CN101609116A CNA2009100631972A CN200910063197A CN101609116A CN 101609116 A CN101609116 A CN 101609116A CN A2009100631972 A CNA2009100631972 A CN A2009100631972A CN 200910063197 A CN200910063197 A CN 200910063197A CN 101609116 A CN101609116 A CN 101609116A
Authority
CN
China
Prior art keywords
phase
voltage
line
line voltage
uab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100631972A
Other languages
Chinese (zh)
Other versions
CN101609116B (en
Inventor
康现伟
罗志刚
陶文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Wuhan Automation Co Ltd
Original Assignee
Wisdri Wuhan Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Wuhan Automation Co Ltd filed Critical Wisdri Wuhan Automation Co Ltd
Priority to CN2009100631972A priority Critical patent/CN101609116B/en
Publication of CN101609116A publication Critical patent/CN101609116A/en
Application granted granted Critical
Publication of CN101609116B publication Critical patent/CN101609116B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention relates to import the new detection method of phase shortage, specifically: the step-down of line voltage warp voltage detecting circuit is handled, and send the sampling of AD mouth behind signal conditioning circuit, by relatively obtaining line voltage max and minimum value, gets its mean value, obtains the line voltage bias; The line voltage that is sampled by AD deducts the line voltage bias, and obtains the line instantaneous voltage by AD conversion formula and line voltage sampling circuit linear relationship; By the line instantaneous voltage, be converted into the phase voltage formula according to line voltage, obtain the three-phase phase voltage instantaneous value; Sampling phase voltage cycle obtains the three-phase phase voltage maximal value, and carries out the size ordering, when tri-phase unbalance factor surpasses the threshold values of setting, then judges the input side phase shortage.The present invention can directly detect the input phase voltage and judge phase shortage; Can detect input voltage phase, this is that traditional phase shortage detection method is out of the question; Use reliably, can correctly detect whether phase shortage of input three-phase supply.

Description

A kind of new detection method of phase shortage of importing
Technical field
The present invention relates to the three-phase consumer, particularly relate to a kind of lack detection circuit and detection method thereof of three-phase consumer.
Background technology
In the three-phase alternating current source power supply system,, and think phase shortage has taken place if wherein one when disconnecting mutually owing to fuse or the fault of air switch.Charge to electric capacity through rectification and through thereafter buffer resistance when three-phase electricity, when phase shortage not taking place, in a power frequency period, 6 wave heads will be arranged; And when open-phase fault takes place, have only 2 voltage wave heads in the power frequency period, and electric capacity will charge repeatedly on a large scale, and this situation is unallowed.
At present the phase shortage detection method generally is that ripple situation according to capacitive side voltage after the rectification judges whether phase shortage, and is bigger but this method is influenced by power network fluctuation, reduced reliability.
Summary of the invention
Technical matters to be solved by this invention is: a kind of economy, reliable and practical input phase shortage detection method are provided, and this method can be judged whether phase shortage of three-phase alternating current source power supply system in a kind of mode more intuitively.
The present invention solves its technical matters and adopts following technical scheme:
The new detection method of input phase shortage provided by the invention, it adopts the method that may further comprise the steps:
(1) step-down of line voltage warp voltage detecting circuit is handled, and send the sampling of AD mouth behind signal conditioning circuit, by relatively obtaining line voltage max and minimum value, gets its mean value, obtains the line voltage bias;
(2) the line voltage that is sampled by AD deducts the line voltage bias, and obtains the line instantaneous voltage by AD conversion formula and line voltage sampling circuit linear relationship;
(3) by the line instantaneous voltage, be converted into the phase voltage formula according to line voltage, obtain the three-phase phase voltage instantaneous value;
(4) sampling phase voltage cycle obtains the three-phase phase voltage maximal value, and carries out the size ordering, when tri-phase unbalance factor surpasses the threshold values of setting, then judges the input side phase shortage.
The new detection method of input phase shortage provided by the invention, it is judging during the three-phase alternating current source power supply system is to the load equipment power supply process the whether application of phase shortage.
The present invention compares with traditional phase shortage detection method has following major advantage:
One. can directly detect the input phase voltage, obtain phase voltage, directly judge phase shortage by line voltage, more directly perceived.
They are two years old. and can detect input voltage phase, this is that traditional phase shortage detection method is out of the question.
They are three years old. and testing circuit is simple, realize to be very easy in the system of digital signal processor spare is arranged, and to use reliably, can correctly detect whether phase shortage of input three-phase supply.
Description of drawings
Fig. 1 is the schematic diagram of line voltage uab testing circuit.
Fig. 2 is the schematic diagram of signal uab modulate circuit.
Embodiment
The invention will be further described below in conjunction with embodiment.
The new detection method of input phase shortage provided by the invention, it adopts the method that may further comprise the steps:
(1) step-down of line voltage warp voltage detecting circuit is handled, and send the sampling of AD mouth behind signal conditioning circuit, by relatively obtaining line voltage max and minimum value, gets its mean value, obtains the line voltage bias.
(2) the line voltage that is sampled by AD deducts the line voltage bias, and obtains the line instantaneous voltage by AD conversion formula and line voltage sampling circuit linear relationship.
(3) by the line instantaneous voltage, be converted into the phase voltage formula according to line voltage, obtain the three-phase phase voltage instantaneous value.
Described line voltage is converted into the phase voltage formula:
ua = 2 uab + ubc 3 ub = ubc - uab 3 uc = - uab + 2 ubc 3
In the formula: if
ua = 2 U sin ( ωt ) ub = 2 U sin ( ωt - 2 π 3 ) uc = 2 U sin ( ωt + 2 π 3 )
Then
uab = 6 U sin ( ωt + π 6 ) ubc = 6 U sin ( ωt - π 2 )
In the above-mentioned formula: ua, ub and uc uc are respectively a, b and c three-phase phase voltage, and uab is a and b phase line voltage, and ubc is b and c phase line voltage, and U is the effective value of three-phase alternating voltage phase voltage, and ω is the angular velocity of alternating voltage, and t is the time.
(4) sampling phase voltage cycle obtains the three-phase phase voltage maximal value, and carries out the size ordering, when tri-phase unbalance factor surpasses the threshold values of setting, then judges the input side phase shortage.
The new detection method of input phase shortage provided by the invention, it is used to judge whether phase shortage of three-phase AC electrical supply system.
For example, the frequency conversion speed-adjusting system that is used to judge TMS320F2812 DSP control phase shortage whether.Its step comprises:
(1) in a line voltage cycle, sample uab_AD, ubc_AD, and ordering reservation maximal value and minimum value to sampling, promptly obtain maximal value and minimum value in the line voltage cycle, ask for the mean value of maximal value and minimum value, thereby ask for the input line voltage biasing.
(2) value that DSP is sampled deducts input line voltage biasing, obtains uab and ubc value uab_DSP, the ubc_DSP in DSP, have just have negative,
And according to DSP AD formula, 3V correspondence 2 in the system 12-1 promptly uab ′ uab _ DSP = 3 2 12 - 1 Ask for the analog voltage uab ' after input line voltage uab step-down is handled among Fig. 2;
In like manner can ask for the analog voltage of ubc '.
(3) by uab ′ = R 2 R 1 + R 2 uab , Ask for line instantaneous voltage uab, in like manner ask for ubc;
(4) by the line instantaneous voltage, be converted into the phase voltage formula according to line voltage, obtain the three-phase phase voltage instantaneous value;
(5) in a phase voltage cycle, ask for the maximal value of three-phase phase voltage respectively, and ordering, when tri-phase unbalance factor surpasses the setting threshold values, judge its input side phase shortage.
Line voltage detecting circuit and signal conditioning circuit that the present invention adopts are prior art, and their circuit theory diagrams are respectively Fig. 1 and Fig. 2.Its hardware signal processing procedure is as follows:
Line voltage uab handles through line voltage detecting circuit step-down shown in Figure 1, that is:
uab ′ = R 2 R 1 + R 2 uab , As R1=3M Ω, during R2=10K Ω, K = R 2 R 1 + R 2 = 1 300 , Through circuit shown in Figure 2 voltage signal is promoted again and be converted into the voltage range that DSP can accept, at this moment, uab _ AD = uab ′ + U 2 ; In like manner also can obtain ubc_AD, uab_AD, ubc_AD;
To promote then when voltage signal after transforming send the DSPAD cause for gossip and detect.

Claims (4)

1. import the new detection method of phase shortage for one kind, it is characterized in that adopting the method that may further comprise the steps:
(1) step-down of line voltage warp voltage detecting circuit is handled, and send the sampling of AD mouth behind signal conditioning circuit, by relatively obtaining line voltage max and minimum value, gets its mean value, obtains the line voltage bias;
(2) the line voltage that is sampled by AD deducts the line voltage bias, and obtains the line instantaneous voltage by AD conversion formula and line voltage sampling circuit linear relationship;
(3) by the line instantaneous voltage, be converted into the phase voltage formula according to line voltage, obtain the three-phase phase voltage instantaneous value;
(4) sampling phase voltage cycle obtains the three-phase phase voltage maximal value, and carries out the size ordering, when tri-phase unbalance factor surpasses the threshold values of setting, then judges the input side phase shortage.
2. the new detection method of input phase shortage according to claim 1 is characterized in that line voltage is converted into the phase voltage formula and is:
ua = 2 uab + ubc 3 ub = ubc - uab 3 uc = - uab + 2 ubc 3
In the above-mentioned formula: ua, ub and uc are respectively a, b and c three-phase phase voltage, and uab is a and b phase line voltage, and ubc is b and c phase line voltage, and U is the effective value of three-phase alternating voltage phase voltage.
3. according to the purposes of the new detection method of the described input phase shortage of arbitrary claim in the claim 1 to 2, it is characterized in that this method judging whether phase shortage of three-phase AC electrical supply system.
4. purposes according to claim 3, the method that it is characterized in that adopting following steps is to whether phase shortage detects in the power supply process by the frequency conversion speed-adjusting system of TMS320F2812 DSP control:
(1) in a line voltage cycle, sample uab_AD, ubc_AD, and to adopting ordering reservation maximal value and the minimum value that bar arrives, promptly obtain maximal value and minimum value in the line voltage cycle, ask for the mean value of maximal value and minimum value, thereby ask for the input line voltage biasing;
(2) value that DSP is sampled deducts the input line voltage biasing, obtain uab and the ubc digital quantity in DSP, having just has negatively, and the analog voltage uab ' after asking for input line voltage uab step-down and handle according to DSP AD formula in like manner asks for the analog voltage ubc ' after the ubc step-down is handled;
(3) by uab ′ = R 2 R 1 + R 2 uab , Ask for line instantaneous voltage uab, in like manner ask for ubc;
(4) by the line instantaneous voltage, be converted into the phase voltage formula according to line voltage, obtain the three-phase phase voltage instantaneous value;
(5) in a phase voltage cycle, ask for the maximal value of three-phase phase voltage respectively, and ordering, when tri-phase unbalance factor surpasses the setting threshold values, judge its input side phase shortage.
CN2009100631972A 2009-07-17 2009-07-17 New method for detecting input phase failure Active CN101609116B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100631972A CN101609116B (en) 2009-07-17 2009-07-17 New method for detecting input phase failure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100631972A CN101609116B (en) 2009-07-17 2009-07-17 New method for detecting input phase failure

Publications (2)

Publication Number Publication Date
CN101609116A true CN101609116A (en) 2009-12-23
CN101609116B CN101609116B (en) 2011-11-23

Family

ID=41482943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100631972A Active CN101609116B (en) 2009-07-17 2009-07-17 New method for detecting input phase failure

Country Status (1)

Country Link
CN (1) CN101609116B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102323491A (en) * 2011-08-09 2012-01-18 深圳市海浦蒙特科技有限公司 Method for detecting open phase of three-phase input power supply
CN102353851A (en) * 2011-09-05 2012-02-15 中冶南方(武汉)自动化有限公司 Transducer input default phase detection method based on direct-current bus voltage
CN102798770A (en) * 2012-08-09 2012-11-28 中国西电电气股份有限公司 Method for detecting default phase of frequency converter
CN103364647A (en) * 2013-07-31 2013-10-23 襄垣县树元电器有限公司 Device for detecting high voltage default phase of transformer
CN108254654A (en) * 2016-12-28 2018-07-06 贵州中烟工业有限责任公司 The method and device of faulty line in a kind of diagnosis polyphase circuit
CN109557387A (en) * 2018-12-29 2019-04-02 上海辛格林纳新时达电机有限公司 A kind of method and frequency converter of input voltage pile defection
CN113049888A (en) * 2020-12-18 2021-06-29 中冶南方(武汉)自动化有限公司 Rectifier input three-phase voltage open-phase detection method and system based on two-way line voltage sampling
CN113514711A (en) * 2020-04-09 2021-10-19 浙江海利普电子科技有限公司 Phase sequence detection device and phase sequence detection method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102323491A (en) * 2011-08-09 2012-01-18 深圳市海浦蒙特科技有限公司 Method for detecting open phase of three-phase input power supply
CN102323491B (en) * 2011-08-09 2013-12-11 深圳市海浦蒙特科技有限公司 Method for detecting open phase of three-phase input power supply
CN102353851A (en) * 2011-09-05 2012-02-15 中冶南方(武汉)自动化有限公司 Transducer input default phase detection method based on direct-current bus voltage
CN102798770A (en) * 2012-08-09 2012-11-28 中国西电电气股份有限公司 Method for detecting default phase of frequency converter
CN102798770B (en) * 2012-08-09 2014-08-27 中国西电电气股份有限公司 Method for detecting default phase of frequency converter
CN103364647A (en) * 2013-07-31 2013-10-23 襄垣县树元电器有限公司 Device for detecting high voltage default phase of transformer
CN108254654A (en) * 2016-12-28 2018-07-06 贵州中烟工业有限责任公司 The method and device of faulty line in a kind of diagnosis polyphase circuit
CN108254654B (en) * 2016-12-28 2022-06-17 贵州中烟工业有限责任公司 Method and device for diagnosing fault line in multi-phase circuit
CN109557387A (en) * 2018-12-29 2019-04-02 上海辛格林纳新时达电机有限公司 A kind of method and frequency converter of input voltage pile defection
CN113514711A (en) * 2020-04-09 2021-10-19 浙江海利普电子科技有限公司 Phase sequence detection device and phase sequence detection method
CN113049888A (en) * 2020-12-18 2021-06-29 中冶南方(武汉)自动化有限公司 Rectifier input three-phase voltage open-phase detection method and system based on two-way line voltage sampling
CN113049888B (en) * 2020-12-18 2023-07-04 中冶南方(武汉)自动化有限公司 Method and system for detecting open-phase voltage of three-phase input voltage of rectifier

Also Published As

Publication number Publication date
CN101609116B (en) 2011-11-23

Similar Documents

Publication Publication Date Title
CN101609116B (en) New method for detecting input phase failure
CN103048544B (en) Insulation resistance monitoring method of photovoltaic power generation system
KR101511655B1 (en) Charger with Embedded Battery Diagnosis And Control Method thereof
US8423233B2 (en) Degradation determining apparatus for power storage device and degradation determining method for power storage device
CN103344839B (en) A kind of busbar joint contact resistance method for wirelessly testing and device
CN101666846B (en) System and method for detecting anomaly of secondary wiring of current mutual inductor
CN102955134B (en) A kind of online test method of accumulator health status and device
WO2015098523A1 (en) Ground fault detection device
CN101470174B (en) Accumulator monitoring equipment and method thereof
CN102201687A (en) Charging device
CN103323646B (en) A kind of current sensor used for electric vehicle and detection method thereof
CN106249076A (en) By the distribution transformer condition detection method under the influence of harmonic load and system
CN104682487A (en) Mine power battery
CN104348215A (en) Charger, battery module, and systems and methods for identifying and monitoring a battery charger
CN109474063B (en) Alternating current power grid power supply system, state monitoring circuit thereof and power utilization equipment
CN102082458A (en) Inverter intelligent charging control method
CN104682523A (en) Intelligent charger
CN103278776A (en) Electric automobile battery insulation detecting system
CN102539973A (en) Charge and discharge detecting system of electric automobile
JP2005024469A (en) Higher harmonic monitoring system, and higher harmonic monitoring method
CN203587700U (en) Internal resistance online detection device for parallelly-connected storage battery
CN103605000A (en) Method for online detecting internal resistance of storage batteries connected in parallel
CN102377841A (en) Mobile terminal and solar energy charging method thereof
CN210427707U (en) Integrated insulation detection's on-vehicle machine test system that charges
CN101814759A (en) Energy balance control device and energy balance control method of battery pack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant