CN101492964A - Mass concrete construction method - Google Patents
Mass concrete construction method Download PDFInfo
- Publication number
- CN101492964A CN101492964A CNA2009100679539A CN200910067953A CN101492964A CN 101492964 A CN101492964 A CN 101492964A CN A2009100679539 A CNA2009100679539 A CN A2009100679539A CN 200910067953 A CN200910067953 A CN 200910067953A CN 101492964 A CN101492964 A CN 101492964A
- Authority
- CN
- China
- Prior art keywords
- construction method
- concrete construction
- mass concrete
- concrete
- concreting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to a method for constructing mass concrete, and belongs to the technical field of concrete construction. The method for constructing the mass concrete comprises a construction process of pouring concrete, and is characterized in that the concrete is poured for several times, so as to finish the construction of the mass concrete through the mode of pouring the concrete for several times. The method has the advantages that the method has simple process, convenient construction and low construction cost, is not limited by factors such as other construction conditions and the like, can be applied to any mass concrete construction site, and ensures the construction quality of the concrete.
Description
Technical field
The invention belongs to the concrete construction technology field, particularly relate to a kind of mass concrete construction method.
Background technology
At present, mass concrete construction method is to adopt a concreting to finish job practices, owing to reasons such as concrete in mass heat radiations, causes problems such as distress in concrete.General adopt insulation or in concrete mode such as the logical cooling water of pipe laying solve heat dissipation problem, such job practices trouble, influence programming, the construction cost height, restricted by other condition elements, and construction quality still can't effectively be ensured, causes the follow-up use hidden danger of concrete in mass, influences security performance.
Summary of the invention
The present invention provides a kind of mass concrete construction method for solving the problem that prior art exists.
Order of the present invention provides that a kind of to have activities simple, easy construction, the mass concrete construction method of characteristics such as construction quality is secure.
Mass concrete construction method of the present invention adopts following technical scheme:
A kind of mass concrete construction method comprises the concrete pouring construction process, is characterized in: concreting divides to be carried out for several times, finishes mass concrete construction by several concreting mode.
Mass concrete construction method of the present invention can also be taked following technical measures:
Described a kind of mass concrete construction method is characterized in: concreting for several times is twice concreting.
Described a kind of mass concrete construction method is characterized in: twice concreting is to carry out the concreting first time earlier, leaves the hole when building on concrete, carries out the concreting second time then in the hole of leaving for the first time and finishes.
Described a kind of mass concrete construction method is characterized in: pitch of holes is 300-1000mm.
Described a kind of mass concrete construction method is characterized in: concrete hole is cylindrical.
Described a kind of mass concrete construction method is characterized in: cylindrical hole is quincunx arrangement mode.
Described a kind of mass concrete construction method is characterized in: the diameter of cylindrical hole is 300-1000mm.
Advantage that the present invention has and good effect:
The present invention is owing to adopted the brand-new technology scheme, and therefore, it is simple that mass concrete construction method has activities, easy construction, construction cost is low, not restricted by factors such as other execution conditions, applicable any big long-pending concrete construction site, advantage such as concrete construction quality is secure.
Description of drawings
Fig. 1 is a mass concrete construction bridge construction schematic diagram of the present invention;
Fig. 2 is the A-A cross-sectional view of Fig. 1.
Among the figure, 1-bridge, 2-cylindrical hole.
The specific embodiment
For further understanding technology contents of the present invention, characteristics and effect, enumerate following example now, and conjunction with figs. is described in detail as follows:
With reference to accompanying drawing 1 and Fig. 2.
Embodiment
A kind of mass concrete construction method, in the large bridge work progress, concreting is divided into twice to be carried out, twice concreting is to carry out the concreting first time earlier, leave blind hole when building on concrete, concrete blind hole is cylindrical, is quincunx arrangement mode, bore dia is 800mm, and pitch of holes is 800mm; During by concrete construction evenly quincunx arranging the mode of cylindrical hole is set, mass concrete construction is changed into non-mass concrete construction, thereby efficiently solves a series of problems such as heat radiation, crack of large volume construction.After for the first time building successfully, in the quincunx hole of leaving for the first time of arranging of cylindrical hole, carry out the concreting second time again, realize the large bridge casting of concrete in mass at last.This job practices activities is simple, and construction cost is low, not restricted by factors such as other execution conditions, and construction quality is secure.
Claims (7)
1. a mass concrete construction method comprises the concrete pouring construction process, it is characterized in that: concreting divides to be carried out for several times, finishes mass concrete construction by several concreting mode.
2. according to the described a kind of mass concrete construction method of claim 1, it is characterized in that: concreting for several times is twice concreting.
3. according to the described a kind of mass concrete construction method of claim 2, it is characterized in that: twice concreting is to carry out the concreting first time earlier, on concrete, leave the hole when building, in the hole of leaving for the first time, carry out the concreting second time then and finish.
4. according to the described a kind of mass concrete construction method of claim 3, it is characterized in that: pitch of holes is 300-1000mm.
5. according to the described a kind of mass concrete construction method of claim 3, it is characterized in that: concrete hole is cylindrical.
6. according to the described a kind of mass concrete construction method of claim 5, it is characterized in that: cylindrical hole is quincunx arrangement mode.
7. according to the described a kind of mass concrete construction method of claim 5, it is characterized in that: the diameter of cylindrical hole is 300-1000mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100679539A CN101492964A (en) | 2009-02-26 | 2009-02-26 | Mass concrete construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100679539A CN101492964A (en) | 2009-02-26 | 2009-02-26 | Mass concrete construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101492964A true CN101492964A (en) | 2009-07-29 |
Family
ID=40923745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2009100679539A Pending CN101492964A (en) | 2009-02-26 | 2009-02-26 | Mass concrete construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101492964A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102454298A (en) * | 2010-10-18 | 2012-05-16 | 五冶集团上海有限公司 | Method for constructing large-sized reinforced concrete frame beam |
CN103669356A (en) * | 2013-11-13 | 2014-03-26 | 雅砻江流域水电开发有限公司 | Large-sized normal concrete thick layer pouring method |
CN105239725A (en) * | 2015-11-17 | 2016-01-13 | 中建二局第三建筑工程有限公司 | Construction method and construction template for ultrahigh oblique concrete column |
-
2009
- 2009-02-26 CN CNA2009100679539A patent/CN101492964A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102454298A (en) * | 2010-10-18 | 2012-05-16 | 五冶集团上海有限公司 | Method for constructing large-sized reinforced concrete frame beam |
CN102454298B (en) * | 2010-10-18 | 2016-06-01 | 五冶集团上海有限公司 | Large-sized reinforced concrete construction of frame beam method |
CN103669356A (en) * | 2013-11-13 | 2014-03-26 | 雅砻江流域水电开发有限公司 | Large-sized normal concrete thick layer pouring method |
CN103669356B (en) * | 2013-11-13 | 2015-10-28 | 雅砻江流域水电开发有限公司 | Large volume normal concrete thick layer casting method |
CN105239725A (en) * | 2015-11-17 | 2016-01-13 | 中建二局第三建筑工程有限公司 | Construction method and construction template for ultrahigh oblique concrete column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202745404U (en) | External repairing and reinforcing device of reinforced concrete chimney cylinder wall after tapping and sampling | |
CN104358360A (en) | Full-grouting sleeve for connection of construction reinforcing steel bars | |
CN101492964A (en) | Mass concrete construction method | |
CN203613817U (en) | Base device for steel-structured safety protection fence | |
CN203321054U (en) | Tower of wind turbine generator | |
CN209066848U (en) | A kind of external hanging type hanging basket holder device | |
CN204299044U (en) | A kind of building iron connects uses full grout sleeve | |
CN102720347B (en) | Scaffold tool type wall connecting piece and construction method thereof | |
CN104234325B (en) | The installation method of FRP rib tape screw plug bond type anchorage | |
CN206752693U (en) | A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node | |
CN202658872U (en) | Tool connecting tube of building scaffold | |
CN203411992U (en) | Reserved hole template of deep hole in mass concrete | |
CN203499262U (en) | One-off pouring structure of door and window hole lintel structure and vertical plate strip concrete structure | |
CN202644967U (en) | Scaffold tool type wall connecting piece | |
CN209874074U (en) | Porous inclined plane slip casting embedded pipe | |
CN204876349U (en) | Steel bar anchoring device | |
CN203393904U (en) | Reinforcement fabric hoop | |
CN207878936U (en) | Fabricated construction precast facade bearing diagonal fixing device | |
CN202380645U (en) | Steel bar anchoring component with reinforced concrete structure | |
CN207863442U (en) | A kind of easy device for positioning and installing convenient for building facade temporary component bearing | |
CN203640284U (en) | Split bolt capable of being repeatedly used | |
CN208668927U (en) | A kind of dedicated injection plastic metallic combination connector of compound heat preservation die plate | |
CN207453121U (en) | A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts | |
CN202007410U (en) | Novel tower crane base | |
CN203393739U (en) | Forming mold for reserved holes of equipment foundations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20090729 |