CN101463588A - Pole erecting bridge construction method - Google Patents

Pole erecting bridge construction method Download PDF

Info

Publication number
CN101463588A
CN101463588A CNA2008100588821A CN200810058882A CN101463588A CN 101463588 A CN101463588 A CN 101463588A CN A2008100588821 A CNA2008100588821 A CN A2008100588821A CN 200810058882 A CN200810058882 A CN 200810058882A CN 101463588 A CN101463588 A CN 101463588A
Authority
CN
China
Prior art keywords
bridge
bridge pier
post
steel plate
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100588821A
Other languages
Chinese (zh)
Inventor
陈力立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2008100588821A priority Critical patent/CN101463588A/en
Publication of CN101463588A publication Critical patent/CN101463588A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a pole setting bridge construction method, used for bridge piers, bridge girders and high-rise buildings; the new construction method is simple, flexible and convenient, saves the steel pipes used for scaffolds as well as time, money and labor, therefore, the benefit is increased.

Description

Pole erecting bridge construction method
The present invention relates to the bridge construction field.
At the building in the modern times bridge formation of repairing the roads, build a house and make the room, all be old routinely way usually, do from the basis, from top to bottom.Scaffolding, formwork, and the highrise building effort is dangerous especially big.Construct a road especially now, railway, bridge formation build bridge in the place of the high ditch depth in mountain.Hard especially, time-consuming.For solution to the problems described above.A kind of new method of the special release of the present invention.Be exactly at the bridge pier post more than 10 meters, good in surface irrigation, wait solidify good after, it is erected with winch as pole erecting.Digging basis pouring bridge pier post can carry out simultaneously, and bridge is also aimed at bridge pier in the past and put down as pole erecting to 40~50 degree rotations.Bridge construction is faster like this, saves time, economizes scaffold, saves money.
The object of the present invention is to provide a kind of new bridge constructing method.
A kind of new bridge constructing method of the present invention is that bridge pier and bridge are watered on the ground, with the method for pole erecting the bridge pier post is erected.Pier is protected in pouring then.Bridge erects and moves on on the bridge pier.Concrete implement according to the size of bridge pier with two greater than 10-20 centimetre on bridge pier post, thick 20 to 30 millimeters steel plate is as connection hinge steel plate.That block plate of pier footing can be opened the mouth that perfusion mixes earth, and a mouthful size is according to circumstances decided, and two block plates will bore reinforced hole.The hinge steel plate centre that is used for bridge increases a rotation steel plate centre has that piece rotation hole of a rotation hole and bridge to connect at rotational pin, is convenient to turn to.Rotate the dumb bearing of installing.Is just can erect under the guide peg power transmission with winch at the sub-frame of the people that two bars are done.After bridge pier erects that the connecting screw that then goes up two block plates tightens and two block plates weld, at clump of steel plate junction perfusion, with protection steel plate and bridge pier.For ease of the pouring bridge pier, adopt square or rectangle.The shape that bridge pier that can be as required and bridge pier post top need is watered.Tens meters, rice up to a hundred, all available the method more than the hundreds of rice.Only crab is wanted big power.Also available assembly pulley increases strength and reaches needs.The upright good protection of the pouring again pier 13 of bridge pier post.Bridge pier post, the several and a plurality of prefabricated components of bridge contour level building can connect assembling, erect after also can assembling.Also can wait upright good bridge pier post or place and assemble behind the bridge prefabricated component, support member being hung on connection.As the cement chimney that water tower, water channel groove, water channel groove pier stud, TV transmission tower and factory use, reach the high building highrise building and all can adopt this method.
A kind of bridge constructing method of the present invention has following advantage than prior art:
1, simple and flexible is convenient.
2, save the steel pipe of the flat frame of leg.
3, easy construction saves time.
4, save money, laborsavingly can increase benefit.
The present invention will be further described below in conjunction with accompanying drawing.Fig. 1 is an a kind of embodiment of new bridge constructing method; Fig. 2 is the hinge jaw 70 steel plate screws 8 of hinge steel plate; Fig. 3 is rotation steel plate, the rotation pin-and-hole 10 that increases, and the basis connects steel plate 9; Fig. 4 is the base steel plates plan view.Pouring mixes earth mouth 11, and reinforcing bar 12,15th, pier footing are that dotted line is represented.Fig. 6 is prefabricated support connector, connects parent part 18, and dotted line is an attachment pegs 19, connects bull 20.
Winch 1 among Fig. 1, winch cable 2, guiding man-like shelf 3, track cable 4, bridge emblem post 5, pier footing 6.13 is protection piers among Fig. 5, two hinge steel plates in the 14 dotted lines protection pier.

Claims (6)

1, pole erecting bridge construction method is characterized in that: the cement bridge pier post good in surface irrigation erects at crab 1.
2, it is characterized in that according to claim 1: have guiding man-like shelf 3, bridge pier post 5 and a basis 6 under hinge steel plate 16 connects, not to be shifted.
3, it is characterized in that according to claim 1: bridge connect to rotate under steel plate 17 effects rotating turret to bridge pier being provided with rotational pin.
4, it is characterized in that according to claim 1: the upright good protection of the pouring again pier 13 of bridge pier post.
5, it is characterized in that according to claim 1: this method can be used for chimney stack, water tower, TV transmission tower, high building highrise building etc.
6, according to claim 1, require 5 it is characterized in that: the several and a plurality of prefabricated components of bridge pier post, bridge contour level building can connect assembling, erect after also can assembling.Also can wait upright good bridge pier post or place and assemble behind the bridge prefabricated component, support member being hung on connection.
CNA2008100588821A 2008-09-05 2008-09-05 Pole erecting bridge construction method Pending CN101463588A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100588821A CN101463588A (en) 2008-09-05 2008-09-05 Pole erecting bridge construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100588821A CN101463588A (en) 2008-09-05 2008-09-05 Pole erecting bridge construction method

Publications (1)

Publication Number Publication Date
CN101463588A true CN101463588A (en) 2009-06-24

Family

ID=40804362

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100588821A Pending CN101463588A (en) 2008-09-05 2008-09-05 Pole erecting bridge construction method

Country Status (1)

Country Link
CN (1) CN101463588A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074140A (en) * 2014-07-04 2014-10-01 大连船舶工业工程公司 Steel bridge main tower closure method and auxiliary mechanism thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074140A (en) * 2014-07-04 2014-10-01 大连船舶工业工程公司 Steel bridge main tower closure method and auxiliary mechanism thereof
CN104074140B (en) * 2014-07-04 2015-12-23 大连船舶工业工程公司 Steel bridge king-tower closure workmanship method and auxiliary body thereof

Similar Documents

Publication Publication Date Title
CN102220806B (en) Construction method for supporting and reinforcing ultrahigh hanging single-sided vertical formwork
CN103741604B (en) Totally-prefabricated assembling type reinforced concrete bridge splicing structure and attaching method thereof
JP3177157U (en) A simple tower instrument in a high-rise bridge.
CN110805257B (en) Flower basket overhanging type section steel bearing beam structure and construction method
CN104060629B (en) The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo
CN210031842U (en) Combined supporting system for adjacent deep foundation pit based on row piles, connecting beams and counter-pulling anchor cables
JP2014001542A (en) Foundation for installation of column, and construction method for the column
CN104405062A (en) Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN109098181A (en) The recyclable full prefabricated pile apical cap beam recycled and its construction method
CN109695247B (en) Deep foundation pit temporary pipeline comprehensive arrangement system and construction method
CN106065668B (en) A kind of construction techniques
US7976244B2 (en) Method and system for constructing and installing docks
CN207160629U (en) A kind of spliced workmen's running gear
CN210263929U (en) A preformed hole template for building civil engineering
KR20190030885A (en) Construction Method for Model House combining of the concept Korean Houses and Wood Houses
CN205348963U (en) A security fence for building site
CN101463588A (en) Pole erecting bridge construction method
EP1156160A1 (en) A canopy
CN110424455A (en) The underground confined space is without fertile slot structure side wall big steel form plate system and construction method
CN114033171B (en) Clamp type triangular support system of cantilever roof panel and construction method thereof
CN205445125U (en) Execute i -shaped assembled enclosure fast
US20120005976A1 (en) Modular foundation system and method
CN205557538U (en) Assembled underground structure system based on prefabricated component
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN209194572U (en) A kind of corrugated steel construction retaining wall of culvert end

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090624