CN101426126B - Projection wall window regulation method for large screen monitoring system - Google Patents

Projection wall window regulation method for large screen monitoring system Download PDF

Info

Publication number
CN101426126B
CN101426126B CN2007100941895A CN200710094189A CN101426126B CN 101426126 B CN101426126 B CN 101426126B CN 2007100941895 A CN2007100941895 A CN 2007100941895A CN 200710094189 A CN200710094189 A CN 200710094189A CN 101426126 B CN101426126 B CN 101426126B
Authority
CN
China
Prior art keywords
projection wall
window
monitoring system
cut apart
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007100941895A
Other languages
Chinese (zh)
Other versions
CN101426126A (en
Inventor
董文生
范昀
徐利再
赵�怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baosight Software Co Ltd
Original Assignee
Shanghai Baosight Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baosight Software Co Ltd filed Critical Shanghai Baosight Software Co Ltd
Priority to CN2007100941895A priority Critical patent/CN101426126B/en
Publication of CN101426126A publication Critical patent/CN101426126A/en
Application granted granted Critical
Publication of CN101426126B publication Critical patent/CN101426126B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Controls And Circuits For Display Device (AREA)

Abstract

The invention discloses a projection wall window regulation method pf a large-screen monitoring system, which includes: firstly selecting object required to divide and the division number at the user interface of the customer terminal; and then computing the coordinates of the left upper point and the right lower point of each divided small window; transmitting the coordinates from the customer terminal to a system control server through a control command; the system control server transmitting the control command to a projection wall control unit, and then the projection wall control unit controls the projection wall to opens a window at the corresponding position based upon the windows locating information provided in the control command, and connecting the designated input signal onto the designated windows according to the control command. The invention has advantages of simple operation and capability of arbitrary partition to the projection wall. The invention is applied in window regulation of large-screen monitoring system in intelligent buildings, rail traffic, tunnels, coal mines, petrochemical factories and other fields.

Description

The projection wall window regulation method of large screen monitoring system
Technical field
The present invention relates to a kind of window regulation method that is applicable to the large screen monitoring system in fields such as intelligent building, track traffic, tunnel, colliery, petrochemical industry.
Background technology
Along with the development of Chinese national economy and improving constantly of living standards of the people, the motor vehicles owning rate is soaring day by day in the city, and existing traffic infrastructure has been in the high load capacity operating state.In recent years, urban public transport develop rapidly, subway, tunnel and to stride the construction of river, bridge spanning the sea in full swing.What how to manage urban transportation, minimizing traffic congestion and traffic accident effectively is the common issue with that each urban development faces.Under this background, industry begins to be devoted to the exploitation of real-time traffic supervisory control system.Meanwhile, the supervisory control system of other field also receives the concern of all circles day by day.
The world today has entered the information explosion epoch, and only several projectors can't satisfy the display requirement of information, thereby is arisen at the historic moment by the projection wall that a plurality of projecting cells are formed.Constantly applying and improve along with high-resolution projector, no matter be abroad or at home, the splicing of taking large screen monitoring system based on projection wall equipment to carry out figure, image in the major project has become scheduling, the requisite means of command centre and instrument.
Large screen monitoring system is mainly used in the demonstration bulk information, as video image, computer simulation image, network information image etc.The monitor staff can make corresponding judgment and scheduling by the information of observing on the large-screen.
Large screen monitoring system hardware is formed and is comprised: the projection wall that a plurality of projecting cells are formed, projection wall control unit, video matrix, video signal source, Control Server etc.Each projecting cell of forming projection wall in the large screen monitoring system only shows a part of entire image, all projecting cell is combined a complete big picture that has just constituted projection wall, and the resolution of big picture is the multiple of each projecting cell resolution.The image of every road signal all is that the form with window is presented on the projection wall.Position of window, size, quantity can change arbitrarily.The management of large screen monitoring system is realized by software.Large screen monitoring system software is in order to functions such as the adjustment that realizes projection wall window, network control, matrix switchings.Some prediction schemes commonly used that can also prestore can be called prediction scheme during use at any time, can realize Expected Results, thereby simplify operation, have improved efficient.
Existing large screen monitoring system generally only has the function of creating floating frame and merging window, and can not realize projecting cell cut apart once more or whole projection wall is carried out integral body cutting apart, existing in addition large screen monitoring system also can't satisfy to switch specifies the operation (needs by the matrix handoff functionality of other video monitoring system finish) of a certain video signal source to projection wall arbitrarily.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of projection wall window regulation method of large screen monitoring system, and it is simple to operate, can cut apart arbitrarily projection wall.
For solving the problems of the technologies described above, the projection wall window regulation method of large screen monitoring system of the present invention comprises the steps:
At first, select the object that to cut apart and cut apart number in the user interface of client;
The left upper apex of each wicket after the computed segmentation and bottom right apex coordinate then;
Described coordinate is sent to system's Control Server by client by control command;
System's Control Server is sent to the projection wall control unit with described control command, the projection wall control unit is left window according to the window's position information Control projection wall that provides in the control command in corresponding position, and the projection wall control unit is connected on the window of appointment according to the input signal of control command with appointment;
The described object of cutting apart comprises to be cut apart a certain projecting cell of projection wall, and promptly the unit is cut apart and projection wall integral body is cut apart, and promptly integral body is cut apart;
Carry out the unit when cutting apart, the computational methods of the left upper apex of each wicket after cutting apart and bottom right apex coordinate are,
The left upper apex coordinate:
[x1+(i-1)×(x2-x1)/n,y1+(j-1)×(y2-y1)/n],
The bottom right apex coordinate:
[x1+i×(x2-x1)/n,y1+j×(y2-y1)/n],
In the formula: (x1, y1), (x2 is y2) for desiring to cut apart the left upper apex and the bottom right apex coordinate of projecting cell; I, j are the row and column with respect to projecting cell of cutting apart rear hatch; N is cut apart several square roots.
The present invention can realize large-screen layout management flexibly, and layout management relates generally to floating frame and merges window in the prior art, projecting cell is not cut apart with integral body and is cut apart.Adopt method of the present invention to realize window setting flexibly to projection wall as required, satisfy the different needs that show occasion, can better bring into play the monitoring function of large screen monitoring system.
The present invention can realize seamless link with video monitoring system after the window adjustment of projection wall is finished.In the prior art, realize that some specification signals source is connected to the large-screen window and generally need strides two different systems and operate, at first in video monitoring system, video signal source is switched to one of them input (generally realizing) of large-screen, in large screen monitoring system, the input port of this large-screen is connected to the large-screen window then with video matrix.And among the present invention, realize this function and just can realize to window as long as the user directly drags the video signal source icon in the large screen monitoring system client.
Description of drawings
The present invention is further detailed explanation below in conjunction with the drawings and specific embodiments:
Fig. 1 is the frame structure schematic diagram of large screen monitoring system;
Fig. 2 is cut apart and the user interface schematic diagram of new window projecting cell;
Fig. 3 carries out the user interface schematic diagram that integral body is cut apart to projection wall;
Fig. 4 is a control flow chart of the present invention.
Embodiment
Referring to Fig. 4 and in conjunction with shown in Figure 1, the projection wall window regulation method of large screen monitoring system of the present invention is realized as follows:
At first, select the object that to cut apart and cut apart number in the user interface of client.The described object of cutting apart comprises to be cut apart (being called for short the unit cuts apart) and projection wall integral body is cut apart (being called for short integral body cuts apart) a certain projecting cell of projection wall.
The left upper apex of each wicket after the computed segmentation and bottom right apex coordinate then; Described coordinate is sent to system's Control Server by client by control command; System's Control Server is sent to the projection wall control unit with described control command, the projection wall control unit is left window according to the window's position information Control projection wall that provides in the control command in corresponding position, and the projection wall control unit is connected on the window of appointment according to the input signal of control command with appointment.If the user has set this window and has needed the video signal displayed source, then system's Control Server will be transmitted control command to video matrix, video matrix switches this video signal source to the corresponding input port of projection wall, thereby finishes the demonstration of video signal source on window.
System's Control Server returns to user interface with control information, makes the situation that user interface can the actual response projection wall.
Described unit is cut apart, and promptly can cut apart any projecting cell arbitrarily in projection wall, such as a certain projecting cell being carried out 4 cut apart, 9 cut apart, 16 cutting apart etc. (can only be square number, be set to 16 at most simultaneously and cut apart).
Carry out the unit when cutting apart, the computational methods of the left upper apex of each wicket after each is cut apart and bottom right apex coordinate are: [generally speaking the left upper apex coordinate of whole projection wall is (0 with respect to the position of whole projection wall according to the projecting cell of desiring to cut apart, 0)], be its left upper apex and bottom right apex coordinate [(x1, y1), (x2, y2)], (as if cutting apart number is 4, then n=2 in conjunction with cutting apart several n^2; As if cutting apart number is 9, then n=3; If to cut apart number is 16, n=4 then) calculates the left upper apex and the bottom right apex coordinate of each wicket after cutting apart; (i wherein, j) (it is capable with respect to the i of projecting cell to cut apart the back for individual wicket, the window of j row) left upper apex and bottom right apex coordinate are respectively, left upper apex coordinate: [x1+ (i-1) * (x2-x1)/n, y1+ (j-1) * (y2-y1)/n] the bottom right apex coordinate: [x1+i* (x2-x1)/n, y1+j* (y2-y1)/n]
In the formula: (x1, y1), (x2 is y2) for desiring to cut apart the left upper apex and the bottom right apex coordinate of projecting cell; I, j are the row and column with respect to projecting cell of cutting apart rear hatch; N is cut apart several square roots.
Described integral body is cut apart, and promptly can cut apart arbitrarily projection wall, is made up of 3 row *, 4 row piece projecting cells such as combination, can in use projection wall be divided into window layout modes such as 4 row *, 5 row or 4 row *, 6 row as required.
Carry out integral body when cutting apart, according to the position and the size of projection wall, i.e. its left upper apex and bottom right apex coordinate [(x1, y1), (x2, y2)], generally speaking (x1 y1) is (0,0), if projection wall is rearranged by 3 row *, 4 row projecting cells, and each projecting cell length and width is 1024*768, then (x2, y2) be (4096,2304), cut apart number and be the capable * n row of m, calculate the left upper apex and the bottom right apex coordinate of each wicket after cutting apart.Wherein, the (i, j) left upper apex and the bottom right apex coordinate of individual window (it is capable that whole projection wall is cut apart back i, the window of j row) are respectively:
Left upper apex coordinate: [x1+ (i-1) * (x2-x1)/n, y1+ (j-1) * (y2-y1)/m]
Bottom right apex coordinate: [x1+i* (x2-x1)/n, y1+j* (y2-y1)/m]
In the formula: (x1, y1), (x2 y2) is the left upper apex and the bottom right apex coordinate of projection wall; I, j are the row and column that whole projection wall is cut apart rear hatch; M, n represent to cut apart several row and columns.
Referring to Fig. 2, wherein dotted line is represented undivided projection wall, form by 3*4 projecting cell, 4 projecting cells (dotted border) in the upper left corner have been merged into a new window (solid border), the projecting cell in the lower left corner is divided into 4 windows (solid border wicket), a newly-built on the right floating frame (solid border).
In Fig. 3, be that projection wall is carried out schematic diagram after whole 4*6 is cut apart.Dotted line is represented undivided projection wall, is made up of 3*4 projecting cell, the window that the solid line bar touches off all after cutting apart.
For the window after cutting apart, can carry out seamless link with video monitoring system, directly drag video source in the video source list to any window, just can realize being connected of video source and this window, also can utilize interface to realize other self-defining attended operation modes.
The control procedure of described seamless link is:
At first, video signal source is switched to a certain input of projection wall.Projection wall has a plurality of inputs, and vision signal can send a signal to some windows of projection wall by these inputs.Send the video switch order to system's Control Server in client, system's Control Server is transmitted the video switch order and is driven to video matrix, and video matrix drives the control that realizes video matrix equipment, and promptly the Switch Video signal source is to a certain input of projection wall.
Then, connect a certain window of the input of projection wall to projection wall, system's Control Server issues control command to the projection wall control unit, and the projection wall control unit is directly controlled projection wall and connected.
More than two control actions be one step completed for the operator, promptly directly drag video source in the video source list to any window, feel it is seamless link from visual effect.
Can carry out program management for any window of cutting apart, both can preserve current layout in actual mechanical process is prediction scheme, also can carry out off-line prediction scheme editor and management under the situation of no actual projection wall.Adopt the scheme of simulated projections wall and analog video signal, on user interface, can directly carry out prediction scheme editor and preservation.
User interface adopts the ActiveX control mode to realize in the present invention, and this control provides abundant interface to call for external system, by these interfaces, and can self-defined monitoring interface mode of operation in the practical engineering application process.
Described system Control Server is meant system's Control Server of limited company of Baosight " integrated centralized monitor command system " product, the major function of this server is the control command of collecting other all subsystems in " integrated centralized monitor command system " product, according to the control command parameter, these control commands are transmitted to equipment.
More than by embodiment the present invention is had been described in detail; but it is not in order to limit the present invention; for the person of ordinary skill of the art; under the prerequisite that does not break away from the principle of the invention; also can make some distortion and improvement, these also should be considered as belonging to protection scope of the present invention.

Claims (9)

1. the projection wall window regulation method of a large screen monitoring system is characterized in that: comprise the steps:
At first, select the object that to cut apart and cut apart number in the user interface of client;
The left upper apex of each wicket after the computed segmentation and bottom right apex coordinate then;
Described coordinate is sent to system's Control Server by client by control command;
System's Control Server is sent to the projection wall control unit with described control command, the projection wall control unit is left window according to the window's position information Control projection wall that provides in the control command in corresponding position, and the projection wall control unit is connected on the window of appointment according to the input signal of control command with appointment;
The described object of cutting apart comprises to be cut apart a certain projecting cell of projection wall, and promptly the unit is cut apart and projection wall integral body is cut apart, and promptly integral body is cut apart;
Carry out the unit when cutting apart, the computational methods of the left upper apex of each wicket after cutting apart and bottom right apex coordinate are,
The left upper apex coordinate:
[x1+(i-1)×(x2-x1)/n,y1+(j-1)×(y2-y1)/n],
The bottom right apex coordinate:
[x1+i×(x2-x1)/n,y1+j×(y2-y1)/n],
In the formula: (x1, y1), (x2 is y2) for desiring to cut apart the left upper apex and the bottom right apex coordinate of projecting cell; I, j are the row and column with respect to projecting cell of cutting apart rear hatch; N is cut apart several square roots.
2. the projection wall window regulation method of large screen monitoring system as claimed in claim 1, it is characterized in that: if the user has set described specified window and needed the video signal displayed source, then system's Control Server will be transmitted control command to video matrix, video matrix switches this video signal source to the corresponding input port of projection wall, thereby finishes the demonstration of video signal source on window.
3. the projection wall window regulation method of large screen monitoring system as claimed in claim 1 is characterized in that: carrying out the unit when cutting apart, is 4 to cut apart, 9 cut apart or 16 cut apart to the number of cutting apart of any projecting cell.
4. the projection wall window regulation method of large screen monitoring system as claimed in claim 1 is characterized in that: carry out integral body when cutting apart, the left upper apex of each wicket after cutting apart and bottom right apex coordinate are calculated as follows:
The left upper apex coordinate:
[x1+(i-1)×(x2-x1)/n,y1+(j-1)×(y2-y1)/m]
The bottom right apex coordinate:
[x1+i×(x2-x1)/n,y1+j×(y2-y1)/m]
In the formula: (x1, y1), (x2 y2) is the left upper apex and the bottom right apex coordinate of projection wall; I, j are the row and column that whole projection wall is cut apart rear hatch; M, n represent to cut apart several row and columns.
5. the projection wall window regulation method of large screen monitoring system as claimed in claim 1 or 2, it is characterized in that: described system Control Server returns to user interface with control information, makes the situation that user interface can the actual response projection wall.
6. the projection wall window regulation method of large screen monitoring system as claimed in claim 1 or 2 is characterized in that: for the window after cutting apart, can carry out seamless link with video monitoring system.
7. the projection wall window regulation method of large screen monitoring system as claimed in claim 6, it is characterized in that: the control procedure of described seamless link is:
At first, video signal source is switched to a certain input of projection wall: send the video switch order to system's Control Server in client, system's Control Server is transmitted the video switch order and is driven to video matrix, video matrix drives the control that realizes video matrix equipment, and promptly the Switch Video signal source is to a certain input of projection wall;
Then, connect a certain window of the input of projection wall to projection wall, system's Control Server issues control command to the projection wall control unit, and the projection wall control unit is directly controlled projection wall and connected.
8. the projection wall window regulation method of large screen monitoring system as claimed in claim 1 or 2, it is characterized in that: can carry out program management for any window of cutting apart, both can preserve current layout in actual mechanical process is prediction scheme, also can carry out off-line prediction scheme editor and management under the situation of no actual projection wall; Adopt the scheme of simulated projections wall and analog video signal, on user interface, directly carry out prediction scheme editor and preservation.
9. the projection wall window regulation method of large screen monitoring system as claimed in claim 1 or 2 is characterized in that: user interface adopts the ActiveX control mode to realize.
CN2007100941895A 2007-11-01 2007-11-01 Projection wall window regulation method for large screen monitoring system Active CN101426126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100941895A CN101426126B (en) 2007-11-01 2007-11-01 Projection wall window regulation method for large screen monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100941895A CN101426126B (en) 2007-11-01 2007-11-01 Projection wall window regulation method for large screen monitoring system

Publications (2)

Publication Number Publication Date
CN101426126A CN101426126A (en) 2009-05-06
CN101426126B true CN101426126B (en) 2011-02-09

Family

ID=40616419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100941895A Active CN101426126B (en) 2007-11-01 2007-11-01 Projection wall window regulation method for large screen monitoring system

Country Status (1)

Country Link
CN (1) CN101426126B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106708455A (en) * 2016-12-15 2017-05-24 广东威创视讯科技股份有限公司 Virtual window-based splicing wall control method and apparatus

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI423184B (en) * 2010-09-21 2014-01-11 Chiefway Optronics Co Ltd The device and the method of implementing interactive advertising
CN102547205A (en) * 2011-12-21 2012-07-04 广东威创视讯科技股份有限公司 Method and system for displaying ultra-high resolution image
CN102708841B (en) * 2012-04-16 2015-04-29 广东威创视讯科技股份有限公司 Signal window-opening method and device
KR102091005B1 (en) * 2013-06-17 2020-03-19 삼성전자주식회사 Display system and controlling method thereof
CN103763536B (en) * 2014-01-29 2016-02-03 中达电通股份有限公司 Based on the method and system of CS framework control DLP projector equipment seamless switching
CN104519392B (en) * 2014-12-26 2018-02-13 广东威创视讯科技股份有限公司 The switching method and system of a kind of terminal display image of combination
KR101675804B1 (en) * 2015-05-27 2016-11-15 한화테크윈 주식회사 Surveillance system wherein video wall is formed
CN105427832A (en) * 2015-11-23 2016-03-23 广东威创视讯科技股份有限公司 Signal windowing method and device
CN109034754A (en) * 2018-09-29 2018-12-18 重庆盾琪科技有限公司 Major project Dispatch and Command Center
CN109348290A (en) * 2018-10-12 2019-02-15 北京凯视达科技有限公司 Control method, apparatus, readable storage medium storing program for executing and the electronic equipment of video playing
CN111385521B (en) * 2018-12-27 2021-11-16 浙江宇视科技有限公司 Method for distributed display of user interface and decoding equipment
CN109783707A (en) * 2019-01-23 2019-05-21 欧普照明股份有限公司 A kind of moade setting method and device of monitoring system
CN111580763A (en) * 2019-02-19 2020-08-25 西安诺瓦电子科技有限公司 Picture display control method, device, system and computer readable medium
CN110162288A (en) * 2019-06-03 2019-08-23 北京淳中科技股份有限公司 A kind of method, apparatus, equipment and the medium of determining display area
CN111010600A (en) * 2019-12-05 2020-04-14 深圳市创维群欣安防科技股份有限公司 Tiled fusion windowing method based on distributed cloud splicing and display screen
CN111124336B (en) * 2019-12-12 2023-10-31 深圳创维数字技术有限公司 Distributed cloud splicing window pre-operation method and cloud splicing control platform
CN111782123B (en) * 2020-05-25 2021-08-17 北京博睿维讯科技有限公司 Screen display method and display device
CN112839199B (en) * 2020-12-25 2024-06-14 山东兰陵经济开发区管理委员会 Key data combined display platform and method
CN113010046B (en) * 2021-05-26 2021-10-01 广州朗国电子科技股份有限公司 Method for adapting signal source in multi-window mode, electronic equipment and storage medium
CN113596577B (en) * 2021-07-22 2023-03-21 上海领路人科技股份有限公司 Visual cutting and issuing method, device, medium and terminal of linkage video
CN117061717B (en) * 2023-10-12 2024-01-09 杭州罗莱迪思科技股份有限公司 Projection spliced video effective control method, system and application thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1476242A (en) * 2002-07-23 2004-02-18 ������������ʽ���� Display system, network answering display device, terminal apparatus and controlling program
CN1677374A (en) * 2004-03-31 2005-10-05 精工爱普生株式会社 Image display system
CN1782984A (en) * 2004-11-30 2006-06-07 北京中科大洋科技发展股份有限公司 Multiple picture frame splitting system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1476242A (en) * 2002-07-23 2004-02-18 ������������ʽ���� Display system, network answering display device, terminal apparatus and controlling program
CN1677374A (en) * 2004-03-31 2005-10-05 精工爱普生株式会社 Image display system
CN1782984A (en) * 2004-11-30 2006-06-07 北京中科大洋科技发展股份有限公司 Multiple picture frame splitting system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
付晓光 等.大屏幕集中式监视系统--50英寸高清等离子显示器在中小演播室中的应用实例.现代电视技术 1.2007,(1),106-107.
付晓光等.大屏幕集中式监视系统--50英寸高清等离子显示器在中小演播室中的应用实例.现代电视技术 1.2007,(1),106-107. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106708455A (en) * 2016-12-15 2017-05-24 广东威创视讯科技股份有限公司 Virtual window-based splicing wall control method and apparatus

Also Published As

Publication number Publication date
CN101426126A (en) 2009-05-06

Similar Documents

Publication Publication Date Title
CN101426126B (en) Projection wall window regulation method for large screen monitoring system
US20230115110A1 (en) Traffic simulation method and apparatus, computer device, and storage medium
CN107729065B (en) Three-dimensional monitoring method and system
CN102789327B (en) Method for controlling mobile robot on basis of hand signals
Liu et al. Corridor-based emergency evacuation system for Washington, DC: system development and case study
Zou et al. Simulation-based emergency evacuation system for Ocean City, Maryland, during hurricanes
CN103794103A (en) Constructing method for portable two-passage port crane simulator
CN102280027A (en) Intersection semiphysical dynamic microcosmic simulation system and method
CN211149757U (en) Real standard system of rail transit simulation driving
CN102508617A (en) Video control system in video monitoring system and method
WO2022057697A1 (en) Vehicle braking system and method capable of achieving autonomous driving
CN108205883A (en) It is a kind of to be lined up guiding system and method
CN106696973A (en) Ore blending dispatching system based on ore grade and control method of ore blending system
CN106448779A (en) Method and device for gang controlling screen of master control room of nuclear electrical power plant
JP2014019182A (en) Train operation command device
CN114148380A (en) Line network driving monitoring system
CN108320610A (en) A kind of public security traffic commander's simulation training system based on network cooperating
CN107170250A (en) A kind of smart city road instruction system
CN110497935A (en) A kind of downhole coal mine shuttle car automatic control system
CN215932387U (en) Intelligent building visual interaction platform based on Internet of things
CN202886964U (en) Device capable of enabling setting information of controllers at both ends of vehicle to be consistent
CN103792893A (en) Device and method capable of enabling setting information of controllers at both ends of vehicle to be consistent
CN113065044A (en) Driving state checking method, device, equipment and storage medium
CN105467872A (en) Graphical configuration sequentialization control system
CN220205105U (en) Sliding-type multi-screen display

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant