CN101397909B - 坍塌超深竖井人工掘进修复新工法 - Google Patents

坍塌超深竖井人工掘进修复新工法 Download PDF

Info

Publication number
CN101397909B
CN101397909B CN2008101969799A CN200810196979A CN101397909B CN 101397909 B CN101397909 B CN 101397909B CN 2008101969799 A CN2008101969799 A CN 2008101969799A CN 200810196979 A CN200810196979 A CN 200810196979A CN 101397909 B CN101397909 B CN 101397909B
Authority
CN
China
Prior art keywords
steel
concrete
mould
construction
steel casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008101969799A
Other languages
English (en)
Other versions
CN101397909A (zh
Inventor
颜克诚
占仲国
邱进锋
陈哲俊
詹建华
万凯军
魏帮明
桂志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING Co filed Critical CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING Co
Priority to CN2008101969799A priority Critical patent/CN101397909B/zh
Publication of CN101397909A publication Critical patent/CN101397909A/zh
Application granted granted Critical
Publication of CN101397909B publication Critical patent/CN101397909B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种坍塌超深竖井人工掘进修复新工法,包括:掘进、装模板、装钢筋、浇注混凝土、装锚杆、装Mn钢护筒、浇注混凝土。其优点是:采用钢模板+钢筋砼衬砌+锚杆+Mn钢护筒掘进方案,集三位于一体化,不仅保证了施工安全,且在施工进度上效果显著,可以将成功经验部分运用于类似竖井或断层、溶洞、流沙等复杂岩体的工程治理,加快施工进度,减少工程投资;该项技术在国内仅处于起步阶段,大大缩短了施工工期,并提高了井内作业人员的安全系数,保证了竖井施工质量。

Description

坍塌超深竖井人工掘进修复新工法
技术领域
本发明涉及矿山勘探技术领域,具体的说是一种坍塌超深竖井人工掘进修复新工法。
背景技术
目前,国内大部分矿山常采用竖井+平硐的矿山运输方法,这种方法快捷、经济、运输风险小。在竖井勘探、设计过程中,往往慎之又慎,一般选择较好的地层。在大口径竖井使用中,产生坍塌阻塞,数量更是罕见。但随着国家经济的发展,在目前各项技术日益发达的情况下,建设单位为了降低项目投资,以及后期运营成本,还是会在一些地质条件相对较差的位置选址、建井,加上后期的不合理使用等各种负面因素,这些都为竖井坍塌破损提供了条件。因此,进行大口径竖井修复加固的施工工法研究更显重要。目前,该项技术在国内仅处于初步阶段,有些建设单位在矿井坍塌以后,不得已痛定思痛,重新选址建井,矿井设备搬迁或更新,造成很大的经济损失。
发明内容
本发明的目的是设计一种操作简单、安全、高效、施工周期短的坍塌超深竖井人工掘进修复新工法。
本发明坍塌超深竖井人工掘进修复新工法,其步骤如下:
(1)按照设计的直径,挖掘一个1.0~1.4m的深坑;
(2)安装钢模板,模板之间用螺栓拼接,其角钢部分单面满焊,钢模板外侧设置挂筋,浇注C30护壁砼后再掘进第2模;
(3)在第2模开挖尺寸满足要求后,并于护壁砼浇注前,在上一模每块钢模板侧壁内侧焊接至少2根钢筋,其长度L=1150~1500mm,另一端伸入第2模钢模板外侧拟浇注砼护壁处,并浇注C30护壁砼直至第2模钢模板顶口;
(4)上下钢模接缝(h≤400mm)处采用M10浆砌砖做模,内充填C30细石砼;钢模板作为支撑的一部分,不拆除;
(5)接着在上模底端施工均布12根自钻式锚杆L=5000mm,并对其进行压力注浆;
(6)视孔内安全情况如此循环施工10次或更深,即可进行钢护筒安装作业;
(7)分片焊接安装Mn钢护筒(高1800mm,直径3000mm),在Mn钢护筒和钢模板之间加装多根竖钢筋和横钢筋;
(8)安装Mn钢护筒后,及时进行对中作业,误差40mm,并在Mn钢护筒顶部预留一个混凝土浇注口;
(9)浇灌C10砼封底,浇至Mn钢护筒底口上300mm止,浇灌完毕待24小时后方可进行Mn钢护筒内侧泵送压灌混凝土施工;
(10)接泵管至Mn钢护筒顶部开口处,向外泵送压灌混凝土C30,直至灌满;
(11)照此循环施工至设计要求的井深。
本发明坍塌超深竖井人工掘进修复新工法的优点是:采用钢模板+钢筋砼衬砌+锚杆+Mn钢护筒掘进方案,集三位于一体化,不仅保证了施工安全,且在施工进度上效果显著,可以将成功经验部分运用于类似竖井或断层、溶洞、流沙等复杂岩体的工程治理,加快施工进度,减少工程投资;该项技术在国内仅处于起步阶段,大大缩短了施工工期,并提高了井内作业人员的安全系数,保证了竖井施工质量。
附图说明
图1为井内修复的结构示意图。
图2为钢模板的结构示意图。
具体实施方式
根据图1、图2所示,一种坍塌超深竖井人工掘进修复新工法,其步骤如下:
(1)按照设计的直径,挖掘一个1.0~1.4m的深坑;
(2)安装钢模板,模板之间用螺栓拼接,其角钢部分单面满焊,钢模板外侧设置挂筋,浇注C30护壁砼后再掘进第2模;
(3)在第2模开挖尺寸满足要求后,并于护壁砼浇注前,在上一模每块钢模板侧壁内侧焊接至少2根钢筋,其长度L=1150~1500mm,另一端伸入第2模钢模板外侧拟浇注砼护壁处,并浇注C30护壁砼直至第2模钢模板顶口;
(4)上下钢模接缝(h≤400mm)处采用M10浆砌砖做模,内充填C30细石砼;钢模板作为支撑的一部分,不拆除;
(5)接着在上模底端施工均布12根自钻式锚杆L=5000mm,并对其进行压力注浆;
(6)视孔内安全情况如此循环施工10次或更深,即可进行钢护筒安装作业;
(7)分片焊接安装Mn钢护筒(高1800mm,直径3000mm),在Mn钢护筒和钢模板之间加装多根竖钢筋和横钢筋;
(8)安装Mn钢护筒后,及时进行对中作业,误差40mm,并在Mn钢护筒顶部预留一个混凝土浇注口;
(9)浇灌C10砼封底,浇至Mn钢护筒底口上300mm止,浇灌完毕待24小时后方可进行Mn钢护筒内侧泵送压灌混凝土施工;
(10)接泵管至Mn钢护筒顶部开口处,向外泵送压灌混凝土C30,直至灌满;
(11)照此循环施工至设计要求的井深。

Claims (1)

1.一种坍塌超深竖井人工掘进修复新工法,其特征在于:其步骤如下:
(1)按照设计的直径,挖掘一个1.0~1.4m的深坑;
(2)安装钢模板,模板之间用螺栓拼接,其角钢部分单面满焊,钢模板外侧设置挂筋,浇注C30护壁砼后再掘进第2模;
(3)在第2模开挖尺寸满足要求后,并于护壁砼浇注前,在上一模每块钢模板侧壁内侧焊接至少2根钢筋,其长度L=1150~1500mm,另一端伸入第2模钢模板外侧拟浇注砼护壁处,并浇注C30护壁砼直至第2模钢模板顶口;
(4)上下钢模接缝处采用M10浆砌砖做模,其高度h≤400mm,内充填C30细石砼;钢模板作为支撑的一部分,不拆除;
(5)接着在上模底端施工均布12根自钻式锚杆L=5000mm,并对其进行压力注浆;
(6)视孔内安全情况如此循环施工10次或更深,即可进行钢护筒安装作业;
(7)分片焊接安装Mn钢护筒,其高度1800mm,直径3000mm,在Mn钢护筒和钢模板之间加装多根竖钢筋和横钢筋;
(8)安装Mn钢护筒后,及时进行对中作业,误差40mm,并在Mn钢护筒顶部预留一个混凝土浇注口;
(9)浇灌C10砼封底,浇至Mn钢护筒底口上300mm止,浇灌完毕待24小时后方可进行Mn钢护筒内侧泵送压灌混凝土施工;
(10)接泵管至Mn钢护筒顶部开口处,向外泵送压灌混凝土C30,直至灌满;
(11)照此循环施工至设计要求的井深。
CN2008101969799A 2008-09-17 2008-09-17 坍塌超深竖井人工掘进修复新工法 Active CN101397909B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101969799A CN101397909B (zh) 2008-09-17 2008-09-17 坍塌超深竖井人工掘进修复新工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101969799A CN101397909B (zh) 2008-09-17 2008-09-17 坍塌超深竖井人工掘进修复新工法

Publications (2)

Publication Number Publication Date
CN101397909A CN101397909A (zh) 2009-04-01
CN101397909B true CN101397909B (zh) 2011-04-20

Family

ID=40516719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101969799A Active CN101397909B (zh) 2008-09-17 2008-09-17 坍塌超深竖井人工掘进修复新工法

Country Status (1)

Country Link
CN (1) CN101397909B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644465A (zh) * 2012-05-14 2012-08-22 中国水电顾问集团华东勘测设计研究院 一种竖井溶洞回填处理施工方法

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2459084C1 (ru) * 2011-01-20 2012-08-20 Общество с ограниченной ответственностью "МЕТРОБАЛТСТРОЙ" Способ реконструкции вертикальной шахты
CN102287192A (zh) * 2011-06-24 2011-12-21 中煤第五建设有限公司 立井井筒装备安装用六层施工吊盘
CN102305075A (zh) * 2011-06-28 2012-01-04 中国水利水电第五工程局有限公司 一种不良地质条件下的竖井施工方法
CN102619521B (zh) * 2012-04-19 2014-10-29 中国矿业大学 一种立井基岩段井壁结构的施工方法
CN104453913B (zh) * 2014-12-19 2016-08-03 玉溪大红山矿业有限公司 一种竖井工作面超前预注浆方法
CN104790980A (zh) * 2015-04-02 2015-07-22 济南城建集团有限公司 一种隧道施工中溶洞的处理方法
CN105422104B (zh) * 2015-12-17 2018-02-23 大同煤矿集团有限责任公司 立井井筒加固维护方法
CN105952476B (zh) * 2016-06-14 2018-07-06 山东华联矿业股份有限公司 矿山立井井壁接茬工艺
CN106368709B (zh) * 2016-09-30 2019-04-23 首钢集团有限公司 一种立井的施工方法
CN109630128B (zh) * 2019-02-19 2024-02-06 广东华方工程设计有限公司 一种预制钢筋混凝土装配式自重下沉竖井
CN110206550A (zh) * 2019-05-27 2019-09-06 中铁十八局集团第四工程有限公司 一种复杂地质开挖盾构接收井的施工工法
CN111594176B (zh) * 2020-07-20 2020-11-03 中国铁建重工集团股份有限公司 针对戈壁地质环境的竖井掘进施工方法及竖井结构
CN113944466A (zh) * 2021-09-02 2022-01-18 成都大学 一种高速公路长大隧道竖井围护破碎围岩井壁的加固结构
CN113944467B (zh) * 2021-09-02 2024-04-09 成都大学 一种竖井围护破碎围岩井壁预防塌方的施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644465A (zh) * 2012-05-14 2012-08-22 中国水电顾问集团华东勘测设计研究院 一种竖井溶洞回填处理施工方法
CN102644465B (zh) * 2012-05-14 2014-06-25 中国水电顾问集团华东勘测设计研究院 一种竖井溶洞回填处理施工方法

Also Published As

Publication number Publication date
CN101397909A (zh) 2009-04-01

Similar Documents

Publication Publication Date Title
CN101397909B (zh) 坍塌超深竖井人工掘进修复新工法
CN104389608B (zh) 盾构穿越风井的施工方法
CN110821503B (zh) 一种超深盾构区间风井先隧后主体施工方法
CN103321653B (zh) 地下洞室顶拱塌方后的衬砌处理方法
CN109209392B (zh) 适用于大断面隧道ⅳ-ⅴ级围岩的全环开挖方法
CN109595004B (zh) 一种隧道二扩四扩挖方法
JP3833403B2 (ja) 大断面トンネルのいわし骨工法
CN103821219A (zh) 顶管施工改型检查井施工方法
CN108286442A (zh) 适用于软弱围岩隧道两台阶一次快速封闭成环的开挖方法
WO1999028595A1 (fr) Procede de construction a structure de type 'squelette de baleine' pour tunnel a section importante
CN103437795B (zh) 纵向、环向锚固联合快速超前支护方法
CN203321531U (zh) 地下洞室顶拱塌方后的衬砌处理结构
CN106761474A (zh) 一种可主动运渣土的全套管工法用钢套管及其施工方法
CN103362117A (zh) 注浆段全段注浆的方法
CN108265706A (zh) 一种在溶洞地质内的工程桩及成桩工艺
CN105484763B (zh) 一种深部煤矿半封闭钢筋混凝土管片支护方法
CN106837382A (zh) 一种地铁隧道围岩地面预注浆加固工艺
CN102817621A (zh) 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法
CN104533425A (zh) 一种立井整体浇筑段壁座及立井整体浇筑段壁座施工方法
CN102635359B (zh) 隧道通风竖井节能快速施工方法
CN104453915B (zh) 大断面竖井预注浆加固快速开挖方法
CN207348879U (zh) 尾水隧洞结构
CN106089252A (zh) 一种不均质松散体的注浆加固方法
CN205444192U (zh) 一种桥梁桩冲桩施工系统
CN105840209A (zh) 锚桩在隧道洞身段控制变形施工工法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WUHAN SURVEYING-GEOTECHNICAL RESEARCH INSTITUTE OF

Free format text: FORMER OWNER: CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING COMPANY

Effective date: 20110906

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110906

Address after: 430080 Wuhan, Heilongjiang Province, Qingshan District, metallurgical Road, No. 177, No.

Patentee after: Wuhan Surveying-Geotechnical Research Institute of China Metallurgical Science and Industry Group Co

Address before: 430080 Wuhan, Heilongjiang Province, Qingshan District, metallurgical Road, No. 177, No.

Patentee before: China Metallurgy Group Wukan Ground Foundational Engineering Company