CN101397909B - 坍塌超深竖井人工掘进修复新工法 - Google Patents
坍塌超深竖井人工掘进修复新工法 Download PDFInfo
- Publication number
- CN101397909B CN101397909B CN2008101969799A CN200810196979A CN101397909B CN 101397909 B CN101397909 B CN 101397909B CN 2008101969799 A CN2008101969799 A CN 2008101969799A CN 200810196979 A CN200810196979 A CN 200810196979A CN 101397909 B CN101397909 B CN 101397909B
- Authority
- CN
- China
- Prior art keywords
- steel
- concrete
- mould
- construction
- steel casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101969799A CN101397909B (zh) | 2008-09-17 | 2008-09-17 | 坍塌超深竖井人工掘进修复新工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101969799A CN101397909B (zh) | 2008-09-17 | 2008-09-17 | 坍塌超深竖井人工掘进修复新工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101397909A CN101397909A (zh) | 2009-04-01 |
CN101397909B true CN101397909B (zh) | 2011-04-20 |
Family
ID=40516719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101969799A Active CN101397909B (zh) | 2008-09-17 | 2008-09-17 | 坍塌超深竖井人工掘进修复新工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101397909B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102644465A (zh) * | 2012-05-14 | 2012-08-22 | 中国水电顾问集团华东勘测设计研究院 | 一种竖井溶洞回填处理施工方法 |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2459084C1 (ru) * | 2011-01-20 | 2012-08-20 | Общество с ограниченной ответственностью "МЕТРОБАЛТСТРОЙ" | Способ реконструкции вертикальной шахты |
CN102287192A (zh) * | 2011-06-24 | 2011-12-21 | 中煤第五建设有限公司 | 立井井筒装备安装用六层施工吊盘 |
CN102305075A (zh) * | 2011-06-28 | 2012-01-04 | 中国水利水电第五工程局有限公司 | 一种不良地质条件下的竖井施工方法 |
CN102619521B (zh) * | 2012-04-19 | 2014-10-29 | 中国矿业大学 | 一种立井基岩段井壁结构的施工方法 |
CN104453913B (zh) * | 2014-12-19 | 2016-08-03 | 玉溪大红山矿业有限公司 | 一种竖井工作面超前预注浆方法 |
CN104790980A (zh) * | 2015-04-02 | 2015-07-22 | 济南城建集团有限公司 | 一种隧道施工中溶洞的处理方法 |
CN105422104B (zh) * | 2015-12-17 | 2018-02-23 | 大同煤矿集团有限责任公司 | 立井井筒加固维护方法 |
CN105952476B (zh) * | 2016-06-14 | 2018-07-06 | 山东华联矿业股份有限公司 | 矿山立井井壁接茬工艺 |
CN106368709B (zh) * | 2016-09-30 | 2019-04-23 | 首钢集团有限公司 | 一种立井的施工方法 |
CN109630128B (zh) * | 2019-02-19 | 2024-02-06 | 广东华方工程设计有限公司 | 一种预制钢筋混凝土装配式自重下沉竖井 |
CN110206550A (zh) * | 2019-05-27 | 2019-09-06 | 中铁十八局集团第四工程有限公司 | 一种复杂地质开挖盾构接收井的施工工法 |
CN111594176B (zh) * | 2020-07-20 | 2020-11-03 | 中国铁建重工集团股份有限公司 | 针对戈壁地质环境的竖井掘进施工方法及竖井结构 |
CN113944466A (zh) * | 2021-09-02 | 2022-01-18 | 成都大学 | 一种高速公路长大隧道竖井围护破碎围岩井壁的加固结构 |
CN113944467B (zh) * | 2021-09-02 | 2024-04-09 | 成都大学 | 一种竖井围护破碎围岩井壁预防塌方的施工方法 |
-
2008
- 2008-09-17 CN CN2008101969799A patent/CN101397909B/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102644465A (zh) * | 2012-05-14 | 2012-08-22 | 中国水电顾问集团华东勘测设计研究院 | 一种竖井溶洞回填处理施工方法 |
CN102644465B (zh) * | 2012-05-14 | 2014-06-25 | 中国水电顾问集团华东勘测设计研究院 | 一种竖井溶洞回填处理施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101397909A (zh) | 2009-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101397909B (zh) | 坍塌超深竖井人工掘进修复新工法 | |
CN104389608B (zh) | 盾构穿越风井的施工方法 | |
CN110821503B (zh) | 一种超深盾构区间风井先隧后主体施工方法 | |
CN103321653B (zh) | 地下洞室顶拱塌方后的衬砌处理方法 | |
CN109209392B (zh) | 适用于大断面隧道ⅳ-ⅴ级围岩的全环开挖方法 | |
CN109595004B (zh) | 一种隧道二扩四扩挖方法 | |
JP3833403B2 (ja) | 大断面トンネルのいわし骨工法 | |
CN103821219A (zh) | 顶管施工改型检查井施工方法 | |
CN108286442A (zh) | 适用于软弱围岩隧道两台阶一次快速封闭成环的开挖方法 | |
WO1999028595A1 (fr) | Procede de construction a structure de type 'squelette de baleine' pour tunnel a section importante | |
CN103437795B (zh) | 纵向、环向锚固联合快速超前支护方法 | |
CN203321531U (zh) | 地下洞室顶拱塌方后的衬砌处理结构 | |
CN106761474A (zh) | 一种可主动运渣土的全套管工法用钢套管及其施工方法 | |
CN103362117A (zh) | 注浆段全段注浆的方法 | |
CN108265706A (zh) | 一种在溶洞地质内的工程桩及成桩工艺 | |
CN105484763B (zh) | 一种深部煤矿半封闭钢筋混凝土管片支护方法 | |
CN106837382A (zh) | 一种地铁隧道围岩地面预注浆加固工艺 | |
CN102817621A (zh) | 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法 | |
CN104533425A (zh) | 一种立井整体浇筑段壁座及立井整体浇筑段壁座施工方法 | |
CN102635359B (zh) | 隧道通风竖井节能快速施工方法 | |
CN104453915B (zh) | 大断面竖井预注浆加固快速开挖方法 | |
CN207348879U (zh) | 尾水隧洞结构 | |
CN106089252A (zh) | 一种不均质松散体的注浆加固方法 | |
CN205444192U (zh) | 一种桥梁桩冲桩施工系统 | |
CN105840209A (zh) | 锚桩在隧道洞身段控制变形施工工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: WUHAN SURVEYING-GEOTECHNICAL RESEARCH INSTITUTE OF Free format text: FORMER OWNER: CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING COMPANY Effective date: 20110906 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20110906 Address after: 430080 Wuhan, Heilongjiang Province, Qingshan District, metallurgical Road, No. 177, No. Patentee after: Wuhan Surveying-Geotechnical Research Institute of China Metallurgical Science and Industry Group Co Address before: 430080 Wuhan, Heilongjiang Province, Qingshan District, metallurgical Road, No. 177, No. Patentee before: China Metallurgy Group Wukan Ground Foundational Engineering Company |