CN101537972A - Synchronization equipment of ring-shaped crane double trolley - Google Patents

Synchronization equipment of ring-shaped crane double trolley Download PDF

Info

Publication number
CN101537972A
CN101537972A CN200910073981A CN200910073981A CN101537972A CN 101537972 A CN101537972 A CN 101537972A CN 200910073981 A CN200910073981 A CN 200910073981A CN 200910073981 A CN200910073981 A CN 200910073981A CN 101537972 A CN101537972 A CN 101537972A
Authority
CN
China
Prior art keywords
trolley
ring
driving mechanism
installation
dolly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910073981A
Other languages
Chinese (zh)
Inventor
武建平
顾翠云
高秀芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Heavy Industry Co Ltd
Original Assignee
Taiyuan Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Heavy Industry Co Ltd filed Critical Taiyuan Heavy Industry Co Ltd
Priority to CN200910073981A priority Critical patent/CN101537972A/en
Publication of CN101537972A publication Critical patent/CN101537972A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The invention relates to synchronization equipment of a ring-shaped crane double trolley and relates to a ring-shaped crane used in a nuclear power station. The synchronization equipment comprises a travelling trolley containing a driving mechanism, an installation trolley, and a joint operating device connecting the traveling trolley and the installation trolley, and is characterized in that the installation trolley is not provided with the driving mechanism. As only the travelling trolley of the synchronization equipment is provided with the driving mechanism, the driving mechanism of the installation trolley is canceled, the motor power running the driving mechanism is correspondingly added, and the traveling trolley drags the installation trolley by the joint operating device. In this way, the desynchronized problem during the parallel operation of the two trolleys is completely solved, and a set of running driving mechanism is reduced, thus reducing the cost of the product.

Description

The synchronous device of equipment of ring-shaped crane double trolley
Technical field
The present invention relates to the used in nuclear power station polar crane, the synchronous device of particularly a kind of polar crane running trolley and installation dolly and car.
Background technology
Used in nuclear power station polar crane (hanging hereinafter to be referred as ring) is installed in the reactor building, and in the Nuclear Power Station stage, ring hangs the handling that is used to install the various heavy waress in the reactor building.In the nuclear station operation phase, ring hangs and is used for the required various handling services of maintenance of equipment in reactor cold-refueling and the reactor building.The safe reliability that ring hangs requires very high.Ring is hung in during the nuclear station installation, work compound behind running trolley and installation dolly and the car need be installed dolly and do not used separately; After installing, dolly is installed will be removed, and the run duration ring hangs only needs a running trolley just can satisfy operating needs.
As shown in Figure 1, the running trolley 1 of existing polar crane is provided with driver train 4, dolly 3 is installed is provided with driver train 5, behind joint operating device 2 and car, because two dollies have driver train separately respectively, therefore there are two problems that the dolly synchronous effect is not good.
Summary of the invention
The objective of the invention is to overcome the shortcoming of prior art, a kind of synchronous device of equipment of ring-shaped crane double trolley is provided, solved running trolley and the asynchronous problem that dolly and car are installed, and reduced by a cover operation driver train.
The present invention is achieved through the following technical solutions its goal of the invention.
A kind of synchronous device of equipment of ring-shaped crane double trolley comprises: contain the running trolley of driver train, dolly is installed, and connect running trolley and the joint operating device that dolly is installed, it is characterized in that: described installation dolly is not provided with driver train.
The present invention is hung in during the nuclear station installation according to ring, work compound after need and dolly and car being installed with running trolley, and hang the only actual condition of a running trolley of needs at the run duration ring, simultaneously, in order to solve the stationary problem of two dollies and car, the present invention only is provided with driver train on running trolley, and has cancelled the driver train that dolly is installed, and the corresponding power of motor that increases the operation driver train, running trolley drags the installation dolly by joint operating device.Like this, the asynchronous problem when thoroughly having solved two dollies and car, and reduced by a cover operation driver train, reduced cost of product.
Description of drawings
Fig. 1 is the structural representation of a kind of equipment of ring-shaped crane double trolley synchronous device of prior art;
Fig. 2 is the structural representation of a kind of equipment of ring-shaped crane double trolley synchronous device of the present invention.
The present invention is elaborated by preferred embodiment below in conjunction with accompanying drawing.
The specific embodiment
As shown in Figure 2, a kind of synchronous device of equipment of ring-shaped crane double trolley by running trolley 1, is installed dolly 3, and connects running trolley 1 and joint operating device 2 compositions that dolly 3 is installed.Operation driver train 4 is set on the described running trolley 1, and described installation dolly 3 is not provided with driver train.Running trolley 1 drags by joint operating device 2 dolly 3 is installed, and has both thoroughly solved the stationary problem of two dollies, has reduced by a cover operation driver train again.

Claims (1)

1, a kind of synchronous device of equipment of ring-shaped crane double trolley, comprise: the running trolley (1), the installation dolly (3) that contain driver train (4), and connect running trolley (1) and the joint operating device (2) that dolly (3) is installed, it is characterized in that: on the described installation dolly (3) driver train is not set.
CN200910073981A 2009-03-18 2009-03-18 Synchronization equipment of ring-shaped crane double trolley Pending CN101537972A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910073981A CN101537972A (en) 2009-03-18 2009-03-18 Synchronization equipment of ring-shaped crane double trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910073981A CN101537972A (en) 2009-03-18 2009-03-18 Synchronization equipment of ring-shaped crane double trolley

Publications (1)

Publication Number Publication Date
CN101537972A true CN101537972A (en) 2009-09-23

Family

ID=41121413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910073981A Pending CN101537972A (en) 2009-03-18 2009-03-18 Synchronization equipment of ring-shaped crane double trolley

Country Status (1)

Country Link
CN (1) CN101537972A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105540438A (en) * 2015-12-21 2016-05-04 太原重工股份有限公司 Crane and joint operating device thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105540438A (en) * 2015-12-21 2016-05-04 太原重工股份有限公司 Crane and joint operating device thereof

Similar Documents

Publication Publication Date Title
CN101425761B (en) Serial parallel structure electric power transformation device
CN104192724B (en) Special purpose crane produced by a kind of aluminium section bar
CN101423181B (en) Hoisting mechanism of ring crane
CN205344500U (en) Dismounting device of slide rail type engine
CN101537972A (en) Synchronization equipment of ring-shaped crane double trolley
CN203497949U (en) Dual-cart driving control circuit of crane and crane thereof
CN202296881U (en) Electrical failure inquiry system of bridge crane
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN101723252B (en) Overhead-traveling installation method of 400t overhead travelling crane replacement equipment
CN207473361U (en) A kind of work mine locomotive inverter-fed traction intelligence control system
CN105905804B (en) A kind of control crane hoisting and the traversing mixing differential driving mechanism of trolley
CN203318561U (en) Disc type transportation line of scraped car disassembly line
CN204958029U (en) Elevator control system
CN202785315U (en) Big wheeled crane
CN201825690U (en) Small-size hoisting device for replacing ladle pipe of aluminum output ladle
CN204038893U (en) A kind of vehicle frame overturning system
CN201240778Y (en) Crane control system and crane including the same
CN201183715Y (en) Double-crane linkage for overhead travelling crane
CN203976243U (en) Permanent magnetic crane
CN104140047B (en) Permanent magnetic crane
CN206633944U (en) A kind of vehicle modules electric control system
CN204038906U (en) Special purpose crane produced by a kind of aluminium section bar
CN201058576Y (en) Transmission equipment for control signal and electric power of bank container crane carriage
CN203667889U (en) Steel wire rope electric hoist
CN208561481U (en) Wireless controlled standard crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090923