CN101552434B - Bypass current working method - Google Patents

Bypass current working method Download PDF

Info

Publication number
CN101552434B
CN101552434B CN2008102313452A CN200810231345A CN101552434B CN 101552434 B CN101552434 B CN 101552434B CN 2008102313452 A CN2008102313452 A CN 2008102313452A CN 200810231345 A CN200810231345 A CN 200810231345A CN 101552434 B CN101552434 B CN 101552434B
Authority
CN
China
Prior art keywords
isolation switch
bar
supply line
cable
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008102313452A
Other languages
Chinese (zh)
Other versions
CN101552434A (en
Inventor
刘金超
张升学
周保民
张孝刚
白强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyang Power Supply Co of Henan Electric Power Co
Original Assignee
Xinyang Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinyang Power Supply Co of Henan Electric Power Co filed Critical Xinyang Power Supply Co of Henan Electric Power Co
Priority to CN2008102313452A priority Critical patent/CN101552434B/en
Publication of CN101552434A publication Critical patent/CN101552434A/en
Application granted granted Critical
Publication of CN101552434B publication Critical patent/CN101552434B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a bypass current working method comprising the following steps of arranging a 02# rod, a 03# rod, and a 04 #rod which are adjacent in sequence in a power supply line, wherein power supply fault exists between the 02# rod and the 03# rod; respectively installing isolation switches on the 02# rod and the 04# rod, disconnecting the isolation switch and respectively electricallyconnecting an isolation switch upper lead; paving a cable between the 02# rod and the 04# rod; electrically connecting a 02# isolation switch down lead on the 02# rod so as to lead the 02# isolation switch to be communicated with the cable; turning on the 02# isolation switch, checking the cable phase sequence, making records of a nuclear phase, and then disconnecting the 02# isolation switch; contrasting the records of the nuclear phase and then electrically connecting a 04# isolation switch down lead so as to lead the 04# isolation switch to be communicated with the cable; and finally turning on the 02# isolation switch and the 04# isolation switch sequentially after confirming the inerrability of the phase sequence. The working method not only eliminates the inconvenience caused by power outage, but also improves working efficiency and power supply reliability, thus having popularization and application value.

Description

Bypass current working method
Technical field
The present invention relates to repairing of a kind of supply line or repair method, specifically, related to a kind of bypass current working method.
Background technology
In existing live line working rules and method, generally speaking, charged montage fire all is to forbid the on-load operation; In the repairing or maintenance of supply line, this just makes existing operational method extremely complicated, and time-consuming consumption power, can't ensure the reliability of electricity consumption.
At above problem, people are seeking a kind of new technical solution always.
Summary of the invention
The objective of the invention is at the deficiencies in the prior art, thereby but provide a kind of live line working, repairing efficient height, bypass current working method that power supply reliability is strong.
To achieve these goals, the invention provides a kind of bypass current working method, adjacent successively in supply line have 02# bar, 03# bar and a 04# bar, wherein, has power supply trouble between 02# bar and the 03# bar, and this working system may further comprise the steps:
Step 1, on the 02# of supply line bar and the 04# of supply line bar, 02# isolation switch and 04# isolation switch are installed respectively, disconnect isolation switch, and charged respectively connecting on the isolation switch go between, and 02# isolation switch, 04# isolation switch one end are communicated with the supply line at 02# bar and 04# bar place respectively;
Cable laying between the 02# of supply line bar and the 04# of supply line bar, and the cable two ends are separately fixed on the 02# of supply line bar and the 04# of the supply line bar uses megohmmeter the cable line that lays is shaken whether survey insulation resistance qualified, guarantees that ground connection is good;
Step 2, send the charged 02# of the connecting isolation switch of electric side downlead, make 02# isolation switch other end communication cable one end at the 02# of supply line bar strain section;
Step 3, the 02# isolation switch that closes are checked cable other end phase sequence, and carry out the nuclear phase record, then, disconnect the 02# isolation switch again;
Step 4, contrast nuclear phase record, the charged 04# isolation switch downlead that connects makes the 04# isolation switch other end communication cable other end;
Step 5, measurement 02# bar place supply line current value, and keep a record, after the affirmation phase sequence was errorless, 02# isolation switch and 04# isolation switch successively closed;
Measure the 02# of supply line bridge ceases to be busy road and cable current value respectively, check the shunting situation, and keep a record, judge whether cable has electric current to pass through;
After step 6, affirmation cable have electric current to pass through, disconnect the 02# of supply line bar strain insulator bow line, and the lead tail colligation that will cut-off;
Step 7, the disconnection 03# of supply line bar arrive the strain insulator bow line of the 02# of supply line bar direction;
Step 8, prune job scene confirm that the 02# of supply line bar is not charged to overhead transmission line between the 03# bar, and operation is finished.
The relative prior art of the present invention has outstanding substantive distinguishing features and obvious improvement, specifically, this bypass current working method is that on-load cut-offs line load, original load is transferred in another bypass when disconnecting, do not make original line outage, and can guarantee its safe and stable operation; This method not only can solve because of the production that power failure brings, life inconvenience, and has improved operating efficiency, has also improved power supply reliability simultaneously, and it has application value.
Embodiment
Below by embodiment, technical scheme of the present invention is described in further detail.
Adjacent successively in supply line have 02# bar, 03# bar and a 04# bar, wherein, has power supply trouble between 02# bar and the 03# bar, and this bypass current working method may further comprise the steps:
Step 1, on the 02# of supply line bar and the 04# of supply line bar, 02# isolation switch and 04# isolation switch are installed respectively, disconnect isolation switch, and charged respectively connecting on the isolation switch go between, and 02# isolation switch, 04# isolation switch one end are communicated with the supply line at 02# bar and 04# bar place respectively;
Cable laying between the 02# of supply line bar and the 04# of supply line bar, and the cable two ends are separately fixed on the 02# of supply line bar and the 04# of the supply line bar uses megohmmeter the cable line that lays is shaken whether survey insulation resistance qualified, guarantees that ground connection is good;
Step 2, send the charged 02# of the connecting isolation switch of electric side downlead, make 02# isolation switch other end communication cable one end at the 02# of supply line bar strain section;
Step 3, the 02# isolation switch that closes are checked cable other end phase sequence, and carry out the nuclear phase record, then, disconnect the 02# isolation switch again;
Step 4, contrast nuclear phase record, the charged 04# isolation switch downlead that connects makes the 04# isolation switch other end communication cable other end;
Step 5, use pincers type ammeter are measured 02# bar place supply line current value, and keep a record, and after the affirmation phase sequence was errorless, 02# isolation switch and 04# isolation switch successively closed;
Use pincers type ammeter to measure the 02# of supply line bridge ceases to be busy road and cable current value respectively, check the shunting situation, and keep a record, judge whether cable has electric current to pass through;
After step 6, affirmation cable have electric current to pass through, use long handle insulation bolt clipper and insulated clamp to disconnect the 02# of supply line bar strain insulator bow line, and the lead tail colligation that will cut-off;
Step 7, use long handle insulation bolt clipper and insulated clamp disconnect the strain insulator bow line of the 03# of supply line bar to the 02# of supply line bar direction;
Step 8, prune job scene confirm that the 02# of supply line bar is not charged to overhead transmission line between the 03# bar, and operation is finished
By this operational method, transform or during overhaul, can effectively solve the problem that causes the power load loss because of whole piece line outage a certain section of a certain supply line; This method had both improved power supply reliability, improved operating efficiency again, and simultaneously, the bypass drainage has solved the technical barrier that live line working can not the on-load operation.
Economic and Efficiency Analysis: afternoon on July 11st, 2008, meet kurtosis just in the summer, total capacity is that marquis's 21 lines of 8850KVA break down, adopt this method operation, can save interruption duration 5 hours, if calculate by load 65%, only this item can reduce 15998 yuan=8950KVA of economic loss * 65% * 5H * 0.55 yuan;
Its indirect economic effect of what is more important: improved power supply reliability, reduced frequency of power cut, ensured the demand of people, changed the situation that maintenance must have a power failure, obtained good economic benefit and social benefit to electricity consumption.
Should be noted that at last: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit; Although with reference to preferred embodiment the present invention is had been described in detail, those of ordinary skill in the field are to be understood that: still can make amendment or the part technical characterictic is equal to replacement the specific embodiment of the present invention; And not breaking away from the spirit of technical solution of the present invention, it all should be encompassed in the middle of the technical scheme scope that the present invention asks for protection.

Claims (1)

1. a bypass current working method is characterized in that, adjacent successively in supply line have 02# bar, 03# bar and a 04# bar, wherein, has power supply trouble between 02# bar and the 03# bar, and this working system may further comprise the steps:
Step 1, on the 02# of supply line bar and the 04# of supply line bar, 02# isolation switch and 04# isolation switch are installed respectively, disconnect isolation switch, and charged respectively connecting on the isolation switch go between, and 02# isolation switch, 04# isolation switch one end are communicated with the supply line at 02# bar and 04# bar place respectively;
Cable laying between the 02# of supply line bar and the 04# of supply line bar, and the cable two ends are separately fixed on the 02# of supply line bar and the 04# of the supply line bar uses megohmmeter the cable line that lays is shaken whether survey insulation resistance qualified, guarantees that ground connection is good;
Step 2, send the charged 02# of the connecting isolation switch of electric side downlead, make 02# isolation switch other end communication cable one end at the 02# of supply line bar strain section;
Step 3, the 02# isolation switch that closes are checked cable other end phase sequence, and carry out the nuclear phase record, then, disconnect the 02# isolation switch again;
Step 4, contrast nuclear phase record, the charged 04# isolation switch downlead that connects makes the 04# isolation switch other end communication cable other end;
Step 5, measurement 02# bar place supply line current value, and keep a record, after the affirmation phase sequence was errorless, 02# isolation switch and 04# isolation switch successively closed;
Measure the 02# of supply line bridge ceases to be busy road and cable current value respectively, check the shunting situation, and keep a record, judge whether cable has electric current to pass through;
After step 6, affirmation cable have electric current to pass through, disconnect the 02# of supply line bar strain insulator bow line, and the lead tail colligation that will cut-off;
Step 7, the disconnection 03# of supply line bar arrive the strain insulator bow line of the 02# of supply line bar direction;
Step 8, prune job scene confirm that the 02# of supply line bar is not charged to overhead transmission line between the 03# bar, and operation is finished.
CN2008102313452A 2008-12-12 2008-12-12 Bypass current working method Expired - Fee Related CN101552434B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102313452A CN101552434B (en) 2008-12-12 2008-12-12 Bypass current working method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102313452A CN101552434B (en) 2008-12-12 2008-12-12 Bypass current working method

Publications (2)

Publication Number Publication Date
CN101552434A CN101552434A (en) 2009-10-07
CN101552434B true CN101552434B (en) 2011-08-17

Family

ID=41156483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102313452A Expired - Fee Related CN101552434B (en) 2008-12-12 2008-12-12 Bypass current working method

Country Status (1)

Country Link
CN (1) CN101552434B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103078268A (en) * 2012-12-28 2013-05-01 上海市电力公司 Uninterrupted power overhauling method of 10kV cables between two annular net cabinets
CN107525998A (en) * 2017-09-08 2017-12-29 广东电网有限责任公司东莞供电局 System and method for detecting leakage current of zinc oxide arrester
CN107505490A (en) * 2017-09-08 2017-12-22 广东电网有限责任公司东莞供电局 Method for installing current transformer at grounding down lead of operating lightning arrester
CN112242666B (en) * 2020-09-29 2022-04-19 浙江大有实业有限公司带电作业分公司 Method for replacing outgoing cable of line with radial structure
CN113328374A (en) * 2021-04-19 2021-08-31 国网浙江淳安县供电有限公司 Earth potential all-terrain on-load operation method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1224262A (en) * 1999-01-25 1999-07-28 西宁供电局 Live-wire work method for 10 KV multiloop insulated conductor

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1224262A (en) * 1999-01-25 1999-07-28 西宁供电局 Live-wire work method for 10 KV multiloop insulated conductor

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨晓翔等.带负荷更换10kV线路柱上开关的作业方法.《湖州师范学院学报》.2009,第31卷 *
王明春.10kV电缆带电作业旁路系统.《农村电气化》.2006,(第9期),第1页. *

Also Published As

Publication number Publication date
CN101552434A (en) 2009-10-07

Similar Documents

Publication Publication Date Title
CN101552434B (en) Bypass current working method
CN202103478U (en) Comprehensive intelligent distribution box
CN103311910A (en) Direct current traction power supply system and protective method
CN104158103B (en) A kind of city power distribution room quick-speed first-aid repair method
CN101064431B (en) Method for replacing 10kV distributing transformer with charge
CN204928156U (en) Distribution network bridge joint line structure
CN204732777U (en) A kind of cable line uninterrupted operation system
CN209419320U (en) Utilize the energy storage station station power use system of energy storage device
CN209183952U (en) Low-voltage capacitance compensating device and sectionalized single busbar connection system
CN102480109A (en) Method for replacing 10kV distribution line lead under load
CN104092284A (en) Working method for replacing 10kV transformer through spare power automatic switching technology in electrified mode
CN207853185U (en) The female simultaneous other system structure of substation
KR20090024035A (en) Current transformer changing method with extra transformer
CN201910386U (en) Temporary connecting device for live replacement of fuse tube of drop-out fuse
CN101145690A (en) Master-slave low-voltage distribution energy-saving device and its method
CN203812997U (en) Accumulator remote maintenance system
CN204156596U (en) A kind of transforming plant DC power supply installed nearby
CN208078616U (en) A kind of mobile outdoor repair cable distribution box
CN201868941U (en) Uninterrupted switching device for transformer substation direct-current power supply
CN204794339U (en) System for electrified adoption is hauled oneself willingly into technique fully and is replaced 10kV transformer
CN102435832A (en) Single-phase distribution transformer operation monitoring metering device
CN106549484A (en) Low-voltage platform area low-voltage power supply standby power throw-in device
CN204967416U (en) Low mutual reserve switching device in district of presenting a theatrical performance as last item on a programme
CN106019037A (en) Testing method of reliable-power-supply intelligent online leakage-protector poweroff-free testing device
CN100401611C (en) Four-way power supply equalization switched transformer station wiring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110817

Termination date: 20111212