CN101613990A - The job practices of rail iron trusses T type stiffening rib orthotropic plate bridge floor - Google Patents

The job practices of rail iron trusses T type stiffening rib orthotropic plate bridge floor Download PDF

Info

Publication number
CN101613990A
CN101613990A CN200910059983A CN200910059983A CN101613990A CN 101613990 A CN101613990 A CN 101613990A CN 200910059983 A CN200910059983 A CN 200910059983A CN 200910059983 A CN200910059983 A CN 200910059983A CN 101613990 A CN101613990 A CN 101613990A
Authority
CN
China
Prior art keywords
bridge floor
beam section
stiffening rib
steel plate
type stiffening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910059983A
Other languages
Chinese (zh)
Other versions
CN101613990B (en
Inventor
杨咏漪
陈克坚
吴玉芬
秦小林
魏永幸
朱敏
任杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN2009100599835A priority Critical patent/CN101613990B/en
Publication of CN101613990A publication Critical patent/CN101613990A/en
Application granted granted Critical
Publication of CN101613990B publication Critical patent/CN101613990B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a kind of job practices of rail iron trusses T type stiffening rib orthotropic plate bridge floor, be intended to improve the efficiency of construction of bridge floor, make that construction quality is easier to be guaranteed.It comprises the steps: 1. T type stiffening rib (11), longeron (12) to be welded on the bridge floor steel plate (10), forms bridge floor steel plate sections; 2. two crossbeams (20) are penetrated bridge floor steel plate sections and welding with it respectively, form the unjointed beam section; 3. the lifting of unjointed beam section puts in place, with the lower chord bolt of crossbeam (20) with steel truss girder, finishes the installation of a unjointed beam section.The invention has the beneficial effects as follows, finish the assembling of unjointed beam section in the venue, assembling, welding quality is easier is guaranteed; The unjointed beam section lifted assemble bridge deck on the steel truss girder, can improve the efficiency of construction of bridge floor significantly.

Description

The job practices of rail iron trusses T type stiffening rib orthotropic plate bridge floor
Technical field
The present invention relates to railroad bridge, particularly a kind of job practices of steel truss girder T type stiffening rib orthotropic plate bridge floor.
Background technology
Highway and rail iron trusses orthotropic plate mostly are U type stiffening rib, its job practices is fairly simple, lay crossbeam and longeron earlier and then lay orthotropic plate, because U type stiffening rib is up big and down small, thereby can directly lay, but U type stiffening rib can only single-sided welding, and is very strict to welding process requirement, and fatigue failure appears in welding position easily.T type stiffening rib can two-sidedly weld, and has solved the problem of the aforementioned existence of U type stiffening rib, but there is bigger difficulty of construction in T type stiffening rib.
At present, the job practices that T type stiffening rib orthotropic plate bridge floor adopts is undertaken by following step: ground 1. on the scene processes each bridge floor steel plate sections, and soon T type stiffening rib, longeron are welded on the bridge floor steel plate; 2. two crossbeams lifting of first sections is put in place and with the lower chord bolt of steel truss girder, penetrate first bridge floor steel plate sections again and weld with crossbeam; 3. two crossbeams lifting of next sections is put in place and with the lower chord bolt of steel truss girder, penetrate next bridge floor steel plate sections again.Because construction the time can only aloft be constructed on one section one section ground, and require great effort very much when bridge floor steel plate sections penetrated crossbeam, there is the low deficiency of efficiency of construction in this method, and construction quality also is not easy to be guaranteed.
Summary of the invention
Technical problem to be solved by this invention provides a kind of job practices of rail iron trusses T type stiffening rib orthotropic plate bridge floor, can improve the efficiency of construction of bridge floor significantly, and makes that construction quality is easier to be guaranteed.
The technical solution adopted for the present invention to solve the technical problems is: the job practices of rail iron trusses T type stiffening rib orthotropic plate bridge floor of the present invention, comprise the steps: 1. T type stiffening rib, longeron to be welded on the bridge floor steel plate, form bridge floor steel plate sections; Two crossbeams are penetrated bridge floor steel plate sections and welding with it respectively, form the unjointed beam section; 3. the lifting of unjointed beam section puts in place, with the lower chord bolt of crossbeam and steel truss girder, finishes the installation of a unjointed beam section.
The invention has the beneficial effects as follows, finish the assembling of unjointed beam section in the venue, assembling, welding quality is easier is guaranteed; The unjointed beam section lifted assemble bridge deck on the steel truss girder, can improve the efficiency of construction of bridge floor significantly.
Description of drawings
This manual comprises following five width of cloth accompanying drawings:
Fig. 1 is a construction method step of the present invention schematic diagram 1.;
Fig. 2 is a construction method step of the present invention schematic diagram 2.;
Fig. 3 is the schematic diagram that 2. construction method step of the present invention finishes the unjointed beam section;
Fig. 4 is a construction method step of the present invention schematic diagram 3.;
Fig. 5 is the enlarged drawing of local A among Fig. 4.
Component shown in the figure, toponym and pairing mark: bridge floor steel plate 10, T type stiffening rib 11, longeron 12, crossbeam 20, shear connector 30.
The specific embodiment
The present invention is further described below in conjunction with drawings and Examples.
The job practices of rail iron trusses T type stiffening rib orthotropic plate bridge floor of the present invention comprises the steps:
1. with reference to Fig. 1, T type stiffening rib 11, longeron 12 are welded on the bridge floor steel plate 10, form bridge floor steel plate sections;
2. with reference to Fig. 2 and Fig. 3, two crossbeams 20 are penetrated bridge floor steel plate sections and welding with it, form the unjointed beam section; With reference to Fig. 2,, can alleviate difficulty of construction because two crossbeams 20 can be respectively penetrated from vertical end of bridge floor steel plate sections.
3. the lifting of unjointed beam section puts in place, with the lower chord bolt of crossbeam 20 with the bridge main truss, finishes the installation of a unjointed beam section.
Be further to reduce the construction operation amount on the bridge main truss, and become in the lifting operation of unjointed beam section, with reference to Fig. 4, described step 2. after, can be with the upset of unjointed beam section, welding has the shear connector 30 of suspension ring structure on bridge floor steel plate 10.With reference to Fig. 5, this novel shear connector 30 is welded by the steel plate of two square crossings, on its 4 facades, be provided with slotted eye, except that the effect that can be subjected to bidirectional stress make steel work and reinforced concrete structure is more effective combine, slotted eye also constitute can for wirerope wear around the suspension ring structure, therefore also can make things convenient for the lifting operation of unjointed beam section.

Claims (2)

1. the job practices of rail iron trusses T type stiffening rib orthotropic plate bridge floor comprises the steps: 1. T type stiffening rib (11), longeron (12) to be welded on the bridge floor steel plate (10), forms bridge floor steel plate sections; 2. two crossbeams (20) are penetrated bridge floor steel plate sections and welding with it respectively, form the unjointed beam section; 3. the lifting of unjointed beam section puts in place, with the lower chord bolt of crossbeam (20) with steel truss girder, finishes the installation of a unjointed beam section.
2. the job practices of rail iron trusses T type stiffening rib orthotropic plate bridge floor according to claim 1 is characterized in that: described step 2. after, the upset of unjointed beam section is gone up the shear connector (30) that welding has the suspension ring structure at bridge floor steel plate (10).
CN2009100599835A 2009-07-14 2009-07-14 Construction method of railway steel truss girder T-shaped stiffening rib orthotropic slab bridge deck Active CN101613990B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100599835A CN101613990B (en) 2009-07-14 2009-07-14 Construction method of railway steel truss girder T-shaped stiffening rib orthotropic slab bridge deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100599835A CN101613990B (en) 2009-07-14 2009-07-14 Construction method of railway steel truss girder T-shaped stiffening rib orthotropic slab bridge deck

Publications (2)

Publication Number Publication Date
CN101613990A true CN101613990A (en) 2009-12-30
CN101613990B CN101613990B (en) 2010-09-01

Family

ID=41493862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100599835A Active CN101613990B (en) 2009-07-14 2009-07-14 Construction method of railway steel truss girder T-shaped stiffening rib orthotropic slab bridge deck

Country Status (1)

Country Link
CN (1) CN101613990B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433837A (en) * 2011-12-26 2012-05-02 中铁大桥勘测设计院集团有限公司 Orthogonal anisotropic plate integrated steel bridge deck of side box girder and longitudinal and transverse beam railway and construction method
CN103920974A (en) * 2014-03-12 2014-07-16 中铁宝桥集团有限公司 Large steel bridge deck and manufacture method thereof
CN104389261A (en) * 2014-11-18 2015-03-04 湖南大学 Prefabricated ultra-high-performance concrete pi-shaped beam unit, bridge structure and construction method thereof
CN105256890A (en) * 2015-11-11 2016-01-20 北京筑福国际工程技术有限责任公司 Tiled steel plate structure adopting T-shaped ribs and construction method thereof
CN106835989A (en) * 2017-02-10 2017-06-13 中交路桥华南工程有限公司 The method that floorings installation is carried out using truss-like assistance platform
CN106835948A (en) * 2017-03-01 2017-06-13 华汇工程设计集团股份有限公司 The well formula steel plate shear force construction and its construction method of a kind of assembled composite beam bridge
CN109797650A (en) * 2017-11-16 2019-05-24 杨岳华 It hooks tooth form steel plate shear force and steel reinforced concrete combines thin plate
CN110184896A (en) * 2019-04-18 2019-08-30 天津大学前沿技术研究院 A kind of UHPC wafer board composite beam bridge shear connector and mounting structure and construction method
RU2702444C1 (en) * 2019-02-06 2019-10-08 Валерий Васильевич Харин Bridge overpass pipe-concrete structure
CN111549650A (en) * 2020-04-25 2020-08-18 上海洪铺钢结构工程有限公司 Steel structure bridge and machining process thereof
CN111560846A (en) * 2020-04-30 2020-08-21 中交路桥华南工程有限公司 Method for mounting bridge deck system steel longitudinal and transverse beams
CN112627001A (en) * 2021-01-15 2021-04-09 太原理工大学 Steel plate concrete composite slab bridge

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433837A (en) * 2011-12-26 2012-05-02 中铁大桥勘测设计院集团有限公司 Orthogonal anisotropic plate integrated steel bridge deck of side box girder and longitudinal and transverse beam railway and construction method
CN102433837B (en) * 2011-12-26 2014-03-12 中铁大桥勘测设计院集团有限公司 Orthogonal anisotropic plate integrated steel bridge deck of side box girder and longitudinal and transverse beam railway and construction method
CN103920974A (en) * 2014-03-12 2014-07-16 中铁宝桥集团有限公司 Large steel bridge deck and manufacture method thereof
CN103920974B (en) * 2014-03-12 2016-06-22 中铁宝桥集团有限公司 A kind of Large Steel floorings and manufacture method
CN104389261A (en) * 2014-11-18 2015-03-04 湖南大学 Prefabricated ultra-high-performance concrete pi-shaped beam unit, bridge structure and construction method thereof
CN104389261B (en) * 2014-11-18 2016-05-25 湖南大学 Prefabricated ultra-high performance concrete π ellbeam unit, bridge structure and construction method thereof
CN105256890A (en) * 2015-11-11 2016-01-20 北京筑福国际工程技术有限责任公司 Tiled steel plate structure adopting T-shaped ribs and construction method thereof
CN106835989A (en) * 2017-02-10 2017-06-13 中交路桥华南工程有限公司 The method that floorings installation is carried out using truss-like assistance platform
CN106835948A (en) * 2017-03-01 2017-06-13 华汇工程设计集团股份有限公司 The well formula steel plate shear force construction and its construction method of a kind of assembled composite beam bridge
CN109797650A (en) * 2017-11-16 2019-05-24 杨岳华 It hooks tooth form steel plate shear force and steel reinforced concrete combines thin plate
RU2702444C1 (en) * 2019-02-06 2019-10-08 Валерий Васильевич Харин Bridge overpass pipe-concrete structure
CN110184896A (en) * 2019-04-18 2019-08-30 天津大学前沿技术研究院 A kind of UHPC wafer board composite beam bridge shear connector and mounting structure and construction method
CN110184896B (en) * 2019-04-18 2021-04-06 天津大学前沿技术研究院 Shear connector of UHPC waffle slab combined beam bridge, mounting structure and construction method
CN111549650A (en) * 2020-04-25 2020-08-18 上海洪铺钢结构工程有限公司 Steel structure bridge and machining process thereof
CN111560846A (en) * 2020-04-30 2020-08-21 中交路桥华南工程有限公司 Method for mounting bridge deck system steel longitudinal and transverse beams
CN111560846B (en) * 2020-04-30 2022-02-11 中交路桥华南工程有限公司 Method for mounting bridge deck system steel longitudinal and transverse beams
CN112627001A (en) * 2021-01-15 2021-04-09 太原理工大学 Steel plate concrete composite slab bridge

Also Published As

Publication number Publication date
CN101613990B (en) 2010-09-01

Similar Documents

Publication Publication Date Title
CN101613990B (en) Construction method of railway steel truss girder T-shaped stiffening rib orthotropic slab bridge deck
CN201512345U (en) Multifunctional integrated lifting frame
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN106835951A (en) A kind of replaceable prefabricated assembled combined beam structure and manufacturing process
CN206667037U (en) Replaceable prefabricated assembled combined beam structure
CN102352604A (en) Truss sheet unit of steel truss girder, steel truss girder structure and mounting method thereof
CN206859479U (en) A kind of steel bar girder laminated floor slab
CN109231006A (en) The construction method of hanging hang structure under a kind of steel structure truss
CN209397475U (en) A kind of novel plate-purlin bondbeam
CN102943546A (en) Main girder for boiler steel structure
CN104060542A (en) Transverse bridge direction prestress exerting device for combined beam cable-stayed bridge and transverse bridge direction prestress exerting method
CN102979033A (en) Steel truss girder all-welded joist slice and construction method thereof
CN103806593B (en) A kind of precast concrete
CN205257790U (en) Fixed high -low leg handle portal crane
CN107268417A (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN104863267A (en) Novel beam-column reinforced joint with variable-thickness flange at end part of beam
CN102493553A (en) Member for connection node of reinforced beam and steel beam and construction method thereof
CN203741690U (en) Pedestrian overcrossing assembling type steel truss girder
CN103806538B (en) A kind of precast reinforced concrete structure
CN203583378U (en) Floor plate truss trolley for mounting bridge deck slab of composite structure bridge
CN204850048U (en) Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel
CN202401394U (en) Crossbeam structure of railway steel-girder cable-stayed bridge decking
CN108086478A (en) Quadrate steel pipe column and I-beam flat push type dovetail assembling frame Joint design method
CN107285200A (en) A kind of high large-span truss integral translation construction method for hanging

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant