CN101509287B - Gypsum poured non-bearing wall - Google Patents
Gypsum poured non-bearing wall Download PDFInfo
- Publication number
- CN101509287B CN101509287B CN2009101024568A CN200910102456A CN101509287B CN 101509287 B CN101509287 B CN 101509287B CN 2009101024568 A CN2009101024568 A CN 2009101024568A CN 200910102456 A CN200910102456 A CN 200910102456A CN 101509287 B CN101509287 B CN 101509287B
- Authority
- CN
- China
- Prior art keywords
- gypsum
- plaster
- wall
- parts
- straight tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention discloses a non-bearing wall body by gypsum pouring formed by a plurality of hollow gypsum keels and the gypsum encapsulating the keels. The gypsum is obtained by situ casting of a gypsum slurry, wherein each material weight part of the gypsum slurry is: 80-95 parts of a semi-hydrated gypsum powder, 3-15 parts of a batch, 0.5-2.5 parts of an air-leading water-reducing agent, and a water-solid ratio is 0.5-0.7. The semi-hydrated gypsum powder is a semi-hydrated natural gyspsum, a semi-hydrated phospho gypsum or a semi-hydrated desulfurized gypsum. The batch is one, two or more than two of a fly ash, a blast furnace slag and a cement. The air-leading water-reducing agent is one, two or more than two of a triterpenoid saponim, a calcium lignosulphonate, sodium beta-naphthalene sulfonic. The gypsum keels are formed by a hollow straight tube (1) and a thin straight tube (2) with holes (3) arranged on both ends of the hollow straight tube. The invention has high construction efficiency and high quality of the wall body and can greatly reduce labor intensity and enjoy low cost.
Description
Technical field
The present invention relates to building materials field, relate in particular to non-bearing wall body.
Background technology
At present building field has non-bearing wall body miscellaneous, and selecting for use more is 240mm solid clay brick, structural clay tile, haydite hollow brick, concrete hollow block, cinder building-block and air-entrained concrete building block etc.Its construction technology is that traditional-handwork is built by laying bricks or stones, plastered basically, and labour intensity height, efficient are low, complex procedures, progress are slow, and all wet trade, particularly clay solid brick, has been subjected to the strictness restriction of policy.The present effect that adopts flyash hollow batten or gypsum lath construction is than high several times of building block, and floor space is little, but most batten exists the weakness that can't overcome: weight is big, transportation is inconvenient, breakage rate is high, the body of wall seam is easy to crack etc.Also has prefabricated three-in-one exterior wall plate in addition, it is with space enclosing structure layer (generally being steel concrete), insulation layer (polyphenyl plate or rock cotton board) and outside finish three unification, in factory's time processing moulding, directly installs to on-the-spot, but production technology more complicated, cost are too high.Adopt traditional gypsum plank to add the lightgage steel joist frame and make vertical partition wall, then exist not sound insulation, not durable, many shortcomings such as shock resistance is poor, moisture-sensitive cracking.
Summary of the invention
The objective of the invention is to overcome above-mentioned shortcoming and a kind of efficiency of construction height is provided, wall quality is good, can alleviate labor strength and the low non-bearing wall body featuring plaster pouring of cost greatly.
Another object of the present invention also is to provide the preparation method of this non-bearing wall body featuring plaster pouring.
Non-bearing wall body featuring plaster pouring of the present invention, by some hollow gypsum studs and the parcel keel gypsum constitute, gypsum is that the calcium plaster cast-in-site gets; Wherein each parts by weight of raw materials of calcium plaster is: semi-hydrated gypsum powder 80-95 part; Batch 3-15 part; Gas tracting subtractive agent 0.5-2.5 part; The water-solid ratio value is 0.5-0.7.
Above-mentioned non-bearing wall body featuring plaster pouring, wherein: semi-hydrated gypsum powder is the half water plaster of paris, half water ardealite or half water desulfurated plaster.
Above-mentioned non-bearing wall body featuring plaster pouring, wherein: batch be in flyash, blast-furnace cinder, the cement a kind of, two or more.
Above-mentioned non-bearing wall body featuring plaster pouring, wherein: gas tracting subtractive agent be in triterpenoid saponin, calcium lignosulfonate, the sodium a kind of, two or more.
Above-mentioned non-bearing wall body featuring plaster pouring, wherein: gypsum stud constitutes one by hollow straight tube and the with holes thin straight tube of being located at the hollow straight tube two ends and forms.
The preparation method of non-bearing wall body featuring plaster pouring of the present invention may further comprise the steps:
(1) the molded work of body of wall: emit the body of wall position line in body of wall to be cast position, select engineering plastics plate or other light material thin plate according to body of wall shape to be cast and size then, assembly unit engineering plastics plate, couple together with the plate of gypsum stud body of wall mould two sides, the sprue gate is left at body of wall mould middle part, exhaust opening is left at the top, checks simultaneously whether sprue gate and exhaust opening be unobstructed;
(2) cast in: after treating that the molded work of body of wall finishes, be connected with the sprue gate of template with watering pump priming.The calcium plaster that stirs is poured in the grouting machine, and unlatching is watered pump priming and is poured into a mould, and when gypsum slurry is overflowed from exhaust opening, stops cast;
(3) dismounting body of wall mould: after treating that body of wall solidifies fully, engineering plastics plate or other light material thin plate are removed, order is removed gypsum stud two ends redundance from top to bottom, and Puttying gets final product on body of wall.
The present invention compared with prior art has tangible advantage and effect.By above technical scheme as can be known, be assembled into the body of wall mould, both satisfied the needs of the different-thickness of body of wall, also alternative plaster leveling layer by engineering plastics or other light material thin plate; Adopt gypsum stud, both regular worker's engineering plastics plate formed whole non with the gypsum of pouring into a mould again simultaneously.In the gypsum cast non-bearing wall body, after calcium plaster solidified, itself and gypsum stud formed complete one, and the surface of wall after the moulding is more smooth, need not at the plaster leveling layer, only needed Puttying to get final product.Batch can reduce water absorbing capacity, improves the moistureproof ability of gypsum wall; Improve the intensity of body of wall simultaneously, reduced wall crazing.Gas tracting subtractive agent can reduce the mixing water amount, is beneficial to improve strength of wall body and durability; Improve the mobile performance of calcium plaster simultaneously, need not make each corner that bobbing machine just can be filled into calcium plaster shell firm by ramming, in conveyance conduit, can not block because of gypsum sets.Thereby body of wall has protection against the tide, anti-be full of cracks, and sound insulation, heat insulation effect, and have higher intensity.Simultaneously, can adopt mechanized construction, the body of wall moulding is fast, and the demolition works plastics are fast, can alleviate labor strength greatly, thereby its efficiency of construction height, and wall quality is good, can alleviate labor strength greatly and cost is low
Description of drawings
Fig. 1 is the structural representation of gypsum stud;
Fig. 2 is the A-A sectional view of Fig. 1.
Mark among the figure:
1, hollow straight tube; 2, thin straight tube, 3, the hole.
The specific embodiment
Non-bearing wall body featuring plaster pouring of the present invention, by some hollow gypsum studs and the parcel keel gypsum constitute, gypsum is that the calcium plaster cast-in-site gets; Wherein each parts by weight of raw materials of calcium plaster is: 90 parts of the half water plasters of paris, 9.5 parts in flyash, 0.5 part of calcium lignosulfonate, 60 parts in water.
The preparation method of non-bearing wall body featuring plaster pouring may further comprise the steps:
(1) the molded work of body of wall: emit the body of wall position line in body of wall to be cast position, select to have convex tenon and Baltimore groove according to body of wall shape to be cast and size then, engineering plastics plate or other light material thin plate, buckle assembly unit mutually and form wall enclosure, hollow gypsum keel (referring to Fig. 1-2) constitute one by hollow straight tube 1 and the with holes thin straight tube 2 of being located at the hollow straight tube two ends and form, the step that forms between hollow straight tube 1 and the with holes 3 thin straight tubes 2 blocks engineering plastics plate or other light material thin plate of the both sides of wall enclosure, pass hole 3 on the thin cylinder in two ends with pin then, the plate on body of wall two sides is coupled together, thereby increased whole casing intensity.Check whether sprue gate and exhaust opening be unobstructed;
(2) cast in: after treating that the molded work of body of wall finishes, be connected with the sprue gate of template with watering pump priming.Material requirement according to the body of wall making, with 90 parts of the half water plasters of paris, 9.5 parts in flyash, 0.5 part of calcium lignosulfonate, 60 parts in water, join in the mixer, the calcium plaster that stirs is poured in the grouting machine, unlatching is watered pump priming and is carried out the pouring gypsum slurry when exhaust opening overflows, and stops cast;
(3) dismounting body of wall mould: treat that body of wall solidifies back (about 1-2 hour) fully, engineering plastics plate or other light material thin plate are removed that order is removed gypsum stud two ends redundance from top to bottom, Puttying gets final product on body of wall.
Non-bearing wall body featuring plaster pouring of the present invention, by some hollow gypsum studs and the parcel keel gypsum constitute, gypsum is that the calcium plaster cast-in-site gets; Wherein each parts by weight of raw materials of calcium plaster is: 85 parts of half water ardealites, 14 parts of blast-furnace cinders, 1.0 parts of triterpenoid saponins, 65 parts in water.
The preparation method of non-bearing wall body featuring plaster pouring may further comprise the steps:
(1) the molded work of body of wall: emit the body of wall position line in body of wall to be cast position, select to have convex tenon and Baltimore groove according to body of wall shape to be cast and size then, engineering plastics plate or other light material thin plate, buckle assembly unit mutually and form wall enclosure, hollow gypsum keel (referring to Fig. 1-2) constitute one by hollow straight tube 1 and the with holes thin straight tube 2 of being located at the hollow straight tube two ends and form, the step that forms between hollow straight tube 1 and the with holes 3 thin straight tubes 2 blocks engineering plastics plate or other light material thin plate of the both sides of wall enclosure, pass hole 3 on the thin cylinder in two ends with pin then, the plate on body of wall two sides is coupled together, thereby increased whole casing intensity.Check whether sprue gate and exhaust opening be unobstructed;
(2) cast in: after treating that the molded work of body of wall finishes, be connected with the sprue gate of template with watering pump priming.Material requirement according to the body of wall making, with 85 parts of half water ardealites, 14 parts of blast-furnace cinders, 1.0 parts of triterpenoid saponins, 65 parts in water, join in the mixer, the calcium plaster that stirs is poured in the grouting machine, unlatching is watered pump priming and is carried out the pouring gypsum slurry when exhaust opening overflows, and stops cast;
(3) dismounting body of wall mould: treat that body of wall solidifies back (about 1-2 hour) fully, engineering plastics plate or other light material thin plate are removed that order is removed gypsum stud two ends redundance from top to bottom, Puttying gets final product on body of wall.
Non-bearing wall body featuring plaster pouring of the present invention, by some hollow gypsum studs and the parcel keel gypsum constitute, gypsum is that the calcium plaster cast-in-site gets; Wherein each parts by weight of raw materials of calcium plaster is: 95 parts of half water desulfurated plasters, 3 parts of cement, 2 parts of sodiums, 55 parts in water.
The preparation method of non-bearing wall body featuring plaster pouring may further comprise the steps:
(1) the molded work of body of wall: emit the body of wall position line in body of wall to be cast position, select to have convex tenon and Baltimore groove according to body of wall shape to be cast and size then, engineering plastics plate or other light material thin plate, buckle assembly unit mutually and form wall enclosure, hollow gypsum keel (referring to Fig. 1-2) constitute one by hollow straight tube 1 and the with holes thin straight tube 2 of being located at the hollow straight tube two ends and form, the step that forms between hollow straight tube 1 and the with holes 3 thin straight tubes 2 blocks engineering plastics plate or other light material thin plate of the both sides of wall enclosure, pass hole 3 on the thin cylinder in two ends with pin then, the plate on body of wall two sides is coupled together, thereby increased whole casing intensity.Check whether sprue gate and exhaust opening be unobstructed;
(2) cast in: after treating that the molded work of body of wall finishes, be connected with the sprue gate of template with watering pump priming.Material requirement according to the body of wall making, with 95 parts of half water desulfurated plasters, 3 parts of cement, 2 parts of sodiums, 55 parts in water, join in the mixer, the calcium plaster that stirs is poured in the grouting machine, unlatching is watered pump priming and is carried out the pouring gypsum slurry when exhaust opening overflows, and stops cast;
(3) dismounting body of wall mould: treat that body of wall solidifies back (about 1-2 hour) fully, engineering plastics plate or other light material thin plate are removed that order is removed gypsum stud two ends redundance from top to bottom, Puttying gets final product on body of wall.
Embodiment 4
Non-bearing wall body featuring plaster pouring of the present invention, by some hollow gypsum studs and the parcel keel gypsum constitute, gypsum is that the calcium plaster cast-in-site gets; Wherein each parts by weight of raw materials of calcium plaster is: 85 parts of half water ardealites, 5 parts in flyash, 4.5 parts of blast-furnace cinders, 3 parts of cement, 0.5 part of triterpenoid saponin, 1 part of calcium lignosulfonate, 1 part of sodium, 50 parts in water.
The preparation method of non-bearing wall body featuring plaster pouring may further comprise the steps:
(1) the molded work of body of wall: emit the body of wall position line in body of wall to be cast position, select to have convex tenon and Baltimore groove according to body of wall shape to be cast and size then, engineering plastics plate or other light material thin plate, buckle assembly unit mutually and form wall enclosure, hollow gypsum keel (referring to Fig. 1-2) constitute one by hollow straight tube 1 and the with holes thin straight tube 2 of being located at the hollow straight tube two ends and form, the step that forms between hollow straight tube 1 and the with holes 3 thin straight tubes 2 blocks engineering plastics plate or other light material thin plate of the both sides of wall enclosure, pass hole 3 on the thin cylinder in two ends with pin then, the plate on body of wall two sides is coupled together, thereby increased whole casing intensity.Check whether sprue gate and exhaust opening be unobstructed;
(2) cast in: after treating that the molded work of body of wall finishes, be connected with the sprue gate of template with watering pump priming.Material requirement according to the body of wall making, with 85 parts of half water ardealites, 5 parts in flyash, 4.5 parts of blast-furnace cinders, 3 parts of cement, 0.5 part of triterpenoid saponin, 1 part of calcium lignosulfonate, 1 part of sodium, 50 parts in water, join in the mixer, the calcium plaster that stirs is poured in the grouting machine, unlatching is watered pump priming and is carried out the pouring gypsum slurry when exhaust opening overflows, and stops cast;
(3) dismounting body of wall mould: treat that body of wall solidifies back (about 1-2 hour) fully, engineering plastics plate or other light material thin plate are removed that order is removed gypsum stud two ends redundance from top to bottom, Puttying gets final product on body of wall.
The above, it only is preferred embodiment of the present invention, be not that the present invention is done any pro forma restriction, any technical solution of the present invention content that do not break away from,, all still belong in the scope of technical solution of the present invention any simple modification, equivalent variations and modification that above embodiment did according to technical spirit of the present invention.
Claims (5)
1. non-bearing wall body featuring plaster pouring is characterized in that: the gypsum by some hollow gypsum studs and parcel keel constitutes, and gypsum is that the calcium plaster cast-in-site gets;
Wherein each parts by weight of raw materials of calcium plaster is: semi-hydrated gypsum powder 80-95 part; Batch 3-15 part; Gas tracting subtractive agent 0.5-2.5 part; The water-solid ratio value is 0.5-0.7.
2. non-bearing wall body featuring plaster pouring as claimed in claim 1 is characterized in that: semi-hydrated gypsum powder is the half water plaster of paris, half water ardealite or half water desulfurated plaster.
3. non-bearing wall body featuring plaster pouring as claimed in claim 1 or 2 is characterized in that: batch be in flyash, blast-furnace cinder, the cement a kind of, two or more.
4. non-bearing wall body featuring plaster pouring as claimed in claim 3 is characterized in that: gas tracting subtractive agent be in triterpenoid saponin, calcium lignosulfonate, the sodium a kind of, two or more.
5. non-bearing wall body featuring plaster pouring as claimed in claim 1 is characterized in that: constitute one by hollow straight tube (1) and (3) with holes thin straight tube (2) of being located at the hollow straight tube two ends and form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101024568A CN101509287B (en) | 2009-03-06 | 2009-03-06 | Gypsum poured non-bearing wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101024568A CN101509287B (en) | 2009-03-06 | 2009-03-06 | Gypsum poured non-bearing wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101509287A CN101509287A (en) | 2009-08-19 |
CN101509287B true CN101509287B (en) | 2011-04-06 |
Family
ID=41001808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101024568A Active CN101509287B (en) | 2009-03-06 | 2009-03-06 | Gypsum poured non-bearing wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101509287B (en) |
-
2009
- 2009-03-06 CN CN2009101024568A patent/CN101509287B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN101509287A (en) | 2009-08-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101285330A (en) | Environment protection type structure thermal insulation concrete block, masonry and method for anti-knock domestic architecture | |
CN101196067A (en) | Light phase transition heat preserving wall building block | |
CN105113699A (en) | High-strength concrete block used as outer wall of grouted composite wall as well as grouted composite wall and construction method thereof | |
CN112079602A (en) | Integrally cast assembled polyphenyl particle concrete light partition board and preparation method thereof | |
CN101294434A (en) | Novel composite thermal insulation building block and producing method thereof | |
CN103601461A (en) | Filling material | |
CN201050124Y (en) | Light aggregate concrete formwork lattice type wall | |
WO2017007435A1 (en) | A multi-hollow, cement based, lightweight building block and its manufacturing method | |
CN201224941Y (en) | Environment protection type structure thermal insulation concrete building block, masonry and anti-vibration residential building | |
CN103590515B (en) | A kind of self-balancing precast surface, cast-in-place core filler wall | |
CN201560522U (en) | Self-insulation interlocking wall building block | |
CN101509287B (en) | Gypsum poured non-bearing wall | |
CN2915993Y (en) | Desulfurized gypsum hollow wall slab | |
Rafi et al. | Analytical study on special concretes with M20 & M25 grades for construction | |
CN113233858A (en) | Environment-friendly plastering material for building interior walls and preparation method thereof | |
CN111926985A (en) | Building brick for house building | |
CN101492937B (en) | Construction method for water stop belt for moisture-proof water stop | |
CN205577171U (en) | Cast -in -place light composite wall that builds of assembled non -bearing | |
CN104563379A (en) | Preparation method for EPS (expandable polystyrene)-foam cement composite self-insulation vertical wall block | |
CN103556769A (en) | Interlocking blocked anti-seismic building block | |
CN1005578B (en) | Sandwiched masonry unit using wall rib as a neutral surface structure | |
CN1212457C (en) | Outer making up and inner casting non-bearing wall and constructing method | |
CN1232711C (en) | Light heat-insulating wall block | |
CN203613708U (en) | Self heat preservation wall body building block | |
CN208701992U (en) | Foamed concrete fills wall construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |