CN101614134A - 钻、爆、抽三位一体卸压防突方法 - Google Patents

钻、爆、抽三位一体卸压防突方法 Download PDF

Info

Publication number
CN101614134A
CN101614134A CN200910182169A CN200910182169A CN101614134A CN 101614134 A CN101614134 A CN 101614134A CN 200910182169 A CN200910182169 A CN 200910182169A CN 200910182169 A CN200910182169 A CN 200910182169A CN 101614134 A CN101614134 A CN 101614134A
Authority
CN
China
Prior art keywords
hole
pressure
fried
quick
shot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910182169A
Other languages
English (en)
Other versions
CN101614134B (zh
Inventor
林柏泉
翟成
孙鑫
吴海进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2009101821692A priority Critical patent/CN101614134B/zh
Publication of CN101614134A publication Critical patent/CN101614134A/zh
Application granted granted Critical
Publication of CN101614134B publication Critical patent/CN101614134B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种钻、爆、抽三位一体卸压防突方法,最适用于高瓦斯低透气性突出煤层区域性卸压防突。在采煤或掘进工作面前方的煤层上交替布置顺层或穿层的控制孔和爆破孔孔位;先逐一对交替布置的控制孔进行施工作业,并对煤层进行瓦斯抽采卸压;再逐一施工交替布置的爆破孔,放置乳化炸药,引爆起爆线进行起爆,直至完成该工作面的所有爆破孔作业,进行下一工作面的循环作业。该方法可使煤体透气性可提高20~50倍,整体卸压充分,起到防止突出的有效作用,为工作高效、安全开采提供了良好的条件。其方法简单,操作方便、使用效果好,提高了劳动效率,降低了劳动强度。

Description

钻、爆、抽三位一体卸压防突方法
技术领域
本发明涉及钻、爆、抽三位一体卸压防突方法。尤其适用于高瓦斯低透气性突出煤层区域性卸压防突。
背景技术
煤与瓦斯突出是煤矿开采过程中的严重自然灾害之一,特别是随着煤炭生产的高效集约化和开采深度的增加,瓦斯涌出量越来越大,瓦斯爆炸和瓦斯突出危险的威肋越来越严重,瓦斯灾害已成为制约高效集约化开采技术发展和安全生产的最重要因素。因此,如何有效地解决高瓦斯煤层开采过程中的瓦斯涌出问题,对煤矿安全生产具有十分重要的意义。我国自20世纪70年代以来对高瓦斯低透气性突出危险煤层进行了多种卸压增透防突技术的探索性试验研究。
目前采用的高瓦斯低透气性煤层消突措施主要有深孔松动爆破、水力冲孔、水力割缝和煤层注水等,这些方法均存在钻孔有效影响范围小、工作面钻孔施工工作量大和防突效率低的问题,需要采取卸压增透的方法,扩大钻孔有效影响范围,提高整体消突效果。
发明内容
技术问题:本发明的目的是提供一种钻、爆、抽三位一体卸压防突方法,将钻孔施工技术、控制预裂爆破技术与钻孔控制和抽放技术相结合,扩大钻孔卸压影响范围,提高煤层透气性,提高整体消突效果,安全有效地解决高瓦斯低透气性突出煤层开采过程中的煤与瓦斯突出问题。
技术方案:本发明钻、爆、抽三位一体卸压防突方法:
(1)在采煤或掘进工作面前方的煤层上交替布置顺层或穿层的控制孔和爆破孔孔位;
(2)逐一对交替布置的控制孔进行施工作业,每施工一个控制孔,对其进行常规封孔作业,并通过抽放孔管、汇流管和支管将钻孔连入抽采管网,对煤层进行瓦斯抽采卸压;
(3)逐一施工交替布置的爆破孔,在每一个爆破孔末端放置乳化炸药,采用不耦合的正向装药方式,用封孔剂密封爆破孔,引爆起爆线进行起爆,直至完成该工作面的所有爆破孔作业;
(4)进行下一工作面的循环作业,为保证工作面的安全和有利于整体卸压,需要在下一工作面留有不小于10~30m的超前安全距离。
所述控制孔和爆破孔顺层钻孔深度为8~15m,穿层钻孔深度20~40m;所述的爆破孔的封孔长度为孔深的25%~40%;所述的正向装药采用组内雷管串联方式连接、组间雷管并联方式连接,实行一次起爆;所述的乳化炸药的前端安置一木圆锥。
有益效果:本发明将钻孔施工技术、控制预裂爆破技术与钻孔抽放技术相结合,实现钻、爆、抽三位一体,尤其适用于高瓦斯低透气性突出煤层区域性卸压防突。通过在工作面前方煤体中交替施工若干长钻孔,包括爆破孔和控制孔。利用爆破孔内爆生气体尖劈作用,使炮孔周围产生柱状的压缩粉碎圈和沿爆破孔和控制孔连心线方向的贯穿爆破裂隙体,达到地应力转移,煤体透气性增大的目的,同时将控制孔密封后作为抽放孔,抽排煤体中的瓦斯,加速高压瓦斯的排放,这样不仅降低了瓦斯压力梯度,减少了突出势能,而且实现了空间上、时间上的超前防护作用,给煤层内部卸压、瓦斯释放和流动创造了良好的条件,有效消除煤与瓦斯突出危险性。该方法可使煤体透气性可提高20~50倍,整体卸压充分,起到防止突出的有效作用,为工作高效、安全开采提供了良好的条件,变高瓦斯突出危险煤层为低瓦斯无突出危险煤层,其方法简单,操作方便、使用效果好,提高了劳动效率,降低了劳动强度。
附图说明
图1是本发明的钻、爆、抽三位一体爆破卸压防突示意图。
图2是本发明的一段区域内的多排钻孔布置图。
图3是本发明的三位一体卸压防突区域卸压增透示意图。
图中:1-煤层,2-乳化炸药,3-封孔剂,4-爆破孔,5-起爆线,6-木圆锥,7-黄泥,8-PVC管,9-控制孔,10-裂隙
具体实施方式
下面结合附图中的实施例对本发明作进一步的描述:
本发明的钻、爆、抽三位一体卸压防突方法:
(1)在采煤或掘进工作面前方的煤层1上交替布置顺层或穿层的控制孔9和爆破孔4孔位;安单排或多排布置打若干长钻孔,钻孔施工阶段普通钻孔施工工艺基本一致,可根据需要选择螺旋或者圆形钻杆;
(2)先逐一对交替布置的控制孔9进行施工作业,控制孔9顺层钻孔深度为8~15m,穿层钻孔深度20~40m,每施工一个控制孔9,对其进行常规封孔作业,并通过抽放孔管、汇流管和支管将钻孔连入抽采管网,对煤层进行瓦斯抽采卸压;直至该区域的控制孔9相关作业完毕。钻孔孔口负压不低于20KPa;
(3)逐一施工交替布置的爆破孔4,爆破孔4与控制孔9孔数比例为1∶2~3;爆破孔4顺层钻孔深度为8~15m,穿层钻孔深度20~40m;在施工完毕的爆破孔4内用PVC管8进行正向装药,在用PVC管8送药的过程中,PVC管8前段的木圆锥6可以起到疏通爆破孔4内岩屑和煤屑的作用,使其顺利送药至爆破孔4底端。孔内装药方式采用组内雷管串联方式连接、组间雷管并联方式连接;装药完毕后用黄泥7对乳化炸药2进行封堵;实行一次起爆;用封孔剂3密封爆破孔4,引爆起爆线5进行起爆;爆破孔4的封孔长度为孔深的25%~40%;直至完成该工作面所有的爆破孔4作业;穿层钻孔情况下,对煤层段全长进行装药爆破。
(4)进行下一工作面的循环作业,为保证工作面的安全和有利于整体卸压,需要在下一工作面留有不小于10~30m的超前安全距离。

Claims (5)

1.一种钻、爆、抽三位一体卸压防突方法,其特征在于:
(1)在采煤或掘进工作面前方的煤层(1)上交替布置顺层或穿层的控制孔(9)和爆破孔(4)孔位;
(2)逐一对交替布置的控制孔(9)进行施工作业,每施工一个控制孔(9),对其进行常规封孔作业,并通过抽放孔管、汇流管和支管将钻孔连入抽采管网,对煤层进行瓦斯抽采卸压;
(3)逐一施工交替布置的爆破孔(4),在每一个爆破孔(4)末端放置乳化炸药(2),采用不耦合的正向装药方式,用封孔剂(3)密封爆破孔(4),引爆起爆线(5)进行起爆,直至完成该工作面的爆破孔(4)作业;
(4)进行下一工作面的循环作业,为保证采煤工作的安全和有利于整体卸压,需要在下一工作面留有不小于10~30m的超前安全距离。
2.根据权利要求1所述的钻、爆、抽三位一体卸压防突方法,其特征在于:所述控制孔(9)和爆破孔(4)顺层钻孔深度为8~15m,穿层钻孔深度20~40m。
3.根据权利要求1所述的钻、爆、抽三位一体卸压防突方法,其特征在于:所述的爆破孔(4)的封孔长度为孔深的25%~40%。
4.根据权利要求1所述的钻、爆、抽三位一体卸压防突方法,其特征在于:所述的正向装药采用组内雷管串联方式连接、组间雷管并联方式连接,实行一次起爆。
5.根据权利要求1所述的钻、爆、抽三位一体卸压防突方法,其特征在于:所述的乳化炸药(2)的前端安置一木圆锥(6)。
CN2009101821692A 2009-07-15 2009-07-15 钻、爆、抽三位一体卸压防突方法 Expired - Fee Related CN101614134B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101821692A CN101614134B (zh) 2009-07-15 2009-07-15 钻、爆、抽三位一体卸压防突方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101821692A CN101614134B (zh) 2009-07-15 2009-07-15 钻、爆、抽三位一体卸压防突方法

Publications (2)

Publication Number Publication Date
CN101614134A true CN101614134A (zh) 2009-12-30
CN101614134B CN101614134B (zh) 2011-07-06

Family

ID=41494001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101821692A Expired - Fee Related CN101614134B (zh) 2009-07-15 2009-07-15 钻、爆、抽三位一体卸压防突方法

Country Status (1)

Country Link
CN (1) CN101614134B (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806563A (zh) * 2010-03-10 2010-08-18 杜文博 安全起爆装置
CN102022133A (zh) * 2010-11-16 2011-04-20 郑州大学 区域瓦斯井下高压射流掏穴卸压防突方法
CN102071955A (zh) * 2010-11-03 2011-05-25 河南理工大学 松软高突煤层掘进预留煤体加固防突方法
CN102155257A (zh) * 2011-03-28 2011-08-17 河南理工大学 阶梯式钻孔卸压防突方法
CN102296957A (zh) * 2011-07-22 2011-12-28 山东科技大学 冲击地压煤层巷道掘进时的一炮贯通卸压法
CN102747953A (zh) * 2012-03-06 2012-10-24 中国矿业大学 一种松软煤层分步式钻护一体化系统及工艺
CN103161493A (zh) * 2013-04-10 2013-06-19 中国矿业大学 气液固三相耦合爆破弱化冲击地压及增透方法
CN106567710A (zh) * 2016-10-18 2017-04-19 安徽理工大学 一种均匀卸压一体垮落的快速揭煤方法
CN107143374A (zh) * 2017-06-29 2017-09-08 张海轩 带压式钻孔正压排采的瓦斯开采方法及系统
CN108086945A (zh) * 2018-01-20 2018-05-29 仝耀军 一种穿层钻孔分离式全程瓦斯抽采封孔装置及其封孔方法
CN108708722A (zh) * 2018-03-27 2018-10-26 山东科技大学 一种用于低透气性煤层的高效防治冲击地压的方法
CN108895934A (zh) * 2018-07-27 2018-11-27 中国矿业大学 一种深孔松动爆破装炸药方法及装置
CN111594183A (zh) * 2020-05-21 2020-08-28 陕西正通煤业有限责任公司 一种利用原卸压孔提升爆破效果的煤层深孔爆破泄压方法
CN114251080A (zh) * 2021-12-28 2022-03-29 中国矿业大学 一种可控爆压均匀卸压增透方法及系统
CN116877078A (zh) * 2023-07-21 2023-10-13 中国矿业大学 一种基于能量单元切割的突出煤层消突方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100462523C (zh) * 2007-06-29 2009-02-18 淮南矿业(集团)有限责任公司 沿空留巷y型通风采空区顶板卸压瓦斯抽采的方法
CN100557194C (zh) * 2007-08-24 2009-11-04 阳泉煤业(集团)有限责任公司 综放工作面高抽巷下返钻孔初采瓦斯抽放方法
CN100591893C (zh) * 2008-05-27 2010-02-24 河南理工大学 用于消除突出煤层抽采盲区的沿顶钻孔施工方法
CN101280688B (zh) * 2008-05-27 2011-05-04 河南理工大学 突出煤层掘进工作面沿顶钻进大循环区域性消突方法

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806563B (zh) * 2010-03-10 2013-06-26 杜文博 安全起爆装置
CN101806563A (zh) * 2010-03-10 2010-08-18 杜文博 安全起爆装置
CN102071955A (zh) * 2010-11-03 2011-05-25 河南理工大学 松软高突煤层掘进预留煤体加固防突方法
CN102071955B (zh) * 2010-11-03 2013-01-23 河南理工大学 松软高突煤层掘进预留煤体加固防突方法
CN102022133A (zh) * 2010-11-16 2011-04-20 郑州大学 区域瓦斯井下高压射流掏穴卸压防突方法
CN102022133B (zh) * 2010-11-16 2012-07-25 郑州大学 区域瓦斯井下高压射流掏穴卸压防突方法
CN102155257A (zh) * 2011-03-28 2011-08-17 河南理工大学 阶梯式钻孔卸压防突方法
CN102155257B (zh) * 2011-03-28 2013-01-30 河南理工大学 阶梯式钻孔卸压防突方法
CN102296957A (zh) * 2011-07-22 2011-12-28 山东科技大学 冲击地压煤层巷道掘进时的一炮贯通卸压法
CN102296957B (zh) * 2011-07-22 2013-07-17 山东科技大学 冲击地压煤层巷道掘进时的一炮贯通卸压法
CN102747953B (zh) * 2012-03-06 2014-07-30 中国矿业大学 一种松软煤层分步式钻护一体化系统及工艺
CN102747953A (zh) * 2012-03-06 2012-10-24 中国矿业大学 一种松软煤层分步式钻护一体化系统及工艺
CN103161493A (zh) * 2013-04-10 2013-06-19 中国矿业大学 气液固三相耦合爆破弱化冲击地压及增透方法
CN106567710A (zh) * 2016-10-18 2017-04-19 安徽理工大学 一种均匀卸压一体垮落的快速揭煤方法
CN107143374A (zh) * 2017-06-29 2017-09-08 张海轩 带压式钻孔正压排采的瓦斯开采方法及系统
CN107143374B (zh) * 2017-06-29 2019-03-05 张海轩 带压式钻孔正压排采的瓦斯开采方法及系统
CN108086945B (zh) * 2018-01-20 2023-10-03 河南永锦能源有限公司 一种穿层钻孔分离式全程瓦斯抽采封孔装置及其封孔方法
CN108086945A (zh) * 2018-01-20 2018-05-29 仝耀军 一种穿层钻孔分离式全程瓦斯抽采封孔装置及其封孔方法
CN108708722A (zh) * 2018-03-27 2018-10-26 山东科技大学 一种用于低透气性煤层的高效防治冲击地压的方法
CN108895934A (zh) * 2018-07-27 2018-11-27 中国矿业大学 一种深孔松动爆破装炸药方法及装置
CN108895934B (zh) * 2018-07-27 2020-06-26 中国矿业大学 一种深孔松动爆破装炸药方法
CN111594183A (zh) * 2020-05-21 2020-08-28 陕西正通煤业有限责任公司 一种利用原卸压孔提升爆破效果的煤层深孔爆破泄压方法
CN114251080A (zh) * 2021-12-28 2022-03-29 中国矿业大学 一种可控爆压均匀卸压增透方法及系统
CN116877078A (zh) * 2023-07-21 2023-10-13 中国矿业大学 一种基于能量单元切割的突出煤层消突方法

Also Published As

Publication number Publication date
CN101614134B (zh) 2011-07-06

Similar Documents

Publication Publication Date Title
CN101614134B (zh) 钻、爆、抽三位一体卸压防突方法
CN101614135B (zh) 钻、爆、抽三位一体瓦斯抽采方法
CN101832149B (zh) 一种井下注热抽采煤层瓦斯的方法
CN102168543B (zh) 一种通过爆炸方式增加页岩气采收率的方法及装置
CN103195466A (zh) 一种定向水压爆破提高煤层透气性的方法
CN103161493B (zh) 气液固三相耦合爆破弱化冲击地压及增透方法
CN101440704B (zh) 可地浸矿层连续高能气体压裂增渗方法及专用高能气体发生器
CN102080519A (zh) 气—煤共采的地面负压抽采煤层气的方法
CN109209472A (zh) 一种冲孔、爆破、注水相互耦合的煤层卸压防突方法
CN103821516A (zh) 二次卸压防治冲击地压的方法
CN111155979B (zh) 水压致裂与毫秒微差爆破协同建造干热岩人工热储的方法
CN106194147B (zh) 一种煤炭地下气化开采中直井水平井联合点火的方法
CN110067558A (zh) 一种急倾斜特厚煤层回采巷道联合卸压防治冲击矿压方法
CN102494571A (zh) 一种隧道减震爆破的施工方法
CN102777180A (zh) 一种煤矿主动式区域性防治冲击地压的方法
CN110195580A (zh) 一种气液两相联合作用煤层增透方法
CN203362135U (zh) 提高煤层透气性的射孔装置
CN104296609B (zh) 深孔梯段爆破中含不同坚硬程度岩层的控制爆破方法
CN105443133B (zh) 一种非开挖施工中的地下岩石聚能装药爆破装置和方法
CN101581232B (zh) 高压气体冲击破裂煤体瓦斯预抽方法
CN108590688A (zh) 一种带有液压钻机的tbm掘进机及其掘进施工方法
CN105507872B (zh) 穿层钻孔内水力冲孔与预裂爆破联合增透抽采系统
CN102041966A (zh) 一种顺层或穿层双动力快速钻进及扩孔一体化装置及方法
CN105275435A (zh) 一种精确延时预裂爆破强化抽采煤层瓦斯的方法
CN106089216A (zh) 岩石隧道破岩施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110706

Termination date: 20160715

CF01 Termination of patent right due to non-payment of annual fee