CN101607303A - Novel method for anchoring hot-cast anchor - Google Patents

Novel method for anchoring hot-cast anchor Download PDF

Info

Publication number
CN101607303A
CN101607303A CNA2008100393429A CN200810039342A CN101607303A CN 101607303 A CN101607303 A CN 101607303A CN A2008100393429 A CNA2008100393429 A CN A2008100393429A CN 200810039342 A CN200810039342 A CN 200810039342A CN 101607303 A CN101607303 A CN 101607303A
Authority
CN
China
Prior art keywords
anchor
panel
hot
steel wire
novel method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100393429A
Other languages
Chinese (zh)
Inventor
李刚
罗国强
张海良
卢斌
张晓昱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Pujiang Cable Co Ltd
Zhejiang Pujiang Cable Co Ltd
Original Assignee
Shanghai Pujiang Cable Co Ltd
Zhejiang Pujiang Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Pujiang Cable Co Ltd, Zhejiang Pujiang Cable Co Ltd filed Critical Shanghai Pujiang Cable Co Ltd
Priority to CNA2008100393429A priority Critical patent/CN101607303A/en
Publication of CN101607303A publication Critical patent/CN101607303A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention relates to the method in a kind of mechanical casting technology field, specifically is a kind of novel method for anchoring hot-cast anchor.Mainly comprise step: (1) produces wire sub-panel according to steel wire quantity and anchor cup size; When (2) making anchor steel wire is passed wire sub-panel and carry out the branch silk; (3) fix wire sub-panel and anchor cup, control the anchor cable perpendicularity well; (4) casting pltine; (5) the anti-top after the alloy cooling.The present invention introduces the method for wire sub-panel in the hot-cast anchor, to improve the casting properties of hot-cast anchor, improve the anchoring property of hot-cast anchor rope.

Description

Novel method for anchoring hot-cast anchor
Technical field
The present invention relates to the method in a kind of mechanical casting technology field, specifically is a kind of novel method for anchoring hot-cast anchor.
Background technology
The hot-cast anchor rope is the affixed member product of hot-cast ground tackle at the cable body two ends.Cable body adopts hot-cast technology to be connected with the hot-cast ground tackle.Steel wire penetrates in the anchor cup, pours into liquid pltine in anchor cup cavity, by alloy graining to reach with cable body and the affixed purpose of ground tackle.Therefore, the contact area of the casting rate of alloy and alloy and steel wire is one of important indicator of weighing the anchoring hot-cast anchor performance.
In hot-cast anchor casting cycle in the past, spread out one by one by artificial steel wire often, and separate with easy wire netting with steel tendon.Owing to the toughness reason of steel wire self, scattered steel wire all can produce by a small margin " playback " phenomenon (steel wire of bunchy all can be in various degree after scattering return when the script bunchy position), will cause dispersion effect not ideal enough like this.Simultaneously,, occur the phenomenon that several steel wires become thigh easily, be unfavorable for the casting of alloy like this for the many situations of steel wire quantity.And divide silk inhomogeneous, it is stressed to influence anchoring.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, a kind of novel method for anchoring hot-cast anchor is provided.The present invention introduces the method for wire sub-panel in the hot-cast anchor, to improve the casting properties of hot-cast anchor, improve the anchoring property of hot-cast anchor rope.
The present invention is achieved by the following technical solutions, the present invention includes following steps:
(1), produces wire sub-panel according to steel wire quantity and anchor cup size;
When (2), making anchor steel wire is passed wire sub-panel and carry out the branch silk;
(3), fix wire sub-panel and anchor cup, control the anchor cable perpendicularity well;
(4), casting pltine;
(5), the anti-top after the alloy cooling.
Described step (1) is specially: according to the drag-line specification, determine steel wire quantity and ground tackle size, corresponding wire sub-panel is produced in design.
Dug many apertures on the described wire sub-panel, the quantity in hole is the same with steel wire quantity, and the arrangement mode in hole is also corresponding with drag-line steel wire arrangement mode.
Described step (2) is specially: according to anchor cup size, divest the PE sheath of cable body two ends certain-length, exposed drag-line is stretched in the anchor cup, and steel wire penetrated in the corresponding wire sub-panel hole one by one carry out the branch silk, want rule evenly when penetrating.
Described step (3) is specially: anchor cup and wire sub-panel are fixed on the casting bed, guarantee the perpendicularity between anchor cup and the drag-line, should be controlled at 90 ± 0.5 degree.
Described step (4) is specially: with the pltine fusing, the pltine under the molten condition is poured in the anchor cup cavity finish the casting operation then.
Described step (5) is specially: after treating the alloy cooling, from anchor cup rear end the alloy body of casting is carried out roof pressure with the power more than or equal to 0.45~0.6 times of nominal Breaking load.
Compared with prior art, the present invention has following beneficial effect:
1, the introducing of wire sub-panel has improved the deployment conditions of steel wire, and the contact area of steel wire and alloy is increased, and makes that simultaneously alloy is more prone to pour into, and can improve the casting rate of alloy, thereby improves anchoring property.
2, the introducing of wire sub-panel makes the deployment conditions of steel wire more regular, more even, also makes ground tackle and being connected of cable body stressed more even, thereby improves anchoring.
Description of drawings
Fig. 1 each member schematic diagram for relating in the hot-cast technology of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing embodiments of the invention are elaborated: present embodiment has provided detailed embodiment being to implement under the prerequisite with the technical solution of the present invention, but protection scope of the present invention is not limited to following embodiment.
As shown in Figure 1, present embodiment comprises:
1. produce wire sub-panel 1 according to steel wire quantity and anchor cup size.According to the drag-line specification, determine steel wire 3 quantity and ground tackle size, corresponding wire sub-panel 1 is produced in design.Dug many apertures on the wire sub-panel 1, the quantity in hole is the same with steel wire 3 quantity, and the arrangement mode in hole is also corresponding with drag-line steel wire arrangement mode.
When 2, making anchor steel wire 3 is passed wire sub-panel and carry out the branch silk.The system anchor according to anchor cup size, divests the PE sheath of cable body two ends certain-length.Exposed drag-line is stretched in the anchor cup, and steel wire 3 penetrated in corresponding wire sub-panel 1 hole one by one carry out the branch silk, want rule evenly when penetrating.
3, fix wire sub-panel and anchor cup, control the anchor cable perpendicularity well.Anchor cup and wire sub-panel 1 are fixed on the casting bed, guarantee the perpendicularity between anchor cup and the drag-line, should be controlled at (90 ± 0.5) °.
4, casting pltine 2.With the pltine fusing, the pltine under the molten condition is poured in the anchor cup cavity 4 finish the casting operation then.
5, the anti-top after the alloy cooling.After treating the alloy cooling, the alloy body of casting is carried out roof pressure with the power that is not less than 0.45~0.6 times of nominal Breaking load from anchor cup rear end.
The introducing of wire sub-panel has improved the deployment conditions of steel wire, and the contact area of steel wire and alloy is increased, and makes that simultaneously alloy is more prone to pour into, and can improve the casting rate of alloy, thereby improves anchoring property.The introducing of wire sub-panel makes the deployment conditions of steel wire more regular, more even, also makes ground tackle and being connected of cable body stressed more even, thereby improves anchoring.

Claims (7)

1. a novel method for anchoring hot-cast anchor is characterized in that, comprises the steps:
(1), produces wire sub-panel according to steel wire quantity and anchor cup size;
When (2), making anchor steel wire is passed wire sub-panel and carry out the branch silk;
(3), fix wire sub-panel and anchor cup, control the anchor cable perpendicularity well;
(4), casting pltine;
(5), the anti-top after the alloy cooling.
2. novel method for anchoring hot-cast anchor as claimed in claim 1 is characterized in that, described step (1) is specially: according to the drag-line specification, determine steel wire quantity and ground tackle size, corresponding wire sub-panel is produced in design.
3. as claim 1 or 2 described novel method for anchoring hot-cast anchor, it is characterized in that dug many apertures on the described wire sub-panel, the quantity in hole is the same with steel wire quantity, and the arrangement mode in hole is also corresponding with drag-line steel wire arrangement mode.
4. novel method for anchoring hot-cast anchor as claimed in claim 1, it is characterized in that, described step (2), be specially: according to anchor cup size, divest the PE sheath of cable body two ends certain-length, exposed drag-line is stretched in the anchor cup, and steel wire penetrated in the corresponding wire sub-panel hole one by one carry out the branch silk, want rule evenly when penetrating.
5. novel method for anchoring hot-cast anchor as claimed in claim 1 is characterized in that, described step (3) is specially: anchor cup and wire sub-panel are fixed on the casting bed, guarantee the perpendicularity between anchor cup and the drag-line, should be controlled at 90 ± 0.5 degree.
6. novel method for anchoring hot-cast anchor as claimed in claim 1 is characterized in that, described step (4) is specially: with the pltine fusing, the pltine under the molten condition is poured in the anchor cup cavity finish the casting operation then.
7. novel method for anchoring hot-cast anchor as claimed in claim 1 is characterized in that, described step (5) is specially: after treating the alloy cooling, from anchor cup rear end the alloy body of casting is carried out roof pressure with the power more than or equal to 0.45~0.6 times of nominal Breaking load.
CNA2008100393429A 2008-06-20 2008-06-20 Novel method for anchoring hot-cast anchor Pending CN101607303A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100393429A CN101607303A (en) 2008-06-20 2008-06-20 Novel method for anchoring hot-cast anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100393429A CN101607303A (en) 2008-06-20 2008-06-20 Novel method for anchoring hot-cast anchor

Publications (1)

Publication Number Publication Date
CN101607303A true CN101607303A (en) 2009-12-23

Family

ID=41481300

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100393429A Pending CN101607303A (en) 2008-06-20 2008-06-20 Novel method for anchoring hot-cast anchor

Country Status (1)

Country Link
CN (1) CN101607303A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103752799A (en) * 2014-01-03 2014-04-30 广东坚朗五金制品股份有限公司 Hot-casting anchoring method of stainless steel cables
CN105239507A (en) * 2015-10-28 2016-01-13 上海市城市建设设计研究总院 Steering gear of cable member
CN106216637A (en) * 2016-09-13 2016-12-14 巨力索具股份有限公司 A kind of horizontal teemer of hot-cast anchor rope is filled with and casting method
CN108118616A (en) * 2016-11-29 2018-06-05 上海浦江缆索股份有限公司 Aluminum cald steel wire main cable strand and its manufacturing method
CN111535174A (en) * 2020-04-27 2020-08-14 东南大学 Dispersion anchoring device and dispersion anchoring method suitable for large-tonnage FRP inhaul cable
CN112091197A (en) * 2020-09-16 2020-12-18 湖南湘电动力有限公司 Casting method for filling inert gas into casting body for protection
CN114192745A (en) * 2021-11-05 2022-03-18 江苏法尔胜缆索有限公司 Novel main cable strand anchor grouting method for suspension bridge

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103752799A (en) * 2014-01-03 2014-04-30 广东坚朗五金制品股份有限公司 Hot-casting anchoring method of stainless steel cables
CN103752799B (en) * 2014-01-03 2016-06-29 广东坚朗五金制品股份有限公司 Stainless steel cable heat casting anchoring process
CN105239507A (en) * 2015-10-28 2016-01-13 上海市城市建设设计研究总院 Steering gear of cable member
CN106216637A (en) * 2016-09-13 2016-12-14 巨力索具股份有限公司 A kind of horizontal teemer of hot-cast anchor rope is filled with and casting method
CN108118616A (en) * 2016-11-29 2018-06-05 上海浦江缆索股份有限公司 Aluminum cald steel wire main cable strand and its manufacturing method
CN108118616B (en) * 2016-11-29 2019-12-03 上海浦江缆索股份有限公司 Aluminum cald steel wire main cable strand and its manufacturing method
CN111535174A (en) * 2020-04-27 2020-08-14 东南大学 Dispersion anchoring device and dispersion anchoring method suitable for large-tonnage FRP inhaul cable
CN112091197A (en) * 2020-09-16 2020-12-18 湖南湘电动力有限公司 Casting method for filling inert gas into casting body for protection
CN112091197B (en) * 2020-09-16 2021-07-23 湖南湘电动力有限公司 Casting method for filling inert gas into casting body for protection
CN114192745A (en) * 2021-11-05 2022-03-18 江苏法尔胜缆索有限公司 Novel main cable strand anchor grouting method for suspension bridge

Similar Documents

Publication Publication Date Title
CN101607303A (en) Novel method for anchoring hot-cast anchor
CN202401772U (en) Supporting lug with clip top pressing and top loosing functions and clip limit
CN106401196A (en) Steel strand tensioning device for pre-stressed anchorage device
CN201943000U (en) Chill casting anchorage device equipped with spherical surface wire separating plate
CN201679149U (en) Device for middle connection and tension of steel stands
CN202830736U (en) Bundle combing device for steel strands
CN203715978U (en) Nylon strand steel rope
CN205029257U (en) Cable stainless steel ribbon
CN205583563U (en) Cable fixing frame for helicopter
CN211446603U (en) Health monitoring applicable bridge inhaul cable based on fiber Bragg grating sensing technology
CN208815415U (en) A kind of steel strand penetrating device
CN204780602U (en) Prestress wire overspeed device tensioner
CN201539103U (en) Detachable inner-clamping jack
CN207611622U (en) A kind of core wire of twisted wire, a kind of core of twisted wire and a kind of twisted wire
CN201377331Y (en) Full-length pressure grouting anchor rod
CN205669319U (en) A kind of prestressing force penetrating device
CN106555499A (en) Existing single loop strain insulator steel tower cable draws lower beam
CN204039899U (en) A kind of pontoon bridge grappling plough anchor
CN204984457U (en) Anchor rope prevents that curved scissors destroys rigging and prevents that curved scissors destroys anchor rope support system
CN205583568U (en) Helicopter cable fixed bolster
CN201266128Y (en) Security anchor withdrawing apparatus adopting double-anchor structure
CN2695525Y (en) Special anchoring device for
CN215442722U (en) Anchoring device for unbonded steel strand
CN204891015U (en) Fire extinguishing systems gas control device
CN205171538U (en) Built -in fitting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20091223