CN101546191A - Method and system for acquiring and controlling pipelining data - Google Patents

Method and system for acquiring and controlling pipelining data Download PDF

Info

Publication number
CN101546191A
CN101546191A CN200910111378A CN200910111378A CN101546191A CN 101546191 A CN101546191 A CN 101546191A CN 200910111378 A CN200910111378 A CN 200910111378A CN 200910111378 A CN200910111378 A CN 200910111378A CN 101546191 A CN101546191 A CN 101546191A
Authority
CN
China
Prior art keywords
terminal
production
quality
router
assembly line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910111378A
Other languages
Chinese (zh)
Inventor
苏添置
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XIAMEN ZHIYING COMMUNICATION TECHNOLOGY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200910111378A priority Critical patent/CN101546191A/en
Publication of CN101546191A publication Critical patent/CN101546191A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses a system for acquiring and controlling pipelining data, which comprises an analysis device, a terminal display, a router, at least one production terminal and at least one quality terminal; the production terminal is connected with an equipment rotation sensor, a first timing piecework switch, a key and a power supply respectively; the quality terminal is connected with a second timing piecework switch, the key and the power supply respectively; the production terminal and the quality terminal are connected with the analysis device through the router and send the acquired information to the analysis device respectively; and the analysis device sends an instruction to the terminal display through the router. The system can realize real-time monitoring, has objective and accurate analytic result and improves the training and production efficiency. The invention also discloses a method for acquiring and controlling the pipelining data.

Description

Assembly line work data acquisition and management-control method and system
Technical field
The present invention relates to data acquisition and management and control, particularly a kind of data collection and analysis system that is applied in pipelining.
Background technology
Refinement along with the division of labor, most of at present production or manufacturing all adopt pipelining, as sewing or the manufacturing shop, in order to realize the maximization of production efficiency, the supvr always combines the production efficiency of rewards and punishments mechanism with the operative employee, comprehensive consideration operative employee's product performance and qualification rate, in addition, the factory that has also can often hold professional training etc., teach the main points of operation and the method for enhancing productivity to operative employees, yet Guan Li drawback is like this: because each operative employee's working method difference, it is different to produce custom, the reason that often influences production efficiency is also different, but the supvr merely determines its ability to work by operative employee's throughput rate, and it is carried out elementary or intermediate training etc., can not fundamentally improve operative employee's deficiency, the result is often got half the result with twice the effort; Although a lot of workshops all can carry out commenting in week, the moon is commented etc., arrange the streamline supvr with making form such as each operative employee's working condition and report, but because the difference of personal like and evaluation criterion, the result often loses deviation, can not accomplish practical fully, thereby influence the raising of productivity effect.
In order to understand each operative employee's working condition targetedly, be convenient to detail knowledge and cause the ineffective reason of each operative employee, the supvr needs the overall process parameter of production process is followed the tracks of understanding, and the analysis-by-synthesis condition of production, thereby make the adjustment of corresponding work flow process or the system of rewards and penalties, the concrete data that need understand and the mode of obtaining data are (is example with the tailoring workshop at this):
(1) at data collection station the rotation sensing apparatus is set, utilizes its rotation data of gathering the sewing operation equipment machine, thereby judge this operative employee's whether running at full capacity of proficiency, equipment machine;
(2) product whenever finishing of operative employee all can a corresponding unique bar code, by at data collection station pick-up slip font code, and obtains the information that the operative employee produces product;
(3) at data collection station camera is installed, utilize the video acquisition of camera, obtain the operation image data of operative employee in the process of producing corresponding product, thus can be when quality problems occurring, judge the link that goes wrong easily, and carry out timely and correct correction;
(4) by detecting the triggering situation of the various buttons of data collection station, gather relevant data message, the correlation circumstance of evaluation and test operative employee entry information;
(5) install the first time and piece counting switch at data collection station, when the operative employee takes off or when sending product from streamline, this behavior all can be by the aforementioned first time and piece counting inductive switching, thereby can obtain operative employee's the practical operation time and finish the product quantity data;
(6) work, the operation by the color monitor indicating command operative employee on the data collection station requires graph text informations such as image, operation technological requirement (job instruction), various point-to-point notice and warning;
(7) supvr utilizes connection various electronic boards on computers, and various information are transmitted in commander's work on the spot;
(8) three look warning lamps are connected with data collection station, and when sending various instructions and information, the flicker of corresponding respectively control different frequency and the light of different colours;
(9) with aforementioned all data that on data collection station, collect, all import in the software analysis disposal system, carry out data statistic analysis and issue.
Yet, although aforementioned each several part device can be complete with operative employee's all parameter acquisitions in process of production, yet it is the distributed collection data, and have only when the supvr specially goes to inquire about, just can obtain all data, these data are not real-time transmission, thereby do not have a real-time, for example when the supvr finds that the operative employee reports the machinery and equipment fault, urge the service worker place under repair, however the fault that this moment might equipment machine be excluded, it is untimely to cause the supvr to feed back, the workman has done a lot of idle works, the production cost height.
In view of this, the inventor studies improvement at present data acquisition, monitoring and analysing terminal system, and this case produces thus.
Summary of the invention
Fundamental purpose of the present invention is to provide a kind of assembly line work data acquisition and management-control method and system, and it can realize real-time monitoring, and analysis result is objective, accurate, enhancement training and production efficiency.
In order to reach above-mentioned purpose, solution of the present invention is:
A kind of assembly line work data acquisition and management-control method comprise the steps: rotation data, time and piece counting and the button trigger message of (1) acquisition stream waterline implement machine; (2) aforementioned data and information are handled, obtained average revolution, stop frequency, running time, quality status and the working condition of equipment; (3) according to aforementioned result the operative employee on the streamline is sent steering order.
In the above-mentioned steps (1), also gather the operation video of whole operative employees on the whole piece streamline.
In the above-mentioned steps (2), also the operation video is carried out segmentation, and integrate the production procedure video that becomes respectively corresponding each part product.
A kind of assembly line work data acquisition and managing and control system comprise an analytical equipment, a terminal display, a router, at least one production terminal and at least one quality terminal; Aforementioned production terminal is connected with equipment rotation sensor, the first time and piece counting switch, button and power supply respectively, and the quality terminal connects the second time and piece counting switch, button and power supply respectively; The production terminal is connected with analytical equipment via router with the quality terminal, and respectively the information that collects is sent into analytical equipment, and analytical equipment will instruct and send into terminal display by router.
The above-mentioned first time and piece counting switch comprises the production button fetching and delivering the material inductor and needing the operative employee pressing that is arranged on the streamline when finishing production.
The above-mentioned second time and piece counting switch comprises the inspection button fetching and delivering the material inductor and needing the quality inspection workman pressing that is arranged on the streamline when finishing detection.
Above-mentioned production terminal or quality terminal also connect a bar code harvester respectively, and router connects a data storage device that stores with the pairing product information of bar code.
Above-mentioned router also connects an on-the-spot electronic board, and the instruction that analytical equipment sends is sent into on-the-spot electronic board by router and shown.
Above-mentioned production terminal or quality terminal also are connected with a video acquisition device that is used to gather workman's operational circumstances respectively, and send into analytical equipment via router.
Above-mentioned production terminal or quality terminal also are connected with warning lamp and hummer, and analytical equipment triggers corresponding warning lamp and hummer work simultaneously when production terminal or quality terminal transmission instruction.
After adopting such scheme, the present invention is connected production terminal, quality terminal by router with analytical equipment, data are analyzed and classified, can obtain the various data of production line in real time, intuitively understand each operative employee's production status, as skill level, rest situation, quality status etc., thereby targetedly it is launched training, enhance productivity, and can in time adjust, teach and prevent, reach effectively, the purpose of emphasis, management and control in time site work; Also can be used as the performance appraisal basis of all the other relevant departments of evaluation (as machine maintenance group, streamline supvr) simultaneously, management science, objective.
Description of drawings
Fig. 1 is general structure frame figure of the present invention;
Fig. 2 is a whole connection diagram of the present invention;
Fig. 3 is the synoptic diagram of production terminal among the present invention;
Fig. 4 is the synoptic diagram of quality terminal among the present invention;
Fig. 5 is the schematic diagram data that analytical equipment generates among the present invention.
Embodiment
Below in conjunction with drawings and the specific embodiments the present invention is elaborated.
At first with reference to shown in Figure 1, the concrete steps of assembly line work data acquisition of the present invention and management-control method are:
(1) rotation data of acquisition stream waterline implement machine, time and piece counting and button trigger message;
(2) aforementioned data and information are handled, obtained average revolution, stop frequency, running time, quality status and the working condition of equipment;
(3) according to aforementioned result the operative employee on the streamline is sent steering order.
In abovementioned steps (1), also gather the operation video of whole operative employees on the whole piece streamline, and in step (2), the operation video is carried out segmentation, and integrate the production procedure video that becomes respectively corresponding each part product, the whole process of being convenient to transfer about same product is produced image data.
With reference to figure 1 and shown in Figure 2, assembly line work data acquisition of the present invention and managing and control system, comprise an analytical equipment 1, a terminal display 3, a router two, at least one production terminal 60 and at least one quality terminal 70, wherein, production terminal 60 can be determined (being that example illustrates with production terminal 60 only among Fig. 1) according to the size in workshop and the actual conditions of streamline with the concrete number of quality terminal 70.
Production terminal 60 is set together with direct labor's worktable, and with reference to shown in Figure 3, it is connected with equipment rotation sensor 4, the first time and piece counting switch, button 6 and power supply 10 respectively.
The effect of equipment rotation sensor 4 is rotation datas of acquisition stream waterline implement machine, respective operations worker's skilled operation degree, and these data are sent into production terminal 60.
The first time and piece counting switch is used for product quantity and the deadline that the recording operation worker is finished, in the present embodiment, adopt dual mode to carry out record, a kind of be with production terminal 60 with fetch and deliver the material inductor 5 be connected, when the operative employee takes off raw material to be processed on by streamline, or when sending completed product, fetch and deliver the action that material inductor 5 all can be sensed the operative employee, and record data; Another kind of mode is to connect to produce button 61, when the operative employee finishes a product, presses and produces button 61, and will note product quantity this moment; Specifically, two kinds of recording modes can be used for different purposes, fetch and deliver material inductor 5 and can only respond to the number of each product that the recorded stream waterline uploads, and if send whole bag processed product simultaneously, when the operative employee adds man-hour, whenever process a product, just need by once producing button 61, therefore, producing button 61 is the numbers that are used for writing down more exactly every product.
Button 6 is arranged on the production terminal 60, and it comprises function key and numerical key, with reference to shown in Figure 3, it is provided with such as function keys such as " fault ", " lacking material ", when the operative employee runs into fault or other situation, all can be by pressing the corresponding function key, and notify the supvr working condition of this moment.
Power supply 10 is used for providing working power to production terminal 60, and this is a known technology, does not give unnecessary details at this.
Quality terminal 70 is set together with quality inspection workman's worktable, with reference to shown in Figure 4, and being provided with of quality terminal 70 can be to be provided with one every several production terminals 60, the difference of itself and production terminal 60 is: the connection device rotation sensor 4, only are connected with the second time and piece counting switch, button 6 and power supply 10.
The function of the second time and piece counting switch is roughly with aforementioned, be used to write down product quantity and the deadline that the quality inspection workman has been checked, in the present embodiment, adopt dual mode to carry out record, a kind of be with quality terminal 60 with fetch and deliver material inductor 5 and be connected, when the quality inspection workman takes off product to be detected on by streamline, or send when detecting the product of finishing, fetch and deliver material inductor 5 and all can sense quality inspection workman's action, and record data; Another kind of mode is to connect to check button 62, when the quality inspection workman has detected a product, presses and checks button 61, and will note product quantity this moment; Specifically, two kinds of recording modes can be used for different purposes, fetch and deliver material inductor 5 and can only respond to the number of each product that the recorded stream waterline uploads, and if send whole bag product to be detected simultaneously, when the quality inspection workman detected, every detection finished a product, just needed by once checking button 61, therefore, check that button 61 is the numbers that are used for writing down more exactly every the product that is detected.
Button 6 comprises function key and numerical key equally, with reference to shown in Figure 4, it is provided with such as function keys such as " bad ", " warnings ", when the quality inspection workman detects product quality when defective, can be by pressing " bad ", the quality condition of record testing product this moment, and notify the supvr detected status of this moment.
Power supply 10 is used for providing working power to quality terminal 60 herein, and this is a known technology, does not give unnecessary details at this.
Terminal display 3 is set together with direct labor's worktable, and its effect is display management personnel's instruction etc., realizes the two-way communication between supvr and the operator.
Analytical equipment 1 is used for the data of production terminal 60 and 70 collections of quality terminal are sorted out, analyzed and handle, be equivalent to the host computer ERP system in the existing structure, and generate data sheet (not shown) intuitively, for supvr's reference, simultaneously, the supvr can be according to current production and quality status, send corresponding instruction, show by terminal display 3, because terminal display 3 concerns one to one with the operative employee, therefore make things convenient for the supvr to instruct targetedly, be convenient to increase work efficiency; In addition, in the present embodiment, analytical equipment 1 also is connected with a computation terminal 11, and the supvr can carry out transferring and importing of information by this computation terminal 11.
Aforementioned production terminal 60, quality terminal 70, terminal display 3 and analytical equipment 1 all are connected with router two, realize the transmission of data by router two, can select the interface number and the model of router two according to the concrete quantity of connection production terminal 60 and quality terminal 70, this is a known technology, repeats no more.
For convenience, in time understand the details of current production, production terminal 60 in the present embodiment and quality terminal 70 also are connected with a bar code harvester 8 respectively, and router two connects a data storage device 9 again, store the relevant product information of corresponding each bar code in the data storage device 9 in advance, then operative employee or quality inspection workman are when operating, only need make bar code harvester 8 gather the bar code of current operand, can send bar code information via router two, by transferring corresponding product information in the data storage device 9, and show at the display panel 80 of production terminal 60 or quality terminal 70.
In addition, present embodiment is also being produced and the detection scene is provided with an on-the-spot electronic board 50, and it also is connected with router two, delivers to on-the-spot electronic board 50 by instruction and notice that the supvr sends via router two, and personnel interior between buying car in installments check.
When quality problems occurring, because during general production, all be just to carry out a quality inspection every several operations, therefore can not know product quality immediately cutting process and misoperation really occur, which go wrong in link in order to be well understood to the operative employee more, also can be equipped with installation one video acquisition device 7 in each production terminal 60 and quality terminal 70, the substantial length of operation situation that is used for the acquisition operations worker is sent all video informations on the whole piece streamline into analytical equipment 1 by router two simultaneously; 1 pair of video information of analytical equipment this moment is carried out staging treating, and the whole piece streamline video that correspondence is produced identical product integrated, thereby make the production of the corresponding product of every section video, when quality problems appear in quality terminal 70 testing products, only need transfer before this video that should product, can know the place of pinpointing the problems, and targetedly this operative employee's mode of operation be corrected, enhance productivity.
Understand the quality of production situation of oneself as early as possible for the ease of the operative employee, present embodiment also is provided with warning lamp 30 and hummer 40 in production terminal 60 and quality terminal 70, this warning lamp 30 can send multiple color (being three looks in the present embodiment), and its flicker frequency difference, be made as when the qualified degree of product quality not simultaneously, corresponding different Show Colors, and when quality is poor more, flicker frequency is high more, after result that quality terminal 70 will detect sends into analytical equipment 1 by router two, analytical equipment 1 sends the warning lamp control signal to each production terminal 60 respectively according to detecting content, control shows different colors, prompting operation worker and workshop management personnel note, intuitively understand the quality condition of product simultaneously according to Show Color, are convenient to change at any time and dispatch; On the other hand, when the workman attentively works, can not in time see warning lamp 30, also just lost ageingly, therefore, present embodiment is also supporting hummer 40, when analytical equipment 1 transmits the warning lamp signal, control hummer 40 simultaneously and pipe, prompting operation worker watches.
During present embodiment work, production terminal 60 and quality terminal 70 are sent into analytical equipment 1 with collected information via router two synchronously, and carry out analyzing and processing by analytical equipment 1, make the underlying basis tables of data, can and arrange plan simultaneously by computation terminal 11 input analytical equipments 1, handled according to the content of input by analytical equipment 1, with reference to shown in Figure 5, its particular content is:
(1) running time: the T.T. that is a product of the every operation of operative employee, it is acquisition time acquisition by the first time and piece counting switch and equipment rotation sensor 4, the non-cutting time+sewing time=running time, by these data as can be seen, the ratio of machine operation time and non-cutting time, the length of non-cutting time has determined the length of operation T.T.;
(2) sewing pin number: being meant sewing single products total sewing needle number, is to gather revolutions by equipment rotation sensor 4 to obtain, and it acts on control product quality (sewing needle gage whether standard);
(3) average revolution: referring to the sewing time of single-piece operation, is to obtain by the revolution that equipment rotation sensor 4 is gathered machinery and equipment, the whether running at full capacity etc. of the proficiency, machine that can observe the workmanship that goes out for drill by the average revolution of equipment;
(4) stop frequency: refer to the stop frequency during single-piece operates in sewing, be to gather revolution by equipment rotation sensor 4 to stop the number of times acquisition, can observe the workmanship's that goes out for drill proficiency thus, whether the analysis operation worker causes the prolongation of running time owing to having more stop frequency;
(5) quality status: the data of being come by quality terminal 70 feedback obtain, according to demonstration, can be clearly quality status in this operative employee's manufacture process of certain part, in time feed back and remind the operator to note operation, avoid more bad product generation;
(6) working condition: according to the fault in the button 6, do over again, have a rest, treat information such as material triggerings etc., the timely situation of recording operation worker non-normal working, so that analyze, and the searching countermeasure.
In sum, a kind of assembly line work data acquisition of the present invention and managing and control system, focus on being provided with respectively production terminal 60 and quality terminal 70, the data of equipment rotation sensor 4 harvesters such as grade are all sent into analytical equipment 1 by router two, the line data analysis of going forward side by side, obtain analyzing data, make decisions, it is advantageous that for the supvr:
(1) information gathering is combined with issue, accomplish seamless process production and management, completed product run one line operative employee does not have the situation of information extension and labour statement's distortion;
(2) can directly obtain the data of production line, monitor the state of production scene in real time, the related personnel can in time obtain abnormal conditions, and in time handles, the problems such as delay, concealment and omission of avoiding artificial information to report and submit;
(3) data of real time record manufacture course of products and image data for product provides the trackability condition and the basis of data message, process video recording, and realize that real time data is related with video, reach the purpose that Data Dynamic is fed back, image data is checked;
(4) by the data that collect are analyzed, the direct low reason place of analysis operation worker production efficiency is taught targetedly and is managed, and reduces the training and the guidance of blindness, both saved training cost, and result of training is good;
(5) production terminal 60 is combined with quality terminal 70, reach the data association of yield and quality;
(6) with the data of the production line that obtained, right through data processing, analysis, pen, active data is set up database, in the future scheduling of production, plan and scheduling provide reliably, science basis accurately, and provide scientific basis for intelligent, robotization program system.
Above embodiment only for explanation technological thought of the present invention, can not limit protection scope of the present invention with this, every technological thought that proposes according to the present invention, and any change of being done on the technical scheme basis all falls within the protection domain of the present invention.

Claims (10)

1, a kind of assembly line work data acquisition and management-control method is characterized in that comprising the steps:
(1) rotation data of acquisition stream waterline implement machine, time and piece counting and button trigger message;
(2) aforementioned data and information are handled, obtained average revolution, stop frequency, running time, quality status and the working condition of equipment;
(3) according to aforementioned result the operative employee on the streamline is sent steering order.
2, assembly line work data acquisition as claimed in claim 1 and management-control method is characterized in that: in the described step (1), also gather the operation video of whole operative employees on the whole piece streamline.
3, assembly line work data acquisition as claimed in claim 2 and management-control method is characterized in that: in the described step (2), also the operation video is carried out segmentation, and integrate the production procedure video that becomes respectively corresponding each part product.
4, a kind of assembly line work data acquisition and managing and control system is characterized in that: comprise an analytical equipment, a terminal display, a router, at least one production terminal and at least one quality terminal; Aforementioned production terminal is connected with equipment rotation sensor, the first time and piece counting switch, button and power supply respectively, and the quality terminal connects the second time and piece counting switch, button and power supply respectively; The production terminal is connected with analytical equipment via router with the quality terminal, and respectively the information that collects is sent into analytical equipment, and analytical equipment will instruct and send into terminal display by router.
5, assembly line work data acquisition as claimed in claim 4 and managing and control system is characterized in that: the described first time and piece counting switch comprises the production button fetching and delivering the material inductor and needing the operative employee pressing that is arranged on the streamline when finishing production.
6, assembly line work data acquisition as claimed in claim 4 and managing and control system is characterized in that: the described second time and piece counting switch comprises the inspection button fetching and delivering the material inductor and needing the quality inspection workman pressing that is arranged on the streamline when finishing detection.
7, assembly line work data acquisition as claimed in claim 4 and managing and control system, it is characterized in that: described production terminal or quality terminal also connect a bar code harvester respectively, and router connects a data storage device that stores with the pairing product information of bar code.
8, assembly line work data acquisition as claimed in claim 4 and managing and control system is characterized in that: described router also connects an on-the-spot electronic board, and the instruction that analytical equipment sends is sent into on-the-spot electronic board by router and shown.
9, assembly line work data acquisition as claimed in claim 4 and managing and control system is characterized in that: described production terminal or quality terminal also are connected with a video acquisition device that is used to gather workman's operational circumstances respectively, and send into analytical equipment via router.
10, assembly line work data acquisition as claimed in claim 4 and managing and control system, it is characterized in that: described production terminal or quality terminal also are connected with warning lamp and hummer, analytical equipment triggers corresponding warning lamp and hummer work simultaneously when production terminal or quality terminal transmission instruction.
CN200910111378A 2009-03-24 2009-03-24 Method and system for acquiring and controlling pipelining data Pending CN101546191A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910111378A CN101546191A (en) 2009-03-24 2009-03-24 Method and system for acquiring and controlling pipelining data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910111378A CN101546191A (en) 2009-03-24 2009-03-24 Method and system for acquiring and controlling pipelining data

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN2010102587318A Division CN101901009A (en) 2009-03-24 2009-03-24 Assembly line work data acquisition and control system

Publications (1)

Publication Number Publication Date
CN101546191A true CN101546191A (en) 2009-09-30

Family

ID=41193358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910111378A Pending CN101546191A (en) 2009-03-24 2009-03-24 Method and system for acquiring and controlling pipelining data

Country Status (1)

Country Link
CN (1) CN101546191A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104183109A (en) * 2013-05-28 2014-12-03 深圳市菲恩测控科技有限公司 Multifunctional visual data collection terminal for detecting products
CN104460596A (en) * 2014-11-03 2015-03-25 叶校然 PCB enterprise equipment monitoring system
CN106447220A (en) * 2016-10-17 2017-02-22 宁德师范学院 Intelligent operation planning management system
CN106502230A (en) * 2016-12-30 2017-03-15 安徽奥斯朗数控科技有限公司 A kind of intelligence pushes away the method that case equipment carries out information gathering
CN107063233A (en) * 2017-04-12 2017-08-18 无锡研测技术有限公司 Producing line control device based on inertial sensor
CN109005387A (en) * 2018-08-08 2018-12-14 盎锐(上海)信息科技有限公司 For the video capturing device and data analysing method in production line
CN110262373A (en) * 2019-06-14 2019-09-20 深圳市轩辕天恩科技有限公司 Working hour acquisition method, device, computer equipment and storage medium
CN110945444A (en) * 2017-07-24 2020-03-31 株式会社日立制作所 Work improvement support system and method
CN111007823A (en) * 2019-12-25 2020-04-14 北京理工大学 Flexible job shop dynamic scheduling method and device
CN112345547A (en) * 2020-10-29 2021-02-09 东方蓝天钛金科技有限公司 Fluorescent inspection visual data processing system based on MES and processing method thereof
CN113065524A (en) * 2021-04-26 2021-07-02 深圳市商汤科技有限公司 Intelligent workbench management system, intelligent workbench, method, device and medium
CN114200902A (en) * 2021-12-02 2022-03-18 歌尔科技有限公司 Assembly line station-crossing processing equipment and system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104183109A (en) * 2013-05-28 2014-12-03 深圳市菲恩测控科技有限公司 Multifunctional visual data collection terminal for detecting products
CN104460596A (en) * 2014-11-03 2015-03-25 叶校然 PCB enterprise equipment monitoring system
CN106447220A (en) * 2016-10-17 2017-02-22 宁德师范学院 Intelligent operation planning management system
CN106502230A (en) * 2016-12-30 2017-03-15 安徽奥斯朗数控科技有限公司 A kind of intelligence pushes away the method that case equipment carries out information gathering
CN107063233B (en) * 2017-04-12 2020-06-02 无锡研测技术有限公司 Production line management and control device based on inertial sensor
CN107063233A (en) * 2017-04-12 2017-08-18 无锡研测技术有限公司 Producing line control device based on inertial sensor
CN110945444A (en) * 2017-07-24 2020-03-31 株式会社日立制作所 Work improvement support system and method
CN109005387A (en) * 2018-08-08 2018-12-14 盎锐(上海)信息科技有限公司 For the video capturing device and data analysing method in production line
CN110262373A (en) * 2019-06-14 2019-09-20 深圳市轩辕天恩科技有限公司 Working hour acquisition method, device, computer equipment and storage medium
CN111007823A (en) * 2019-12-25 2020-04-14 北京理工大学 Flexible job shop dynamic scheduling method and device
CN112345547A (en) * 2020-10-29 2021-02-09 东方蓝天钛金科技有限公司 Fluorescent inspection visual data processing system based on MES and processing method thereof
CN113065524A (en) * 2021-04-26 2021-07-02 深圳市商汤科技有限公司 Intelligent workbench management system, intelligent workbench, method, device and medium
CN114200902A (en) * 2021-12-02 2022-03-18 歌尔科技有限公司 Assembly line station-crossing processing equipment and system
CN114200902B (en) * 2021-12-02 2024-03-19 歌尔科技有限公司 Pipeline station-passing processing equipment and system

Similar Documents

Publication Publication Date Title
CN101546191A (en) Method and system for acquiring and controlling pipelining data
US10838211B2 (en) Maintenance support device and maintenance support system for factory equipment
CN101901009A (en) Assembly line work data acquisition and control system
EP2855065B1 (en) Method and arrangement in manual welding
US6587812B1 (en) Method and system for monitoring industrial machine
CN110605489B (en) System for accurately controlling welding parameters of complex structure and welding method
CN105741053A (en) Whole life-cycle management model for intelligent gas device
CN109702437B (en) White car body quality on-line management method and system
CN107390649B (en) Project type product processing Internet of things support system
CN111932392A (en) Standard operation guidance system and operation method for intelligent manufacturing and processing production
US20160203445A1 (en) Work order integration and equipment status tracking
CN206649125U (en) Measuring instrument circuit board intelligent test system
CN109784767A (en) A kind of part-subassemble standard intelligence overhaul management control system
CN112130537B (en) Informationized management method and system for mixed-flow assembly line of engine
CN111695771B (en) Electric power material intelligent detection management and control system and method based on Internet of things technology
CN108693839B (en) Intelligent processing modulation system and method
CN104794771B (en) One kind patrols inspection automatic planning and a device
CN201422141Y (en) Data acquisition communication terminal system for assembly line work
JP2020160507A (en) Production control system and computer program
CN112666911A (en) Cooperative control system
CN110049110B (en) Cloud intelligent system
CN204701281U (en) PCB gives up plate marking device
CN104018300A (en) Method for automatically counting sewn workpieces
CN103493081B (en) The coating thickness of vehicle calculates system, computational methods
DE102004045783B4 (en) Thermoforming mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: XIAMEN WIN IN WISDOM INFORMATION TECHNOLOGY CO., L

Free format text: FORMER OWNER: SU TIANZHI

Effective date: 20100707

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 361000 ROOM 2102, NO.875, SHAHE ROAD, SIMING DISTRICT, XIAMEN CITY, FUJIAN PROVINCE TO: 361000 711, CHUANGXIN BUILDING A, SOFTWARE PARK, HUOJU HIGH-TECH ZONE, HULI DISTRICT, XIAMEN CITY, FUJIAN PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20100707

Address after: 361000 Innovation Zone, software park, torch hi tech Zone, Huli District, Huli District, Fujian, Xiamen 711, China A

Applicant after: Xiamen Zhiying Communication Technology Co., Ltd.

Address before: Xiamen City, Fujian province 361000 Wo Road, Siming District Xiamen No. 875 room 2102

Applicant before: Su Tianzhi

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090930