CN101607676B - Multi-suspension-centres crane - Google Patents

Multi-suspension-centres crane Download PDF

Info

Publication number
CN101607676B
CN101607676B CN 200910012510 CN200910012510A CN101607676B CN 101607676 B CN101607676 B CN 101607676B CN 200910012510 CN200910012510 CN 200910012510 CN 200910012510 A CN200910012510 A CN 200910012510A CN 101607676 B CN101607676 B CN 101607676B
Authority
CN
China
Prior art keywords
group
reel
girder
suspension
suspension hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200910012510
Other languages
Chinese (zh)
Other versions
CN101607676A (en
Inventor
邹胜
宋甲晶
徐宏伟
吴克利
王喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Huarui Heavy Industry Group Co Ltd
Original Assignee
Dalian Huarui Heavy Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Huarui Heavy Industry Group Co Ltd filed Critical Dalian Huarui Heavy Industry Group Co Ltd
Priority to CN 200910012510 priority Critical patent/CN101607676B/en
Publication of CN101607676A publication Critical patent/CN101607676A/en
Application granted granted Critical
Publication of CN101607676B publication Critical patent/CN101607676B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The invention discloses a multi-suspension-centres crane which comprises main beams, an operating mechanism, a lifting mechanism and an electric control system, wherein the operating mechanism comprises a bearing mechanism composed of an idle wheel device and an elastic body, and a drive mechanism composed of a motor, a reducer, a winding drum group, two groups of steel ropes, a pulley block and a pulley bracket, wherein the lifting mechanism comprises more than 2 sets of winding machines on each main beam, adopts a multilayer winding and symmetrical rope mode of duplex winding drums and steel ropes, and adopts a mode that a hook connecting piece is respectively hinged or fixedly connected with a corresponding hook group through a pin roll. The multi-suspension-centres crane has the characteristics of safety and reliability, strong practicability and the like through the self-set corresponding control method, is suitable to a crane with ultra-high lifting load, especially the multi-suspension-centres crane for lifting by sections on an offshore drilling platform.

Description

Multi-suspension-centres crane
Technical field
The present invention relates to a kind of hoisting crane, relate in particular to a kind of shipbuilding industry that is applicable to, the multi-suspension-centres crane of lifting usefulness when being specially adapted to marine drilling platform segmentation docking.
Background technology
Along with the in recent years proposition of domestic " marine drilling platform segmentation docking, integral hoisting " theory, need to there be supporting hoisting crane to finish the lifting of this ton equipment of drilling platform, the hoisting capacity of comparing this hoisting crane with conventional hoist has increased an order of magnitude, can reach 20,000 tons even larger, hoisting crane span and lifting altitude all reach more than 100 meter.For alleviating the weight of girder upper-part, winch is usually placed in girder and strides end.For steel rope and the angle between reel and the pulley that guarantees multiple wraps satisfies design regulation (≤1.7 °) and avoid mutually interference between the steel rope, steel wire rope of windlass is restricted (as shown in figure 11) under the span opposite side after reel one brings out rope.The major defect that the hoisting crane of this pattern exists: to the single winding of opposite side, there is locking phenomenon in the transmission that hoists to hoisting mechanism steel wire rope by pulley one side, and electronic force-increasing mechanism need to be set; The lifting mechanism driving efficiency is low in addition, and degradation of energy is more; Specifically there is following technical matters:
1. the simply connected pattern causes single wire rope long, reaches more than 4800 meter, high cost, and steel rope installation difficulty is large;
2. need to arrange that a large amount of dragging rollers prevents that the steel rope downwarp is excessive, complex structure at girder;
3. the suspension centre of single group hoisting mechanism can not synchronous ascending, and electric synchronous mechanism need to be set, and also needs the high harmony of electric system simultaneously;
4. the pulley multiplying power is excessive, and the driving efficiency that hoists is low, and degradation of energy is more, produces easily self-locking;
5. rope causes the relative girders such as hoisting mechanism and leading sheave to rotate to an angle under simply connected reel and the offside span, and the like this requirement of guarantee deflection angle of rope brings very large inconvenience to construction and installation.
The pattern that on hoisting crane, usually adopts polyfluortetraethylene plate to slide at stainless steel sheet simultaneously, it is cliding friction between polyfluortetraethylene plate and stainless steel sheet, friction coefficient is larger, generally be not less than 0.15, horizontal resistance is large, and this has increased the power of driver train, generally can't use the motorized motions pattern, can only adopt hydraulic stepping to drive pattern, cause that running velocity is slow, inefficiency.For reducing the power of driver train, in order to reduce to arrange size, the unloaded driving only is set generally in addition, if adopt fully loaded driving will make driver element excessive.
Summary of the invention
The present invention is directed to the proposition of above problem, a kind ofly have efficiently and develop, failure-free operating unit and shorten the installation period of hoisting crane improves the multi-suspension-centres crane that plays the life structure of lifting efficient.Technical scheme of the present invention is as follows:
A kind of multi-suspension-centres crane comprises girder, operating unit, lifting mechanism and electric-control system, it is characterized in that described operating unit comprises load carrier and driver train:
Described load carrier comprises roller devices and elastic body; Described roller devices comprises main carrying roller devices and track and horizontal bearing roller devices and track thereof, wherein, main carrying roller devices and track thereof are arranged at girder span two-side supporting under carrier bar, and horizontal bearing roller devices and track thereof only are arranged at the carrier bar both sides of girder span one side; Carrier bar is supported on girder span both sides by hinged-support; Described elastic body is arranged between described hinged-support and the carrier bar;
Described driver train adopts driven by power, comprise electrical motor, coupler, retarder, reel group, two groups of steel ropes, assembly pulley and pulley brackets, described electrical motor drives the reel group through coupler, retarder, the reel group drives steel rope, through the driving of assembly pulley realization to hoisting crane; Described reel group adopts light face reel, and steel rope adopts winding of single layer, and wherein two of first group of steel rope fag ends are individually fixed in the two ends of reel group, twine to the middle part along the end of reel group, and in a side rope stretching of reel group; Two fag ends of second group of steel rope then are individually fixed in the middle part of reel group, twine to the end along the middle part of reel group, and its winding direction is opposite with the winding direction of described first group of steel rope, and in the opposite side rope stretching of reel group; The angle of two groups of steel ropes and reel group vertical plane all is not more than 1.7 °;
Described lifting mechanism comprises the above hoisting mechanism of the cover of 2 on the every girder, for every cover hoisting mechanism, add the double crosslinking drum group of division board, two steel ropes and two upper leading sheaves in the middle of comprising, and correspondence comprises that being positioned at the girder homonymy with described double crosslinking drum group strides the individual fixed pulley group of two lower leading sheaves, (2n+1) of end and suspension hook group and 2n suspension hook attaching parts identical with fixed pulley group quantity, wherein, the integer of n=1~4;
Described two steel ropes are wrapped in the division board both sides of described double crosslinking drum group separately, and behind its separately upper leading sheave, lower leading sheave, between described fixed pulley group and suspension hook group, adopt respectively symmetrical winding form, namely in described every cover hoisting mechanism, two steel ropes respectively by the fixed pulley group on both sides and suspension hook group to middle symmetrical the winding, and its terminal is individually fixed on the equilibrium arm; Described 2n suspension hook attaching parts forms hinged or the captive joint pattern by bearing pin with corresponding suspension hook group respectively; Described hoisting mechanism is striden the double crosslinking drum group of end to the section between the upper leading sheave of its correspondence at the girder homonymy, be arranged in respectively on the different vertical dimensions.
Respectively arranged 2-4 row under each carrier bar of girder span both sides in the described operating unit, every row 2-20 row main carrying roller devices and track thereof; 1-2 row has respectively been arranged in each carrier bar both sides of described girder span one side, every row 2-20 row horizontal bearing device and track thereof.
The individual suspension hook group of (2n+1) of every cover hoisting mechanism and 2n corresponding suspension hook attaching parts thereof are linked to be the movable pulley equalizing bar of an integral body in the described lifting mechanism.
Two steel ropes in the described lifting mechanism adopt the multiple wraps pattern to be wrapped in separately the division board both sides of described double crosslinking drum group.
Described girder can be single girder or many girders.
Described electric-control system comprises the lift controlling system that is comprised of frequency converter, communication module and electrical motor, the operation control system that is comprised of frequency converter, communication module and electrical motor, and controller, load transducer, position transduser and upper computer;
Described controller is responsible for upper computer communication, receives control command, return state information, controls simultaneously the operation of each lifting mechanism and operating unit, the feedback signal of receiving sensor;
Described load transducer and position transduser with the tractive force of the load capacity of each lifting mechanism and sling height, operating unit and travel position by self with communication module pass to controller, adjust afterwards the operation of each lifting mechanism and operating unit by the processing of controller;
Its middle controller, sensor, lift controlling system, lift controlling system all connect by bus mode.
A kind of control method of operating unit, it is characterized in that when hoisting crane moves, is the better synchronized operation of the operating unit at control girder two ends, and the operating unit of a common wherein end is as reference side mechanism, the other end is as following side mechanism, and concrete control process comprises the steps:
A, reference side mechanism controls process are as follows:
1) after traversing operation is ready to, mentions anchoring device, open drg;
2) detect all earth anchors and lift and put in place, all drgs be opened to open a sluice gate spacing after, traversing motor brings into operation, motor adopts closed loop control, when the deviation of actual speed and given speed during greater than setting value, automatically compensates;
3) in traversing process, detect simultaneously the size of actual tractive force, if actual tractive force greater than 110% of rated drawbar pull, system's emergency engine kill, simultaneously brake, and investigation fault cause;
4) after traversing putting in place, and after detecting all motor speeds and being zero, all drgs are braked simultaneously, traversing EO;
B, to follow side mechanism controls process as follows:
1) after traversing operation is ready to, mentions anchoring device, open drg;
2) detect all anchoring devices and lift and put in place, all drgs be opened to open a sluice gate spacing after, traversing motor brings into operation, motor adopts closed loop control, when the deviation of actual speed and given speed during greater than setting value, automatically compensate,
3) in traversing process, do the size detection with deviation of stroke and the actual tractive force of reference side, then carry out following steps according to testing result:
If the deviation of stroke of a and reference side, can judge then that to follow side speed fast greater than setting value, control system will be followed side frequency converter speed preset and be reduced in proportion; If otherwise with the skidding journey less than the reference side stroke, can judge that then to follow side speed partially slow, will follow side frequency converter speed preset and scale up and follow the side velocity compensation;
If the tractive force deviation of b and reference side is during greater than setting value Δ 1, control system will be followed according to this bias adjustment the tractive force of side, compensate adjustment;
If the tractive force deviation of c and reference side is during greater than Δ 2, system's emergency engine kill, brake prevents grave accident simultaneously;
If the actual tractive force of d is greater than 110% of rated drawbar pull, simultaneously brake, and investigation fault cause;
4) after traversing the putting in place, and after detecting all motor speeds and being zero, all drgs are braked simultaneously, traversing EO.
Compared with prior art, the present invention has following significant advantage:
Wherein the operating unit roller is made the operation rolling member, and load-carrying capacity is large, speed is large, and electric driving device is simple in structure, and is easy to maintenance; Be arranged at the elastic body between hinged-support and the carrier bar, as the special construction of symmetrical load, effectively offset installation error, guarantee that each roller is on the plane and stressed evenly.Adopt the Vidacare corp of reel group heteropleural four rope stretching forms, for operating mechanism of multi-suspension-centres crane provides a kind of rational solution, simple in structure, easy to maintenance; Simultaneously, heteropleural four goes out rope structure also to be played the fixing effect of hoisting crane, as long as drg is in the lock state that closes, then hoisting crane can be along the track slippage with regard to being fixed.In addition, horizontal bearing roller devices and track thereof only are arranged at a side of crane girder span, and opposite side has guaranteed the statically determimate structure of main beam stress then without the level constraint; The every side master of span was carried evenly bearing load of roller devices when hinged-support had guaranteed the distortion of girder vertical direction.
Wherein lifting mechanism adopts double crosslinking drum, steel rope multiple wraps and symmetrical lower rope pattern, novel structure, solved that superduty large span crane rope drift angle is not easy to guarantee and the steel rope level twines that distance is long, mechanism efficiency is excessively low, mechanism produces the series of problems such as self-locking, suspension centre is asynchronous, difficulty of construction is large easily, also had simultaneously:
(1) greatly reduced the coiling length of single wire rope, cost, the steel rope installation period shortens;
(2) net synchronization capability between the suspension hook group of every cover hoisting mechanism improves greatly;
(3) the pulley multiplying power reduces, and the driving efficiency of winding system obviously improves, and avoids mechanism's self-locking;
(4) difficulty of construction and operating cost reduce greatly.
In a word, the present invention has safe and reliable, and practical characteristics can be avoided great potential safety hazard, is applicable on the ton super large hoisting capacity hoisting crane, the multi-suspension-centres crane of lifting usefulness when being particularly useful for marine drilling platform segmentation docking.
Description of drawings
Fig. 1 is the structural representation of hoisting crane of the present invention;
Fig. 2 is the structural representation of the embodiment of operating unit among the present invention;
Fig. 3 is M partial enlarged drawing among Fig. 2, i.e. the enlarged drawing of main carrying roller devices;
Fig. 4 is the birds-eye view of Fig. 2;
Fig. 5 is the left view of Fig. 2;
Fig. 6 has installation error to cause the not scheme drawing at grade time of its lower plane under two carrier bars;
Fig. 7 is the scheme drawing that elastic body is offset above-mentioned installation error;
Fig. 8 is the heteropleural four rope stretching structural shape scheme drawings of reel group;
Fig. 9 is the reference side mechanism program flow diagram of operating unit of the present invention;
Figure 10 be operating unit of the present invention follow side mechanism program flow diagram;
Figure 11 is the typical structure scheme drawing of restricting under the steel rope offside span in the prior art;
Figure 12 is the structural representation of embodiments of the invention;
Figure 13 is the birds-eye view of Figure 12;
Figure 14 is the enlarged drawing of the cover hoisting mechanism of one among Figure 12 (IV);
Figure 15 shows that as an example of hoisting mechanism (IV) example steel rope duplex, multilayer, symmetrical expression twine the scheme drawing of pattern;
Figure 16 is the C-C section-drawing among Figure 14;
Figure 17 is suspension hook attaching parts scheme drawing I;
Figure 18 is suspension hook attaching parts scheme drawing II;
Figure 19 is the structural representation of the two ends suspension hook group of every cover hoisting mechanism;
Figure 20 is the structural representation of the middle suspension hook group of every cover hoisting mechanism;
Figure 21 is double crosslinking drum group structural representation;
Figure 22 is the structural representation that the suspension hook attaching parts adopts the lifting mechanism of another kind of modification structures;
Figure 23 is the enlarged drawing of the cover hoisting mechanism of one among Figure 22 (IV);
Figure 24 is the annexation enlarged drawing of suspension hook attaching parts and suspension hook group;
Figure 25 is the control system functional block diagram.
The specific embodiment
As shown in Figure 1, a kind of multi-suspension-centres crane comprises girder 3, operating unit 1, lifting mechanism 2 and electric-control system 4, and wherein electric-control system comprises the lift controlling system 401 that is comprised of frequency converter, communication module, electrical motor, the operation control system 402, controller 403, load transducer 404, position transduser 405, the upper computer 406 that are comprised of frequency converter, communication module, electrical motor equally;
Described controller is responsible for upper computer communication, receives control command, return state information, controls simultaneously the operation of each lifting mechanism and operating unit, the feedback signal of receiving sensor;
Described load transducer and position transduser with the tractive force of the load capacity of each lifting mechanism and sling height, operating unit and travel position by self with communication module pass to controller, adjust afterwards the operation of each lifting mechanism and operating unit by the processing of controller;
Its middle controller, sensor, lift controlling system, lift controlling system all connect by bus mode.
The present invention is directed to existing multi-suspension-centres crane and mainly done significantly improvement at operating unit 1 and lifting mechanism 2, specific as follows:
Described operating mechanism of multi-suspension-centres crane 1 such as Fig. 2, Fig. 4 and shown in Figure 5, comprises load carrier and driver train.
Described load carrier comprises hinged-support 101, main carrying roller devices 102, main bearing track 103, horizontal bearing roller devices 104, horizontal bearing roller track 105, carrier bar 106, elastic body 121 etc.; Described main carrying roller devices 102 and track 103 thereof as shown in Figure 3, are arranged at crane girder 3 span two-side supportings in carrier bar 106 times, have respectively arranged 2 rows, 8 row under each carrier bar, as shown in Figure 2; And 105 on horizontal bearing roller devices 104 and track thereof are arranged at carrier bar 106 both sides of girder 3 spans one side, and every side has been arranged 1 row, 6 row, as shown in Figure 5; All by heavy roller finished product buying, pattern is seen the M enlarged drawing among Fig. 3 for main carrying roller devices 102, horizontal bearing roller devices 104.Above-mentioned one-sided without level constraint namely without the design of level carrying roller devices and track thereof, guaranteed the statically determimate structure of main beam stress; Carrier bar 106 is supported on girder 3 span both sides by hinged-support 101, and two groups of masters of the every side of span are carried evenly bearing load of roller devices 102 when having guaranteed the distortion of girder 3 vertical direction; Described elastic body 121 is arranged between described hinged-support 101 and the carrier bar 106, when two carrier bars 106 of hoisting crane one end cause its lower plane not on same plane because of installation error, as shown in Figure 5, two sections elastic bodys 121 have produced different deflections under the different pressures effect, above-mentioned installation error is offset, thereby guaranteed that each roller acts on the plane and stressed evenly, as shown in Figure 6.
Anchoring device 122 is fixed on the carrier bar 106, and the voussoir when shutting down work in the anchoring device 122 is inserted in the hoisting crane support rail beam 107, plays the windbreak anchoring effect.
Described driver train adopts driven by power, drive reel group 112 with electrical motor 108 through coupler 109, retarder 111, reel group 112 drives the driving that steel rope 113, steel rope 114 difference pile warp assembly pulleys 115, assembly pulley 116 and assembly pulley 117, assembly pulley 118 are realized hoisting crane; Pulley bracket 119 is installed on the basis.The reel group adopts heteropleural four rope stretching patterns, as shown in Figure 8, i.e. steel rope winding of single layer, wherein two of steel rope 113 fag ends are fixed in respectively the two ends of reel group 112 by steel rope pressing plate 123, twine to the middle part end along reel group 112, and in a side rope stretching of reel group 112; Two fag ends of steel rope 114 then are fixed in respectively the middle part of reel group 112 by steel rope pressing plate 123, twine to the end along the middle part of reel group 112, and its winding direction is opposite with the winding direction of described steel rope 113, and in the opposite side rope stretching of reel group 112; The angle of two groups of steel ropes and reel group 112 vertical planes all is not more than 1.7 °, disorder cable not when guaranteeing two groups of wirerope-windings; When reel group 112 was rotated, such as steel rope 113 slack ropes, then steel rope 114 tight ropes realized that hoisting crane moves to the left; In like manner such as steel rope 113 tight ropes, then steel rope 114 slack ropes have realized that hoisting crane moves to the right.This mechanism also plays the fixing effect of hoisting crane simultaneously, as long as drg 110 is in the lock state that closes, then hoisting crane can be along the track slippage with regard to being fixed.It is large that described operating unit 1 bears wheel load, running resistance is little, running velocity is large, and maintainable good, work efficiency that can the Effective Raise hoisting crane, plan is used it on the ton superduty multi-suspension-centres crane, can avoid great potential safety hazard, estimates that every hoisting crane can save handling cost 1,000,000 Renminbi every year.
When hoisting crane moves, be the better synchronized operation of the operating unit at control girder two ends, wherein the operating unit of an end is as reference side mechanism usually, and the other end is as following side mechanism, and concrete control process comprises the steps:
Reference side mechanism controls process is as follows as shown in Figure 9:
1) after traversing operation is ready to, mentions anchoring device, open drg;
2) detect all earth anchors and lift and put in place, all drgs be opened to open a sluice gate spacing after, traversing motor brings into operation, motor adopts closed loop control, when the deviation of actual speed and given speed during greater than setting value, automatically compensates;
3) in traversing process, detect simultaneously the size of actual tractive force, if actual tractive force greater than 110% of rated drawbar pull, system's emergency engine kill, simultaneously brake, and investigation fault cause;
4) after traversing putting in place, and after detecting all motor speeds and being zero, all drgs are braked simultaneously, traversing EO;
It is as follows to follow as shown in figure 10 side mechanism controls process:
B, to follow side mechanism controls process as follows:
1) after traversing operation is ready to, mentions anchoring device, open drg;
2) detect all anchoring devices and lift and put in place, all drgs be opened to open a sluice gate spacing after, traversing motor brings into operation, motor adopts closed loop control, when the deviation of actual speed and given speed during greater than setting value, automatically compensate,
3) in traversing process, do with the deviation of stroke of reference side and (utilize and be provided with laser ranging system in the both sides of girder, detect in real time the stroke of both sides) and the size detection of actual tractive force (sheave shaft in the assembly pulley is load transducer, can detect in real time tractive force), then carry out following steps according to testing result:
If the deviation of stroke of a and reference side, can judge then that to follow side speed fast greater than setting value, control system will be followed side frequency converter speed preset and be reduced in proportion; If otherwise with the skidding journey less than the reference side stroke, can judge that then to follow side speed partially slow, will follow side frequency converter speed preset and scale up and follow the side velocity compensation;
If the tractive force deviation of b and reference side is during greater than setting value Δ 1, that is: when both sides tractive force deviation during greater than setting value Δ 1, namely the both sides tractive force is unbalanced, illustrates that there is operation jam phenomenon in girder one side.Can work in coordination with the stroke detection result this moment and carry out the jam investigation, adjust the both sides tractive force and adjust with reference to the direction of main beam stress this moment, for example: illustrate greatly then that when girder becomes at the suffered resistance of reference side the reference side operation is subject to jam, can reduce to follow on the one hand the tractive force (or tractive force of increase reference side) of side, can on-the-spotly investigate jam on the one hand, reach the girder two ends and advance synchronously, make the girder smooth running.
If the tractive force deviation of c and reference side is during greater than Δ 2, that is: when both sides tractive force deviation during greater than setting value Δ 2, namely the both sides tractive force is extremely unbalanced, illustrates that there is very large operation jam phenomenon in girder one side.If untimely ascertaining the reason may cause the girder steel structure impaired, can cause girder to tumble when serious, grave accident occurs, system's emergency engine kill, brake prevents grave accident simultaneously;
If the actual tractive force of d is greater than 110% of rated drawbar pull, simultaneously brake, and investigation fault cause;
4) after traversing the putting in place, and after detecting all motor speeds and being zero, all drgs are braked simultaneously, traversing EO.
Described hoisting mechanism of multi-lifting-point joint crane 2 as shown in Figure 12 and Figure 13, is arranged 6 cover hoisting mechanisms on the every girder, respectively with Roman number I, and II, III, IV, V, VI represents;
Every cover hoisting mechanism as shown in figure 14, adds the double crosslinking drum group 214 of division board 220 in the middle of including, as shown in figure 21, also comprise two steel ropes 210,211, be positioned at girder 3 homonymies with described double crosslinking drum group and stride two of end upper leading sheaves 212,213, two lower leading sheaves 207,209, three fixed pulley groups 204,205, the suspension hook group 201,202,203 of 206 and three correspondences, respectively such as Figure 19, shown in Figure 20, and 2 suspension hook attaching partss 215,216, respectively as shown in Figure 17 and Figure 18;
Described two steel ropes 210,211 separately multiple wraps on division board 220 both sides of described double crosslinking drum group 214, and respectively through its upper leading sheave 212 separately, 213, lower leading sheave 207,209 is rear in described fixed pulley group 204,205,206 and suspension hook group 201,202, adopt symmetrical winding form between 203, i.e. two steel ropes 210,211 are twined to fixed pulley group 205 and suspension hook group 202 symmetries of centre by fixed pulley group 204,206 and the suspension hook group 201,203 on both sides respectively, and its terminal is individually fixed on the equilibrium arm 208, as shown in figure 15;
Described 2 suspension hook attaching partss 215,216, as shown in Figure 17 and Figure 18, it is respectively by stub axle 218 and corresponding suspension hook group 201,202,203 is hinged, or respectively simultaneously by stub axle 218 and ear's bearing pin 219 and corresponding suspension hook group 201,202,203 captive joints, as shown in figure 24; Its concrete pattern that connects adopts grafting, as shown in figure 16.
Described hoisting mechanism is striden end at girder 3 homonymies double crosslinking drum group to its correspondence upper leading sheave between section, be arranged in respectively on the different vertical dimensions.
For big elevating height, organize the large multiplying power lifting mechanism 2 of suspension hook group more, its hoisting mechanism adopts above-mentioned dual multi-layer winding reel, double-steel wire rope to stride the layout pattern of restricting under the end at the homonymy of girder 3, under the span offside, restrict after having avoided in the simply connected pattern steel rope one to bring out rope, as shown in figure 11, reel group and the excessive problem of upper leading sheave spacing; Under the condition that guarantees deflection angle of rope, double crosslinking drum pattern and simply connected reel pattern relatively greatly reduce the multiplying power of assembly pulley, the lifting mechanism driving efficiency has improved 20%, and the length of single wire rope is reduced to 2200m by 4800m, greatly shortens the steel rope installation period when reducing cost.Double crosslinking drum and upper leading sheave keep the layout of a determining deviation to make the easier assurance of deflection angle of rope, and hoisting mechanism and leading sheave group etc. need not the installation that rotates to an angle of relative girder 3, greatly reduce difficulty of construction.
On the other hand, steel rope twines pattern by the both sides assembly pulley to the symmetry of intermediate pulley group, guaranteed the synchronous ascending between a plurality of suspension hook groups of single cover hoisting mechanism: during the independent lifting operation of a cover hoisting mechanism, after suspension hook attaching parts 215,216 couples together by bearing pin, under the winding pattern of symmetrical lay winding wire ropes, lift by crane, suspension hook group 201,202,203 can synchronous ascending, avoid adopting other measure as electric synchronous mechanism etc. is set, simplify mechanism, improved the reliability of complete machine work.
And special many suspension hooks group connecting device has solved nonsynchronous problem of many suspension centres hyperstatic structure and each suspension centre:
When zero load is lifted by crane, for the suspension hook group that guarantees every group of hoisting mechanism synchronously, all suspension hook groups by ear's bearing pin 219 and 218 combineds action of stub axle, are connected into rigid body with suspension hook attaching parts 215,216;
And when fully loaded lifting or the suspension centre of the weight of every group of hoisting mechanism lifting not on the same level straight line time, ear's bearing pin 219 between release hook group and the suspension hook attaching parts 215,216, and only realize hinged between suspension hook groups and the suspension hook attaching parts by stub axle 218, thereby the degree of freedom of assurance suspension hook group vertical direction.
As a kind of modification of such scheme, described 3 suspension hook groups 201,202,203 and corresponding 2 suspension hook attaching partss 215,216 form the movable pulley equalizing bar 217 that is linked to be an integral body, such as Figure 22 and shown in Figure 23.
This lifting mechanism also has a maximum characteristic to be exactly in addition, its automatically controlled part can adopt mode in the past to control, have good commonality, for example adopting patent name is that " multiple hanging points crane electric control method " patent No. is that the control method of saying description among the 200710011935X is controlled.
The above; only be the better specific embodiment of the present invention; but protection scope of the present invention is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to replacement or change according to technical scheme of the present invention and inventive concept thereof, all should be encompassed within protection scope of the present invention.

Claims (4)

1. a multi-suspension-centres crane comprises girder, operating unit, lifting mechanism and electric-control system, it is characterized in that described operating unit comprises load carrier and driver train:
Described load carrier comprises roller devices and elastic body; Described roller devices comprises main carrying roller devices and track and horizontal bearing roller devices and track thereof, wherein, main carrying roller devices and track thereof are arranged at girder and are supported at both ends under the carrier bar, and horizontal bearing roller devices and track thereof only are arranged at the carrier bar both sides of girder one end; Carrier bar is supported on the girder two ends by hinged-support; Described elastic body is arranged between described hinged-support and the carrier bar;
Described driver train adopts driven by power, comprise electrical motor, coupler, retarder, reel group, two groups of steel ropes, assembly pulley and pulley brackets, described electrical motor drives the reel group through coupler, retarder, the reel group drives steel rope, through the driving of assembly pulley realization to hoisting crane; Described reel group adopts light face reel, and steel rope adopts winding of single layer, and wherein two of first group of steel rope fag ends are individually fixed in the two ends of reel group, twine to the middle part along the end of reel group, and in a side rope stretching of reel group; Two fag ends of second group of steel rope then are individually fixed in the middle part of reel group, twine to the end along the middle part of reel group, and its winding direction is opposite with the winding direction of described first group of steel rope, and in the opposite side rope stretching of reel group; First group of wirerope-winding is on reel and from the direction of reel group rope stretching, and second group of wirerope-winding be on the reel group and from the direction of reel group rope stretching, with and the vertical face of the axle of reel group between angle all be not more than 1.7 °;
Described lifting mechanism comprises the above hoisting mechanism of the cover of 2 on the every girder, for every cover hoisting mechanism, add the double crosslinking drum group of division board, two steel ropes and two upper leading sheaves in the middle of comprising, and correspondence comprises that being positioned at the girder homonymy with described double crosslinking drum group strides the individual fixed pulley group of two lower leading sheaves, (2n+1) of end and suspension hook group and 2n suspension hook attaching parts identical with fixed pulley group quantity, wherein, n is the integer in 1~4;
Described two steel ropes are wrapped in the division board both sides of described double crosslinking drum group separately, and behind its separately upper leading sheave, lower leading sheave, between described fixed pulley group and suspension hook group, adopt respectively symmetrical winding form, namely in described every cover hoisting mechanism, two steel ropes respectively by the fixed pulley group on both sides and suspension hook group to middle symmetrical the winding, and its terminal is individually fixed on the equilibrium arm; Described 2n suspension hook attaching parts forms hinged or the captive joint pattern by bearing pin with corresponding suspension hook group respectively; Described hoisting mechanism is striden the double crosslinking drum group of end to the section between the upper leading sheave of its correspondence at the girder homonymy, be arranged in respectively on the different vertical height.
2. multi-suspension-centres crane according to claim 1 is characterized in that respectively having arranged 2-4 row under each carrier bar of girder two ends in the described operating unit, every row 2-20 row main carrying roller devices and track thereof; 1-2 row has respectively been arranged in each carrier bar both sides of described girder one end, every row 2-20 row horizontal bearing device and track thereof.
3. multi-suspension-centres crane according to claim 1 is characterized in that the individual suspension hook group of (2n+1) of every cover hoisting mechanism in the described lifting mechanism and 2n corresponding suspension hook attaching parts thereof are linked to be the movable pulley equalizing bar of an integral body.
4. according to claim 1 or 3 described multi-suspension-centres cranes, it is characterized in that two steel ropes in the described lifting mechanism adopt the multiple wraps patterns to be wrapped in separately the division board both sides of described double crosslinking drum group.
CN 200910012510 2009-07-10 2009-07-10 Multi-suspension-centres crane Active CN101607676B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910012510 CN101607676B (en) 2009-07-10 2009-07-10 Multi-suspension-centres crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910012510 CN101607676B (en) 2009-07-10 2009-07-10 Multi-suspension-centres crane

Publications (2)

Publication Number Publication Date
CN101607676A CN101607676A (en) 2009-12-23
CN101607676B true CN101607676B (en) 2013-04-03

Family

ID=41481609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910012510 Active CN101607676B (en) 2009-07-10 2009-07-10 Multi-suspension-centres crane

Country Status (1)

Country Link
CN (1) CN101607676B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079484B (en) * 2010-02-26 2013-05-22 上海海事大学 Synchronous control system for dual hangers of dual-hoisting yard crane
CN103601093B (en) * 2013-09-17 2016-06-01 中联重科股份有限公司 Tower machine and two lifting mechanism synchronization control method, apparatus and system thereof
CN103754802A (en) * 2014-01-07 2014-04-30 中天建设集团有限公司 Annular guide rail for external wall construction
CN105080166B (en) * 2015-09-10 2017-06-06 中国特种设备检测研究院 The synchronism detecting system of stage machinery
CN105439021B (en) * 2015-12-08 2017-08-15 浙江理工大学 Many suspension centre winding of single layer hoist engines with angle pulley
CN105384065B (en) * 2015-12-18 2018-02-09 天津胜富辉嘉科技有限公司 A kind of traverse displacement unit for overhead traveling crane
CN106865409B (en) * 2017-03-21 2018-03-27 中国十七冶集团有限公司 The modularization hanging method of extra-high voltage experiment hall barricade
CN107055361B (en) * 2017-05-16 2019-04-05 北京航天发射技术研究所 A kind of steady control method of the hydraulic hoisting machine speed of service and control system
CN112225081B (en) * 2020-11-03 2022-07-19 安徽新诺精工股份有限公司 Full-protection milling machine crane
CN112357777A (en) * 2020-11-10 2021-02-12 鞍钢股份有限公司 Method for quickly replacing steel rope of hook beam of gantry crane
CN115258960B (en) * 2022-08-10 2023-11-03 大连重工环保工程有限公司 Multi-lifting-point lifting synchronous control system of floating crane

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100267A (en) * 2007-06-12 2008-01-09 烟台来福士海洋工程有限公司 Hoisting device for loop wheel machine
CN201433053Y (en) * 2009-07-10 2010-03-31 大连华锐股份有限公司 Multiple-lifting-lug hoisting machine

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100267A (en) * 2007-06-12 2008-01-09 烟台来福士海洋工程有限公司 Hoisting device for loop wheel machine
CN201433053Y (en) * 2009-07-10 2010-03-31 大连华锐股份有限公司 Multiple-lifting-lug hoisting machine

Also Published As

Publication number Publication date
CN101607676A (en) 2009-12-23

Similar Documents

Publication Publication Date Title
CN101607676B (en) Multi-suspension-centres crane
CN201433053Y (en) Multiple-lifting-lug hoisting machine
US3519101A (en) Construction elevator system
RU2492134C1 (en) Traveler
CN107201721A (en) A kind of suspension cable construction method of installation
CN209721399U (en) A kind of single failure protection lifting mechanism
KR101239990B1 (en) Mini crane
CN109137758A (en) A kind of self-anchored suspension bridge cable construction technology
CN201560066U (en) Novel light loading and unloading gantry crane
CN107344697A (en) Cable boom hoisting
CN107032245A (en) A kind of head sheave automatic force regulating device and method of extra deep shaft duplex type lifting system
CN113291990A (en) Constant tension ship displacement measuring device
CN105645275B (en) Cable hoist and its construction method
CN101613057B (en) Hoisting mechanism of multi-lifting-point joint crane
CN102061681B (en) Fixed dual-hoisting point cantilever track type joist truss installing method
CN216785553U (en) Eccentric load synchronous constant-speed conveying device for continuous casting slab lifting trolley
CN210286533U (en) Hydraulic dragging lifting type single-beam steel wire rope crane
CN214114594U (en) Elevator suitable for port
CN112744665B (en) Method for roping an elevator
CN114835025A (en) Manned carrying vertical shaft elevator
CN107311048A (en) Cable crane
CN110409398B (en) Full-balance friction-driven vertical ship lift suitable for heavy-load high-lift application
CN101607675B (en) Operating mechanism of multi-suspension-centres crane
CN207090834U (en) Cable boom hoisting
CN207738303U (en) A kind of generator unit stator lifting steering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: DALIAN HUARUI HEAVY INDUSTRY GROUP CO., LTD.

Free format text: FORMER OWNER: DALIAN HUARUI CO., LTD.

Effective date: 20120803

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120803

Address after: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Applicant after: Dalian Huarui Heavy Industry Group Co., Ltd.

Address before: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Applicant before: Huarui Co., Ltd., Dalian

C14 Grant of patent or utility model
GR01 Patent grant