CN101458055B - Once detonation subsection delaying blasting digging method - Google Patents
Once detonation subsection delaying blasting digging method Download PDFInfo
- Publication number
- CN101458055B CN101458055B CN2008102387687A CN200810238768A CN101458055B CN 101458055 B CN101458055 B CN 101458055B CN 2008102387687 A CN2008102387687 A CN 2008102387687A CN 200810238768 A CN200810238768 A CN 200810238768A CN 101458055 B CN101458055 B CN 101458055B
- Authority
- CN
- China
- Prior art keywords
- detonator
- branch
- nonel
- detonates
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102387687A CN101458055B (en) | 2008-12-24 | 2008-12-24 | Once detonation subsection delaying blasting digging method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102387687A CN101458055B (en) | 2008-12-24 | 2008-12-24 | Once detonation subsection delaying blasting digging method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101458055A CN101458055A (en) | 2009-06-17 |
CN101458055B true CN101458055B (en) | 2012-05-23 |
Family
ID=40769061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008102387687A Expired - Fee Related CN101458055B (en) | 2008-12-24 | 2008-12-24 | Once detonation subsection delaying blasting digging method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101458055B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101813445A (en) * | 2009-08-21 | 2010-08-25 | 北京维深数码科技有限公司 | Blasting system and detonation time control method thereof |
CN102042786B (en) * | 2010-11-12 | 2013-03-13 | 中铁十二局集团第二工程有限公司 | Controlled blasting construction method for shallow-buried large-section tunnel |
CN102564249A (en) * | 2012-03-08 | 2012-07-11 | 刘国祥 | Controllable blasting network |
CN103673798B (en) * | 2012-09-10 | 2017-06-13 | 北京铱钵隆芯科技有限责任公司 | Blasting cap initiation control method and device and initiator |
CN103557756B (en) * | 2013-11-01 | 2015-08-05 | 中铁四局集团有限公司 | Advanced pilot tunnel hole-by-hole delay detonation network in tunnel blasting |
CN103557758B (en) * | 2013-11-01 | 2015-08-05 | 中铁四局集团有限公司 | Expanded excavation area hole inside and outside combined delay subarea differential initiation network in tunnel blasting |
-
2008
- 2008-12-24 CN CN2008102387687A patent/CN101458055B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101458055A (en) | 2009-06-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101458055B (en) | Once detonation subsection delaying blasting digging method | |
CN106091848B (en) | It is a kind of to realize overlength, the method for high inclination-angle tunnel anchorage top bar explosion | |
CN102927866B (en) | Open-bench blasting method capable of controlling forward stroke of blasting muck pile | |
CN108007285B (en) | A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation | |
CN108132006B (en) | Anti-clogging quick well formation undercut blast hole arragement construction and its blasting method | |
CN105333778A (en) | Medium-deep hole large-section composite cut blasting structure and method | |
CN105606000B (en) | Partition control blasting method for tunnel rock drilling project | |
CN102494571A (en) | Construction method for damped blasting of tunnels | |
CN102758633A (en) | Construction method for large- cross section tunnel with better condition of surrounding rock | |
CN104819670B (en) | Pre-drilling mesopore shaft excavation blasting method | |
CN105649634B (en) | A kind of high ferro Tunnel Engineering hydraulic drill ring mechanization photoface exploision drivage method | |
KR20110023968A (en) | Controlled blasting method for protecting cut slope, cbps | |
CN102808621B (en) | Method for blasting heavy-inclined thick ore bodies | |
CN108489348B (en) | A kind of deep hole and the knockdown hard rock air bench blasting method of short-bore | |
CN109506530A (en) | A kind of opencut 24m High-bench blasting expands side structure and its side method is expanded in explosion | |
CN102967191A (en) | Blasting method for treatment of gob | |
CN108915694A (en) | It the step tunneling boring unprotect layer tight-face blasting of tunnel lower layer and repairs the roads and protects logical construction method | |
CN109372509A (en) | Arrangement method for double-hollow-hole rhombic cut holes in access filling mining | |
CN108362181B (en) | A kind of driving recovery method of extra narrow vein ore body | |
KR101166776B1 (en) | Induced method for control of blasting environment and back break | |
CN110030889B (en) | Method for forming well by deep hole partition triangular net cut through one-time blasting | |
KR100527878B1 (en) | Controlled rock blasting method utilizing electric detonator and non electric detonator | |
CN110274526A (en) | A kind of soft rock engineering method for excavating and blasting | |
CN112964143B (en) | Three-time blasting method for hollow hole straight-hole cut | |
CN102927863A (en) | New method for blasting construction of all-rock tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: QINGDAO MUNICIPAL ENGINEERING GROUP CO., LTD. QING |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Hailiang Inventor after: Wang Zhifu Inventor after: Yin Zishan Inventor after: Gao Yuanfeng Inventor after: Chen Lianjun Inventor after: Liu Yin Inventor after: Gao Tongwei Inventor after: Zhao Changwei Inventor before: Wang Hailiang Inventor before: Chen Lianjun Inventor before: Liu Yin Inventor before: Gao Tongwei Inventor before: Zhao Changwei |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WANG HAILIANG CHEN LIANJUN LIU YIN GAO TONGWEI ZHAO CHANGWEI TO: WANG HAILIANG WANG ZHIFU YIN ZISHAN GAO YUANFENG CHEN LIANJUN LIU YIN GAO TONGWEI ZHAO CHANGWEI |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20110210 Address after: 266510 Shandong University of Science and Technology, Shandong, Qingdao, 579 Bay Road, economic and Technological Development Zone Applicant after: Shandong Univ. of Science & Technology Co-applicant after: Qingdao Municipal Engineering Group Co., Ltd. Co-applicant after: Qingdao Municipal Affair Construction Development Co., Ltd. Address before: 266510 Shandong University of Science and Technology, Shandong, Qingdao, 579 Bay Road, economic and Technological Development Zone Applicant before: Shandong Univ. of Science & Technology |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |