CN101392516A - 碾压式土石坝施工方法 - Google Patents

碾压式土石坝施工方法 Download PDF

Info

Publication number
CN101392516A
CN101392516A CNA2007102017789A CN200710201778A CN101392516A CN 101392516 A CN101392516 A CN 101392516A CN A2007102017789 A CNA2007102017789 A CN A2007102017789A CN 200710201778 A CN200710201778 A CN 200710201778A CN 101392516 A CN101392516 A CN 101392516A
Authority
CN
China
Prior art keywords
layer
dam
controlling
rolling
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007102017789A
Other languages
English (en)
Other versions
CN101392516B (zh
Inventor
王绍华
王晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2007102017789A priority Critical patent/CN101392516B/zh
Publication of CN101392516A publication Critical patent/CN101392516A/zh
Application granted granted Critical
Publication of CN101392516B publication Critical patent/CN101392516B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种碾压式土石坝施工方法,包含以下内容:第一,采用新鲜坚硬岩石堆筑坝体,即把现场刚开挖出的岩石运输上坝,分层堆筑;第二,控制坝体筑层孔隙率,石料中应含碎石、细料,其中细料含量不超过30%;第三,控制含泥量,小于0.075mm的粉料不超过5%;第四,控制每层铺填厚度;第五,控制碾压遍数;第六,控制筑层湿度。采用30t履带式挖掘机碾压施工,每层厚度为400mm,采用40t履带式挖掘机碾压施工,每层厚渡为600mm;每层碾压3~5遍。筑层湿度控制在13%~15%。本发明充分利用工地现成的大型开挖机械进行碾压作业,不用专门的碾压机具,使施工效率、经济效益大为提高。

Description

碾压式土石坝施工方法
技术领域
本发明涉及一种土石坝施工方法。
背景技术
碾压式土石坝已广泛用于水利水电工程和工矿业的尾矿库工程中,铝工业的赤泥堆场、灰渣堆场就是尾矿库类型的一种。碾压式土石坝,是指用碾压机具将土、砂和石料等分层碾压而建成的一种坝,碾压填筑的主要质量标准是达到设计要求的坝体干密度;所说的碾压机具,一般是用羊足碾或振动碾。
现有的碾压式土石坝施工方法:修建碾压式土石坝,有开挖、运输、堆筑、压实等作业,开挖和堆筑常采用挖掘机,压实则用专门的碾压机具,如羊足碾或振动碾。购置专用的碾压机具以及筑坝过程中碾压机具工时利用率低,导致工程成本增加且施工速度不快,经济效益欠佳。
发明内容
本发明要解决的技术问题是:提供一种碾压式土石坝施工方法,充分利用现成作业机械,以提高施工效率及经济效益,克服现有技术存在的问题。
为了解决上述技术问题,本发明采用以下技术方案:利用工地现成的大型开挖机械进行碾压作业,不用专门的碾压机具,即在开挖、运输、堆筑等作业工序采用履带式挖掘机、铲运机械,接着又用履带式挖掘机进行碾压作业,这样充分利用现成机械,使施工效率、经济效益大为提高。
用履带式挖掘机按照设计工法作业,能使堆筑的坝体碾压密实。
本发明的有益效果是:充分利用工地现成的大型开挖机械进行碾压作业,不用专门的碾压机具,使施工效率、经济效益大为提高。
具体实施方式
本发明的实施例:本发明包含以下内容:
第一,采用新鲜坚硬岩石,把现场刚开挖出的岩石运输上坝,堆筑坝体;
第二,控制坝体筑层孔隙率,石料中应含碎石、细料,细料(5mm左右)的含量不超过30%;
第三,控制含泥量,小于0.075mm的粉料不超过5%;
第四,控制每层铺填厚度,采用30t履带式挖掘机碾压施工,每层厚度为400mm,采用40t履带式挖掘机碾压施工,每层厚渡为600mm;
第五,每层碾压4遍;
第六,保持筑层湿度,筑层含水量控制在13%~15%。可采用加水的办法,控制湿度。
在贵州铝厂的“堆场”工程中采用本技术方案,经过履带式挖掘机碾压,堆石坝的干密度为2.0t/m3,红粘土坝的干密度为1.43t/m3,达到或高于设计要求,且获得节省投资7%、缩短工期的经济效益。

Claims (4)

  1. 【权利要求1】一种碾压式土石坝施工方法,其特征在于:本方法包含以下内容:
    第一,采用岩石堆筑坝体,即把现场刚开挖出的岩石运输上坝,分层堆筑;
    第二,控制坝体筑层孔隙率,石料中细料含量不超过30%;
    第三,控制含泥量,小于0.075mm的粉料不超过5%;
    第四,控制每层铺填厚度;
    第五,控制碾压遍数;
    第六,控制筑层湿度。
  2. 【权利要求2】根据权利要求1所述的碾压式土石坝施工方法,其特征在于:采用30t履带式挖掘机碾压施工,每层铺填厚度为400mm;采用40t履带式挖掘机碾压施工,每层铺填厚渡为600mm。
  3. 【权利要求3】根据权利要求1所述的碾压式土石坝施工方法,其特征在于:每层碾压3~5遍。
  4. 【权利要求4】根据权利要求1所述的碾压式土石坝施工方法,其特征在于:筑层含水量控制在13%~15%。
CN2007102017789A 2007-09-20 2007-09-20 碾压式土石坝施工方法 Expired - Fee Related CN101392516B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007102017789A CN101392516B (zh) 2007-09-20 2007-09-20 碾压式土石坝施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007102017789A CN101392516B (zh) 2007-09-20 2007-09-20 碾压式土石坝施工方法

Publications (2)

Publication Number Publication Date
CN101392516A true CN101392516A (zh) 2009-03-25
CN101392516B CN101392516B (zh) 2011-05-11

Family

ID=40493011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007102017789A Expired - Fee Related CN101392516B (zh) 2007-09-20 2007-09-20 碾压式土石坝施工方法

Country Status (1)

Country Link
CN (1) CN101392516B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101653765B (zh) * 2009-09-11 2013-01-30 中国葛洲坝集团股份有限公司 一种砾石土料级配调整方法
CN111501759A (zh) * 2020-04-28 2020-08-07 中国电建集团华东勘测设计研究院有限公司 一种面板坝堆石料过渡区的分层填筑结构与施工方法
CN113617826A (zh) * 2021-06-30 2021-11-09 中冶成都勘察研究总院有限公司 一种矿山修复梯级台阶覆土方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1080010A (zh) * 1992-06-08 1993-12-29 辽宁省水利水电科学研究所 复合土工膜心(斜)墙土坝的建造方法
JP3312135B2 (ja) * 1999-05-13 2002-08-05 内閣府 沖縄総合事務局長 ダムフィルター材製造方法に於ける砂と砕石の混合方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101653765B (zh) * 2009-09-11 2013-01-30 中国葛洲坝集团股份有限公司 一种砾石土料级配调整方法
CN111501759A (zh) * 2020-04-28 2020-08-07 中国电建集团华东勘测设计研究院有限公司 一种面板坝堆石料过渡区的分层填筑结构与施工方法
CN113617826A (zh) * 2021-06-30 2021-11-09 中冶成都勘察研究总院有限公司 一种矿山修复梯级台阶覆土方法

Also Published As

Publication number Publication date
CN101392516B (zh) 2011-05-11

Similar Documents

Publication Publication Date Title
CN105317459B (zh) 一种用于控制坚硬顶板大面积垮落灾害的分区充填方法
CN108915765B (zh) 一种地下全尾砂-废石膏体充填系统及充填方法
CN106884676A (zh) 一种邻近露天矿的井工塌陷区治理方法
CN101858077B (zh) 袋装挤密浆固小直径碎石桩复合地基施工方法
CN101858199B (zh) 可调控挤土量的双向螺旋挤扩钻头
CN104060619B (zh) 水工心墙堆石坝免围堰的施工方法及结构
CN112195924A (zh) 一种淤泥质粉质黏土层深基坑基底加固处理方法
CN100570077C (zh) 用于岩溶地区赤泥堆场的水平防渗结构
CN205382466U (zh) 一种混凝土面板堆石坝
CN201650119U (zh) 可调控挤土量的双向螺旋挤扩钻头
CN101392516B (zh) 碾压式土石坝施工方法
CN201598610U (zh) 合理利用砂砾石料的面板堆石坝结构
CN202220341U (zh) 一种淤泥中基坑的支护结构
CN106498959A (zh) 用于深覆盖层地基的排水沟
CN103321181A (zh) 全尾渣吹填裂膜丝机织土工模袋筑坝方法
CN106544987B (zh) 一种蓄涝湿地的渠道防渗施工方法
CN109371919A (zh) 心墙防渗的土石挡水结构
CN101929161B (zh) 排岩修筑高碾压透水尾矿坝的方法
CN110804994B (zh) 一种水库大坝施工方法
CN209429056U (zh) 心墙防渗的土石挡水结构
CN206189430U (zh) 用于深覆盖层地基的排水沟
CN215252687U (zh) 一种砾石土心墙坝的分区结构
CN214783786U (zh) 一种侧行式大型布料机
CN104404918A (zh) 采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法
CN107859040A (zh) 一种基坑大面积松软土层的开挖方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110511

Termination date: 20150920

EXPY Termination of patent right or utility model