CN101597906A - 一种挡土挡水支护构造的施工方法 - Google Patents

一种挡土挡水支护构造的施工方法 Download PDF

Info

Publication number
CN101597906A
CN101597906A CNA2009100408664A CN200910040866A CN101597906A CN 101597906 A CN101597906 A CN 101597906A CN A2009100408664 A CNA2009100408664 A CN A2009100408664A CN 200910040866 A CN200910040866 A CN 200910040866A CN 101597906 A CN101597906 A CN 101597906A
Authority
CN
China
Prior art keywords
stake hole
phase
phase stake
water
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100408664A
Other languages
English (en)
Inventor
蒋学文
洪三金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG PROV FOUNDATION ENGINEERING Co
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CNA2009100408664A priority Critical patent/CN101597906A/zh
Publication of CN101597906A publication Critical patent/CN101597906A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种挡土挡水支护构造的施工方法,其包括以下步骤:a)通过成孔机械在地表面施作互相间隔略大于1根桩的第一期桩孔,第一期桩孔内放入刚性筋并浇筑水下混凝土;b)通过成孔机械在第一期桩孔之间施作第二期桩孔;c)通过成孔机械将第二期桩孔与第一期桩孔之间的土体清除形成第三期桩孔;d)在第二期桩孔内下放刚性筋;e)在第二期桩孔和第三期桩孔内同时浇筑水下混凝土形成密贴单排咬合连续的挡土挡水支护构造;本发明由于采用素混凝土作为挡水连接构件,使得排桩整体呈咬合搭接连续,可以完整地阻断地下水的通路,可以起到很好的止水效果,为地下工程安全、顺利地施工提供了保证。

Description

一种挡土挡水支护构造的施工方法
技术领域
本发明涉及建筑工程技术领域,特别是涉及一种挡土挡水支护构造的施工方法。
背景技术
在支护结构中,通常采用排桩作为挡土的受力构件,承受土体和水的压力,由于排桩之间有一定的间距,通常是10~40厘米,因此,地下水仍可通过其间隙进入挖土一侧,因此,需要在桩的外侧另外施做一排或多排咬合连续的水泥土止水桩,或在桩与桩之间的外侧施做不连续的水泥土止水桩来进行挡水。然而,这种方法普遍存在着这样的问题:一、水泥土桩通常有两种形式,一种为搅拌水泥和土体形成的水泥土桩(搅拌桩),另一种为水泥浆喷射切割土体形成的水泥土桩(旋喷桩),水泥土桩在地下存在动水压力或成桩深度过大的情况下,往往成桩不完整,甚至不能成桩,造成挡水失败;二、旋喷桩在不同的地层深度,其成桩直径是不同的,通常形成上大下小的胡萝卜状或葫芦串状,因此,其挡土效果也往往欠佳;三、实际工程中,在具有较厚的透水地层的情况下,采用排桩+水泥土挡水的支护结构形式往往容易失败。
发明内容
为了克服现有技术的不足,本发明提供一种造价低、止水效果好的挡土挡水支护构造的施工方法。
本发明解决其技术问题所采用的技术方案是:
一种挡土挡水支护构造的施工方法,其包括以下步骤:
a)通过成孔机械在地表面施作互相间隔略大于1根桩的第一期桩孔,第一期桩孔内放入刚性筋并浇筑水下混凝土;
b)通过成孔机械在第一期桩孔之间施作第二期桩孔;
c)通过成孔机械将第二期桩孔与第一期桩孔之间的土体清除形成第三期桩孔;
d)在第二期桩孔内下放刚性筋;
e)在第二期桩孔和第三期桩孔内同时浇筑水下混凝土形成密贴单排咬合连续的挡土挡水支护构造。
本发明的有益效果是:本发明由于采用素混凝土作为挡水连接构件,使得排桩整体呈咬合搭接连续,可以完整地阻断地下水的通路,可以起到很好的止水效果,为地下工程安全、顺利地施工提供了保证;同时本发明不需要在桩外侧施工水泥土挡水构件,较大程度地节省了成本,另外,本发明适应于各种土层,从而可以广泛应用于挡土挡水支护结构上。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本挡土挡水支护构造的结构示意图。
具体实施方式
参照图1,一种挡土挡水支护构造的施工方法,其包括以下步骤:
a)通过成孔机械在地表面施作互相间隔略大于1根桩的第一期桩孔1,第一期桩孔1内放入刚性筋11并浇筑水下混凝土;
b)通过成孔机械在第一期桩孔1之间施作第二期桩孔2;
c)通过成孔机械将第二期桩孔2与第一期桩孔1之间的土体清除形成第三期桩孔3;
d)在第二期桩孔2内下放刚性筋21;
由于第一期桩孔1和第二期桩孔2内设置有刚性筋11、21,以承受水土压力所产生的弯矩和剪力。
e)在第二期桩孔2和第三期桩孔3内同时浇筑水下混凝土形成密贴单排咬合连续的挡土挡水支护构造。
第三期桩孔3内不设置刚性筋,起到阻断水、砂的渗流通道,产生挡水作用。
步骤a)、b)、c)施作桩孔时进行泥浆护壁;通过以上步骤形成单排混凝土咬合连续的桩体,开挖基坑一侧的土方,并根据工况计算需要设置一定的冠梁、内支撑或锚拉。
本发明由于采用素混凝土作为挡水连接构件,使得排桩整体呈咬合搭接连续,可以完整地阻断地下水的通路,可以起到很好的止水效果,为地下工程安全、顺利地施工提供了保证;同时,本发明不需要在桩外侧施工水泥土挡水构件,较大程度地节省了成本,另外,本发明适应于各种土层,从而可以广泛应用于挡土挡水支护结构上。

Claims (2)

1.一种挡土挡水支护构造的施工方法,其特征在于:包括以下步骤:
a)通过成孔机械在地表面施作互相间隔略大于1根桩的第一期桩孔(1),第一期桩孔(1)内放入刚性筋(11)并浇筑水下混凝土;
b)通过成孔机械在第一期桩孔(1)之间施作第二期桩孔(2);
c)通过成孔机械将第二期桩孔(2)与第一期桩孔(1)之间的土体清除形成第三期桩孔(3);
d)在第二期桩孔(2)内下放刚性筋(21);
e)在第二期桩孔(2)和第三期桩孔(3)内同时浇筑水下混凝土形成密贴单排咬合连续的挡土挡水支护构造。
2.根据权利要求1所述的一种挡土挡水支护构造的施工方法,其特征在于:所述步骤a)、b)、c)施作桩孔时进行泥浆护壁。
CNA2009100408664A 2009-07-06 2009-07-06 一种挡土挡水支护构造的施工方法 Pending CN101597906A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100408664A CN101597906A (zh) 2009-07-06 2009-07-06 一种挡土挡水支护构造的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100408664A CN101597906A (zh) 2009-07-06 2009-07-06 一种挡土挡水支护构造的施工方法

Publications (1)

Publication Number Publication Date
CN101597906A true CN101597906A (zh) 2009-12-09

Family

ID=41419493

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100408664A Pending CN101597906A (zh) 2009-07-06 2009-07-06 一种挡土挡水支护构造的施工方法

Country Status (1)

Country Link
CN (1) CN101597906A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215949A (zh) * 2013-04-28 2013-07-24 中铁上海工程局有限公司 一种咬合钻孔灌注桩及其施工方法
CN103556634A (zh) * 2013-09-29 2014-02-05 国鼎(南通)管桩有限公司 高强预应力组合支护桩
CN103556633A (zh) * 2013-09-29 2014-02-05 国鼎(南通)管桩有限公司 高强异型预应力组合支护桩
CN110080238A (zh) * 2018-12-07 2019-08-02 深圳市工勘岩土集团有限公司 深厚松散填石层咬合桩一荤二素组合式成桩方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215949A (zh) * 2013-04-28 2013-07-24 中铁上海工程局有限公司 一种咬合钻孔灌注桩及其施工方法
CN103215949B (zh) * 2013-04-28 2016-02-24 中铁上海工程局集团有限公司 一种咬合钻孔灌注桩及其施工方法
CN103556634A (zh) * 2013-09-29 2014-02-05 国鼎(南通)管桩有限公司 高强预应力组合支护桩
CN103556633A (zh) * 2013-09-29 2014-02-05 国鼎(南通)管桩有限公司 高强异型预应力组合支护桩
CN110080238A (zh) * 2018-12-07 2019-08-02 深圳市工勘岩土集团有限公司 深厚松散填石层咬合桩一荤二素组合式成桩方法

Similar Documents

Publication Publication Date Title
CN105178326B (zh) 上软下硬富水地层基坑工程围护结构止水方法
CN102286984A (zh) 一种止水帷幕及其施工方法
CN103882881A (zh) 水下深入岩承台施工方法
CN104674827A (zh) 一种富水地层基坑新型全封闭止水体系及施工方法
CN107489158A (zh) 一种旋挖成孔搅喷水泥土咬合帷幕桩的施工方法
CN108797641A (zh) 一种地铁暗挖车站施工期间全车站止水的结构及其施工方法
CN102926392A (zh) 一种基坑降水系统及其施工方法
CN202194149U (zh) 一种止水帷幕
CN101597906A (zh) 一种挡土挡水支护构造的施工方法
CN204530730U (zh) 一种富水地层基坑新型全封闭止水体系
CN104131566B (zh) 一种地下室无水平支撑基坑的施工方法
CN107489106A (zh) 一种岩石河床水中承台施工方法
CN102839661A (zh) 旋搅喷射锚管桩施工工艺
CN104074183A (zh) 一种钻孔及根部注入砼的组合桩植桩结构及施工方法
CN104563129A (zh) 一种桩身设有加芯水平旋喷桩的双排桩结构
CN107700508A (zh) 一种型钢搅喷水泥土帷幕支护桩的施工方法
CN203307824U (zh) 高层建筑基坑支护结构
CN105113492A (zh) 一种适用于粘性土、砂土、粉土地基的组合桩施工方法
CN102943480B (zh) 一种黄土基坑支护方法
CN204530736U (zh) 高压灌浆环状格栅型基坑隔水帷幕
CN103243721A (zh) 软弱地质条件下高层建筑筏板基础及核心筒开挖施工方法
CN106567382B (zh) 一种碎石层中的基坑帷幕施工方法
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN105350544A (zh) 用于含有块石区域的止水帷幕及其施工方法
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20091209