CN101608455B - Cavity backfill type pile soil bearing capacity adjusting device - Google Patents

Cavity backfill type pile soil bearing capacity adjusting device Download PDF

Info

Publication number
CN101608455B
CN101608455B CN2008100390878A CN200810039087A CN101608455B CN 101608455 B CN101608455 B CN 101608455B CN 2008100390878 A CN2008100390878 A CN 2008100390878A CN 200810039087 A CN200810039087 A CN 200810039087A CN 101608455 B CN101608455 B CN 101608455B
Authority
CN
China
Prior art keywords
cavity
pile
bearing capacity
adjusting device
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100390878A
Other languages
Chinese (zh)
Other versions
CN101608455A (en
Inventor
江欢成
丁朝辉
杜刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JIANGHUANCHENG BUILDING DESIGN CO Ltd
Original Assignee
SHANGHAI JIANGHUANCHENG BUILDING DESIGN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JIANGHUANCHENG BUILDING DESIGN CO Ltd filed Critical SHANGHAI JIANGHUANCHENG BUILDING DESIGN CO Ltd
Priority to CN2008100390878A priority Critical patent/CN101608455B/en
Publication of CN101608455A publication Critical patent/CN101608455A/en
Application granted granted Critical
Publication of CN101608455B publication Critical patent/CN101608455B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention provides a cavity backfill type pile soil bearing capacity adjusting device. The device comprises a cylindrical steel component, wherein the top end of the cylindrical steel component is fixedly connected with a top cover; and the top cover is provided with a concrete casting hole and an exhaust inspection hole. The device is characterized in that the device can be freely deformed in the vertical direction in a cavity state; and after concrete is cast in the cavity, the device can ensure force transfer. After pile construction is carried out at certain height from the designed elevation, the adjusting device is placed on the top of the pile to form a pile top cavity; the adjusting device has small vertical rigidity, can be probably deformed freely in the early phase of the construction of the upper structure; upper load is not transferred to a foundation pile, and is transferred to the natural foundation through a bottom board; and foundation soil can participate in construction in advance. When the upper structure is constructed to certain degree according to the design requirement, concrete is cast into the cavity, and the pile and the foundation soil share the added load according to the rigidity proportion. The device has clear and definite concept on the bearing capacity of the pile and the soil, is advantageous to sufficient mobilization of the bearing capacity of the foundation soil, reduces the number of piles, and saves construction cost.

Description

Cavity backfill type pile soil bearing capacity adjusting device
Technical field:
The present invention relates to the civil construction field, relate in particular to the base apparatus of bridge, building or structure, is a kind of cavity backfill type pile soil bearing capacity adjusting device.
Background technology:
Building and structure often adopt the composite pile foundation of pile soil common action.Because the rigidity of stake is much larger than the rigidity of natural ground, stake is inevitable earlier stressed, and only after pile foundation produced moderate finite deformation, foundation soil just participated in work.Higher for the foundation soil supporting capacity, but still be not enough to bear whole loads, and pile foundation is out of shape less situation, usually has to sacrifice the bearing capacity of foundation soil self, only bears upper load by stake.The distribution of bearing capacity between the stake soil, all the time be a mystery, design is based upon on the basis of experience, for addressing this problem, some experts and scholars recently try out on the stake top and add rubber pad, under the effect of upper load, the less rubber pad of rigidity can produce bigger distortion, makes foundation soil participate in carrying work in advance, and upper load is distributed to stake and natural ground according to rigidity.But rubber pad is set needs complicated computational analysis, and makes rubber pad separately according to project situation, and cost is higher, therefore applies being subjected to certain limitation.
Summary of the invention:
The object of the present invention is to provide a kind of cavity backfill type pile soil bearing capacity adjusting device, described this cavity backfill type pile soil bearing capacity adjusting device can solve the problem that composite pile foundation in the prior art fails to make the bearing capacity of natural ground soil to be given full play to.
Cavity backfill type pile soil bearing capacity adjusting device of the present invention is made of a tubular steel member, and the top of described tubular steel member is fixedly connected with top cover, and described top cover is provided with concrete irrigation hole and exhaust inspection eye.
Further, described cavity cylindrical member is drum type, under vertical uniform load q, and can Free Transform.
Further, described concrete irrigation hole is arranged on the top cover top, and extends to basic end face.
Further, be provided with the exhaust inspection eye in the described top cover, and extend to basic end face.
Further, the upside of described top cover is fixedly connected with concrete pouring pipeline and exhaust inspection pipeline, and described concrete pouring pipeline is communicated with cavity, and described exhaust checks that pipeline is communicated with cavity, and the double as anchoring usefulness of pipeline is checked in concrete pouring pipeline and exhaust.
Operating principle of the present invention is: after the construction of stake proceeds to certain altitude apart from design elevation, adjusting device is placed on the stake top, adjusting device can be near Free Transform under the vertical force effect, and concrete irrigation hole and exhaust inspection eye on the top cover extend the foundation slab face.Need by design then, after foundation soil bears a certain amount of load, build the concrete in the described cavity again.Concrete work progress is: the pile foundation injection; Lay cavity backfill type pile soil bearing capacity adjusting device on the stake top; Water and smash the concrete base plate; Superstructure construction when natural ground is stressed when acquiring a certain degree, suspends the loading of superstructure; In cavity, build concrete; After the concrete of after-pouring meets the requirements of intensity, continue the construction of superstructure.
The present invention compares with prior art, and its effect is tangible.The present invention is at the cavity state, and this device is at vertical energy Free Transform; Behind the concrete in having built cavity, can guarantee the transmission of power.Concrete, the present invention utilizes the Free Transform of tubular cavity in the superstructure work progress, and upper load is reached natural ground, makes foundation soil participate in carrying work in advance.When superstructure is constructed to a certain degree, build the concrete in the cavity, pile foundation and foundation soil bore jointly and newly added load this moment.This device is to stake, the distribution of soil bearing capacity, and clear concept, clear and definite, be beneficial to the supporting capacity of the foundation soil of mobilizing to the fullest extent, particularly have the supporting capacity of the foundation soil of good bearing capacity, thereby reduce the quantity of stake, save construction cost.
Description of drawings:
Fig. 1 is the axial section structural representation of cavity backfill type pile soil bearing capacity adjusting device of the present invention.
Fig. 2 is the vertical view of cavity backfill type pile soil bearing capacity adjusting device of the present invention.
The specific embodiment:
Embodiment 1:
As depicted in figs. 1 and 2, cavity backfill type pile soil bearing capacity adjusting device of the present invention is made of a tubular steel member 1, and the top of described tubular steel member 1 is fixedly connected with top cover 2, and described top cover 2 is provided with concrete irrigation hole 41 and exhaust inspection eye 51.
Further, described tubular steel member 1 is drum type.
Further, described tubular steel member 1 is connected and composed up and down by two hollow frustum members.
Further, described concrete irrigation hole 41 is arranged on top cover 2 centers.
Further, be provided with the exhaust inspection eye 51 of two above numbers in the described top cover 2.
Further, be set with ribs 6 on the downside of described top cover 2.
Further, be set with four ribs 6 on the downside of described top cover 2,6 one-tenth intersecting parallels of described four ribs are arranged.
Further, the upside of described top cover 2 is fixedly connected with concrete pouring pipeline 4 and pipeline 1 is checked in exhaust, described concrete pouring pipeline 4 is communicated with concrete irrigation hole 41, described exhaust checks that pipeline 5 is communicated with exhaust inspection eye 51, all has been disposed radially a plurality of anchor slabs 7 on the outer wall of concrete pouring pipeline 4 and exhaust inspection pipeline 5.
The course of work of present embodiment is: after excavation pile construction proceeds to certain altitude apart from design elevation, tubular cavity 1 is placed on stake 3 tops, and form cavity between the stake 3, cavity 1 can be near Free Transform under the vertical force effect, concrete irrigation hole 41 on the top cover 2 and exhaust inspection eye 51 extend to foundation slab 8 above, need by design then, after foundation soil bears a certain amount of load, build the concrete 9 in the described cavity again.Concrete work progress is: the pile foundation injection; Lay cavity backfill type pile soil bearing capacity adjusting device on the stake top; Water and smash the concrete base plate; Superstructure construction when natural ground is stressed when reaching design and needing, suspends the loading of superstructure; In stake 3 tops and tubular cavity, build concrete 9; After the concrete 9 of after-pouring reaches desired strength, continue the construction of superstructure.

Claims (3)

1. cavity backfill type pile soil bearing capacity adjusting device, it is characterized in that: constitute by a tubular steel member, the top of described tubular steel member is fixedly connected with top cover, described top cover is provided with concrete irrigation hole and exhaust inspection eye, described tubular steel member is drum type, under vertical uniform load q, can Free Transform.
2. cavity backfill type pile soil bearing capacity adjusting device as claimed in claim 1 is characterized in that: described concrete irrigation hole is arranged on the top cover top, and extends to basic end face.
3. cavity backfill type pile soil bearing capacity adjusting device as claimed in claim 1 is characterized in that: be provided with described exhaust inspection eye in the described top cover, and extend to basic end face.
CN2008100390878A 2008-06-17 2008-06-17 Cavity backfill type pile soil bearing capacity adjusting device Expired - Fee Related CN101608455B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100390878A CN101608455B (en) 2008-06-17 2008-06-17 Cavity backfill type pile soil bearing capacity adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100390878A CN101608455B (en) 2008-06-17 2008-06-17 Cavity backfill type pile soil bearing capacity adjusting device

Publications (2)

Publication Number Publication Date
CN101608455A CN101608455A (en) 2009-12-23
CN101608455B true CN101608455B (en) 2011-05-18

Family

ID=41482353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100390878A Expired - Fee Related CN101608455B (en) 2008-06-17 2008-06-17 Cavity backfill type pile soil bearing capacity adjusting device

Country Status (1)

Country Link
CN (1) CN101608455B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104711973A (en) * 2015-01-07 2015-06-17 朱奎 Construction method for small-diameter pile composite foundation
CN106592620A (en) * 2016-12-16 2017-04-26 上海岩土工程勘察设计研究院有限公司 Construction method of coordination device for guaranteeing pile-soil co-action

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2221210Y (en) * 1994-11-09 1996-02-28 乔墩华 Pile testing device
CN1699706A (en) * 2005-05-30 2005-11-23 南京工业大学 Pile tip displacement regulating device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2221210Y (en) * 1994-11-09 1996-02-28 乔墩华 Pile testing device
CN1699706A (en) * 2005-05-30 2005-11-23 南京工业大学 Pile tip displacement regulating device

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
JP特开10-273917A 1998.10.13
JP特开2003-160943A 2003.06.06
JP特开2007-204994A 2007.08.16
宰金珉等.端承桩复合桩基及其设计方法.《工业建筑》.2008,第38卷(第01期),60-64,73. *
王玉娥等.复合地基承载力设计方法的讨论与改进思路.《宁波高等专科学校学报》.2000,第12卷(第02期),33-38. *

Also Published As

Publication number Publication date
CN101608455A (en) 2009-12-23

Similar Documents

Publication Publication Date Title
CN203783828U (en) Tower foundation of wind generating set
US20130259581A1 (en) Grouting Cabin Structure of a Grouted Connection in a Foundation of an Offshore Wind Turbine Generator
CN106661856A (en) Transmission tower foundation using micropile
AU2013273463B2 (en) Ribbed foundation for superstructures and method for producing the foundation
CN102409697A (en) Prefabricated tower and mast structure foundation
CN101608455B (en) Cavity backfill type pile soil bearing capacity adjusting device
CN104878786A (en) Inclined-straight alternating group piles-soil-structure interaction experiment model
CN106958259A (en) A kind of concrete towers column foundation and its construction method
CN104790423A (en) Large-scale transmission tower composite top expansion cast-in-place pile foundation
CN101550703B (en) Method for designing reinforced concrete foundation or pile cap
CN101781897A (en) Anchor plate reinforced gabion retaining wall and construction method thereof
US11085165B2 (en) Post-tension tube foundation and method of assembling same
CN201347558Y (en) Ring-shaped bracing structure system of deep and large foundation pit
CN102720208A (en) Tower foundation for wind driven generator on land
CN110607801A (en) Improve fan cushion cap subassembly of stake resistance to plucking bearing capacity
CN204753656U (en) A clump of piles - soil - structure interact experimental model directly replaces to one side
CN211257051U (en) Improve fan cushion cap subassembly of stake resistance to plucking bearing capacity
CN106978816B (en) A kind of Integral tower post case type computer room basis and its construction method and signal of communication tower
CN102535496A (en) Expanded pier structure and forming method thereof
CN216156614U (en) Biconical land fan foundation
CN213014346U (en) Steel pipe pile foundation with stacked precast concrete balancing weights
CN201411704Y (en) Reinforced concrete foundation or pile cap
CN202969406U (en) Wind power generation tower foundation combining reverse frustum with free-standing column
CN112814016A (en) Biconical land fan foundation
CN208907225U (en) A kind of double-row pile foundation pit enclosure structure of arch arrangement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110518

Termination date: 20210617

CF01 Termination of patent right due to non-payment of annual fee