CN101402392A CNA2008102267609A CN200810226760A CN101402392A CN 101402392 A CN101402392 A CN 101402392A CN A2008102267609 A CNA2008102267609 A CN A2008102267609A CN 200810226760 A CN200810226760 A CN 200810226760A CN 101402392 A CN101402392 A CN 101402392A
Authority
CN
China
Prior art keywords
barge
leg
jacket
upper chunk
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008102267609A
Other languages
Chinese (zh)
Inventor
李新仲
侯金林
范模
李达
马巍巍
易丛
崔玉军
贾旭
于春洁
张保军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Research Center filed Critical China National Offshore Oil Corp CNOOC
Priority to CNA2008102267609A priority Critical patent/CN101402392A/en
Publication of CN101402392A publication Critical patent/CN101402392A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a method for assembling an ocean platform and a special assembling device thereof. The special assembling device comprises a barge, wherein a supporting frame is arranged on a deck of the barge, and both sides of the barge are provided with fender devices. When an upper chunk leg is conveyed over a jacket leg, the barge stops moving horizontally; butt joint of an upper chunk and a jacket is completed by utilization of the oceanic tide fall and by pressurization and water carrying of the barge; and ballast is continuously performed on the barge and is withdrawn from a notch of the jacket until a certain safety clearance is formed between the supporting frame and the upper chunk. The method fully utilizes the natural power of the oceanic tide fall, integrates the double action of pressurization and water carrying, achieves the aim of assembling structural objects, saves the resource of a large floating crane and the mounting cost, is convenient to integrally construct the upper chunk of the large ocean platform, reduces the marine debugging time, accelerates completion and commissioning of oil fields, is suitable to be used in shoal areas into which the floating crane can not enter, and can be extended into other projects such as harbor construction, bridge construction and so on.

Description

A kind of platform installation method and special installation apparatus
Technical field
The present invention relates to the construction operating technique of platform, particularly relate to a kind of ocean tide that utilizes and carry out method and special installation apparatus that platform is installed.
Background technology
Along with the China's oil resources consumption increases considerably, the national energy strategy is subjected to very big challenge, develops China's offshore oil resource cost-effectively fast and receives much concern.The marine oil production platform of China's marine petroleum development is owing to more perfect function, PROCESS FOR TREATMENT equipment are complicated more at present, and marine oil production platform upper chunk weight has increasing trend.The installation method of upper chunk normally adopts large-scale floating crane to carry out the sea and installs, if install at the sea of all adopting hanging method to carry out the platform upper chunk, when off-shore oil field is built quantity for a long time, this just needs a large amount of crane barge resources, will inevitably cause crane barge Resource allocation and smoothing difficulty, and the increase cost of installation, even because of the crane barge resource can not put in place on schedule, and oilfield construction is delayed.Therefore, it is extremely urgent to study new upper chunk installation method, especially at the docking technique of large-scale chunk and platform jacket.
Summary of the invention
The purpose of this invention is to provide a kind of platform installation method and special installation apparatus thereof.
The special installation apparatus that is used for the platform installation provided by the invention as shown in Figure 1-Figure 3, comprises a barge 2, and the deck of this barge is provided with support frame 4, and this support frame and platform are complementary, and the both sides of barge are provided with ship side protector 6.
Barge 2 has the stability and the ballast water regulating power of delivery platform upper chunk 1; Support frame 4 on barge 2 decks is the steel space formula truss structures that connect barge 2 and platform upper chunk 1; This support frame was welded as integral body with platform upper chunk 1 before platform upper chunk 1 is installed, separate with upper chunk 1 when butt joint is installed.In addition, in practical operation,, can piston shoes be set, the slideway that is complementary with piston shoes is set on the barge deck in the support frame bottom for ease of the dilatory shipment of this support frame.
The ship side protector 6 of barge both sides can avoid barge 2 bumping between barge 2 and the jacket 3 after the notch that enters between the jacket leg, and the fender material is generally rubber, and the fender installation length is board and the possible length of contact of jacket leg.
The method of utilizing above-mentioned special installation apparatus to carry out the platform installation provided by the invention is on the support frame 4 that earlier platform upper chunk 1 is fixed on barge 2 decks, afterwards barge 2 is checked a side of jacket 3;
When the platform upper chunk leg be positioned at corresponding pipe frame leg directly over the time, barge 2 stops parallel motion and keeps flat floating state, waits for the arrival of seawater high tide level;
When high tide level arrives, in barge 2, add ballast water;
When low tide level (LWL) arrived, because the double action that ballast water increases and tidal level reduces, platform upper chunk 1 fell with barge 2, cuts away the support frame between platform upper chunk 1 and the barge 2 when falling; When the upper chunk leg of platform when docking shock absorber and bump, dock between platform upper chunk leg and the jacket leg;
After butt joint was finished, welding platform upper chunk leg and jacket leg were finished the installation of platform upper chunk.
Wherein, steel jacket 3 is for being located in the platform bottom section unit on the sea bed in advance.
Butt joint shock absorber 5 is divided into two parts up and down: top is welded on the upper chunk leg of platform, and the bottom is welded on the jacket leg.The number of this device depends on the number of the leg that jacket 3 docks with platform upper chunk 1, one cover butt joint shock absorber 5 is all arranged on the leg of every jacket 3, being welded in respectively on the leg of platform upper chunk 1 and jacket 3, is an integral body after butt joint is finished.The effect of this device is to absorb the collision energy that docking operation took place, and avoids damaging works.And the upper chunk leg lower end is established taper and is inserted sharp structure, and each leg upper end of jacket is provided with concave structure, with the convenient steel cylinder zone, top that captures the jacket leg in docking operation, realizes accurately butt joint.
In the above-mentioned installation method, enter the notch of jacket 3 when carrying has the barge 2 of platform upper chunk 1, during platform upper chunk leg process jacket leg, the clean gap between upper chunk leg and the jacket leg is not less than 0.5 meter.When the platform upper chunk leg be positioned at corresponding pipe frame leg directly over the time, bonded assembly part support frame legs between cutting barge 2 and the platform upper chunk 1.
Barge 2 is after the support frame 4 that has cut between platform upper chunk 1 and the barge 2, clean gap between support frame on the barge 24 and upper chunk leg is not less than 0.5 meter, simultaneously, when the clean gap between the horizontal brace of barge 2 hull bottom and jacket 3 is not less than 0.5 meter, barge 2 is withdrawed from notch between the jacket leg.
When docking shock absorber 5 and bump, except that fender 6 and jacket leg bumped, hull 2 jigging motions can not collide jacket 3 other any positions in the platform upper chunk leg; The clean gap of barge 2 bottoms and jacket 3 horizontal braces should be not less than 0.5 meter.In addition, platform upper chunk 1, barge 2 and jacket 3 can bear the impact force that is produced in the whole erection process.
The installation method that the present invention utilizes above-mentioned special installation apparatus to adopt has the following advantages:
1, made full use of the elements of ocean tide drop, and, reached works purpose is installed, saved the large-scale floating crane resource, saved erected cost in conjunction with the double action that adds ballast water.
2, be convenient to large ocean platform upper chunk monolithic construction, reduce the time of marine debugging, quicken the oil field and go into operation.
3, be applicable to the unapproachable shallow water area of crane barge, and can expand on the Other Engineerings such as port construction and bridge construction.
Description of drawings
Fig. 1 is the birds-eye view of platform special installation apparatus provided by the invention and platform upper chunk.
Fig. 2 is the birds-eye view of platform special installation apparatus provided by the invention.
Fig. 3 is the cutaway view of platform special installation apparatus provided by the invention.
Fig. 4 is the cutaway view before platform special installation apparatus provided by the invention docks with the platform upper chunk.
Fig. 5 is a platform special installation apparatus provided by the invention and cutaway view after the platform upper chunk is docked.
The specific embodiment
In conjunction with Fig. 1-shown in Figure 5, specify the ocean tide that utilizes provided by the invention and carry out the method that platform is installed:
Steel jacket platform 3 is installed in the predetermined maritime area in oil field in advance, and leaving in the middle of the jacket 3 can be for the notch of barge 2 turnover, and barge 2 both sides are equipped with ship side protector, and the fender material is generally rubber.Jacket 3 is respectively installed a cover with the top of all legs of chunk bonded assembly and is docked shock absorber 5.Barge 2 carrying upper chunk 1 are to notch one side of jacket 3, barge bow or stern aligned notches direction, do the into preceding dead work of ship, main dead work is the transom that cuts away earlier between part support frame 4 and the upper chunk 1, waits for that the appropriate climate condition enters the notch of jacket 3.
The present invention is subjected to the restriction of certain marine environment condition, main performance assessment criteria is direction, wave height, period of a wave and the tidal level of the relative barge 2 of wave, generally advancing the ship operating condition and be significant wave height carries out less than under 1 meter, flood tide condition, to guarantee between the ship time platform chunk leg and jacket leg certain safety gap is arranged, detailed operating condition need obtain by computational analysis or model test.Begin to enter into notch between the jacket leg at barge 2 under the suitable operating condition, when upper chunk leg being drawn to corresponding pipe frame leg directly over the time, barge 2 stops parallel motion, barge 2 positioned limit its horizontal motion, and wait for the arrival of high tide level and butt joint operation restriction environmental conditions.The butt joint operating condition generally be at significant wave height less than 1 meter, carry out under the ebb tide condition.When high tide level arrives, under the requirement of satisfying the butt joint operating environmental conditions, barge 2 begins to increase ballast water to quicken descending speed, because the increase of barge 2 displacement and the reduction of tidal level, upper chunk 1 is along with barge 2 falls together, the residue that cuts away when falling between platform chunk and the support frame 4 supports, when dropping to certain phase, upper chunk leg will bump with the shock absorber 5 that docks on the jacket leg, the weight of upper chunk 1 is by progressively transferring on the jacket 3, as shown in Figure 5 on the barge 2.After weight shifts and finishes, barge continues ballast, after support frame on the barge 24 and upper chunk had certain safety gap, barge 2 withdrawed from between the notch of jacket 3, and finished the welding job of docking shock absorber 5 on upper chunk leg and the jacket leg.Move back ship time, have certain safety gap between the horizontal brace of assurance barge 2 bottoms and jacket 3.
The inventive method provide utilize ocean tide to carry out platform that the main technical details of embodiment is installed is as follows:
Operating water depth: 28 meters
Jacket leg quantity: 4 * 2
Jacket leg diameter: 2.134 meters
Captain L=142 rice, beam B=36 rice, moldeed depth D=9.75 rice
Chunk size: 57.5 meters * 64 meters
Chunk weight: 10528 tons
Chunk supporting leg spacing: 40 meters.

Claims (9)

1, a kind of erecting equipment that is used for the platform installation, it comprises a barge, it is characterized in that: the deck of described barge is provided with support frame.
2, erecting equipment according to claim 1 is characterized in that: described support frame and described platform are complementary.
3, erecting equipment according to claim 1 and 2 is characterized in that: described barge both sides are provided with ship side protector.
4, a kind of arbitrary described erecting equipment of claim 1-3 that utilizes carries out the method that platform is installed, and is on the support frame that earlier the platform upper chunk is fixed on the barge deck, afterwards barge is checked jacket one side; Described jacket is fixed on the sea bed;
When described platform upper chunk leg be positioned at corresponding pipe frame leg directly over the time, barge stops parallel motion and keeps flat floating state, waits for the arrival of seawater high tide level;
When high tide level arrives, in barge, add ballast water;
When low tide level (LWL) arrived, described platform upper chunk fell with barge, cut away the support frame between described platform upper chunk and the barge when falling; When the upper chunk leg of described platform when docking shock absorber and bump, dock between described platform upper chunk leg and the jacket leg;
Wherein, described butt joint shock absorber is divided into two parts up and down; The top of described butt joint shock absorber is welded on the upper chunk leg of described platform, and the bottom of described butt joint shock absorber is welded on the described jacket leg;
After described butt joint is finished, weld described platform upper chunk leg and jacket leg, finish the installation of described platform upper chunk.
5, method according to claim 4, it is characterized in that: described carrying has the barge of platform upper chunk to enter the notch of jacket, when described platform upper chunk leg was passed through the jacket leg, the clean gap between upper chunk leg and the jacket leg was not less than 0.5 meter.
6, according to claim 4 or 5 described methods, it is characterized in that: after the support frame of described barge between intact described platform upper chunk of described cutting and barge, clean gap between support frame on the described barge and upper chunk leg is not less than 0.5 meter, simultaneously, when the clean gap between the horizontal brace of barge hull bottom and jacket is not less than 0.5 meter, barge is withdrawed from notch between the jacket leg.
7, according to claim 4 or 5 described methods, it is characterized in that: described platform upper chunk leg is when docking shock absorber and bump, and except that fender and jacket leg bumped, the hull jigging motion can not collide other any positions of jacket; The barge bottom should be not less than 0.5 meter with the clean gap of jacket horizontal brace.
8, according to claim 4 or 5 described methods, it is characterized in that: described when the platform upper chunk leg be positioned at corresponding pipe frame leg directly over the time, cut bonded assembly support frame between described barge and the described platform upper chunk.
9, according to claim 4 or 5 described methods, it is characterized in that: described jacket, platform upper chunk and barge can bear the impact force that is produced in the whole erection process.
CNA2008102267609A 2008-11-21 2008-11-21 Ocean platform mounting method and special installation equipment therefor Pending CN101402392A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008102267609A CN101402392A (en) 2008-11-21 2008-11-21 Ocean platform mounting method and special installation equipment therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008102267609A CN101402392A (en) 2008-11-21 2008-11-21 Ocean platform mounting method and special installation equipment therefor

Publications (1)

Publication Number Publication Date
CN101402392A true CN101402392A (en) 2009-04-08

Family

ID=40536583

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008102267609A Pending CN101402392A (en) 2008-11-21 2008-11-21 Ocean platform mounting method and special installation equipment therefor

Country Status (1)

Country Link
CN (1) CN101402392A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101850831A (en) * 2010-05-31 2010-10-06 南通中远船务工程有限公司 Hoisting method of living area block of large ocean maritime work platform
CN102061684A (en) * 2011-01-14 2011-05-18 中国海洋石油总公司 Floating supporter for blocks of ocean platform
CN102117363A (en) * 2011-01-19 2011-07-06 中国海洋石油总公司 Uprighting analysis method for floating Spar platform
CN102409650A (en) * 2011-09-23 2012-04-11 中国海洋石油总公司 Method for mounting shallow water ocean jacket platform
CN102774472A (en) * 2012-07-31 2012-11-14 中国海洋石油总公司 Construction ship with clearance-variable fenders
CN101774422B (en) * 2009-12-30 2013-05-15 天津市海王星海上工程技术有限公司 Novel offshore installation construction resource-combined type pontoon barge
CN103303442A (en) * 2013-05-31 2013-09-18 中国海洋石油总公司 Field crude oil storage and transportation method for shallow water oil field
CN104975589A (en) * 2014-04-04 2015-10-14 广东强光海洋工程有限公司 Device and method for integral assembly and horizontal movement of prestressed concrete ocean fixing platform
CN106516023A (en) * 2016-11-30 2017-03-22 中铁隧道勘测设计院有限公司 Novel transportation method for oversize type prefabricated component
CN109056684A (en) * 2018-09-21 2018-12-21 中国电建集团华东勘测设计研究院有限公司 The split type jacket structure of Large marine platform and its installation method of the installation of support method are floated suitable for shallow sea water
CN109750602A (en) * 2019-01-25 2019-05-14 中交二航局第二工程有限公司 The anti-slamming of offshore lifting is quickly come to nothing device
CN114715360A (en) * 2021-01-05 2022-07-08 中国电建集团华东勘测设计研究院有限公司 Seabed big data center attached to large offshore substation and installation and maintenance process

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101774422B (en) * 2009-12-30 2013-05-15 天津市海王星海上工程技术有限公司 Novel offshore installation construction resource-combined type pontoon barge
CN101850831A (en) * 2010-05-31 2010-10-06 南通中远船务工程有限公司 Hoisting method of living area block of large ocean maritime work platform
CN102061684A (en) * 2011-01-14 2011-05-18 中国海洋石油总公司 Floating supporter for blocks of ocean platform
CN102117363A (en) * 2011-01-19 2011-07-06 中国海洋石油总公司 Uprighting analysis method for floating Spar platform
CN102409650A (en) * 2011-09-23 2012-04-11 中国海洋石油总公司 Method for mounting shallow water ocean jacket platform
CN102774472A (en) * 2012-07-31 2012-11-14 中国海洋石油总公司 Construction ship with clearance-variable fenders
CN102774472B (en) * 2012-07-31 2015-03-11 中国海洋石油总公司 Construction ship with clearance-variable fenders
CN103303442A (en) * 2013-05-31 2013-09-18 中国海洋石油总公司 Field crude oil storage and transportation method for shallow water oil field
CN104975589A (en) * 2014-04-04 2015-10-14 广东强光海洋工程有限公司 Device and method for integral assembly and horizontal movement of prestressed concrete ocean fixing platform
CN104975589B (en) * 2014-04-04 2018-03-20 广东海上城建控股发展有限公司 Prestressed concrete ocean fixed platform integral assembling translating device and method
CN106516023A (en) * 2016-11-30 2017-03-22 中铁隧道勘测设计院有限公司 Novel transportation method for oversize type prefabricated component
CN109056684A (en) * 2018-09-21 2018-12-21 中国电建集团华东勘测设计研究院有限公司 The split type jacket structure of Large marine platform and its installation method of the installation of support method are floated suitable for shallow sea water
CN109750602A (en) * 2019-01-25 2019-05-14 中交二航局第二工程有限公司 The anti-slamming of offshore lifting is quickly come to nothing device
CN109750602B (en) * 2019-01-25 2023-09-22 中交二航局第二工程有限公司 Slamming-preventing quick emptying device for offshore hoisting
CN114715360A (en) * 2021-01-05 2022-07-08 中国电建集团华东勘测设计研究院有限公司 Seabed big data center attached to large offshore substation and installation and maintenance process
CN114715360B (en) * 2021-01-05 2023-02-24 中国电建集团华东勘测设计研究院有限公司 Seabed big data center attached to large offshore transformer substation and installation and maintenance process

Similar Documents

Publication Publication Date Title
CN101402392A (en) Ocean platform mounting method and special installation equipment therefor
CN201309577Y (en) Special installation equipment for installing ocean platforms
EP1808369A1 (en) Truss semi-submersible floating structure
CN104627332A (en) Floating type self-elevating drilling platform
US10029760B2 (en) Low heave semi-submersible offshore structure
CN204097855U (en) Deep-sea semi-submersible type lightweight modules pontoon bridge
CN102963507A (en) Annular lower floating body semi-submersible platform
CN204323659U (en) The bracing or strutting arrangement of the FPSO module of hull
CN201092380Y (en) Ship mooring facilities of marine oil-gas production platform
CN201534603U (en) Catamaran of sea engineering
CN104743058B (en) The method of tension leg platform (TLP) upper chunk floating support mounting
CN102745315A (en) Swaying fender device for mounting large modules in a floatover manner
CN102963494B (en) Buoyancy mounting method for blocks
CN103085946A (en) Butt joint circular table type floating production oil storage system
CN103171743A (en) Butting octagonal frustum pyramid type floating production and oil storage system
CN202847986U (en) Butt joint octagonal frustum type floating type oil production storage system
CN205221016U (en) A light -duty assembly platform device for wave energy electricity generation
CN103010615A (en) Water oil storage device with mooring function and assembly method thereof
CN201816730U (en) Low-heaving semi-submersible type platform hull
CN105644705A (en) Small water plane twin-hull platform
CN102530189A (en) Catamaran for ocean engineering
KR101259089B1 (en) Vessel for installing offshore facility
US20150175245A1 (en) Butt joint octagonal frustum type floating production storage and offloading system
CN202863728U (en) Butt joint circular truncated cone type floating production storage system
Wang et al. Concept design of a new Non-Ship-Shaped FPSO

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20090408