CN101487613A - 一种冰蓄冷空调系统 - Google Patents

一种冰蓄冷空调系统 Download PDF

Info

Publication number
CN101487613A
CN101487613A CNA2009100089029A CN200910008902A CN101487613A CN 101487613 A CN101487613 A CN 101487613A CN A2009100089029 A CNA2009100089029 A CN A2009100089029A CN 200910008902 A CN200910008902 A CN 200910008902A CN 101487613 A CN101487613 A CN 101487613A
Authority
CN
China
Prior art keywords
ice
air
storage unit
conditioning
mouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100089029A
Other languages
English (en)
Other versions
CN101487613B (zh
Inventor
戴思嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
High Spirit Energy Investment Group Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100089029A priority Critical patent/CN101487613B/zh
Publication of CN101487613A publication Critical patent/CN101487613A/zh
Application granted granted Critical
Publication of CN101487613B publication Critical patent/CN101487613B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

本发明涉及一种冰蓄冷空调系统。本方案可以在五种供冷模式下工作,最大限度的利用了用电低谷时期的电力,使用双串联方式可以方便的对当前各种状态进行适应性改动,独特的蛇型钢盘管构造和优异的传热性能,在制冷未期,水被冻结成25MM厚度的冰层包裹在盘管外壁上,冰层之间留有空隙,仍为0度的水,没有冰桥,因此可保证换热均匀,采用制冷剂乙二醇出口温度恒定,并可控制取冷过程,取冰率可达100%。单根100米长蛇形管盘绕在支撑架上,外融冰设备可提供恒定的1度冷冻水,区域供冷减少CFC的使用和CO2的排放,本方案提供了一种平衡用电负荷的有效方法。

Description

一种冰蓄冷空调系统
技术领域
本发明涉及一种空调装置,具体涉及一种冰蓄冷空调装置。
背景技术
近年来,随着我国的经济快速发展,电力工业发展也同比较快。但在一些经济发达地区用电仍很紧张,成为制约经济发展的瓶颈,由于电网负荷率低,供电系统的峰谷差大,造成用电高峰时供电紧缺,同时,城市生活、商业用电的快速增长,特别是夏季用电负荷的骤增,使得城市电网已远不能适应,因此,“转移高峰电力”,充分利用夜间电能已成为政府和电力管理部门致力于缓解电力紧缺的重要和长远的措施之一,并通过制定用电峰谷分时电价政策等手段以推动电力“削峰填谷”的实现。
蓄冰空调系统,作为一项重要的蓄能技术,因其可以大大地缓解由于空调用电负荷在用电峰谷时段的不均衡而造成电网峰谷差的加大,具有很强的“削峰填谷”作用,它的应用不但可以转移电力高峰期用电量,平衡电网的峰谷差,提高发电机组效率,而且可以减少新建电厂、蓄能电站的投资,减少环境污染,有利于生态平衡,从而得到政府有关部门和各级电力部门的大力推广和支持。
蓄冰空调系统即是在电力负荷很低的夜间用电低谷期,采用电制冷机制冷,将冷量以冰的形式贮存起来,在电力负荷较高的白天,也就是用电高峰期,把储存的冷量释放出来,以满足建筑物空调负荷的需要,同时在空调负荷较小的春秋季,减少电制冷机的开启,尽量融冰释冷,满足空调负荷,因此蓄冰空调系统是一种平衡用电负荷的有效方法。
在专利号03236023.1的专利中,介绍了一种蓄冰空调,利用压缩机、风冷换热器、高压贮液器、节流机构、气液分离器及设置在外融冰蓄能槽内部的盘管换热器构成的制冷剂回路,其方案有效克服了风冷式冷水机组在低空调负荷时出现频繁启/停、空调系统的快速响应性差以及结构复杂等缺陷,但是其方案只能其蓄冰槽直接取冰,当蓄冰槽内无冰时,压缩机还是需要从那里经过,这里白天的用电负荷未起到调节作用,且在空调与蓄冰管路中没有分路,不能在空闲时间单独对蓄冰槽进行蓄冰。
发明内容
为解决上述问题,本发明提供一种双循环串联冰蓄冷装置,可实现多路运行,按需要提供多种供冷方案,在削峰填谷与制冷之间达到一个平衡,本方案具体结构如下:一种双循环串联冰蓄冷空调,包括压缩机、蓄冰装置、风冷换热器、空调、气液分离器和高压贮液器,其改进在于:所述气液分离器、压缩机、风冷换热器、高压贮液器、蓄冰装置依次串联形成回路,所述蓄冰装置与气液分离器之间安装有温度传感器A和循环泵A,所述高压贮液器与蓄冰装置之间连接有三通阀A,三通阀A的a口连接高压贮液器,b口连接蓄冰装置,c口连接在蓄冰装置与温度传感器A之间管路上,所述蓄冰装置出口端安装有电动调节阀,所述温度传感器A与循环泵A之间管路上连接有三通阀B,三通阀B的a口连接温度传感器A、b口连接循环泵A、c口与板式交换机连接,所述三通阀B的c口与板式交换机进口端之间管路上依次连接有循环泵B、温度传感器B、膨胀阀,所述板式交换机出口端通过电子控制阀B与空调进口端连接,空调出口端通过循环泵C与板式交换机回水口连接,所述板式交换机出口端连接在三通阀Ba口与循环泵A之间的管路上,所述压缩机与高压贮液器之间有管路连接,所述管路上安装有电子控制阀A,
所述蓄冰装置包括密封桶体、桶体内的支撑架、盘在支撑架上的螺旋形盘管,所述桶体内壁含保温层、防水层。
本方案的一优选方式:所述蓄冰装置外壁上安装有储、溶冰量、水位液晶显示器。
本方案的再一优选方式:所述保温层采用聚苯乙烯。
本方案的又一优选方式:所述盘管为塑料导热材料且螺旋型绕成。
本方案的还一优选方式:所述风冷散热器与蓄冰装置之间安装有冷凝器。
本方案的还一优选方式:所述空调运行模式采用PLC电子程序控制,能够实现远程监控、信号传输。
本发明独特的螺旋形导热塑料盘管构造和优异的传热性能,在制冷未期,水被冻结成12MM厚度的冰层包裹在盘管外壁上,冰层之间留有空隙,仍为0度的水,没有冰桥,这是非完全冻结式构造的成功产品,内融冰系统在融冰过程中,随着融冰比例的增加冰层与盘管之间形成水环,冰层受到外界水的浮力作用,始终与盘管保持良好接触,在冰融化到20-30%时,冰层破裂均匀散落在水中,形成温度均衡的0度冰水混合物,因此可保证换热均匀,采用制冷剂乙二醇出口温度恒定,并可控制取冷过程,取冰率可达100%。内融冰设备保持稳定的2-3度低温融冰出口温度,系统温差可达10度,最大限度降低系统共它设备的容量,节约设备初投资,螺旋形塑料盘管,双方向盘绕,以支撑架固定卡口控制盘管纵向、横向间距,管内紊流传热,热交换充分有效,内融冰设备可提供恒定的1度冷冻水,区域供冷可减少CFC的使用和CO2的排放,减少环境污染和全球性变暖,大温差冷冻循环水减少流量40-60%,从而减少输送冷冻水管径、泵及空调未端系统的成本。采用低温送风系统区别于常规全空气空调系统13度的送风标准温度,在空气分布管道中向空调区域输送4-10度的一次冷风,经过未端混风装置的混合,向空调区域提供标准送风温度的冷风。低温送风系统送风温度低,空气流量低,降低了风机功率和电耗,同时减少了风道尺寸,大温差的冷冰水减少了供水量,水管及泵的规格尺寸,节约设备初投资和运行费用,低温空气可以室内空气相对温度,提高空调舒适性,抑制有害细菌的繁殖,大幅度改善房间空气质量,通过电子控制可以方便实现远程监控,达到统一管理、分散运行的效果。
附图说明
图1  蓄冷空调连接示意图
图2  蓄冰装置结构示意图
具体实施方式
本方案的具体方式如下,气液分离器3、压缩机1、风冷换热器2、高压贮液器4、蓄冰装置5、温度传感器A13和循环泵A15依次串联形成回路,在高压贮液器4与蓄冰装置5之间连接三通阀A10,三通阀A10的a口连接高压贮液器4,b口连接蓄冰装置5,c口连接在蓄冰装置5与温度传感器A13之间管路上,所述蓄冰装置5出口端安装有电动调节阀12,温度传感器A13与循环泵A15之间管路上连接有三通阀B11,三通阀B11的a口连接温度传感器A13、b口连接循环泵A15、c口与板式交换机7连接,三通阀B11的c口与板式交换机7进口端之间管路上依次连接有循环泵B16、温度传感器B14、膨胀阀18,板式交换机7出口端通过电子控制阀C20与空调6进口端连接,空调6出口端通过循环泵C17与板式交换机7回水口连接,所述板式交换机7出口端连接在三通阀B11a口与循环泵A15之间的管路上,压缩机1与高压贮液器4之间有分管路连接,管路上安装有电子控制阀A,
本结构可以实现五种运行模式,见下图
 
运行方式 压缩机 循环泵A 循环泵B 温度传感器A 温度传感器B
制冰 a-b a-c
制冰同时供冷 a-b 调节
制冷机供冷 a-c a-b
单融冰供冷 调节 a-b
制冷机与蓄冰装置同时供冷 调节 a-b
制冰:在此模式下,通过重量比为25%的工业抑制性乙烯乙二醇溶液的循环,在蓄冰装置中制冰,此间,压缩机的工作状况受到监控,当离开压缩机的乙二醇达到最低出口温度时,压缩机即关闭。
制冰同时供冷:当制冰期间存在冷负荷时,用于制冷的一部分低温乙烯乙二醇被分送至冷负荷以满足供冷需求,乙二醇分送量取决于楼宇水回路的设定温度。
单融冰供冷:此时制冷机关闭,回流的热乙烯乙二醇溶液通过融化贮存在蓄冰装置里的冰,被冷却至所需要的温度。
单压缩机供冷:此时开启压缩机满足楼宇全部冷负荷需求,乙二醇溶液不再经过蓄冰装置,而直接流至空调,由压缩机维持系统的设定温度。
压缩机与蓄冰装置同时供冷:压缩机和蓄冰装置同时运行以满足供冷需求,由空调侧回流乙二醇溶液先经过压缩机预冷,再流经蓄冰装置通过融冰冷却至设计温度。
本方案中的蓄冰装置采用密封桶体,在桶体内安装有支撑架、由导热塑料盘管以螺旋形方式盘绕在桶体内的支撑架上,桶体内壁有保温层,在保温层的前后有都有防水层,在桶体的外壁上安装有储冰量传感器、传感器利用实际储冰量换算成4-20mA的电流输出信号或是0.5V的电压信号,从而精确得出箱内的储冰量,进而决定冷量的输出程度,显示器还具备还水位测试功能,可以从显示器观察水位高低得出箱内冰量的多少。保温层采用聚苯乙烯,厚度在80mm左右。
本方案还可以在风冷散热器与蓄冰装置之间安装有冷凝器,以加快蓄冰的速度。
在用热交换器将乙二醇回路和楼宇的冷冰水回路隔开,并可在冷冰水回路中设置基载主机以满足夜间冷负荷,如制冰时需要同时供冷,则在控制过程中需要注意,不能蓄冰装置输出的低温乙二醇通过循环泵送至冷负荷或热交换器,由于乙二醇温度低于0度,热交换器易结冰而被损坏,因此需要从旁路中绕过。
本方案的压缩机在较高的蒸发温度下工作,压缩机的效率得到提高,蒸发温度每提高一度,压缩机效率可提高3%,串联比并联具有输出温度稳定,进而系统的稳定运行,温度差也可达到8-10度,,可提供1-4度冷冻水温度,是大温差送水,送风提供必要的前提条件。
换热盘管固定在特殊设计的支撑钢梁上,可以防止盘管和内壁的防水层接触,避免损伤防水保温层,制冷机的工作状况受到监控,当离开制冷机的乙二醇达到最低出口温度时,制冷机即关闭。
本方案采用的板式换热器是由许多波纹形的传热板片,按一定的间隔,通过橡胶垫片压紧组成的可拆卸的换热设备,板片组装时,两组交替排列,板与板之间用粘结剂把橡胶密封板条固定好,可防止流体泄漏并使两板之间形成狭窄的网形流道,换热板片压成各种波纹形,以增加换热板片面积和刚性,并能使流体在低流速成下形成湍流,以达到强化传热的效果,板上有四个角孔,形成了流体的分配管和泄集管,两种换热介质分别流入各自流道,形成逆流或并流通过每个板片进行热量的交换。本方案的系统必须加装温度感应装置,此装置可直接控制蓄溶冰过程的自动化,在本空调系统中采用电子程序控制,利用PLC程序可以方便的监控每一路的温度运行情况,可实现远程监控,统一管理,对不同温度要求,开启不同的运行模式,能够减少能源浪费,最大限度的利用空闲资源达到节能目的。

Claims (6)

1、一种双循环串联冰蓄冷空调,包括压缩机(1)、蓄冰装置(5)、风冷换热器(2)、空调(6)、气液分离器(3)和高压贮液器(4),其特征在于:所述气液分离器(3)、压缩机(1)、风冷换热器(2)、高压贮液器(4)、蓄冰装置(5)依次串联形成回路,所述蓄冰装置(5)与气液分离器(3)之间安装有温度传感器A(13)和循环泵A(15),所述高压贮液器(4)与蓄冰装置(5)之间连接有三通阀A(10),三通阀A(10)的a口连接高压贮液器(4),b口连接蓄冰装置(5),c口连接在蓄冰装置(5)与温度传感器A(13)之间管路上,所述蓄冰装置(5)出口端安装有电动调节阀(12),所述温度传感器A(13)与循环泵A(15)之间管路上连接有三通阀B(11),三通阀B(11)的a口连接温度传感器A(13)、b口连接循环泵A(15)、c口与板式交换机(7)连接,所述三通阀B(11)的c口与板式交换机(7)进口端之间管路上依次连接有循环泵B(16)、温度传感器B(14)、膨胀阀(18),所述板式交换机(7)出口端通过电子控制阀B(20)与空调(6)进口端连接,空调(6)出口端通过循环泵C(17)与板式交换机(7)回水口连接,所述板式交换机(7)出口端连接在三通阀B(11)a口与循环泵A(15)之间的管路上,所述压缩机(1)与高压贮液器(4)之间有管路连接,所述管路上安装有电子控制阀A(19),
所述蓄冰装置(5)包括密封桶体(26)、桶体内的支撑架(23)、盘在支撑架上的螺旋形盘管(22),所述桶体内壁含保温层(21)、防水层(27)。
2、如权利要求1所述的冰蓄冷空调,其特征在于,所述蓄冰装置(5)外壁上安装有储、溶冰量、水位显示器(24)(25)。
3、如权利要求2所述的冰蓄冷空调,其特征在于,所述保温层采用聚苯乙烯。
4、如权利要求3所述的冰蓄冷空调,其特征在于,所述盘管(22)为塑料导热材料且单根绕成。
5、如权利要求4所述的冰蓄冷空调,其特征在于,所述风冷散热器(2)与蓄冰装置(5)之间安装有冷凝器。
6、如权利要求5所述的冰蓄冷空调,其特征在于,所述空调运行模式采用PLC电子程序控制,能够实现远程实时监控、信号传输。
CN2009100089029A 2009-02-12 2009-02-12 一种冰蓄冷空调系统 Expired - Fee Related CN101487613B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100089029A CN101487613B (zh) 2009-02-12 2009-02-12 一种冰蓄冷空调系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100089029A CN101487613B (zh) 2009-02-12 2009-02-12 一种冰蓄冷空调系统

Publications (2)

Publication Number Publication Date
CN101487613A true CN101487613A (zh) 2009-07-22
CN101487613B CN101487613B (zh) 2011-11-02

Family

ID=40890616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100089029A Expired - Fee Related CN101487613B (zh) 2009-02-12 2009-02-12 一种冰蓄冷空调系统

Country Status (1)

Country Link
CN (1) CN101487613B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102072542A (zh) * 2011-01-26 2011-05-25 中国建筑西北设计研究院有限公司 一种串联式制冷空调及末端蓄冷水系统
TWI404896B (zh) * 2010-06-01 2013-08-11
CN105805872A (zh) * 2016-04-26 2016-07-27 珠海格力电器股份有限公司 冰蓄冷空调系统的控制方法及冰蓄冷空调系统
CN106091192A (zh) * 2016-06-15 2016-11-09 珠海格力电器股份有限公司 空调系统及其控制方法
CN106288577A (zh) * 2016-10-08 2017-01-04 华南理工大学建筑设计研究院 一种多能源大温差区域供冷装置
CN107726500A (zh) * 2017-11-01 2018-02-23 江苏高菱蓄能科技有限公司 一种冰蓄冷机房的防护装置
CN109751729A (zh) * 2018-08-29 2019-05-14 安徽佳谷豆食品有限公司 用于年糕生产的中央空调群控系统
CN114279945A (zh) * 2021-12-27 2022-04-05 敦煌研究院 一种模拟冬季气候侵蚀足尺试样的试验舱体

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2543012Y (zh) * 2002-05-21 2003-04-02 董兴杰 新型盘管蓄冷装置
CN1199027C (zh) * 2002-06-28 2005-04-27 清华大学 一种直接蒸发闭式外融冰热泵空调装置

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI404896B (zh) * 2010-06-01 2013-08-11
CN102072542A (zh) * 2011-01-26 2011-05-25 中国建筑西北设计研究院有限公司 一种串联式制冷空调及末端蓄冷水系统
CN102072542B (zh) * 2011-01-26 2015-04-22 中国建筑西北设计研究院有限公司 一种串联式制冷空调及末端蓄冷水系统
CN106524360A (zh) * 2016-04-26 2017-03-22 珠海格力电器股份有限公司 冰蓄冷空调系统的控制方法
CN105805872A (zh) * 2016-04-26 2016-07-27 珠海格力电器股份有限公司 冰蓄冷空调系统的控制方法及冰蓄冷空调系统
CN106091192A (zh) * 2016-06-15 2016-11-09 珠海格力电器股份有限公司 空调系统及其控制方法
CN106091192B (zh) * 2016-06-15 2018-11-09 珠海格力电器股份有限公司 空调系统及其控制方法
CN106288577A (zh) * 2016-10-08 2017-01-04 华南理工大学建筑设计研究院 一种多能源大温差区域供冷装置
CN106288577B (zh) * 2016-10-08 2022-05-03 华南理工大学建筑设计研究院有限公司 一种多能源大温差区域供冷装置
CN107726500A (zh) * 2017-11-01 2018-02-23 江苏高菱蓄能科技有限公司 一种冰蓄冷机房的防护装置
CN109751729A (zh) * 2018-08-29 2019-05-14 安徽佳谷豆食品有限公司 用于年糕生产的中央空调群控系统
CN114279945A (zh) * 2021-12-27 2022-04-05 敦煌研究院 一种模拟冬季气候侵蚀足尺试样的试验舱体
CN114279945B (zh) * 2021-12-27 2023-11-03 敦煌研究院 一种模拟冬季气候侵蚀足尺试样的试验舱体

Also Published As

Publication number Publication date
CN101487613B (zh) 2011-11-02

Similar Documents

Publication Publication Date Title
CN101487613B (zh) 一种冰蓄冷空调系统
CN201177332Y (zh) 带热回收冰蓄冷的双冷源热泵集中式空调装置
CN104896641B (zh) 一种双蒸发器动态冰蓄冷系统
CN100538221C (zh) 一种动态冰蓄冷方法及设备
CN101532709A (zh) 一种蓄冰制冷装置及蓄冰制冷系统
CN201203221Y (zh) 一种蓄冰制冷装置及蓄冰制冷系统
CN101280941A (zh) 双冷源热泵集中式空调装置
CN109028404B (zh) 一种冰水混合物蓄冷空调系统及其控制方法
CN202040916U (zh) 动态冰蓄冷制冷设备
CN110360769A (zh) 一种具有相变能源塔的热泵系统及其换热方法
CN201003824Y (zh) 冰蓄冷空调装置
CN102506528A (zh) 一种新型冷库融霜系统
CN201844488U (zh) 外融冰式蓄冷系统
CN102519097A (zh) 温湿独立处理的tbab相变蓄冷/载冷空调系统
CN201368551Y (zh) 地源热泵结合冰蓄冷的空调装置
CN106969452A (zh) 一种空调水蓄冷系统
Wang Thermal storage systems
CN102374804A (zh) 一种热管式蓄冷装置
CN218645684U (zh) 一种动态冰蓄冷的制冷系统
CN202133042U (zh) 一种改进室外机换热器的水冷却家用空调
CN104315635B (zh) 中小型大温差双工况动态流态冰冰蓄冷空调
CN110186131A (zh) 一种高效蓄冰系统方法
CN110360852A (zh) 一种相变能源塔及其换热方法
CN104534586A (zh) 系列化直接蒸发式高效多温蓄冰槽
CN204176831U (zh) 中小型大温差双工况动态流态冰冰蓄冷空调

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ICE BANK ENERGY TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: DAI SIJIA

Effective date: 20120606

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100022 FENGTAI, BEIJING TO: 100022 CHAOYANG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20120606

Address after: 100022, room 902, block B, Yintai Center, 2 East Gate Street, Beijing

Patentee after: Ice Bank Energy Technology Co., Ltd.

Address before: 100022 Beijing spark science and Technology Building No. 2 Fengtai District City Fung Fu Road Room 501

Patentee before: Dai Sijia

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100022, room 902, block B, Yintai Center, 2 East Gate Street, Beijing

Patentee after: High spirit Energy Investment Group Limited

Address before: 100022, room 902, block B, Yintai Center, 2 East Gate Street, Beijing

Patentee before: Ice Bank Energy Technology Co., Ltd.

PP01 Preservation of patent right

Effective date of registration: 20180928

Granted publication date: 20111102

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20210928

Granted publication date: 20111102

PD01 Discharge of preservation of patent
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111102

Termination date: 20190212