CN101581198A - Overhead hoisting and butt-joint method for box-type headframe - Google Patents

Overhead hoisting and butt-joint method for box-type headframe Download PDF

Info

Publication number
CN101581198A
CN101581198A CNA2009101166516A CN200910116651A CN101581198A CN 101581198 A CN101581198 A CN 101581198A CN A2009101166516 A CNA2009101166516 A CN A2009101166516A CN 200910116651 A CN200910116651 A CN 200910116651A CN 101581198 A CN101581198 A CN 101581198A
Authority
CN
China
Prior art keywords
headframe
derrick
box
main body
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009101166516A
Other languages
Chinese (zh)
Other versions
CN101581198B (en
Inventor
吴信远
方体利
李世军
刘炳炎
郭保国
刘宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA COAL SEVENTY-ONE ENGINEERING DEPARTMENT
China Coal No 3 Construction Group Co Ltd
Original Assignee
CHINA COAL SEVENTY-ONE ENGINEERING DEPARTMENT
China Coal No 3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA COAL SEVENTY-ONE ENGINEERING DEPARTMENT, China Coal No 3 Construction Group Co Ltd filed Critical CHINA COAL SEVENTY-ONE ENGINEERING DEPARTMENT
Priority to CN2009101166516A priority Critical patent/CN101581198B/en
Publication of CN101581198A publication Critical patent/CN101581198A/en
Application granted granted Critical
Publication of CN101581198B publication Critical patent/CN101581198B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to an overhead and butt-joint method for a box-type headframe, which is characterized in that the method comprises the following steps of: a. manufacturing the box-type headframe as two parts: a mainbody headframe (1) and a hoisting headframe (5); b. installing a well head vertical frame (8) and the mainbody headframe (1) at the proper place according to a normal installation method; c. adopting a hoisting equipment to hoist the hoisting headframe (5) so as to carry out butt-joint positioning with the mainbody headframe along a positioning block; and d. welding the joint of the hoisting headframe and the mainbody headframe, thus forming the box-type headframe entirety. The method has the advantages of: 1. manufacturing and installing the box-type haedframe by section, breaking through the traditional hoisting process, thus reducing the space occupying of the construction field; 2. carrying out installation without stopping production, thus avoiding the loss due to production stopping; and 3. being capable of being applied to the technical renovation engineering of old coal mine and reducing the removal expense of the original building and the loss owning to production stopping.

Description

Box-type headframe lifts docking calculation in the air
Technical field
The technical field that the box-type headframe that the present invention relates to use in colliery, the metal mine lifts under the particularly very narrow on construction ground situation, is engaged in the hoisting of large-scale box type derrick.
Background technology
At present, domestic all is to adopt disposable integral body directly to be lifted by crane traditional hoisting with derrick, but under the very narrow occasion in some well head places, because the box-type headframe entire length has surpassed the well head place, cause and can't on-the-spot integral body make box-type headframe, let alone the integral hoisting box-type headframe.As Turkey's Ku Zilu colliery auxiliary shaft Hoisting System is the technological transformation project in this colliery, the very narrow and moulding in job site, execution conditions are subjected to serious restriction, derrick lifting has been the difficult problem of whole Hoisting System project installation since this project is submitted a tender always, and the well head construction plant is narrow especially, resemble that this execution conditions can not see at home, moreover, the owner require construction period its mine car and the road of automobile fortune coal must guarantee unimpededly in construction period, can not cause full ore deposit to stop production.Extensively retrieve at the problems referred to above, do not find relevant solution as yet.
Summary of the invention
Purpose of the present invention is exactly to surpass under the occasion in well head place the problem how box-type headframe is installed, a kind of segmental hoisting structure and the hanging method thereof of proposition in order to solve in box-type headframe length.
To achieve these goals, the present invention has adopted following technical scheme:
A kind of box-type headframe lifts docking calculation in the air, it is characterized in that may further comprise the steps:
A, box-type headframe is made main body derrick and lifting derrick two parts, main body derrick upper end is provided with articulated mounting and is articulated and connected with the lifting derrick, and the upper end of body derrick is provided with and lifts the locating piece that derrick cooperates, and can be provided with guiding surface on the locating piece
B, well head stand and main body derrick are in place according to conventional mounting method;
C, adopt hanging device will lift derrick to sling and dock location with the main body derrick along locating piece aloft, and make the articulated mounting on the main body derrick and lift derrick and be articulated and connected;
D, will lift derrick and main body derrick junction is welded, constitute box-type headframe integral body.
The invention has the advantages that:
1, by the segmentation of box-shaped derrick is made, installed, the hoisting that breaks traditions dwindles the occupation of land space of construction plant with this, and other building project can carry out in advance, shortens well construction period;
2, can under the ground situation that do not stop production, install, can avoid the loss that stops production;
3, can be applied in the technology innovation project of old ore deposit, reduce the demolition cost and because the loss that stops production and bring of existing building.
The present invention is further described below in conjunction with drawings and Examples.
Description of drawings:
Fig. 1 is the vertical view of main body derrick;
Fig. 2 is the vertical view of lifting derrick;
Fig. 3 is well head stand and main body derrick installation network for location;
Fig. 4 is lifting derrick and main body derrick installation network for location;
Fig. 5 is the I portion zoomed-in view of Fig. 3;
Fig. 6 is that the A of Fig. 3 is to view;
Fig. 7 is the II portion zoomed-in view of Fig. 4;
Fig. 8 is the B-B sectional view of Fig. 7.
The specific embodiment:
As shown in Figure 1 and Figure 2, because the narrow requirement that can not satisfy the derrick overall package in place is divided into two sections manufacturings with the box-shaped derrick.Shown in Figure 1 is main body derrick 1, is positioned at well head 4 centers during manufacturing, and main body derrick 1 end one side is provided with hinged seat 2, and both sides are provided with locating piece 3 in addition.Shown in Figure 2 is lifting derrick 5, and its lower surface is provided with hinged ear 6 and is connected cooperation with hinged seat 2.
As shown in Figure 3, earlier with main lead 7 pull-ups of main body derrick 1 usefulness, fixing after arrival certain altitude and the gradient; Lift by crane well head stand 8 then and be installed in well head 4, main body derrick 1 is connected with well head stand 8.The installation of well head stand and main body derrick belongs to conventional mounting method.
Main body derrick 1 upper end is a box-shaped, and the one side is provided with hinged seat 2, other side is provided with locating piece 3, and wherein the inboard of locating piece 3 is provided with guiding surface 3a, and its gradient is 1: 10, so that the lifting derrick enters the location smoothly, prevents to produce skew in butt joint.Concrete structure such as Fig. 5, shown in Figure 6.
As shown in Figure 4, adopting hanging device will lift derrick 5 slings, locating piece butt joint location on from the top along the main body derrick, and make hinged seat 2 aligned fit on the hinged ear 6 of lifting on the derrick and the main body derrick, adopt taper bearing pin 2a that hinged ear 6 is connected in hinged seat 2, the taper gradient of taper bearing pin is 1: 10, and axle is 1.5mm with the gap in hole.Concrete structure such as Fig. 7, shown in Figure 8, wherein hinged ear 6 is certain angle with hinged seat 2 and main body derrick center line.
At last, will lift derrick and main body derrick junction is welded, constitute box-type headframe integral body.In the welding process, also take following technical measures:
(1) in order to ensure hinge current stabilization in welding, carry out in strict accordance with the requirement of " code for acceptance of construction quality of steel structures " for this processing work, adopt half oxygen cutter to carry out blanking, the preceding iron rust with steel cutting zone surface of gas cutting, dirt etc. are cleaned out, slag, burr and the splash etc. at cleaning groove and edge behind the gas cutting, the work piece cut face must not have crackle, is mingled with, layering and greater than the truncation of 1mm.
(2) in order to guarantee weldquality, adopt DC welder, solder flux adopts the E4315 welding rod to weld, and welding rod should be dried at drying baker, and welding rod is put into incubator after curing, and the stability of welding arc is guaranteed in ready access upon use.
(3) in order to reduce the seam deformation of member, take symmetric method to weld for the hinge both sides, and the welding rod of symmetrical both sides, welding current are consistent, the welding rod of backing welding should adopt the welding rod of φ 3.2mm, continuous welding is adopted in the multilayer welding, the every layer of intact back of welding bead cleaning in time, welding again after the removal of defects.
Separately assemble during (4) owing to epimere and hypomere, can not accurately dock owing to assembly error in the time of might causing butt joint like this.Should fully take into account the amount of contraction of welding during its derrick epimere assembling, can determine grade size of opening of its assembling, answer appropriateness to emit the welding allowance for shrinkage according to the amount of contraction of derrick principal piece welding.After finishing, welding reexamines the location dimension of hinge up and down.
(5),, must adopt and same steel ruler be measured, to guarantee unanimity as a result, the deviation that the minimizing measurement causes for the hinge location of upper and lower section connection of derrick because separately assembling when epimere and hypomere.

Claims (1)

1, a kind of box-type headframe lifts docking calculation in the air, it is characterized in that may further comprise the steps:
A, box-type headframe is made main body derrick (1) and lifting derrick (5) two parts, the main body derrick is provided with hinge linkage with the lifting derrick, and the top of main body derrick is provided with and lifts the locating piece (3) that derrick cooperates, and locating piece is provided with guiding surface;
B, well head stand (8) and main body derrick (1) are in place according to conventional mounting method;
C, adopt hanging device will lift derrick (5) to sling and dock location with main body derrick (1) along locating piece aloft, and make the articulated mounting on the main body derrick and lift derrick and be articulated and connected;
D, will lift derrick (5) and main body derrick (1) junction and weld, constitute box-type headframe integral body.
CN2009101166516A 2009-04-25 2009-04-25 Overhead hoisting and butt-joint method for box-type headframe Expired - Fee Related CN101581198B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101166516A CN101581198B (en) 2009-04-25 2009-04-25 Overhead hoisting and butt-joint method for box-type headframe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101166516A CN101581198B (en) 2009-04-25 2009-04-25 Overhead hoisting and butt-joint method for box-type headframe

Publications (2)

Publication Number Publication Date
CN101581198A true CN101581198A (en) 2009-11-18
CN101581198B CN101581198B (en) 2011-07-27

Family

ID=41363501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101166516A Expired - Fee Related CN101581198B (en) 2009-04-25 2009-04-25 Overhead hoisting and butt-joint method for box-type headframe

Country Status (1)

Country Link
CN (1) CN101581198B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003074A (en) * 2010-10-15 2011-04-06 中国建筑第八工程局有限公司 Construction method for indoor long-span steel connecting bridge
CN102910532A (en) * 2012-05-23 2013-02-06 中煤第三建设(集团)有限责任公司 Method for butting and hoisting large box type derricks in air
CN103803394A (en) * 2014-02-20 2014-05-21 中煤第三建设(集团)有限责任公司 Hoisting method for sleeving outside of concrete headframe with vertical large box type steel structure headframe
CN104234636A (en) * 2014-09-22 2014-12-24 上海外高桥造船有限公司 Installation method for self-elevating platform derrick
CN104555756A (en) * 2015-01-26 2015-04-29 唐山开滦建设(集团)有限责任公司 Single-mast single-pulley-block lifting derrick and construction method thereof
CN106695151A (en) * 2017-03-17 2017-05-24 铜陵有色建安钢构有限责任公司 Mounting method of box type derrick
CN106736095A (en) * 2017-03-17 2017-05-31 铜陵有色建安钢构有限责任公司 A kind of aerial docking calculation of box-type headframe

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2075255U (en) * 1990-08-29 1991-04-17 兰州石油机械研究所 Ordinary h shaped steel derrick
CN2402794Y (en) * 1999-09-10 2000-10-25 中原石油勘探局机械制造总厂 special-shaped derrick

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003074A (en) * 2010-10-15 2011-04-06 中国建筑第八工程局有限公司 Construction method for indoor long-span steel connecting bridge
CN102910532A (en) * 2012-05-23 2013-02-06 中煤第三建设(集团)有限责任公司 Method for butting and hoisting large box type derricks in air
CN102910532B (en) * 2012-05-23 2014-08-13 中煤第三建设(集团)有限责任公司 Method for butting and hoisting large box type derricks in air
CN103803394A (en) * 2014-02-20 2014-05-21 中煤第三建设(集团)有限责任公司 Hoisting method for sleeving outside of concrete headframe with vertical large box type steel structure headframe
CN103803394B (en) * 2014-02-20 2015-11-18 中煤第三建设(集团)有限责任公司 The hoisting method of large-scale box type steel structure derrick erect by cement concrete headframe overcoat dress
CN104234636A (en) * 2014-09-22 2014-12-24 上海外高桥造船有限公司 Installation method for self-elevating platform derrick
CN104555756A (en) * 2015-01-26 2015-04-29 唐山开滦建设(集团)有限责任公司 Single-mast single-pulley-block lifting derrick and construction method thereof
CN104555756B (en) * 2015-01-26 2016-08-24 唐山开滦建设(集团)有限责任公司 Single mast single-sheaved block group lifting derrick and construction method thereof
CN106695151A (en) * 2017-03-17 2017-05-24 铜陵有色建安钢构有限责任公司 Mounting method of box type derrick
CN106736095A (en) * 2017-03-17 2017-05-31 铜陵有色建安钢构有限责任公司 A kind of aerial docking calculation of box-type headframe
CN106736095B (en) * 2017-03-17 2018-12-14 铜陵有色建安钢构有限责任公司 A kind of aerial interconnection method of box-type headframe

Also Published As

Publication number Publication date
CN101581198B (en) 2011-07-27

Similar Documents

Publication Publication Date Title
CN101581198B (en) Overhead hoisting and butt-joint method for box-type headframe
CN201419967Y (en) Sling for large-scale components
CN110723263B (en) Ship rudder blade refitting process
CN102953553B (en) Method for mounting large-span pipe truss by using boom luffing mechanism
CN205444937U (en) Guide tracked conveyer of arc
CN201458582U (en) Ladle turret bay transverse movement hoisting tool
CN103669665A (en) Elevation difference joint construction technology for steel bar truss floor deck construction
CN106567548B (en) Rectangular raw coal bucket is segmented installation method
CN106120664A (en) Ship lift tail-bay main gate construction method
CN216764085U (en) Be arranged in high-rise steel construction transformation component along outer fringe hoist and mount conveyer
CN105834626A (en) Vertical butt welding seam liner support and welding method
CN106049896A (en) Dismantling method for resisting impact load in high-altitude overhanging steel-structure-platform dismantling process
CN115367616A (en) Furnace shell hoisting device for blast furnace overhaul and installation and use method thereof
CN201574034U (en) Connection device for hoisting an I-shaped steel guide rail on an I-shaped steel cross beam
CN214733722U (en) Install elevator hook structure additional
CN110820518B (en) Machining and hoisting method for steel arch bridge suspender
CN208716668U (en) A kind of aluminum alloy mould plate part integral hoisting device for rapid
CN202148619U (en) Double steel plate structure scissors wall
CN219823358U (en) Hoisting guide component
CN101648679A (en) Combined type electric single-girder crane
CN218371201U (en) Hoisting device of converter dismantling machine
CN221002015U (en) High-altitude butt joint auxiliary device for large-span truss
CN218176115U (en) Novel accurate assembly of panel building wall device
CN215402619U (en) Temporary supporting node for steel beam hoisting
CN208748522U (en) A kind of dismounting device of bridge construction bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110727

Termination date: 20160425