CN102817621A - 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法 - Google Patents

一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法 Download PDF

Info

Publication number
CN102817621A
CN102817621A CN2012102860639A CN201210286063A CN102817621A CN 102817621 A CN102817621 A CN 102817621A CN 2012102860639 A CN2012102860639 A CN 2012102860639A CN 201210286063 A CN201210286063 A CN 201210286063A CN 102817621 A CN102817621 A CN 102817621A
Authority
CN
China
Prior art keywords
arch
tunnel
bow member
excavation
sedimentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102860639A
Other languages
English (en)
Other versions
CN102817621B (zh
Inventor
李建军
王法岭
包烨明
郑捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201210286063.9A priority Critical patent/CN102817621B/zh
Publication of CN102817621A publication Critical patent/CN102817621A/zh
Application granted granted Critical
Publication of CN102817621B publication Critical patent/CN102817621B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法,涉及公路、铁路隧道及地下工程施工领域,解决在不良地质隧道仰拱开挖过程中,避免初支整体沉降的问题。包括以下步骤:隧道上半断面开挖施工时,将隧道每节拱架拱脚处均垫槽钢作为纵向托梁,将拱架栓接到槽钢上,槽钢上均匀打设有预留孔;在槽钢所打设的预留孔上施做密排竖向超前锁脚锚管;开挖下台阶时,扩大墙脚基础,使用弧形拱架作为下导拱架,使墙脚延伸至原仰拱内部约0.8-1.2m的位置,弧形拱架与中导拱架连接,弧形拱架左右侧施做竖向锁脚锚杆;施做仰拱与衬砌。本发明针对性较强,可真正防止初支下沉事故的发生,施工工艺及结构简单,可大幅提高工效。

Description

一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法
技术领域
本发明专利涉及公路、铁路隧道及地下工程施工领域,涉及针对软弱围岩及砂土层等不良地质隧道在初期支护过程中控制拱脚与墙脚发生沉降变形的综合施工技术,具体涉及一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法。
背景技术
随着我国经济的快速发展,为拉动地方区域间的经济,国家投资修建的基础建设项目越来越多,尤其以高速铁路、公路为主,在高速铁路、公路的设计与施工中,将不可避免地穿越种种不良地质,如细砂层、湿陷性黄土、断层破碎带等。     
针对上述不良地质隧道的施工中,采用传统的三台阶七部开挖法施工,极易因初期支护拱架拱脚落于虚砂上,隧道拱架沉降较大;并且中下台阶拱架一次开挖临空面较大,造成初期支护背后漏砂,形成空腔,隧道施工带来大变形;喷锚后的隧道墙脚底部,往往处于悬空状态或者采用开挖爆破后的围岩进行临时支撑,导致后患无穷,随着围岩应力的变化和仰拱的开挖,易导致初期支护整体沉降,以致造成初期支护侵入二次衬砌净空,甚至坍塌的危险。
因此,在软弱围岩及砂土层等不良地质隧道开挖支护过程中,控制初期支护整体沉降,是保证隧道安全施工的重要前提。
发明内容
本发明是为了解决在不良地质隧道仰拱开挖过程中,避免初支整体沉降的问题,而提供了一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法。
本发明是通过以下技术方案实现的:
一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法,包括以下步骤:
(1)开挖立设拱架:隧道上半断面开挖施工时,将隧道每节拱架拱脚处均垫槽钢作为纵向托梁,将拱架栓接到槽钢上,增大拱脚处受力面积,所述的槽钢上均匀打设有预留孔;
(2)打设竖向超前锁脚锚管:在开挖下一台阶前,在槽钢所打设的预留孔上施做密排竖向超前锁脚锚管,起到二次托举拱架作用的同时,还能作为下一台阶开挖前的超前支护,防止不良地层侧面的涌滑;
(3)开挖立设下台阶弧形拱架:开挖下台阶时,扩大墙脚基础,使用弧形拱架作为下导拱架,使墙脚延伸至原仰拱内部约0.8-1.2m的位置,弧形拱架通过高强螺栓与中导拱架进行连接,然后在弧形拱架左右侧各施做竖向锁脚锚杆;
(4)施做仰拱与衬砌:开挖仰拱初支始终紧跟下台阶,做到初支及时封闭成环,距离掌子面控制在15~20m,衬砌紧跟仰拱距离掌子面控制在25~30m。
本发明在隧道拱部开挖施工时,将隧道拱架拱脚处垫槽钢作为纵向托梁,将拱架栓接到槽钢上,增大拱脚处受力面积,并起到开挖中台阶时拱脚不悬空的作用,避免了单榀拱架下沉的可能,施工时,注意槽钢体积大小的控制,既能保证受力面积增大又能保证现场安装快捷方便;在开挖下一台阶前,根据先前在纵向槽钢上所打设的预留眼上施做密排竖向超前锚杆,控制在下部开挖时由拱部及侧面出现边墙破碎围岩滑塌及漏砂等现象,造成隧道超挖甚至拱脚下沉变形的可能,竖向超前锁脚锚管的数量及间距应根据地层确定,一般地层稳定性越差数量越多即间距越小,且必须与槽钢及拱架有效连接形成受力整体;将下导拱架支撑在墙脚处弧形延伸至仰拱0.8-1.2m,使用弧形拱架作为下导拱架,通过高强螺栓与中导拱架进行连接,同时在弧形拱架左右侧施作锁脚锚杆,使其形成整体,从而使整个拱架形成整体,可有效防止仰拱在开挖过程中墙脚的相对稳定,消除应力集中,确保围岩结构的稳定性和施工的安全性,施工时,应根据不良地质隧道断面大小,结合上下导拱架长度,同时考虑伸入仰拱的位置,制作下导弧形拱架。
    本发明与现有技术相比,具有以下优点:
⑴着力解决不良地质隧道拱墙脚沉降控制的施工难题,针对性较强;
⑵针对传统的各种方法(如普通扩大拱脚及锁脚锚管等)在此种地层中效果不明显的特点,依靠其技术优势,真正起到防止初期支护下沉事故的发生;
⑶控制初期支护沉降的同时,还将超前支护及仰拱封闭作用应用于其中,形成整套隧道施工保护措施;
⑷通过本综合技术可有效控制每个台阶及仰拱在开挖过程中出现拱墙脚短暂悬空所造成的沉降,消除应力集中,确保初期支护结构的稳定性和施工的安全性;
⑸施工工艺及结构简单,所需设备配件材料易于购买、成本低廉;
⑹避免了因传统施工方法无效的情况下造成的人力、材料、时间上的浪费,工效大幅提高。
附图说明
图1为本发明的施工方法流程框图;
图2本发明施工方法的横断面示意图;
图中:1-槽钢、2-竖向超前锚杆、3-弧形拱架、4-锁脚锚杆。
具体实施方式
实施例1
以下结合附图对本发明做进一步说明。
如图1所述的一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法,包括以下步骤:
(1)开挖立设拱架:隧道上半断面开挖施工时,将隧道每节拱架拱脚处均垫槽钢1作为纵向托梁,将拱架栓接到槽钢1上,增大拱脚处受力面积,所述的槽钢1上均匀打设有预留孔;
(2)打设竖向超前锁脚锚管:在开挖下一台阶前,在槽钢1所打设的预留孔上施做密排竖向超前锁脚锚管2,起到二次托举拱架作用的同时,还能作为下一台阶开挖前的超前支护,防止不良地层侧面的涌滑;
(3)开挖立设下台阶弧形拱架:开挖下台阶时,扩大墙脚基础,使用弧形拱架3作为下导拱架,使墙脚延伸至原仰拱内部约0.8-1.2m的位置,弧形拱架通过高强螺栓与中导拱架进行连接,然后在下导拱架左右侧各施做竖向锁脚锚杆4;
(4)施做仰拱与衬砌:开挖仰拱初支始终紧跟下台阶,做到初支及时封闭成环,距离掌子面控制在15~20m,衬砌紧跟仰拱距离掌子面控制在25~30m。
施工结束后,拱架的横断面示意图如图2所示。

Claims (1)

1.一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法,其特征是包括以下步骤:
(1)开挖立设拱架:隧道上半断面开挖施工时,将隧道每节拱架拱脚处均垫槽钢(1)作为纵向托梁,将拱架栓接到槽钢(1)上,增大拱脚处受力面积,所述的槽钢(1)上均匀打设有预留孔;
     (2)打设竖向超前锁脚锚管:在开挖下一台阶前,在槽钢(1)所打设的预留孔上施做密排竖向超前锁脚锚管(2),起到二次托举拱架作用的同时,还能作为下一台阶开挖前的超前支护,防止不良地层侧面的涌滑;
(3)开挖立设下台阶弧形拱架:开挖下台阶时,扩大墙脚基础,使用弧形拱架(3)作为下导拱架,使墙脚延伸至原仰拱内部约0.8-1.2m的位置,弧形拱架通过高强螺栓与中导拱架进行连接,然后在弧形拱架左右侧各施做竖向锁脚锚杆(4);
(4)施做仰拱与衬砌:开挖仰拱初支始终紧跟下台阶,做到初支及时封闭成环,距离掌子面控制在15~20m,衬砌紧跟仰拱距离掌子面控制在25~30m。
CN201210286063.9A 2012-08-13 2012-08-13 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法 Active CN102817621B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210286063.9A CN102817621B (zh) 2012-08-13 2012-08-13 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210286063.9A CN102817621B (zh) 2012-08-13 2012-08-13 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法

Publications (2)

Publication Number Publication Date
CN102817621A true CN102817621A (zh) 2012-12-12
CN102817621B CN102817621B (zh) 2015-01-21

Family

ID=47302022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210286063.9A Active CN102817621B (zh) 2012-08-13 2012-08-13 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法

Country Status (1)

Country Link
CN (1) CN102817621B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362513A (zh) * 2013-07-29 2013-10-23 中铁七局集团第五工程有限公司 暗挖区间既有洞体改造施工工法
CN103775094A (zh) * 2014-01-22 2014-05-07 安徽水安建设集团股份有限公司 砂砾土地层中型断面输水隧洞两台阶三步开挖施工方法
CN104989410A (zh) * 2015-07-13 2015-10-21 中铁十九局集团第二工程有限公司 浅埋暗挖隧道地表限沉防塌施工方法
CN105888699A (zh) * 2016-06-23 2016-08-24 中铁四局集团有限公司 一种黄土隧道抗沉降支承结构及其施工方法
CN108708747A (zh) * 2018-05-23 2018-10-26 黄建国 一种用于松散砂卵石地质隧道施工的主动应力消除装置
CN112761675A (zh) * 2021-01-26 2021-05-07 中铁八局集团昆明铁路建设有限公司 极小净距斜下穿既有地铁隧道复合支护体系的施工方法
CN113464148A (zh) * 2021-07-30 2021-10-01 中铁二十三局集团有限公司 昔格达地层段浅埋下穿地表大型构筑物施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101230784A (zh) * 2008-01-31 2008-07-30 长安大学 隧道钢拱架锁脚锚杆网喷组合结构
CN101598028A (zh) * 2009-06-29 2009-12-09 中铁二院工程集团有限责任公司 高速铁路超大断面富水黄土隧道衬砌构造
CN101725358A (zh) * 2008-10-31 2010-06-09 中铁四局集团有限公司 隧道超浅埋不均匀风化地层开挖施工方法
CN102312672A (zh) * 2011-09-23 2012-01-11 中南大学 一种适应复杂多变地质条件的大断面隧道快速施工方法
CN102562074A (zh) * 2012-02-03 2012-07-11 中铁四局集团第二工程有限公司 大断面隧道上硬下软复合地层的施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101230784A (zh) * 2008-01-31 2008-07-30 长安大学 隧道钢拱架锁脚锚杆网喷组合结构
CN101725358A (zh) * 2008-10-31 2010-06-09 中铁四局集团有限公司 隧道超浅埋不均匀风化地层开挖施工方法
CN101598028A (zh) * 2009-06-29 2009-12-09 中铁二院工程集团有限责任公司 高速铁路超大断面富水黄土隧道衬砌构造
CN102312672A (zh) * 2011-09-23 2012-01-11 中南大学 一种适应复杂多变地质条件的大断面隧道快速施工方法
CN102562074A (zh) * 2012-02-03 2012-07-11 中铁四局集团第二工程有限公司 大断面隧道上硬下软复合地层的施工方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362513A (zh) * 2013-07-29 2013-10-23 中铁七局集团第五工程有限公司 暗挖区间既有洞体改造施工工法
CN103775094A (zh) * 2014-01-22 2014-05-07 安徽水安建设集团股份有限公司 砂砾土地层中型断面输水隧洞两台阶三步开挖施工方法
CN103775094B (zh) * 2014-01-22 2015-12-30 安徽水安建设集团股份有限公司 砂砾土地层中型断面输水隧洞两台阶三步开挖施工方法
CN104989410A (zh) * 2015-07-13 2015-10-21 中铁十九局集团第二工程有限公司 浅埋暗挖隧道地表限沉防塌施工方法
CN105888699A (zh) * 2016-06-23 2016-08-24 中铁四局集团有限公司 一种黄土隧道抗沉降支承结构及其施工方法
CN108708747A (zh) * 2018-05-23 2018-10-26 黄建国 一种用于松散砂卵石地质隧道施工的主动应力消除装置
CN108708747B (zh) * 2018-05-23 2019-12-13 南京东南建筑机电抗震研究院有限公司 一种用于松散砂卵石地质隧道施工的主动应力消除装置
CN112761675A (zh) * 2021-01-26 2021-05-07 中铁八局集团昆明铁路建设有限公司 极小净距斜下穿既有地铁隧道复合支护体系的施工方法
CN113464148A (zh) * 2021-07-30 2021-10-01 中铁二十三局集团有限公司 昔格达地层段浅埋下穿地表大型构筑物施工方法

Also Published As

Publication number Publication date
CN102817621B (zh) 2015-01-21

Similar Documents

Publication Publication Date Title
CN106337686B (zh) 岩质地层暗挖三层地铁车站伞盖结构及施工方法
CN102817621B (zh) 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法
CN101614125B (zh) V级围岩隧道施工方法
CN101864959B (zh) 一种地下车站主体结构的暗挖施工方法
CN106351670B (zh) 一种封闭的预支护隧道结构
CN103256060B (zh) 富水软弱糜棱岩大断面隧道围岩加固及开挖方法
CN205742213U (zh) 基坑支护结构
CN106050245A (zh) 矩形隧道断面零距离下穿既有车站的支护结构及构建方法
CN105350973A (zh) 一种大跨断面黄土隧道下穿高速公路的施工方法
CN104533446A (zh) 一种大断面软弱围岩隧道双层初期支护预防地质灾害发生的施工方法及其结构
CN106988750B (zh) 一种大跨度区间隧道超近距离下穿既有站的实施方式
CN106194196B (zh) 一种横穿隧道洞身的大型溶洞处理与开挖方法
CN103628885A (zh) 一种超浅埋隧道出洞盖挖施工方法
CN110905530B (zh) 穿越断层破碎带的富水软岩隧道稳定性控制施工方法
CN110924959B (zh) 穿越断层破碎带的富水软弱围岩隧道施工方法
CN104405411B (zh) 超大变断面隧道支护结构
CN205503146U (zh) 一种适用于城市敏感区的浅埋隧道新型支护结构
CN104329095B (zh) 一种既有隧道拓宽施工方法
CN103696784A (zh) 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法
CN110130927A (zh) 一种炭质板岩隧道大变形控制施工方法
CN109404005A (zh) 暗挖隧道小洞进大洞预加固体系及施工方法
CN109057801B (zh) 双侧墙导坑复合台阶式大断面隧道开挖支护的施工方法
CN104763435A (zh) 尾矿渣填区浅埋暗挖大断面隧道施工方法
CN108561156A (zh) 分离式隧道换拱支护结构及其施工方法
CN110486034A (zh) 基于单层四导洞和中导洞内桩基础的地铁车站及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant