CN101565934B CN2009101303551A CN200910130355A CN101565934B CN 101565934 B CN101565934 B CN 101565934B CN 2009101303551 A CN2009101303551 A CN 2009101303551A CN 200910130355 A CN200910130355 A CN 200910130355A CN 101565934 B CN101565934 B CN 101565934B
Authority
CN
China
Prior art keywords
geotextile
laying
underwater
ship
volume
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009101303551A
Other languages
Chinese (zh)
Other versions
CN101565934A (en
Inventor
刘凤松
顾大钊
石月亮
曹华武
于建海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
CCCC First Harbor Engineering Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, CCCC First Harbor Engineering Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN2009101303551A priority Critical patent/CN101565934B/en
Publication of CN101565934A publication Critical patent/CN101565934A/en
Application granted granted Critical
Publication of CN101565934B publication Critical patent/CN101565934B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a method for laying geotextile underwater, which includes steps of: 1. berthing the laying ship along a dike axis; 2, fastening the geotextile to be layed with rope; 3. pulling the pulley set to coil the geotextile; 4. nailing two positioning steel pipes close to the ship edge; 5. putting the geotextile down close to the steel pipes; 6. laying the geotextile coil beneath water, pressing the geotextile edge with a stone bag, then moving the ship; 7. dropping a stone bag upon a determined distance of moving; 8. recycling geotextile tube in the water; 9. pressing the terminal edge of the geotextile with a stone bag, and laying the next block of geotextile. The method for laying geotextile underwater is capable of uniformly distributing gravity onto the draining board ofthe lower layer, and the phenomenon of draining board break due to partially bearing too much force. The method for layer geotextile underwater is further capable of effectively reducing maintenancefrequency of the outer port channel, so as to reduce maintenance cost of the port.

Description

A kind of method of laying geotextile underwater
Technical field
The present invention relates to a kind of method of subaqueous construction method, particularly a kind of laying geotextile underwater.
Background technology
As shown in Figure 1, prevent from the mole basis, to set band drain 1 earlier usually in the training works of silt alluvial, re-lay the sandstone bed course afterwards at the harbour outer channel.But because building stones not of uniform size, the weight of building stones is inhomogeneous, if directly lay sandstone on band drain 1, may cause that band drain 1 is big by volume at regional area, the heavier building stones compression failure of weight.Therefore, need before laying the sandstone bed course, lay geotextile 2 (the common geotextile unit mass 〉=700g/m that lay of one deck such as geotextiles earlier 2Vertical ultimate tension 〉=200KN/m; Broadwise ultimate tension 〉=120KN/m; Joint strength 〉=40KN; Friction factor 〉=0.6 with sand), lay the sandstone bed course then on geotextile 2, geotextile 2 can be evenly distributed to the gravity of sandstone bed course on the band drain 1 of lower floor like this, avoids band drain 1 local pressure excessive, thereby is damaged.
In view of laying geotextile prevents important function in the silt alluvial regulation at the harbour outer channel, the method that is necessary to invent a kind of laying geotextile in fact is so that finish the operation of laying under water of geotextile rapidly efficiently.
Summary of the invention
Main purpose of the present invention is to be, provides a kind of and can finish the method that geotextile is laid operation under water rapidly efficiently.
To achieve these goals, the method for laying geotextile underwater of the present invention is such:
A kind of method of laying geotextile underwater, this method comprises the steps:
Step 1: lay ship and stay the position along the dike axis;
Step 2: geotextile volume bolt that will be to be laid with rope is good;
Step 3: the pulling assembly pulley, the geotextile volume is mentioned;
Step 4: set two positioning steel tubes close aboard;
Step 5: the geotextile volume is put down near steel pipe;
Step 6: the geotextile volume is put into water-bed back the geotextile limit is pressed, move ship then with the rubble bag;
Step 7: whenever move the ship certain distance and just concentrate a collection of rubble bag of throwing;
Step 8: regain the empty geotextile tube of staying in the water;
Step 9: the whole limit of geotextile is pressed with the rubble bag, carry out the laying of next piece.
As preferred implementation, utilize GPS determination step 1 described dike axis.
As preferred implementation, described geotextile the to be laid volume of step 2 is pressed the good and adjacent distance of multiple spot bolt at 2 and is equated.
As preferred implementation, the spacing of described two positioning steel tubes of step 4 is roughly 7 meters.
As preferred implementation, the described certain distance of step 7 is 4~5 meters.
Beneficial effect of the present invention is: the method for laying geotextile underwater of the present invention adopts the roller bearing laying method, can increase work efficiency, and can guarantee construction quality again.The method of laying geotextile underwater of the present invention can be evenly distributed to the gravity of sandstone bed course on the band drain of lower floor, avoids the band drain local pressure excessive and cause the phenomenon of damage.The method of laying geotextile underwater of the present invention can also effectively reduce the frequency of maintenance of harbour outer channel, thereby reduces the maintenance cost at harbour.
Description of drawings
Below, will be described in more detail the specific embodiment of the present invention in conjunction with the accompanying drawings, wherein:
Fig. 1 is the schematic diagram of laying geotextile underwater;
Fig. 2 is the flow chart of laying geotextile underwater method of the present invention.
The specific embodiment
The method of laying geotextile underwater of the present invention preferably adopts first self-propelled covered lighter with good mooring system as the laying boats and ships, each two mouthfuls of mooring system before and after the described laying boats and ships, and ship one side is joined two cover assembly pulleys, is used to transfer geotextile to be laid.In addition, also need one side by side near second self-propelled covered lighter of described laying boats and ships, this second self-propelled covered lighter is used to load the rubble bag and the double as diver uses ship.The direction in the position of described two self-propelled covered lighters is along the dike axis direction, and the centre position of two ships is lays the sideline, and the middle ware of two ships is apart from about 0.4m-0.8m, and this distance just can be put down described geotextile.After described laying boats and ships are in place, water under the diver, the geotextile that the workman will spool with steel pipe in advance along shipboard puts down.The diver pulls at geotextile laying edge in the process of above-mentioned laying geotextile, paves geotextile, afterwards the rubble bag evenly is pressed on the geotextile, and purpose is to prevent that described geotextile from being washed away and forming certain flowing water section by current.
As shown in Figure 2, the method for laying geotextile underwater of the present invention may further comprise the steps:
Step 101: lay ship and stay position (being that the ship limit is the initial sideline that geotextile is laid) along the dike axis;
Step 102: geotextile volume bolt that will be to be laid with rope is good;
Step 103: the pulling assembly pulley, the geotextile volume is mentioned;
Step 104: set two positioning steel tubes that keep at a certain distance away close aboard, preferred 7 meters of described distance;
Step 105: the geotextile rolling-in by steel pipe with assembly pulley slowly put down, entry;
Step 106: the diver is put into water-bed back with the geotextile volume and with the rubble bag geotextile limit is pressed, and commander ship's staff moves ship then, so that sprawl geotextile;
Step 107: ship whenever moves 4~5 meters and just concentrates a collection of rubble bag of throwing, has put up to geotextile;
Step 108: regain the empty geotextile tube of staying in the water;
Step 109: the diver presses the whole limit of geotextile with the rubble bag, and repeating step 101 carries out follow-up laying.
The geotextile laying method of the application of the invention can be increased work efficiency greatly, preferably utilizes GPS to measure sideline and mensuration axis lap width during laying, and it is met design requirement.

Claims (5)

1. the method for a laying geotextile underwater, this method comprises the steps:
Step 1: lay ship and stay the position along the dike axis;
Step 2: geotextile volume bolt that will be to be laid with rope is good;
Step 3: the pulling assembly pulley, the geotextile volume is mentioned;
Step 4: set two positioning steel tubes close aboard;
Step 5: the geotextile volume is put down near steel pipe;
Step 6: the geotextile volume is put into water-bed back the geotextile limit is pressed, move ship then with the rubble bag;
Step 7: whenever move the ship certain distance and just concentrate a collection of rubble bag of throwing;
Step 8: regain the empty geotextile tube of staying in the water;
Step 9: the whole limit of geotextile is pressed with the rubble bag, carry out the laying of next piece.
2. the method for laying geotextile underwater according to claim 1 is characterized in that: utilize GPS determination step 1 described dike axis.
3. the method for laying geotextile underwater according to claim 1 is characterized in that: it is equal that described geotextile the to be laid volume of step 2 is pressed the good and adjacent distance of multiple spot bolt at 2.
4. the method for laying geotextile underwater according to claim 1, it is characterized in that: the spacing of described two positioning steel tubes of step 4 is 7 meters.
5. the method for laying geotextile underwater according to claim 1, it is characterized in that: the described certain distance of step 7 is 4~5 meters.
CN2009101303551A 2008-04-24 2009-04-01 Method for laying geotextile underwater Active CN101565934B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101303551A CN101565934B (en) 2008-04-24 2009-04-01 Method for laying geotextile underwater

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200810104827 2008-04-24
CN200810104827.1 2008-04-24
CN2009101303551A CN101565934B (en) 2008-04-24 2009-04-01 Method for laying geotextile underwater

Publications (2)

Publication Number Publication Date
CN101565934A CN101565934A (en) 2009-10-28
CN101565934B true CN101565934B (en) 2011-01-05

Family

ID=41282282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101303551A Active CN101565934B (en) 2008-04-24 2009-04-01 Method for laying geotextile underwater

Country Status (1)

Country Link
CN (1) CN101565934B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088828A (en) * 2011-11-01 2013-05-08 中交上海航道局有限公司 Construction method for laying underwater geogrids
CN103485308B (en) * 2012-06-09 2015-06-10 浙江科技学院 Underwater geotextile fabric laying method
CN103046553B (en) * 2013-01-30 2014-09-03 安徽水利开发股份有限公司 Method for carrying out deepwater laying on large-volume reinforced mud-filling tubular bags by using geotextiles-laying vessels
CN103774698B (en) * 2014-02-14 2015-05-06 中国十九冶集团有限公司 Soil engineering drainage-free construction method
CN103993605B (en) * 2014-06-11 2016-06-08 安徽水利开发股份有限公司 Blow the method for filling device filling mud filling tube bag with arranging ship boat-carrying and blow filling device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4033506A1 (en) * 1990-10-21 1992-04-23 Naue Fasertechnik Underwater installation system for geotextile mats - uses combination pontoon for installation, guidance, and rockfill
CN1299903A (en) * 2000-10-30 2001-06-20 中国水利水电科学研究院 Underwater drawing, arranging and constructing process
CN1442342A (en) * 2002-03-06 2003-09-17 中港第三航务工程局 Under water flexible raft laying engineering ship and under water flexible raft laying technology
CN101033614A (en) * 2006-03-10 2007-09-12 天津港湾工程研究所 Underwater vacuum prepressing reinforcement soft base technique method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4033506A1 (en) * 1990-10-21 1992-04-23 Naue Fasertechnik Underwater installation system for geotextile mats - uses combination pontoon for installation, guidance, and rockfill
CN1299903A (en) * 2000-10-30 2001-06-20 中国水利水电科学研究院 Underwater drawing, arranging and constructing process
CN1442342A (en) * 2002-03-06 2003-09-17 中港第三航务工程局 Under water flexible raft laying engineering ship and under water flexible raft laying technology
CN101033614A (en) * 2006-03-10 2007-09-12 天津港湾工程研究所 Underwater vacuum prepressing reinforcement soft base technique method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
曹根祥等.长江口深水航道治理工程护底软体排施工成套工艺及设备的开发.水运工程.2006,(12),68-73. *
陆梅兴.航道治理工程软体排铺设船与关键技术的研究.上海海运学院硕士学位论文.2003,全文. *

Also Published As

Publication number Publication date
CN101565934A (en) 2009-10-28

Similar Documents

Publication Publication Date Title
CN101565934B (en) Method for laying geotextile underwater
CN109113020B (en) Seaport breakwater structure and construction method thereof
CN109506044A (en) A kind of pipeline under the ocean construction technology
KR101095496B1 (en) Renewal construction method of decrepit open type wharf and gravity type structure of sheet pile a wharf
CN108457355A (en) Heavy caliber combined type smears band interface rain pipe system and construction method
CN108033283A (en) A kind of great diameter and long HDPE pipelines it is land go out transportation method
CN111424716A (en) Oblique-pulling anchorage type suspension tunnel structure with relay extension of artificial island
CN111980067B (en) Construction method for long-distance conveying of immersed tube by adopting refuting process
CN106284415B (en) A kind of water intake caisson hangs floating construction method
CN103866738A (en) Rock-fill concrete construction method used for wave wall foundation platform
CN105672251B (en) A kind of underground continuous wall groove segment construction method for riding existing sewage pipe
KR20050115835A (en) Vertical drainage apparatus and method for improvement of the sea ground and dredged soil area
CN105735244B (en) A kind of underground continuous wall groove segment design and construction method for riding existing sewage pipe
KR100719069B1 (en) A bottom surface mat construction method and a bottom surface mat construction equipment using the same
KR100672815B1 (en) Sand spreader apparatus and method on water
CN205934935U (en) Novel landfill concrete building structure
CN206552222U (en) Multipurpose integrates mining island ship
JP3201907U (en) Work trolley
CN116377953B (en) Offshore wind power pile surrounding concrete slab hinge sinking bar and construction method thereof
CN111619760B (en) Assembling, butt-jointing and positioning method for large floating raft in natural river
CN114277827B (en) double-GPS positioning round caisson transportation, installation and construction method
CN209779579U (en) Drop template device
JP3788638B2 (en) Seabed ground protection method
KR200408034Y1 (en) Vertical drainage apparatus for improvement of the sea ground and dredged soil area
JPH0739647B2 (en) Method of laying waterproof sheet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant