CN101446086A - Method for treating foundation in mountain area - Google Patents

Method for treating foundation in mountain area Download PDF

Info

Publication number
CN101446086A
CN101446086A CNA2007102027102A CN200710202710A CN101446086A CN 101446086 A CN101446086 A CN 101446086A CN A2007102027102 A CNA2007102027102 A CN A2007102027102A CN 200710202710 A CN200710202710 A CN 200710202710A CN 101446086 A CN101446086 A CN 101446086A
Authority
CN
China
Prior art keywords
foundation
steel pipe
mountain area
pipe pile
treating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007102027102A
Other languages
Chinese (zh)
Inventor
王晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNA2007102027102A priority Critical patent/CN101446086A/en
Publication of CN101446086A publication Critical patent/CN101446086A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a method for treating foundation in a mountain area. In local oil region of a foundation ditch of a foundation in the mountain area, steel pipes are used for piping to the bedrock. Steel pipe pile block serves as a reinforced concrete bearing platform, parallels and levels to rock surface of the foundation ditch. The invention has the advantages of easy operation, greatly reducing work hours, low construction cost, good quality and the like. In the method, a construction site scaffold steel pipe is directly used for construction without needing additional purchasing; and the weight of the steel pipe per meter is only 3kg and the cost is low, thus being particularly suitable for foundation implementation of the mountain area.

Description

Method for treating foundation in mountain area
Technical field:
The present invention relates to a kind of mountain area Measures for Making Ground and Foundation method.
Background technology:
In the building engineering construction in mountain area, favourable one side is the building foundation can be placed on the firm rock foundation, and disadvantageously, the basement rock surface gradient is bigger owing to crouch under the mountain area, so that excavation pit, foundation trench be during to design elevation, and often rock is seen and the part is a soil by big portion on the plane, and present way is that the requirement construction is down deep-cut till seeing basement rock at the Tu Qu of foundation ditch, the soil in Jiang Tu district digs only, fills out concrete placing or the extremely basic end of rubble concrete absolute altitude from basement rock then.And local native sector width or diameter 500mm~600mm only not only can not cut the earth with machinery, and people's operation of also can't going down can only be adopted artificial " luoyang spade " to draw and dig, scratches only, and efficient is very low, and the dark more work efficiency of soil is low more, has a strong impact on programming.
Summary of the invention:
The technical problem to be solved in the present invention is: provide a kind of mountain area Measures for Making Ground and Foundation method, at the local Tu Qu of the foundation ditch basement rock of driving piles, to replace soil is drawn the traditional method of clean back concrete placing.
The local Tu Qu that the present invention is achieved in that at mountain area ground foundation ditch does the steel concrete cushion cap with the steel pipe basement rock of driving piles, steel pipe pile top, and is concordant with the rock face of foundation ditch.
The diameter of steel pipe pile is 50mm.
The end that buries of steel pipe is processed into flat-shaped, sealing.
Spacing between the steel pipe pile is 200mm.
The verticality allowable variation that steel pipe pile is inserted down is 1%.
The present invention compared with prior art has easy and simple to handlely, can significantly reduce man-hour, advantage such as construction cost is low, quality is good.It can directly adopt the building site scaffolding steel pipe to construct, need not to purchase in addition, and every meter weight of this steel pipe 3Kg, expense is cheap, is particularly suitable for the mountain area ground and implements.
The specific embodiment:
Embodiments of the invention: determine to adopt 1~3 steel pipe pile and cushion cap as calculated, direct recruitment ground scaffold steel, the pipe diameter is 50mm, and the end that buries of steel pipe is processed into flat-shaped, sealing, and the spacing between the steel pipe pile is 200mm.The personnel selection hammer impacts basement rock, and the steel concrete cushion cap is done on the steel pipe pile top, and is concordant with the rock face of foundation ditch.The verticality allowable variation of steel pipe pile is 1%, controls during hammering.

Claims (5)

  1. [claim 1] a kind of method for treating foundation in mountain area is characterized in that: with the steel pipe basement rock of driving piles, the steel concrete cushion cap is done on the steel pipe pile top, and is concordant with the rock face of foundation ditch at the local Tu Qu of mountain area ground foundation ditch.
  2. [claim 2] method for treating foundation in mountain area according to claim 1 is characterized in that: the diameter of steel pipe pile is 50mm.
  3. [claim 3] method for treating foundation in mountain area according to claim 1 and 2 is characterized in that: the end that buries of steel pipe is processed into flat-shaped, sealing.
  4. [claim 4] method for treating foundation in mountain area according to claim 1 is characterized in that: the spacing between the steel pipe pile is 200mm.
  5. [claim 5] method for treating foundation in mountain area according to claim 1 is characterized in that: the verticality allowable variation that steel pipe pile is inserted down is 1%.
CNA2007102027102A 2007-11-27 2007-11-27 Method for treating foundation in mountain area Pending CN101446086A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007102027102A CN101446086A (en) 2007-11-27 2007-11-27 Method for treating foundation in mountain area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007102027102A CN101446086A (en) 2007-11-27 2007-11-27 Method for treating foundation in mountain area

Publications (1)

Publication Number Publication Date
CN101446086A true CN101446086A (en) 2009-06-03

Family

ID=40741949

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007102027102A Pending CN101446086A (en) 2007-11-27 2007-11-27 Method for treating foundation in mountain area

Country Status (1)

Country Link
CN (1) CN101446086A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220764A (en) * 2011-04-19 2011-10-19 威海建设集团股份有限公司 Deep foundation pit bracing system and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220764A (en) * 2011-04-19 2011-10-19 威海建设集团股份有限公司 Deep foundation pit bracing system and construction method thereof
CN102220764B (en) * 2011-04-19 2012-09-05 邢占东 Construction method of deep foundation pit bracing system

Similar Documents

Publication Publication Date Title
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN108517877B (en) Supporting construction method combining consolidation grouting of hybrid filling ultra-deep foundation pit with double-row steel pipe piles
CN101280563B (en) Pretensioned prestressing pipe pile construction method under weak expansion soil condition
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN110344400A (en) The hard rock pore-forming construction technology of churning driven opportunity
CN102635119A (en) Supporting method for construction of swirl well
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN102134853A (en) CT sealed steel pipe pile foundation pit water stop supporting device and construction method thereof
CN108442370A (en) The broken pile connector processing method of prestressed concrete pipe pile
CN112281857A (en) Deep foundation pit excavation construction method
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN103510526A (en) Foundation pit stepped supporting method with double-row piles combined with single-row piles
CN202401461U (en) Novel foundation pit shoring structure
CN201943077U (en) Waterproof curtain of CT-type fore shaft steel pipe pile
CN109208594A (en) Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder
CN113216215A (en) Deep groove support reverse construction method in complex environment
CN112482382A (en) Method for crushing boulder in hole pile by using soundless crushing agent
CN110093939B (en) Ecological restoration method for mining area side slope
CN112195945A (en) Deep foundation pit construction method for keeping groundwater dynamically balanced
CN107740419A (en) Foundation pit supporting method and raked pile
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
CN110486531A (en) It a kind of artificial push pipe and rams and manages united pipeline construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20090603