Google Patents

Cable bridge Download PDF

Info

Publication number
CN101644356B
CN101644356B CN2009101842523A CN200910184252A CN101644356B CN 101644356 B CN101644356 B CN 101644356B CN 2009101842523 A CN2009101842523 A CN 2009101842523A CN 200910184252 A CN200910184252 A CN 200910184252A CN 101644356 B CN101644356 B CN 101644356B
Authority
CN
China
Prior art keywords
square tube
shaped steel
inner carrier
cable testing
testing bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009101842523A
Other languages
Chinese (zh)
Other versions
CN101644356A (en
Inventor
赵沭通
谢汉宪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINAGRATE COMPOSITES STRUCTURE (NANTONG) Ltd
Original Assignee
CHINAGRATE COMPOSITES STRUCTURE (NANTONG) Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINAGRATE COMPOSITES STRUCTURE (NANTONG) Ltd filed Critical CHINAGRATE COMPOSITES STRUCTURE (NANTONG) Ltd
Priority to CN2009101842523A priority Critical patent/CN101644356B/en
Publication of CN101644356A publication Critical patent/CN101644356A/en
Application granted granted Critical
Publication of CN101644356B publication Critical patent/CN101644356B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a cable bridge, comprising two C-shaped steels, the openings of which are placed in opposite, and side walls of the lower ends of the two C-shaped steels are all provided with a through hole, a square tube is arranged between the two C-shaped steels in a lateral manner, bottoms of two ends of the square tube are respectively connected with inner parts of bottom ends of the two C-shaped steels, two side walls of the square tube are respectively connected with inner parts of the side walls of the two C-shaped steels, the square tube is in an internal hollow structure, one ends of the two inner piston are all provided with an inner groove, nuts are arranged in the two inner grooves, the two C-shaped steels are connected and fixed with two nuts by respectively passing through two through holes via a bolt, the inner piston can have no concave surface and is fixedly connected with the C-shaped steel by the nuts through the bolt. The cable bridge of the invention has the advantages of light material quality, inflaming retarding, heat resistance, high mechanical strength, insulation and corrosion resistance.

Description

Cable testing bridge
Technical field:
The present invention relates to a kind of cable testing bridge.
Background technique:
Cable testing bridge generally is applicable to places such as the cable laying of large enterprise, major works power transformation, erecting cable, large bridge, subway and marine drilling.Existing cable testing bridge is made by the bulk metal framework mostly, makes so not only that overall structure is heavy but also involve great expense to be unfavorable for transportation, mounting or dismounting and to be extensive use of.If be applied in the erecting cable, can since the cable testing bridge long term exposure in air, easy-to-rust there is no insulating property; Another kind of pattern, and because of what use between its square tube and the C shaped steel is that glue is fixedlyed connected mode, it is determined by special glue fully because of constant intensity, and special glue costs an arm and a leg, glue can be because long term exposure be easily aging in air, so just exist very big safe shadow to suffer from, and working life is short, poor effect.Also have in square tube and to use inner carrier, but need be fixing in the boring of square tube two sides, make like this that square tube intensity reduces, easy-rupturing; And the easy stripped thread of inner carrier, whole cable testing bridge pressurized strength is lower.
Summary of the invention:
The objective of the invention is in order to overcome above deficiency, provide that a kind of material is light, fire-retardant, heatproof, mechanical strength height, perfect heat-dissipating, insulation is corrosion-resistant and can install at the scene, need not weld cable testing bridge.
The objective of the invention is to be achieved through the following technical solutions: a kind of cable testing bridge, comprise two C shaped steel, two C shaped steel openings are staggered relatively, and all be provided with through hole on the lower end sidewall of two C shaped steel, laterally be provided with square tube between two C shaped steel, and bottom, the two ends of square tube is connected with the inside, bottom of two C shaped steel respectively, the two ends of square tube are connected with the interior of two C shaped steel respectively, square tube is the boring structure, the inside, two ends of square tube all is connected with inner carrier by glue, inner carrier all is the boring structure, inner carrier is a square body, all be respectively equipped with a boss and two concave surfaces on each face around the outside of inner carrier, two concave surfaces place the both sides of boss respectively, one end of two inner carriers all is provided with inner groovy, be provided with nut in two inner groovies, two C shaped steel passes two through holes respectively by bolt and two nuts are connected and fixed, C shaped steel and square tube are glass fibre reinforced plastics, inner carrier, nuts and bolt is nonmetal or metallic material, the outer surface of nut has annular knurl, also can realize by another kind of technological scheme, a kind of cable testing bridge, cable testing bridge comprises two C shaped steel, two C shaped steel openings are staggered relatively, and all be provided with through hole on the lower end sidewall of two C shaped steel, between two C shaped steel, laterally be provided with square tube, and bottom, the two ends of square tube is connected with the inside, bottom of two C shaped steel respectively, the two side of square tube is connected with the interior of two C shaped steel respectively, square tube is the boring structure, the inside, two ends of square tube all is connected with first inner carrier by glue, first inner carrier is the boring structure, two first bolts pass described two first inner carrier cross settings respectively, and an end of two first bolts passes two through holes on the C shaped steel respectively and is connected and fixed by first nut, first inner carrier all is a square body, all be respectively equipped with a boss and two concave surfaces on each face around the outside of the inner carrier and first inner carrier, two concave surfaces place the both sides of boss respectively, first inner carrier, first bolt and first nut all are nonmetal or metallic material.
The present invention compared with prior art has the following advantages: inner carrier is set in square tube, and inner carrier is a hollow-core construction, and establish inner groovy at an end of inner carrier, and nut is set in concave surface, by bolt inner carrier is fixedlyed connected with C shaped steel, this sampling technology is comparatively simple, and all be respectively equipped with a boss and two concave surfaces on each face around the outside of inner carrier, fix by glue and square tube, can store glue in two concave surfaces, have seal action, and have the effect of exhaust in installation process, C shaped steel and square tube are glass fibre reinforced plastics, inner carrier, nuts and bolt is a nylon engineering plastic, the glass steel or stainless steel, steel, carbon steel material, make bulk strength higher, material is light, and it is corrosion-resistant to insulate.
Description of drawings:
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation of inner carrier of the present invention;
Fig. 3 is that the A of Fig. 2 is to structural representation;
Fig. 4 is the structural representation of another embodiment of the present invention;
Fig. 5 is the structural representation of the present invention's first inner carrier;
Fig. 6 is that the B of Fig. 5 is to structural representation;
Number in the figure: 1-C shaped steel, 2-through hole, 3-square tube, 4-inner carrier, 5-inner groovy, 6-nut, 7-bolt, 8-boss, 9-concave surface, 10-first inner carrier, 11-first bolt, 12-first nut.
Embodiment:
In order to deepen the understanding of the present invention, the invention will be further described below in conjunction with embodiment and accompanying drawing, and this embodiment only is used to explain the present invention, does not constitute the qualification to protection domain of the present invention.
As Fig. 1, Fig. 2, Fig. 3 shows a kind of embodiment of cable testing bridge of the present invention, cable testing bridge comprises two C shaped steel 1, two C shaped steel 2 openings are staggered relatively, and all be provided with through hole 2 on the lower end sidewall of two C shaped steel 1, laterally be provided with square tube 3 between two C shaped steel 1, and bottom, the two ends of square tube 3 is connected with the inside, bottom of two C shaped steel 1 respectively, the two side of square tube 3 is connected with the interior of two C shaped steel 1 respectively, square tube 3 is the boring structure, the inside, two ends of square tube 3 all is connected with inner carrier 4 by glue, inner carrier 4 is a square body, and be the boring structure, all be respectively equipped with a boss 8 and two concave surfaces 9 on each face around the outside of inner carrier 4, two concave surfaces 9 place the both sides of boss 8 respectively, inner carrier 4 is fixing by glue and square tube 3, can store glue in two concave surfaces 9, has seal action, and in installation process and have an effect of exhaust, two inner carriers 4 all are provided with inner groovy 5 away from an end of square tube 3 ends, be provided with nut 6 in two inner groovies 5, two C shaped steel 1 passes two through holes 2 respectively by bolt 7 and two nuts 6 are connected and fixed, C shaped steel 1 and square tube 3 are glass fibre reinforced plastics, inner carrier 4, nut 6 and bolt 7 can be nylon, engineering plastics, nonmetallic material or stainless steels such as glass fibre reinforced plastics, copper, metallic material such as carbon steel are made, the outer surface of nut 6 has annular knurl, make that like this material is lighter, and has the corrosion resistant effect of insulation, bulk strength is higher, and integral body is born pressure and surpassed U.S. NEMA FG1-C grade standard.
As Fig. 4, Fig. 5, Fig. 6 shows the another kind of embodiment of cable testing bridge of the present invention, described cable testing bridge comprises two C shaped steel 1, two C shaped steel 1 openings are staggered relatively, and all be provided with through hole 2 on the lower end sidewall of two C shaped steel 1, laterally be provided with square tube 3 between two C shaped steel 1, and bottom, the two ends of square tube 3 is connected with the inside, bottom of two C shaped steel 1 respectively, the two side of square tube 3 is connected with the interior of two C shaped steel 1 respectively, square tube 3 is the boring structure, the inside, two ends of square tube 3 all is connected with first inner carrier 10 by glue, two first inner carriers 10 all are square body, and be the boring structure, two first bolts 11 pass two first inner carrier 10 cross settings respectively, and an end of two first bolts 11 passes two through holes 2 on the C shaped steel 1 respectively and is connected and fixed by first nut 12, all be respectively equipped with a boss 8 and two concave surfaces 9 on each face around the outside of first inner carrier 10, two concave surfaces 9 place the both sides of boss 8 respectively, first inner carrier 10 is fixing by glue and square tube 3, can store glue in two concave surfaces 9, has seal action, and in installation process and have an effect of exhaust, C shaped steel 1 and square tube 3 are glass fibre reinforced plastics, first inner carrier 10, first nut 12 and first bolt 11 can be nylon, engineering plastics, nonmetallic material or stainless steels such as glass fibre reinforced plastics, copper, metallic material such as carbon steel are made, so not only material is light, fire-retardant, anticorrosion and mechanical strength is high, perfect heat-dissipating.Integral body is born pressure and is surpassed U.S. NEMA FG1-C grade standard.

Claims (8)

1. cable testing bridge, it is characterized in that: described cable testing bridge comprises two C shaped steel (1), described two C shaped steel (1) opening is staggered relatively, and all be provided with through hole (2) on the lower end sidewall of two C shaped steel (1), laterally be provided with square tube (3) between described two C shaped steel (1), and bottom, the two ends of square tube (3) is connected with the inside, bottom of two C shaped steel (1) respectively, the two ends of described square tube (3) are connected with the interior of two C shaped steel (1) respectively, described square tube (3) is the boring structure, the inside, two ends of described square tube (3) all is connected with inner carrier (4) by glue, described inner carrier (4) all is the boring structure, one end of the inner carrier (4) that the two ends of described square tube (3) are internally connected with all is provided with inner groovy (5), be provided with nut (6) in the described inner groovy (5), described two C shaped steel (1) all are connected and fixed with described nut (6) by the through hole (2) that bolt (7) passes respectively on it.
2. cable testing bridge, it is characterized in that: described cable testing bridge comprises two C shaped steel (1), described two C shaped steel (1) opening is staggered relatively, and all be provided with through hole (2) on the lower end sidewall of two C shaped steel (1), laterally be provided with square tube (3) between described two C shaped steel (1), and bottom, the two ends of square tube (3) is connected with the inside, bottom of two C shaped steel (1) respectively, the two side of described square tube (3) is connected with the interior of two C shaped steel (1) respectively, described square tube (3) is the boring structure, the inside, two ends of described square tube (3) all is connected with first inner carrier (10) by glue, described first inner carrier (10) is the boring structure, two first bolts (11) pass first inner carrier (10) cross setting that the two ends of described square tube (3) are internally connected with respectively, and the through hole (2) that an end of two first bolts (11) passes respectively on two C shaped steel (1) is connected and fixed by first nut (12).
3. according to the described cable testing bridge of claim 1, it is characterized in that: described inner carrier (4) is a square body, all be provided with a boss (8) and two concave surfaces (9) on each face around described inner carrier (4) is outside, described two concave surfaces (9) place the both sides of boss (8) respectively.
4. according to the described cable testing bridge of claim 2, it is characterized in that: described first inner carrier (10) is a square body, all be provided with a boss (8) and two concave surfaces (9) on each face around described first inner carrier (10) is outside, described two concave surfaces (9) place the both sides of boss (8) respectively.
5. according to claim 1 or 2 described cable testing bridges, it is characterized in that: described C shaped steel (1) and square tube (3) are glass fibre reinforced plastics.
6. according to the described cable testing bridge of claim 1, it is characterized in that: described inner carrier (4), nut (6), bolt (7) are nonmetal or metallic material.
7. according to the described cable testing bridge of claim 2, it is characterized in that: described first inner carrier (10), first bolt (11) and first nut (12) all are nonmetal or metallic material.
8. according to the described cable testing bridge of claim 1, it is characterized in that: the outer surface of described nut (6) has annular knurl.
CN2009101842523A 2009-08-24 2009-08-24 Cable bridge Expired - Fee Related CN101644356B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101842523A CN101644356B (en) 2009-08-24 2009-08-24 Cable bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101842523A CN101644356B (en) 2009-08-24 2009-08-24 Cable bridge

Publications (2)

Publication Number Publication Date
CN101644356A CN101644356A (en) 2010-02-10
CN101644356B true CN101644356B (en) 2011-01-05

Family

ID=41656353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101842523A Expired - Fee Related CN101644356B (en) 2009-08-24 2009-08-24 Cable bridge

Country Status (1)

Country Link
CN (1) CN101644356B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104421496A (en) * 2013-08-23 2015-03-18 江苏中洋集团股份有限公司 Standard U-shaped bridge structure for fixing pipeline of underground garage

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0292389A1 (en) * 1987-05-22 1988-11-23 Constructions Electriques De La Seine U-shaped profiled channels and methods of manufacturing the same
EP1087484A1 (en) * 1999-09-24 2001-03-28 Robert Graham Du Gay Supporting means for cables
CN2502437Y (en) * 2001-08-13 2002-07-24 张志强 Plugging cable bridge support
CN201028131Y (en) * 2007-03-23 2008-02-27 上海超高工程塑料有限公司 Adjustable-width step type cable bridge rack underplate
CN101232159A (en) * 2008-01-24 2008-07-30 王强 Cable bridge rack
CN201213210Y (en) * 2008-06-13 2009-03-25 马纪财 High strength iron belly glass steel bridge rack
CN201475491U (en) * 2009-08-24 2010-05-19 中格复合材料(南通)有限公司 Cable bridge

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0292389A1 (en) * 1987-05-22 1988-11-23 Constructions Electriques De La Seine U-shaped profiled channels and methods of manufacturing the same
EP1087484A1 (en) * 1999-09-24 2001-03-28 Robert Graham Du Gay Supporting means for cables
CN2502437Y (en) * 2001-08-13 2002-07-24 张志强 Plugging cable bridge support
CN201028131Y (en) * 2007-03-23 2008-02-27 上海超高工程塑料有限公司 Adjustable-width step type cable bridge rack underplate
CN101232159A (en) * 2008-01-24 2008-07-30 王强 Cable bridge rack
CN201213210Y (en) * 2008-06-13 2009-03-25 马纪财 High strength iron belly glass steel bridge rack
CN201475491U (en) * 2009-08-24 2010-05-19 中格复合材料(南通)有限公司 Cable bridge

Also Published As

Publication number Publication date
CN101644356A (en) 2010-02-10

Similar Documents

Publication Publication Date Title
CN202402815U (en) Split mounting type concrete lined metal corrugated pipe
CN104481178A (en) Composite material substation structure
CN101644356B (en) Cable bridge
CN201475491U (en) Cable bridge
CN205509403U (en) Cable testing bridge mounting structure
CN103422699A (en) Electric transmission line tower made of composite materials
CN114719100B (en) GIL is with flange double seal structure
CN202090658U (en) Insert plate used for node connection of steel tubular tower, steel tubular tower and nodes thereof
US20190236944A1 (en) Traffic Signal and Sign Support Structures and System
CN204311817U (en) A kind of combined type composite material shaft tower
CN214274751U (en) Double-layer seamless steel pipe
CN205382632U (en) Steel structure beam
CN111255290A (en) Steel angle buckling-restrained reinforcing device for power transmission tower
CN203500659U (en) Cable bridge with canopy
KR20090132540A (en) Joining method of composite wind tower
CN215671430U (en) Connecting hardware fitting and composite cross arm
CN216269265U (en) Pipe structure, bogie and rail vehicle
CN213392500U (en) Wind power generation tower with internal connecting device
CN217897374U (en) Steel member reinforced structure for electric power iron tower
CN220693459U (en) Internet of things monitoring equipment mounting structure
CN215407750U (en) Lattice formula steel-pipe tower owner material reinforcing apparatus
CN211689909U (en) Transparent protective cover for end part of stay cable
CN203544010U (en) Guide cylinder constitution structure used for installation of tread brake
CN202231392U (en) Lining type sealed socket
CN218333415U (en) Wiring terminal for transformer bushing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105

Termination date: 20200824

CF01 Termination of patent right due to non-payment of annual fee