CN101527086A - 航班时隙分配的实现方法 - Google Patents

航班时隙分配的实现方法 Download PDF

Info

Publication number
CN101527086A
CN101527086A CN 200910068604 CN200910068604A CN101527086A CN 101527086 A CN101527086 A CN 101527086A CN 200910068604 CN200910068604 CN 200910068604 CN 200910068604 A CN200910068604 A CN 200910068604A CN 101527086 A CN101527086 A CN 101527086A
Authority
CN
China
Prior art keywords
flight
time slot
time
flow
management program
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200910068604
Other languages
English (en)
Other versions
CN101527086B (zh
Inventor
赵嶷飞
王超
岳仁田
黄宝军
高伟
张春凤
李楠
徐肖豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Civil Aviation University of China
Original Assignee
Civil Aviation University of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Civil Aviation University of China filed Critical Civil Aviation University of China
Priority to CN2009100686049A priority Critical patent/CN101527086B/zh
Publication of CN101527086A publication Critical patent/CN101527086A/zh
Application granted granted Critical
Publication of CN101527086B publication Critical patent/CN101527086B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Traffic Control Systems (AREA)

Abstract

本发明涉及一种航班时隙分配的实现方法,该方法通过计算机管理系统辅助实现,系统中还包括一个流量管理程序生成/评估子系统,流量管理程序生成/评估子系统,用作航班时隙分配的实现方法的操作平台;本发明方法在流量和容量的统计和预测的基础上,及时发现出现的和可能出现的流量问题,辅助流量管理人员提出解决流量问题的多种方案和相应的实施效果,辅助他们做出最终决策,尤其在地面延误程序中,通过起飞时隙分配算法为需要地面延误的航班分配满足整体最优、公平、公正的原则的起飞时隙,对于改进国内空中交通流量技术领域的现状具有创新和实用性及很高的推广价值。

Description

航班时隙分配的实现方法
技术领域
本发明涉及空中交通流量管理领域,特别涉及一种可应用于空中交通流量管理、并可有效地解决空中交通拥挤问题的新的航班时隙分配的实现方法。
背景技术
作为空中交通流量管理系统的理论核心,系统运行管理算法是分析空中交通形势,评估预测空中交通系统容量,提出科学、合理、可行的流量管理建议解决空中交通拥挤问题的理论核心。
在空中交通流量管理系统实现基本数据的采集和集成后,系统运行管理算法的正确运行就成为保证系统实践价值的关键性因素。
考虑来自空域中、各机场的多种限制,为未起飞的航班分配起飞时间是实施预战术、战术空中交通流量管理的一项主要任务。航班的起飞时间分配,即从一个或者多个机场起飞的航班,考虑到起降机场、沿途航线的各项容量限制,为航班生成一个合理的起飞时间。
考虑到国内空中交通流量管理的现状,
在空中交通流量管理中,尚缺少一种适合中国国情的、可更有效解决空中交通拥挤问题的航班时隙分配的实现方法。
发明内容
鉴于现有技术领域存在的不足,本发明目的在于,在流量和容量的统计和预测的基础上,及时发现出现的和可能出现的流量问题,辅助流量管理人员提出解决流量问题的多种方案和相应的实施效果,辅助他们做出最终决策。尤其在地面延误程序中,通过起飞时隙分配算法为需要地面延误的航班分配满足整体最优、公平、公正的原则的起飞时隙。
本发明是这样实现的:一种航班时隙分配的实现方法,通过计算机管理系统辅助实现,所述计算机管理系统主要由客户端/服务器/数据库模式(C/S/D)网络构成,其特征在于,系统中还包括一个流量管理程序生成/评估子系统,所述流量管理程序生成/评估子系统,用作所述航班时隙分配的实现方法的操作平台;所述航班时隙分配的实现方法,包括如下步骤:
步骤一、在计算机系统中编制流量管理程序生成/评估子系统程序,建立航班数据计算的数学模型;并生成流量管理程序生成/评估子系统操作界面;
步骤二、在流量管理程序生成/评估子系统操作界面调取相关航班数据;操作系统对相关航班数据进行计算;
步骤三、操作系统,筛选受影响航班;
步骤四、操作系统,筛选受影响航班;
步骤五、操作系统,筛选优先航班;
步骤六、系统生成可用时隙资源;
步骤七、操作系统,根据航班状态生成优先级不同的五组航班;
步骤八、操作系统,对每组航班根据预计到达时间先后排序;
步骤九、按时隙分配算法分配到达时隙或起飞时隙。
本发明在客户端/服务器/数据库模式(C/S/D)计算机网络中运用了新的航班时隙分配的方法,和现有技术相比,本发明方法在流量和容量的统计和预测的基础上,及时发现出现的和可能出现的流量问题,辅助流量管理人员提出解决流量问题的多种方案和相应的实施效果,辅助他们做出最终决策。尤其在地面延误程序中,通过起飞时隙分配算法为需要地面延误的航班分配满足整体最优、公平、公正的原则的起飞时隙,对于改进国内空中交通流量技术领域的现状具有创新和实用性及很高的推广价值。
附图说明
图1是本发明的航班时隙分配实现方法流程图;
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明,应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
在本发明实施例中,主要采用客户端/服务器/数据库模式(C/S/D),客户端接收服务器端的数据进行相关显示,还可以通过定时读取数据库相关表数据进行刷新显示。
如图1所示为航班时隙分配的实现方法流程:
建立数学模型。
FSCH=FIGT-TAXI                                                               (1)
F={F|FARRD=D}∩(({F|A<FSCH<B}∪{F|A<FETA<B})-({F|A<FSCH<B}∩{F|FETA<A}))
                                                                              (2)
FActive={F|FETD<(C+H)}∪FInF1                                               (3)
F3={F|FDepAirport∈EmptDepApt}                                               (4)
F1=F2+FActive+F3+Finternational                                              (5)
FINTD=FINTA-FETE                                                             (6)
其中:FSCH—航班的班期到达时间,FIGT——航班的班期挡轮挡时间,TAXI——滑行时间,D——目的空域代码,FARRD——航班的目的空域,A——控制起始时间,B——控制终止时间,FETA——航班的预计到达时间,F——受影响航班集合,FActive——活动中的航班;C——程序发布时间,H——豁免起飞时间,FInF1——飞行中的航班,F3——优先机场起飞的航班,FDepAirport——航班的起飞机场,EmptDepApt—优先机场,F1——优先航班,F2——输入的优先航班,Finternational——国际航班,FINTD——意图起飞时间,FINTA——意图到达时间,FETE——预计飞行时间。
读入完整的控制参数。从流量管理程序生成/评估子系统中获取目的空域名称、目的空域代码D、控制起始时间A、控制终止时间B、豁免起飞时间H、影响机场InFluenceDepApt、优先机场EmptDepApt、优先航班F2、实施统一进区域间隔起飞机场MITApt、实施统一进区域间隔起飞机场分组MITAptGroup等参数。
筛选受影响航班。按式(2)筛选受影响航班。
筛选优先航班。从飞行计划或4D航迹中获取国际航班,按式(3)计算活动中的航班,按式(4)计算优先机场起飞的航班,按式(5)计算优先航班。
生成可用时隙资源。算法为程序控制的每个时间段生成到达时隙,小时容量为m时每个15分钟容量的分配规则见表1,不同容量值下时隙值序列的生成规则见表2,最终生成的时隙的数量恰等于流量管理中心指定的容量值。
表1 小时容量为m时每个15分钟容量的分配规则
 容量值为m(架/60min)  第一个15min容量取值  第二个15min容量取值  第三个15min容量取值  第四个15min容量取值
 能被4整除  m/4  m/4  m/4  m/4
 除以4余1  m/4  m/4  m/4  m/4+1
 除以4余2  m/4  m/4+1  m/4  m/4+1
 除以4余3  m/4  m/4+1  m/4+1  m/4+1
表2 不同容量值下时隙值序列的生成规则
  容量值(架/15min)   时隙个数   时隙值序列   举例
  1   1   15   10:00-10:14(15min)
  2   2   7-8   10:00-10:06(7min),10:07-10:14(8min)
  3   3   5-5-5
  4   4   3-4-4-4
  5   5   3-3-3-3-3
  6   6   2-3-2-3-2-3
  7   7   2-2-2-2-2-2-3
  8   8   1-2-2-2-2-2-2-2
  9   9   1-2-1-2-1-2-2-2-2
  10   10   1-2-1-2-1-2-1-2-1-2
  11   11   1-2-1-1-2-1-1-2-1-1-2
  12   12   1-2-1-1-1-1-2-1-1-1-1-2
  13   13   1-1-1-1-1-2-1-1-1-1-1-1-2
  14   14   1-1-1-1-1-1-1-1-1-1-1-1-1-1
  15   15   1-1-1-1-1-1-1-1-1-1-1-1-1-1-1
根据航班状态生成优先级不同的五组航班。航班按状态分组。第一组:优先航班。第二组:已经受控的航班(发生在程序修改或多个程序同时运行的情况)。第三组:没有延误的联程航班(延误判别标准:起飞时间大于原始起飞时间15分钟(含)以上)。第四组:未优先和未受控的非联程航班。第五组:有延误的联程航班。第一组航班优先级最高,第二组航班优先级次之,第三组航班优先级再次,第四组航班优先较低,第五组航班优先级最低。
若可以得到航空公司的协同,每组内的航班都按班期时刻表到达时间先后排序。若不能得到航空公司的协同,每组内的航班按预计到达时间先后排序。预计到达时间用最新的4D航迹到达时间计算:有飞行航迹的,用飞行航迹推算预计到达时间;没有飞行航迹有计划航迹的,用计划航迹推算预计到达时间;没有计划航迹的用班期时刻表航迹推算预计到达时间。
按时隙分配算法分配到达时隙或起飞时隙。该算法为优先级不同的五组航班依次分配到达时隙。第一组航班在分配时隙时被给予最高的优先权,尽量直接使用其预计到达时间占用的时隙。第二组航班拥有第二等的优先权,尽量直接使用受控的时隙。第三组航班拥有第三等的优先权,尽量使用其所在的时隙。后两组航班将最后分配时隙,从剩余的时隙中依次安排时隙,生成对应的受控到达时间。每组内的航班都按顺序尽可能使用其预计到达时间所在的时隙。时隙分配实现方法流程见图1,具体流程描述如下:
首先判断航班预计到达时间所在的到达时隙是否被占用,若未被占用,则把该时隙分配给该航班,并使该时隙的状态变为占用状态,此航班到达时隙分配结束;若被占用,则获取或计算航班的最早到达时间。若航空公司给了航班的最早到达时间,则获取这个时间;若航空公司未给航班的最早到达时间,则由流量管理人员给其分配一个最早到达时间,一般默认最早到达时间=预计到达时间-20分钟。得到的最早到达时间若小于控制起始时间A,则令最早到达时间=A。然后计算当前航班最早到达时间所在时隙n,若n<=N,判断n时隙是否被占用,若未被占用,则把该时隙分配给该航班,并使该时隙的状态变为占用状态,此航班到达时隙分配结束;若被占用,则定位到下一个时隙n+1,然后再判断和循环。当循环到n>N时说明没有为当前航班分配到合适的时隙,此时,强制分配最后一个时隙给该航班,用最后一个时隙的开始时间作为该航班的意图到达时间,同时滞留航班数累加1,此航班到达时隙分配结束。
航班意图到达时间等于意图到达时隙的开始值,如分配到的时隙为14:24-14:27,则分配的意图到达时间为14:24。
活动状态指航班在飞行中或在豁免起飞时间内即将起飞的状态。若某航班处于活动状态,则只为该航班生成意图到达时间,而不生成意图起飞时间。若航班未处于活动状态,更改意图到达时间为所在时隙的开始时间。按式(6)计算航班意图起飞时间。预计飞行时间可通过最新的4D航迹计算而得:有航空公司协同的,用航空公司提供的预计飞行时间;有计划航迹的,用计划航迹计算预计飞行时间;没有计划航迹的用班期时刻表航迹计算预计飞行时间。
流量管理程序生成/评估子系统新建预案或加载预案,或加载方案模板,得以快速输入相关控制参数。
从4D航迹生成系统中按参数提取相关航班的4D航迹信息,将系统中的航迹头数据和航班最新4D航迹数据导入到相应的内存快照表中,模拟运行后调用算法,获得相关航班的意图起飞时间;根据航班意图起飞时间生成相关航班的意图航迹(只修改内存中的意图航迹,不更新数据库),生成流量预测的直方图显示在流量管理程序生成/评估子系统的显示端,将计算的在线评估指标显示在流量管理程序生成/评估子系统的显示端,待发布的公告信息发布在显示端,模拟运行参数调整妥当后将发布信息发布到其他席位,标志着流量管理程序正式启动,同时流量管理程序预案保存在中间库中。Supervisor席位可以查看、修改、取消(终止)正在运行的流量管理程序,对流量管理程序进行管理。

Claims (1)

1、一种航班时隙分配的实现方法,通过计算机管理系统辅助实现,所述计算机管理系统主要由客户端/服务器/数据库模式网络构成,其特征在于,系统中还包括一个流量管理程序生成/评估子系统,所述流量管理程序生成/评估子系统,用作所述航班时隙分配的实现方法的操作平台;所述航班时隙分配的实现方法,包括如下步骤:
步骤一、在计算机系统中编制流量管理程序生成/评估子系统程序,建立航班数据计算的数学模型;并生成流量管理程序生成/评估子系统操作界面;
步骤二、在流量管理程序生成/评估子系统操作界面调取相关航班数据;操作系统对相关航班数据进行计算;
步骤三、操作系统,筛选受影响航班;
步骤四、操作系统,筛选受影响航班;
步骤五、操作系统,筛选优先航班;
步骤六、系统生成可用时隙资源;
步骤七、操作系统,根据航班状态生成优先级不同的五组航班;
步骤八、操作系统,对每组航班根据预计到达时间先后排序;
步骤九、按时隙分配算法分配到达时隙或起飞时隙。
CN2009100686049A 2009-04-24 2009-04-24 航班时隙分配的实现方法 Expired - Fee Related CN101527086B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100686049A CN101527086B (zh) 2009-04-24 2009-04-24 航班时隙分配的实现方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100686049A CN101527086B (zh) 2009-04-24 2009-04-24 航班时隙分配的实现方法

Publications (2)

Publication Number Publication Date
CN101527086A true CN101527086A (zh) 2009-09-09
CN101527086B CN101527086B (zh) 2011-04-13

Family

ID=41094938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100686049A Expired - Fee Related CN101527086B (zh) 2009-04-24 2009-04-24 航班时隙分配的实现方法

Country Status (1)

Country Link
CN (1) CN101527086B (zh)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102651176A (zh) * 2011-02-22 2012-08-29 通用电气公司 用于管理空中交通的方法和系统
CN103065506A (zh) * 2012-12-13 2013-04-24 民航华东航管设备安装工程处 一种航路点流量控制方法
CN103065504A (zh) * 2012-12-13 2013-04-24 民航华东航管设备安装工程处 一种航空器起飞时刻控制方法
CN103426331A (zh) * 2013-08-22 2013-12-04 南京莱斯信息技术股份有限公司 多机场协同放行系统航班排序决策方法
CN103544672A (zh) * 2013-10-12 2014-01-29 厦门航空有限公司 同一甘特图界面下同时显示航班动态与预案的方法及系统
CN104008674A (zh) * 2014-06-16 2014-08-27 中国民航大学 一种基于模式匹配的终端区进场飞行时间预测方法
CN104299454A (zh) * 2014-10-10 2015-01-21 南京莱斯信息技术股份有限公司 一种恶劣天气下多机场协同放行系统航班排序方法
CN104751683A (zh) * 2015-03-27 2015-07-01 中国民用航空飞行学院 机场航班滑行调度指挥系统及方法
US9177480B2 (en) 2011-02-22 2015-11-03 Lockheed Martin Corporation Schedule management system and method for managing air traffic
CN105160944A (zh) * 2015-08-31 2015-12-16 中国电子科技集团公司第二十八研究所 一种航路资源动态分配工具及其实现方法
CN105469647A (zh) * 2016-01-29 2016-04-06 中国电子科技集团公司第二十八研究所 一种航路时隙资源协同多目标优化分配方法
CN105679102A (zh) * 2016-03-03 2016-06-15 南京航空航天大学 一种全国飞行流量时空分布预测推演系统及方法
CN109740871A (zh) * 2018-12-18 2019-05-10 温州云航信息科技有限公司 一种基于缓冲机制的航班时隙资源利用方法及对应系统
US10354538B2 (en) 2017-09-20 2019-07-16 Honeywell International Inc. Efficient time slot allocation for a flight plan of an aircraft
CN110084516A (zh) * 2019-04-28 2019-08-02 南京航空航天大学 一种民航航段运行时间标准修订方法
CN110503857A (zh) * 2019-09-12 2019-11-26 温州云航信息科技有限公司 基于众包代理机制的航班时隙资源分配方法及系统
CN111462533A (zh) * 2020-03-13 2020-07-28 海南太美航空股份有限公司 航班起飞时刻管理方法及系统
CN111554127A (zh) * 2019-02-12 2020-08-18 通用电气公司 飞行器停机位恢复优化
CN112201082A (zh) * 2020-10-27 2021-01-08 上海行沙科技有限公司 一种航班放行时隙的n点置换方法
WO2021004473A1 (zh) * 2019-07-10 2021-01-14 中国民航信息网络股份有限公司 航班生效批次的生效调整方法及装置
CN113808439A (zh) * 2021-08-23 2021-12-17 南京莱斯信息技术股份有限公司 航班流量管理体系下的离场排序方法
CN114299762A (zh) * 2021-12-03 2022-04-08 南京莱斯信息技术股份有限公司 一种基于一致性监测的航班时隙自动优化方法及系统
CN114627684A (zh) * 2022-01-24 2022-06-14 中国民用航空中南地区空中交通管理局海南分局 受多重流量管理策略影响下航班起飞时隙分配计算方法

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102651176A (zh) * 2011-02-22 2012-08-29 通用电气公司 用于管理空中交通的方法和系统
US9177480B2 (en) 2011-02-22 2015-11-03 Lockheed Martin Corporation Schedule management system and method for managing air traffic
CN103065506A (zh) * 2012-12-13 2013-04-24 民航华东航管设备安装工程处 一种航路点流量控制方法
CN103065504A (zh) * 2012-12-13 2013-04-24 民航华东航管设备安装工程处 一种航空器起飞时刻控制方法
CN103065504B (zh) * 2012-12-13 2015-01-07 民航华东航管设备安装工程处 一种航空器起飞时刻控制方法
CN103426331A (zh) * 2013-08-22 2013-12-04 南京莱斯信息技术股份有限公司 多机场协同放行系统航班排序决策方法
CN103544672A (zh) * 2013-10-12 2014-01-29 厦门航空有限公司 同一甘特图界面下同时显示航班动态与预案的方法及系统
CN104008674A (zh) * 2014-06-16 2014-08-27 中国民航大学 一种基于模式匹配的终端区进场飞行时间预测方法
CN104008674B (zh) * 2014-06-16 2016-01-20 中国民航大学 一种基于模式匹配的终端区进场飞行时间预测方法
CN104299454A (zh) * 2014-10-10 2015-01-21 南京莱斯信息技术股份有限公司 一种恶劣天气下多机场协同放行系统航班排序方法
CN104751683A (zh) * 2015-03-27 2015-07-01 中国民用航空飞行学院 机场航班滑行调度指挥系统及方法
CN105160944A (zh) * 2015-08-31 2015-12-16 中国电子科技集团公司第二十八研究所 一种航路资源动态分配工具及其实现方法
CN105469647B (zh) * 2016-01-29 2017-10-17 中国电子科技集团公司第二十八研究所 一种航路时隙资源协同多目标优化分配方法
CN105469647A (zh) * 2016-01-29 2016-04-06 中国电子科技集团公司第二十八研究所 一种航路时隙资源协同多目标优化分配方法
CN105679102B (zh) * 2016-03-03 2018-03-27 南京航空航天大学 一种全国飞行流量时空分布预测推演系统及方法
CN105679102A (zh) * 2016-03-03 2016-06-15 南京航空航天大学 一种全国飞行流量时空分布预测推演系统及方法
US10354538B2 (en) 2017-09-20 2019-07-16 Honeywell International Inc. Efficient time slot allocation for a flight plan of an aircraft
CN109740871A (zh) * 2018-12-18 2019-05-10 温州云航信息科技有限公司 一种基于缓冲机制的航班时隙资源利用方法及对应系统
WO2020125699A1 (zh) * 2018-12-18 2020-06-25 杭州坚果壳科技开发有限公司 一种基于缓冲机制的航班时隙资源利用方法及对应系统
CN111554127A (zh) * 2019-02-12 2020-08-18 通用电气公司 飞行器停机位恢复优化
CN110084516A (zh) * 2019-04-28 2019-08-02 南京航空航天大学 一种民航航段运行时间标准修订方法
WO2021004473A1 (zh) * 2019-07-10 2021-01-14 中国民航信息网络股份有限公司 航班生效批次的生效调整方法及装置
CN110503857A (zh) * 2019-09-12 2019-11-26 温州云航信息科技有限公司 基于众包代理机制的航班时隙资源分配方法及系统
CN111462533A (zh) * 2020-03-13 2020-07-28 海南太美航空股份有限公司 航班起飞时刻管理方法及系统
CN112201082A (zh) * 2020-10-27 2021-01-08 上海行沙科技有限公司 一种航班放行时隙的n点置换方法
CN112201082B (zh) * 2020-10-27 2021-08-03 上海行沙科技有限公司 一种航班放行时隙的n点置换方法
CN113808439A (zh) * 2021-08-23 2021-12-17 南京莱斯信息技术股份有限公司 航班流量管理体系下的离场排序方法
CN113808439B (zh) * 2021-08-23 2023-02-24 南京莱斯信息技术股份有限公司 航班流量管理体系下的离场排序方法
CN114299762A (zh) * 2021-12-03 2022-04-08 南京莱斯信息技术股份有限公司 一种基于一致性监测的航班时隙自动优化方法及系统
CN114627684A (zh) * 2022-01-24 2022-06-14 中国民用航空中南地区空中交通管理局海南分局 受多重流量管理策略影响下航班起飞时隙分配计算方法
CN114627684B (zh) * 2022-01-24 2023-08-18 中国民用航空中南地区空中交通管理局海南分局 受多重流量管理策略影响下航班起飞时隙分配计算方法

Also Published As

Publication number Publication date
CN101527086B (zh) 2011-04-13

Similar Documents

Publication Publication Date Title
CN101527086B (zh) 航班时隙分配的实现方法
Kohl et al. Airline disruption management—perspectives, experiences and outlook
CN105575108B (zh) 一种智能公交调度运营方法
CN109409599A (zh) 基于实时需求的定制公交线路开通优化方法
Deshpande et al. The impact of airline flight schedules on flight delays
Huisman A column generation approach for the rail crew re-scheduling problem
Bratu et al. An analysis of passenger delays using flight operations and passenger booking data
CN108082224B (zh) 基于afc时变客流的城市轨道交通列车运行图编制方法
CN107564270A (zh) 一种智能公交调度运营方法
CN110334959A (zh) 一种航班舱位资源分配方法及装置
Doomernik Performance and efficiency of high-speed rail systems
Zhao et al. An integrated approach of train scheduling and rolling stock circulation with skip-stopping pattern for urban rail transit lines
CN103632212A (zh) 一种时变用户均衡动态网络演化客流预测系统和方法
Cadarso et al. Improving robustness of rolling stock circulations in rapid transit networks
CN107464043A (zh) 一种空间众包中多类型任务的分配方法
CN101527087B (zh) 航班过台间隔的实现方法
CN111310383B (zh) 基于htcpn的机场牵引车动态优化调度方法
Jiang et al. A simulation model for estimating train and passenger delays in large-scale rail transit networks
Kotegawa et al. Impact of service network topology on air transportation efficiency
CN105023228A (zh) 一种基于航班离港时刻的旅客聚集监测系统和监测方法
CN108764510A (zh) 面向大规模路网的城市轨道交通并行仿真任务分解方法
Zhang et al. Optimizing single-depot vehicle scheduling problem: fixed-interval model and algorithm
Schettini et al. Demand-driven timetabling for a metro corridor using a short-turning acceleration strategy
CN105138391B (zh) 面向广域分布云系统公平的多任务虚拟机分配方法
Tian et al. Designing and planning sustainable customized bus service for departing attendees of planned special events: A two-phase methodology integrating data-driven and demand-responsive

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110413

Termination date: 20170424