CN101544023B - Preparation method for preformed hole split pouring fender pile - Google Patents

Preparation method for preformed hole split pouring fender pile Download PDF

Info

Publication number
CN101544023B
CN101544023B CN 200910081892 CN200910081892A CN101544023B CN 101544023 B CN101544023 B CN 101544023B CN 200910081892 CN200910081892 CN 200910081892 CN 200910081892 A CN200910081892 A CN 200910081892A CN 101544023 B CN101544023 B CN 101544023B
Authority
CN
China
Prior art keywords
pile
preparation
mould
fender
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200910081892
Other languages
Chinese (zh)
Other versions
CN101544023A (en
Inventor
陈宇
朱建舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongji Pile Industry Co Ltd
Original Assignee
Shanghai Zhongji Pile Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=41191530&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN101544023(B) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Shanghai Zhongji Pile Industry Co Ltd filed Critical Shanghai Zhongji Pile Industry Co Ltd
Priority to CN 200910081892 priority Critical patent/CN101544023B/en
Publication of CN101544023A publication Critical patent/CN101544023A/en
Application granted granted Critical
Publication of CN101544023B publication Critical patent/CN101544023B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a preformed hole split pouring fender pile, belongs to the field of building, in particular relate to a fender pile capable of barricading earth and water and applied to deep foundation pit engineering, and discloses a preparation method for the preformed hole split pouring fender pile. The cross section mode of the fender file is a square of which two semi-circles of opposite lateral surfaces are cut off. The fender pile is a preformed pile, has better compactness, permeability resistance, side pressure resistance and shearing resistance capacity, and does not need maintenance. The fender pile has simple construction, saves time and labor, and has short construction period and water retaining function; and the construction is completed by only driving a row of piles.

Description

A kind of preparation method of preformed hole amalgamation pouring fender pile
Technical field
Preformed hole amalgamation pouring fender pile of the present invention, especially a kind of preparation method of preformed hole amalgamation pouring fender pile belongs to building field.
Background technology
Along with the development of City Underground Transportation and high-rise, deep-foundation pit engineering construction increases gradually, meets with various disease accidents unavoidably in construction, as foundation pit enclosure structure leak, founding etc.Progressive very fast on worker's method of building enclosure engineering in recent years, and on the improvement stratum, implement on worker's method of hydrophobic, sealing not surprising, some worker's method since service condition be difficult to grasp, very risky, careless slightlyly just can breed disaster.Traditional deep layer foundation ditch is handled and used a lot of years in engineering, along with using more and more widely, has many shortcomings to come out.Long construction period, impervious bad, maintenance trouble etc., and construction costs is higher.To different stratum, general foundation pit enclosure structure mainly contains [school moon coin, the research of SWM fender post and application, Geotechnical Engineering technology such as diaphram wall, artificial digging pile, cast-in-situ bored pile, the stake of SMW worker's method, deep layer stirring concrete earth enclosure wall and steel sheet pile, 2003,2].
Diaphram wall, this structure are suitable for full water soft stratum, as full water sand bed, saturated soft mud etc.Diaphram wall can intercept underground water effectively in this type of soil layer, but its cost is very high, is applicable to municipal key project, and is not suitable for general engineerings such as skyscraper.Artificial digging pile and cast-in-situ bored pile all are to adopt the campshed piling wall to keep off soil and waterproof, realize going along with sb. to guard him of foundation ditch, it is not suitable for the deep layer base pit engineering, the quality control instability, and soil erosion is easily caused in the slit between stake, particularly in high water level bury matter area, need to take suitable working measure solving the dash problem according to engineering specifications, and between stake and the stake mainly by stake apical cap beam with enclose purlin and be linked to be integral body, thereby relative globality is relatively poor, though can fix inter-pile soil by slip casting, but the construction relative complex [Zhao Shouzhi, the slip casting preliminary treatment is sent out to solve between the fender post stake and is stablized, the geotechnique basis, 2007,6].The stake of SMW worker's method is the stiffness material that inserts H shaped steel or other kind in cement mixing method, comes the bending resistance of refinforced cement soil mixing pile, shear resistance.Though this kind method is faster than construction of diaphragm wall speed, take up an area of and lack, the relative fender post of its construction costs is higher, and steel using amount is big, and construction is complicated.Deep layer stirring concrete earth enclosure wall does not have in the general hole and supports, and is convenient to mechanization and cuts the earth fast, dual-use function with retaining soil, sealing, but its displacement is relatively large, will note preventing to influence surrounding environment especially when foundation ditch length is big, and when cement-soil stirring pile construction.Steel sheet pile is a kind of underground exterior-protected structure stake of using always, though the bearing capacity height, the stake footpath is less, is not suitable for dark basic unit engineering, and its construction costs height, and quantities is big, and keeping off native load performance and sealing effect does not have fender post good.
Summary of the invention
The object of the present invention is to provide a kind of preparation method of preformed hole amalgamation pouring fender pile, the fender post for preparing is a prefabricated pile, and its density, impermeability, lateral pressure resistant power and shear resistance are all better, need not maintenance.
Preformed hole amalgamation pouring fender pile of the present invention, wherein, described fender post sectional form is that the square of two semicircles removed in the opposite flank;
Above-mentioned fender post is a hollow pile, and its processing method is:
A, preparation reinforcement cage skeleton;
B, preparation high performance concrete and the mould that is complementary, and on mould, be coated with the isolation lubricant;
C, be installed in steel reinforcement cage on the mould and tighten drawing device;
D, with in the high performance concrete that the prepares feeding punching block, by the anti-bending strength of product reinforcing bar is carried out pre-stretch-draw, reach locking behind the required value, anchoring;
E, put into and carry out centrifugal on the centrifuge and pour out surplus slurry;
The demoulding after f, the steam curing;
G, finished product are stacked by the hardening of cement requirement, and carry out natural curing or water curing by the hardening of cement requirement.
Above-mentioned fender post is a solid pile, and its processing method is:
A, preparation reinforcement cage skeleton;
B, preparation high performance concrete and the mould that is ready to be complementary are coated with the isolation lubricant on mould;
C, be installed in steel reinforcement cage on the mould and tighten drawing device;
D, reinforcing bar is carried out pre-stretch-draw, reach locking after the requirement, anchoring by the anti-bending strength of product; For the not stretch-draw that does not have the prestressing force requirement;
E, with in the high performance concrete that the prepares feeding punching block, start vibrations equipment simultaneously, vibrate, closely knit;
The demoulding after f, the steam curing;
G, finished product are stacked by the hardening of cement requirement, and carry out natural curing or water curing by the hardening of cement requirement.
The implementation method of the single step technology among the above-mentioned hollow pile and the preparation method of solid pile and parameter thereof all are mature technologies of the prior art, and various technology are all carried out according to the building standard of country and got final product.The concrete standard of using is: GB50007-2002, GB/T 20344-2004, GB 50202-2002, GB/T50344-2004, GB 13474-1999, GB/T 554-2008.
Above-mentioned isolation lubricant dry weight component is by weight: 10 parts of sodium alginates, 3 parts of emulsifying agent Tween (emulsifier tween), 3 parts of emulsifying agent Spam (emolsifier span), 5 parts in graphite, 80 parts of inserts talcum powder add 5~6 times of mixing and stirring of water by weight; Wherein, described emulsifying agent Tween (emulsifier tween) and emulsifying agent Spam (emolsifier span) belong to the D-sorbite fatty acid ester, the source is directly directly to purchase from each domestic big producer, commercial grade can reach requirement of the present invention, and other components in the above-mentioned isolation lubricant all come from commercial the purchase and obtain.
The coating thickness of isolating lubricant should be basic demand can cover the surface fully, and the thickness of coating is no more than 1 centimetre, and preferred thickness is 0.2-0.5 centimetre.
Above-mentioned steam curing is carried out as follows: the fender post after the cast leaves standstill 2-4 hour (preferred 3 hours), programming rate be 10~30 ℃/h (preferred 20 ℃/h), constant temperature phase temperature range is 55~80 ℃ (preferred 65 ℃), constant temperature time 8~12 hours (preferred 10 hours), cooling rate be 10~30 ℃/h (preferred 20 ℃/h).
The inventor has obtained isolating the optimum composition and the proportioning ratio of lubricant through long-term experiment, makes product of the present invention be very easy to the demoulding in preparation, and effect is very good.Another one inventive point of the present invention is exactly steam-cured mode, and the inventor has passed through experiment repeatedly, obtains result of the present invention, can increase the intensity of product of the present invention.By experimental production construction note and statistics analysis, need only constantly delivering vapor in steam-cured canopy, keep temperature of shed between 55~80 ℃, concrete intensity can increase rapidly, can to reach more than 90% (be that the C40 concrete reaches about 36MPa to intensity behind the 24h, satisfy the stretch-draw requirement), effect is very obvious.
Can use construction method of installation conventional in this area, preferably carry out installation in the following manner:
Amalgamation sealing steel pipe is squeezed into method: two are stitched together, middle two semicircles are combined into cylindrical hole, insert the steel pipe of hollow sealing in the hole, with two squeeze into together and go along with sb. to guard him workshop section, simultaneously also squeeze into the steel pipe of hollow sealing respectively, steel pipe is pulled out from cylindrical hole after requiring the degree of depth when squeezing in the semicircle vacancy in two outsides;
The amalgamation breast boards is squeezed into method: two are stitched together, and middle two semicircles are combined into cylinder, and the bottom is established breast boards and two and squeezed into together and go along with sb. to guard him workshop section in the hole, also establishes the semicircle breast boards respectively in the semicircle vacancy in two outsides simultaneously, squeezes into stake;
The available hammering method of stake, vibratory drilling method, plunging and the water jetting pile sinking squeezing into or imbed, after stake quantity reaches design load, perfusion chance water is hard cementing material in the cylindrical hole that two centres are vacated, and comprising: cement, cement waterglass, modified water glass, chemical pulp, cementing material; Grouting mode comprises delamination pour slurry, grouting with small pipe, the slip casting of TSS pipe, curtain-grouting, high-pressure slip-casting.
Above-mentioned fender post is a plain concrete pile.
Above-mentioned fender post is reinforced concrete pile and the described opposite flank unreinforced that removes semicircle.
Above-mentioned fender post is that reinforced concrete pile and the described opposite flank arrangement of reinforcement that removes semicircle are less.Fender post can use steel reinforced concrete or plain concrete, and arrangement of reinforcement zone main when using steel reinforced concrete is at two straight flanges, and two have the limit of semicircle to lack arrangement of reinforcement or unreinforceds.
Particularly the present invention has following advantage:
1, fender post of the present invention is a prefabricated pile, and its density, impermeability, lateral pressure resistant power and shear resistance are all better, need not maintenance;
2, the present invention constructs simply, and is time saving and energy saving as long as squeeze into a campshed, short construction period, and dash is made good use of;
3, uniform specification of the present invention, convenient transportation, haul distance is long, and noiselessness is pollution-free, and the construction organization facility.
Description of drawings
Fig. 1 is the schematic cross-section of plain concrete solid pile of the present invention;
Fig. 2 is the schematic cross-section of two amalgamations of plain concrete solid pile of the present invention;
Fig. 3 inserts the schematic cross-section of steel pipe for two amalgamations of plain concrete solid pile of the present invention;
Fig. 4; Schematic cross-section for reinforced concrete hollow stake of the present invention;
Fig. 5 is the schematic cross-section of two amalgamations of reinforced concrete hollow stake of the present invention;
Fig. 6 is two amalgamations of reinforced concrete hollow stake of the present invention, and the schematic cross-section that the water-soluble pad of underlay and both sides are pasted solubility and the semicylinder of certain rigidity is arranged is inserted in the amalgamation hole;
Fig. 7 is the schematic perspective view of plain concrete solid pile of the present invention;
Fig. 8 is the schematic perspective view of reinforced concrete hollow stake of the present invention.
The specific embodiment
Following examples only are used for illustrating how characteristic feature of an invention and further explanation implement the present invention, are not used for limiting protection scope of the present invention.
Embodiment 1
Preformed hole amalgamation pouring fender pile is as Fig. 1~shown in Figure 3.
Above-mentioned fender post is a solid pile, and its processing method is:
A, preparation reinforcement cage skeleton;
B, preparation high performance concrete and the mould that is ready to be complementary are coated with the isolation lubricant on mould;
C, be installed in steel reinforcement cage on the mould and tighten drawing device;
D, reinforcing bar is carried out pre-stretch-draw, reach locking after the requirement, anchoring by the anti-bending strength of product; For the not stretch-draw that does not have the prestressing force requirement;
E, with in the high performance concrete that the prepares feeding punching block, start vibrations equipment simultaneously, vibrate, closely knit;
The demoulding after f, the steam curing;
G, finished product are stacked by the hardening of cement requirement, and carry out natural curing or water curing by the hardening of cement requirement.
Above-mentioned isolation lubricant dry weight component is by weight: sodium alginate 10, and emulsifying agent Tween3, emulsifying agent Spam3,5 parts in graphite, inserts talcum powder 80 adds 6 times of mixing and stirring of water by weight;
Above-mentioned steam curing is carried out as follows: the fender post after the cast left standstill 3 hours, and programming rate is 10 ℃/h, and constant temperature phase temperature is 55 ℃, constant temperature time 8 hours, and cooling rate is 10 ℃/h.
Sectional form is that the square of two semicircles 1 removed in the opposite flank and it carries out installation in the following manner:
Two are stitched together, as shown in Figure 5.Middle two semicircles are combined into cylindrical hole 2.Insert the steel pipe 21 of hollow sealing and two as shown in Figure 5 in the hole and squeeze into together and go along with sb. to guard him workshop section, also squeeze into the steel pipe 21 of hollow sealing respectively in the semicircle vacancy in two outsides simultaneously, steel pipe 21 is pulled out from cylindrical hole 2 after requiring the degree of depth when squeezing into;
Sunk by hammer is used in the stake of squeezing into, and after stake quantity reached design load, perfusion chance water was hard cementing material in the cylindrical hole 2 that two centres are vacated: cement; Grouting mode uses high-pressure slip-casting.
Embodiment 2
Preformed hole amalgamation pouring fender pile is as Fig. 4~shown in Figure 6.
Above-mentioned fender post is a hollow pile, and its processing method is:
A, preparation reinforcement cage skeleton;
B, preparation high performance concrete and the mould that is complementary, and on mould, be coated with the isolation lubricant;
C, be installed in steel reinforcement cage on the mould and tighten drawing device;
D, with in the high performance concrete that the prepares feeding punching block, by the anti-bending strength of product reinforcing bar is carried out pre-stretch-draw, reach locking behind the required value, anchoring;
E, put into and carry out centrifugal on the centrifuge and pour out surplus slurry;
The demoulding after f, the steam curing;
G, finished product are stacked by the hardening of cement requirement, and carry out natural curing or water curing by the hardening of cement requirement.
Above-mentioned isolation lubricant dry weight component is by weight: sodium alginate 10, and emulsifying agent Tween3, emulsifying agent Spam3,5 parts in graphite, inserts talcum powder 80 adds 5 times of mixing and stirring of water by weight;
Above-mentioned steam curing is carried out as follows: the fender post after the cast left standstill 4 hours, and programming rate is 30 ℃/h, and constant temperature phase temperature is 80 ℃, constant temperature time 12 hours, and cooling rate is 30 ℃/h.
Sectional form is that the square of two semicircles 1 removed in the opposite flank and it carries out installation in the following manner:
Two are stitched together, as shown in Figure 4.Middle two semicircles are combined into cylindrical hole 2.The bottom is established breast boards 22 and two and is squeezed into together and go along with sb. to guard him workshop section in the hole as shown in Figure 5, also establishes semicircle breast boards 23 respectively in the semicircle vacancy in two outsides simultaneously;
Sunk by hammer is used in the stake of squeezing into, and after stake quantity reached design load, perfusion chance water was hard cementing material in the cylindrical hole 2 that two centres are vacated: modified water glass; Grouting mode uses the slip casting of TTS pipe.
Embodiment 3
Preformed hole amalgamation pouring fender pile, as shown in Figure 7.
Above-mentioned fender post is a solid pile, and its processing method is:
A, preparation high performance concrete and the mould that is complementary, and on mould, be coated with the isolation lubricant;
B, with in the high performance concrete that the prepares feeding punching block;
C, put into and carry out centrifugal on the centrifuge and pour out surplus slurry;
The demoulding after d, the steam curing;
E, finished product are stacked by the hardening of cement requirement, and carry out natural curing or water curing by the hardening of cement requirement.
Above-mentioned isolation lubricant dry weight component is by weight: sodium alginate 10, and emulsifying agent Tween3, emulsifying agent Spam3,5 parts in graphite, inserts talcum powder 80 adds 5 times of mixing and stirring of water by weight;
Above-mentioned steam curing is carried out as follows: the fender post after the cast left standstill 2 hours, and programming rate is 20 ℃/h, and constant temperature phase temperature range is 65 ℃, constant temperature time 10 hours, and cooling rate is 20 ℃/h.
Sectional form is that the square of two semicircles 1 removed in the opposite flank and it carries out installation in the following manner:
Two are stitched together, as shown in Figure 4.Middle two semicircles are combined into cylindrical hole 2.The bottom is established breast boards 22 and two and is squeezed into together and go along with sb. to guard him workshop section in the hole as shown in Figure 5, also establishes semicircle breast boards 23 respectively in the semicircle vacancy in two outsides simultaneously;
Sunk by hammer is used in the stake of squeezing into, and after stake quantity reached design load, perfusion chance water was hard cementing material in the cylindrical hole 2 that two centres are vacated: cement waterglass; Grouting mode uses grout curtain.

Claims (3)

1. the preparation method of a preformed hole amalgamation pouring fender pile, it is characterized in that: described fender post sectional form is that the square of two semicircles removed in the opposite flank, and it is prepared in the following manner:
For hollow pile, its preparation method is:
A, preparation reinforcement cage skeleton;
B, preparation high performance concrete and the mould that is complementary, and on mould, be coated with the isolation lubricant;
C, be installed in steel reinforcement cage on the mould and tighten drawing device;
D, with in the high performance concrete that the prepares feeding mould, by the anti-bending strength of product reinforcing bar is carried out pre-stretch-draw, reach locking behind the required value, anchoring;
E, put into and carry out centrifugal on the centrifuge and pour out surplus slurry;
The demoulding after f, the steam curing;
G, finished product are stacked by the hardening of cement requirement, and carry out natural curing or water curing by the hardening of cement requirement;
For solid pile, its preparation method is:
A, preparation reinforcement cage skeleton;
B, preparation high performance concrete and the mould that is ready to be complementary are coated with the isolation lubricant on mould;
C, be installed in steel reinforcement cage on the mould and tighten drawing device;
D, reinforcing bar is carried out pre-stretch-draw, reach locking after the requirement, anchoring by the anti-bending strength of product; For the not stretch-draw that does not have the prestressing force requirement;
E, with in the high performance concrete that the prepares feeding mould, start vibrations equipment simultaneously, vibrate, closely knit;
The demoulding after f, the steam curing;
G, finished product are stacked by the hardening of cement requirement, and carry out natural curing or water curing by the hardening of cement requirement;
Described isolation lubricant dry weight component is by weight: 10 parts of sodium alginates, 3 parts of emulsifying agent Tween (emulsifier tween), 3 parts of emulsifying agent Spam (emolsifier span), 5 parts in graphite, 80 parts of inserts talcum powder add 5~6 times of mixing and stirring of water by weight;
Described steam curing is carried out as follows: the fender post after the cast left standstill 2-4 hour, and programming rate is 10~30 ℃/h, and constant temperature phase temperature range is 55~80 ℃, constant temperature time 8~12 hours, and cooling rate is 10~30 ℃/h.
2. the construction method of the fender post that the preparation method of preformed hole amalgamation pouring fender pile according to claim 1 makes is characterized in that: the construction method of described fender post comprises:
1) amalgamation sealing steel pipe is squeezed into method: two are stitched together, middle two semicircles are combined into cylindrical hole, insert the steel pipe of hollow sealing in the hole, with two squeeze into together and go along with sb. to guard him workshop section, simultaneously also squeeze into the steel pipe of hollow sealing respectively, steel pipe is pulled out from cylindrical hole after requiring the degree of depth when squeezing in the semicircle vacancy in two outsides;
2) the amalgamation breast boards is squeezed into method: two are stitched together, and middle two semicircles are combined into cylinder, and the bottom is established breast boards and two and squeezed into together and go along with sb. to guard him workshop section in the hole, also establishes the semicircle breast boards respectively in the semicircle vacancy in two outsides simultaneously, squeezes into stake;
3) the available hammering method of stake, vibratory drilling method, plunging and the water jetting pile sinking squeezing into or imbed, after stake quantity reached design load, perfusion chance water was hard cementing material in the cylindrical hole that two centres are vacated, and comprising: cement, cement waterglass, modified water glass; Grouting mode comprises delamination pour slurry, grouting with small pipe, the slip casting of TSS pipe, curtain-grouting, high-pressure slip-casting.
3. the preparation method of preformed hole amalgamation pouring fender pile according to claim 1 is characterized in that: described fender post is reinforced concrete pile and the described opposite flank unreinforced that removes semicircle.
CN 200910081892 2009-04-15 2009-04-15 Preparation method for preformed hole split pouring fender pile Expired - Fee Related CN101544023B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910081892 CN101544023B (en) 2009-04-15 2009-04-15 Preparation method for preformed hole split pouring fender pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910081892 CN101544023B (en) 2009-04-15 2009-04-15 Preparation method for preformed hole split pouring fender pile

Publications (2)

Publication Number Publication Date
CN101544023A CN101544023A (en) 2009-09-30
CN101544023B true CN101544023B (en) 2011-08-03

Family

ID=41191530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910081892 Expired - Fee Related CN101544023B (en) 2009-04-15 2009-04-15 Preparation method for preformed hole split pouring fender pile

Country Status (1)

Country Link
CN (1) CN101544023B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510158B (en) * 2016-01-11 2018-04-03 河南理工大学 Anchoring body dynamic tensile test device and experimental method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0562238A1 (en) * 1992-03-24 1993-09-29 Kabushiki Kaisha ASK Kenkyusho Underground water cutoff wall and method of constructing the same
CN2260103Y (en) * 1996-08-05 1997-08-20 郭同元 Pile
JP2002266344A (en) * 2001-03-08 2002-09-18 Sumitomo Metal Ind Ltd Cutoff member and cutoff method using the same
CN2709522Y (en) * 2004-06-11 2005-07-13 岳毅 Hydraulic spile pile device of water-resisting, concrete placing and seam sealing
CN201137158Y (en) * 2007-12-25 2008-10-22 杭州南方土木工程咨询有限公司 Rotatable dual spindle drilling occluded side force-resistant guard post wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0562238A1 (en) * 1992-03-24 1993-09-29 Kabushiki Kaisha ASK Kenkyusho Underground water cutoff wall and method of constructing the same
CN2260103Y (en) * 1996-08-05 1997-08-20 郭同元 Pile
JP2002266344A (en) * 2001-03-08 2002-09-18 Sumitomo Metal Ind Ltd Cutoff member and cutoff method using the same
CN2709522Y (en) * 2004-06-11 2005-07-13 岳毅 Hydraulic spile pile device of water-resisting, concrete placing and seam sealing
CN201137158Y (en) * 2007-12-25 2008-10-22 杭州南方土木工程咨询有限公司 Rotatable dual spindle drilling occluded side force-resistant guard post wall

Also Published As

Publication number Publication date
CN101544023A (en) 2009-09-30

Similar Documents

Publication Publication Date Title
CN101544022B (en) Preparation method for preformed hole fender pile
CN103215960B (en) Grouting method for high polymer vertical support system
CN101343871B (en) Composite pile with high permanent stability protection layer and its production and construction method
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
CN102518135A (en) Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles
CN103215952A (en) High polymer anchoring grouting method
CN101487254A (en) Construction method of vibrating immersed tube gravel slip-casting pile
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN203174619U (en) Reverse raft concrete terrace
CN102650128A (en) Cement mixing pile with stiffness core capable of draining and pre-pressing firstly and then grouting as well as construction method thereof
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN111794216A (en) Construction method of uplift carrier pile
CN103195060B (en) Soft soil foundation prestressing bolt anchorage structure and uses thereof
CN208056095U (en) I-shaped precast concrete and its compound soil-baffling structure of assembled cabin format
CN208219694U (en) A kind of prefabricated barricade
CN114032943A (en) Cold region fabricated concrete bearing platform and miniature pile combined foundation
CN102626946A (en) Manufacture method for concrete irregular fender post
CN102839647B (en) Stirring pile-permeable concrete pile compound foundation and treatment method thereof
CN202559340U (en) First-drainage post-preloading grouting stiff-core cement mixing pile
CN101544023B (en) Preparation method for preformed hole split pouring fender pile
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN205776152U (en) Prestressed anchor waveform sheet pile retaining structure
CN109989397B (en) Square combined type cement-soil composite pile and forming method thereof
CN101704649A (en) Slurry formula of pile-sinking technique of non-soil borrowing lead-hole prestress pipe pile or prefabricated square pile
CN201794077U (en) Immersed tube pouring type reinforced concrete beam and cement pile supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI ZHONGJI PILES CO., LTD.

Free format text: FORMER OWNER: LI GUOHUA

Effective date: 20091204

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20091204

Address after: 2, building 4, 437 Guang Yue Road, Shanghai, Hongkou District, China: 200434

Applicant after: Shanghai Zhongji Pile Industry Co., Ltd.

Address before: Beijing City, Fengtai District district at the West 15-5-504 post encoding: 100161

Applicant before: Li Guohua

C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Shanghai Zhongji Pile Industry Co., Ltd.

Document name: Notification to Pay the Fees

Addressee: Shanghai Zhongji Pile Industry Co., Ltd.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Shanghai Zhongji Pile Industry Co., Ltd.

Document name: Notification of Termination of Patent Right

Addressee: Shanghai Zhongji Pile Industry Co., Ltd.

Document name: Notification of Termination of Patent Right

DD01 Delivery of document by public notice
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20190415

CF01 Termination of patent right due to non-payment of annual fee