CN101403252B - Hanging cradle for inner wall construction of chimney or well - Google Patents
Hanging cradle for inner wall construction of chimney or well Download PDFInfo
- Publication number
- CN101403252B CN101403252B CN2008101949193A CN200810194919A CN101403252B CN 101403252 B CN101403252 B CN 101403252B CN 2008101949193 A CN2008101949193 A CN 2008101949193A CN 200810194919 A CN200810194919 A CN 200810194919A CN 101403252 B CN101403252 B CN 101403252B
- Authority
- CN
- China
- Prior art keywords
- underframe
- construction
- chimney
- guide plate
- wall construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to an aerial working nacelle used in building construction and decoration, in particular to a nacelle used in chimney or well inner wall construction. According to the technical proposal provided by the invention, the nacelle comprises an annular installation underframe the upper surface of which is provided with a plurality of fixing guide plates, a construction unit plate which is connected with the installation underframe by a detachable sliding connection way is arranged above the underframe, a telescopic guide plate which can slide along the fixing guide plate is arranged on the bottom end surface of the construction unit plate, and a fastening device which can fasten the fixing guide plate and the telescopic guide plate together is arranged between the two plates. When in use, the nacelle can meet the construction requirements of chimney inner walls or well inner walls with all types of curved surfaces, and has simple assemble and disassembly, the whole working face construction and material transportation can be carried out synchronously, thus greatly shortening the construction period and reducing the cost simultaneously..
Description
Technical field
The present invention relates to a kind of building operations, finishing high-lift operation hanging cradle, especially a kind of chimney or well hanging cradle for inner wall construction.
Background technology
In recent years, aerial work basket at home and abroad is widely used.General conventional hanging basket platform all is the cuboid working platform, is fit to lean against lifting on the planar walls, finishes the tasks such as finishing, japanning, maintenance of this face.
Along with the develop rapidly of relevant industries such as domestic and international power plant, chimney, hoistway moulding style varied, work plane pyramid type, shaped form etc. have occurred except that simple circle, even increasing arbitrary diameter metope.Therefore, originally the working platform of cuboid form has seemed dull stiff, can not adapt to the needs of various radians, diameter, curved surface chimney.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, provide a kind of and can adapt to the inner wall of stack of various curved surfaces or well inner wall construction needs, assembly unit and dismounting are simple, the entire working surface construction is transported the chimney or the well hanging cradle for inner wall construction that can carry out simultaneously with material.
According to technical scheme provided by the invention, described chimney or well hanging cradle for inner wall construction, the installation underframe that comprises annular, be provided with the plurality of fixed guide plate at the upper surface that underframe is installed, the detachably construction unit board that connects of the mode of being slidingly connected of utilization is set installing above the underframe, bottom face at the construction unit board is provided with and can be provided with the fastener with they fastening one between resting guide and flexible guide plate along the flexible guide plate of resting guide slip.
Described installation underframe is annular, and described resting guide is along the axis direction setting that underframe is installed.The liftable mass transport platform that hole shape coincide in being provided with in the centre bore that underframe is installed and being somebody's turn to do.Described construction unit board is the fan ring-type.
Described fastener is included in some first locking holes of offering on the resting guide, on flexible guide plate, offer some second locking holes, distance between adjacent two first locking holes equates with distance between adjacent two second locking holes, be plugged with fastening bolt in first locking hole and second locking hole.
When the present invention used, inner wall of stack or well inner wall construction needs, assembly unit and the dismounting that can adapt to various curved surfaces were simple, and the entire working surface construction can be carried out simultaneously with the material transportation, has shortened the duration greatly, and cost descends simultaneously.
Description of drawings
Fig. 1 is an overall structure schematic diagram of the present invention.
Fig. 2 is a monolithic construction unit board and the connection status front view that underframe is installed among Fig. 1.
Fig. 3 is the left view of Fig. 2.
The specific embodiment
The invention will be further described below in conjunction with concrete drawings and Examples.
As shown in the figure: it comprises the installation underframe 1 of annular, be provided with plurality of fixed guide plate 2 at the upper surface that underframe 1 is installed, be provided with above the underframe 1 and its construction unit board 3 that is connected by the detachable mode of being slidingly connected installing, bottom face at construction unit board 3 is provided with and can be provided with the fastener with they fastening one between resting guide 2 and flexible guide plate 4 along the flexible guide plate 4 of resting guide 2 slips.
Described installation underframe 1 is annular, and described resting guide 2 is along the axis direction setting that underframe 1 is installed.The liftable mass transport platform 5 that hole shape coincide in being provided with in the centre bore that underframe 1 is installed and being somebody's turn to do.Described construction unit board 3 is the fan ring-type.
Described fastener is included in the some first locking hole 2a that offer on the resting guide 2, on flexible guide plate 4, offer some second locking hole 4a, distance between the adjacent two first locking hole 2a equates with distance between the adjacent two second locking hole 4a, be plugged with fastening bolt 6 in the first locking hole 2a and the second locking hole 4a.
Install underframe 1 by being erected at well head or chimney top mouthful support and on cable suspended in chimney or in the well, and on hawser, be provided with the lifting drive that underframe 1 and mass transport platform 5 are installed, when the flexible guide plate 4 of construction unit board 3 is being installed between the resting guide 2 that fixedly installs on the underframe 1 fixing after the slip, the unit board 3 of can will constructing as requested outwards stretches or inwardly shrinks, thereby adapts to the construction requirement of various different-diameters, curved surface chimney or well inwall.
The liftable mass transport platform 5 that hole shape coincide in being provided with in the centre bore that underframe 1 is installed and being somebody's turn to do makes the transportation of whole construction work plane and material carry out simultaneously, and a gas is synthetic, has shortened the duration greatly, and cost descends simultaneously.
Claims (4)
1. chimney or well hanging cradle for inner wall construction, the installation underframe (1) that comprises annular, it is characterized in that: be provided with plurality of fixed guide plate (2) at the upper surface that underframe (1) is installed, in that being installed, underframe (1) top is provided with and its construction unit board (3) that is connected by the detachable mode of being slidingly connected, bottom face at construction unit board (3) is provided with and can be provided with the fastener with they fastening one between resting guide (2) and flexible guide plate (4) along the flexible guide plate (4) of resting guide (2) slip;
Described fastener is included in some first locking holes (2a) of offering on the resting guide (2), on flexible guide plate (4), offer some second locking holes (4a), distance between adjacent two first locking holes (2a) equates with distance between adjacent two second locking holes (4a), is plugged with fastening bolt (6) in first locking hole (2a) and second locking hole (4a).
2. chimney as claimed in claim 1 or well hanging cradle for inner wall construction is characterized in that: described installation underframe (1) is annular, and described resting guide (2) is along the axis direction setting that underframe (1) is installed.
3. chimney as claimed in claim 1 or 2 or well hanging cradle for inner wall construction is characterized in that: the liftable mass transport platform (5) that hole shape coincide in being provided with in the centre bore that underframe (1) is installed and being somebody's turn to do.
4. chimney as claimed in claim 1 or well hanging cradle for inner wall construction is characterized in that: described construction unit board (3) is the fan ring-type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101949193A CN101403252B (en) | 2008-10-27 | 2008-10-27 | Hanging cradle for inner wall construction of chimney or well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101949193A CN101403252B (en) | 2008-10-27 | 2008-10-27 | Hanging cradle for inner wall construction of chimney or well |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101403252A CN101403252A (en) | 2009-04-08 |
CN101403252B true CN101403252B (en) | 2010-09-22 |
Family
ID=40537392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101949193A Expired - Fee Related CN101403252B (en) | 2008-10-27 | 2008-10-27 | Hanging cradle for inner wall construction of chimney or well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101403252B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080446B (en) * | 2011-02-18 | 2012-04-18 | 中国水利水电第七工程局成都水电建设工程有限公司 | Lifting platform for shaft construction |
CN104032943A (en) * | 2014-06-20 | 2014-09-10 | 山东电力建设第一工程公司 | Hydraulic lifting telescopic platform device |
CN106481060B (en) * | 2016-10-08 | 2019-05-07 | 霍尔果斯新国金新能源科技有限公司 | Operating platform and hanging method for tower |
-
2008
- 2008-10-27 CN CN2008101949193A patent/CN101403252B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101403252A (en) | 2009-04-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2012373801C1 (en) | Early-removal formwork system for concreting of constructions comprising beams, plates and columns | |
CN101403252B (en) | Hanging cradle for inner wall construction of chimney or well | |
CN201310169Y (en) | Connecting structure of wall decorative plate and wall | |
CN102535700A (en) | Independently detachable small unit type stone curtain wall hanging piece system | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN201297028Y (en) | Hanging basket for inner wall construction of chimney or well | |
CN202530600U (en) | Independent dismounting small unit type stone curtain wall pendant system | |
CN201972369U (en) | Floor | |
CN202924620U (en) | Mounting support for mounting equipment in narrow space | |
CN204059595U (en) | Detachable building | |
CN101660660B (en) | Novel installing method of gas cabinet | |
CN202064255U (en) | Novel floor | |
CN214739838U (en) | Dish knot formula scaffold frame based on BIM | |
CN203213588U (en) | Floor supporting and early-dismounting template made of aluminum alloy | |
CN203998724U (en) | A kind of tower machine attached wall assembling and disassembling stand | |
CN211623533U (en) | High temperature resistant vehicle vent-pipe of easy dismouting | |
CN210846883U (en) | Spraying device is used in production of car wiper spring | |
CN202672700U (en) | Height adjusting device of scaffold ricker | |
CN208870243U (en) | A kind of curtain wall installing structure | |
CN103101848A (en) | Portable maintenance cantilever hoist of tower crane | |
CN202090580U (en) | Telescopic operating platform | |
CN202055496U (en) | Easy-to-adjust moving operation platform | |
CN201901560U (en) | Device for installing rope blocking tube | |
CN201972330U (en) | Handrail | |
CN201554159U (en) | Multifunctional reinforcement bar support bench |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100922 Termination date: 20111027 |