CN1013786B CN 89106823 CN89106823A CN1013786B CN 1013786 B CN1013786 B CN 1013786B CN 89106823 CN89106823 CN 89106823 CN 89106823 A CN89106823 A CN 89106823A CN 1013786 B CN1013786 B CN 1013786B
Authority
CN
China
Prior art keywords
lining pipe
pipe fitting
prefabricated
prefabricated lining
permeable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CN 89106823
Other languages
Chinese (zh)
Other versions
CN1039871A (en
Inventor
孔凡震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 89106823 priority Critical patent/CN1013786B/en
Publication of CN1039871A publication Critical patent/CN1039871A/en
Publication of CN1013786B publication Critical patent/CN1013786B/en
Expired legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a sinking well constructing method for a civil prefabricated pipe and prefabricated well wall pipes. When a well is constructed, the prefabricated well wall pipes are put under the ground; the prefabricated well wall pipe sinks when the earth is dug; sections of the prefabricated well wall pipes are connected through connecting holes or connecting rings. Each of the prefabricated well wall pipes is prefabricated with reinforced concrete. The present invention has the advantages of safe and reliable well construction, labor saving, reduction of occupation area, little investment and fast effect, and is a civil well constructing method with great popularization value.

Description

Wall fabricated side-wall tube
The present invention relates to a kind of civilian wall casing, relate in particular to a kind of civilian well prefabricated lining pipe.
The civilian wall casing of prior art mostly is brick, barnacle becomes.This borehole wall floor space of block system is big, investment is big, danger is big, recruitment is many and take effect slow.Also useful metal wall casing or plastics wall casing, though small investment, floor space are little, wall casing is too narrow, breaks down to be difficult for getting rid of.
The objective of the invention is to overcome the deficiencies in the prior art, provide that a kind of making is simple, small investment, wall casing be wide, can be used for the civilian well prefabricated lining pipe of open caisson well-digging method.
The object of the present invention is achieved like this: making ring muscle and the prefabricated internal diameter of perpendicular muscle with reinforcing bar is that 800~1500mm, wall thickness are that 80~150mm, height are the steel concrete borehole wall pipe fitting of 800~1500mm.For ease of connecting between borehole wall pipe fitting, be equipped with 3-6 connecting ring in two ends up and down at every joint borehole wall pipe fitting, or beat 3-6 connecting ring.Feature of the present invention also is: manufactured common prefabricated lining pipe fitting and permeable prefabricated lining pipe fitting according to the purposes difference, common prefabricated lining pipe fitting is cement, sand, stone mixing cast entirely.Permeable prefabricated lining pipe fitting improves the water yield of well for increasing the water permeability of wall casing, is provided with the permeable district of cement, stone structure at the middle part of every joint borehole wall pipe fitting.For guaranteeing that permeable prefabricated lining pipe fitting has enough intensity, it respectively has one section ordinary concrete enhancement Layer in two ends up and down, and is evenly distributed with 3-6 ordinary concrete reinforcement column on borehole wall pipe fitting circumference.Also shouldn't column, borehole wall pipe fitting middle part is permeable district entirely.
Major advantage of the present invention is: during well-digging, the saving of labor, save money, save time, instant effect, safety.The production of prefabricated lining pipe is simple, easy to use.Dig 1 well, invest over thousands of unit, 30 of recruitments were finished in 4 days, took up an area of 5 square metres.It is a kind of civilian well well-digging method that promotional value is arranged very much.
Advantage of the present invention is: make simple, cost is low, size can be selected, easy to use.During well-digging, the people digs in the prefabricated lining pipe fitting, and is heavy while digging, and prefabricated lining pipe fitting joint is connected by connecting ring or connecting hole with internode.
Reaching embodiment in conjunction with the accompanying drawings is further described the present invention:
The attached view of accompanying drawing 1 common prefabricated lining pipe fitting
Accompanying drawing 2 common prefabricated lining pipe fitting sectional drawings
Accompanying drawing 3 permeable prefabricated lining pipe fitting sectional drawings
1-borehole wall pipe fitting 2-connecting ring 3-erects muscle
The permeable district of 4-ring muscle 5-connecting hole 6-
7-enhancement Layer 8-strengthens column
Shown in accompanying drawing 1, accompanying drawing 2: select for use the reinforcing bar of φ 6mm to make perpendicular muscle (3) and ring muscle (4) among the embodiment, the two ends up and down of borehole wall pipe fitting (1) respectively are equipped with 4 connecting rings (2), borehole wall pipe fitting (1) is an ordinary reinforced concrete structure, and its match ratio (weight ratio) water: sand: stone is 1: 2.38: 3.76.Wall casing (1) Guan Gaowei 1000mm, internal diameter are that 1000mm, wall thickness are 100mm.
As shown in Figure 3: permeable prefabricated lining pipe fitting basic structure is identical with common prefabricated lining pipe fitting.Select for use the reinforcing bar of φ 6mm to make perpendicular muscle (3) and ring muscle (4), each makes a call to 4 connecting holes (5) at borehole wall pipe fitting (1) upper/lower terminal, and it is enhancement Layer (7) that upper/lower terminal respectively has 200mm high, also be evenly distributed with 4 reinforcement columns (8) on borehole wall pipe fitting circumferencial direction, remainder is permeable district (6).Enhancement Layer (7), reinforcement column (8) are ordinary reinforced concrete structure, promptly mix cast by cement, sand, stone.Permeable district (6) mixes cast with cement, stone to form.Wall casing (1) Guan Gaowei 1000mm, internal diameter are that 1000mm, wall thickness are 100mm.
During well-digging, earlier permeable prefabricated lining pipe fitting is placed on undergroundly, the people digs in pipe, and is heavy while digging, and when a joint borehole wall pipe fitting sinks to undergroundly fully, places a joint again.Be connected by connecting ring (2) or connecting hole (5) between joint and the joint, making it is one to put in order structure.Away from using common prefabricated lining pipe fitting behind the water-yielding stratum instead.

Claims (3)

1, a kind of by perpendicular muscle of reinforcing bar conduct and the prefabricated civilian well prefabricated lining pipe that forms of ring muscle, it comprises common prefabricated lining pipe fitting, it is characterized in that it also comprises permeable prefabricated lining pipe fitting, respectively there is 3-6 connecting ring at the two ends up and down of each prefabricated lining pipe fitting, or beat 3-6 connecting hole, at the two ends up and down of permeable prefabricated lining pipe fitting one section enhancement Layer is arranged respectively, also be evenly distributed with 3-6 in a circumferential direction and respectively strengthen column, remainder is permeable district.
2, civilian well prefabricated lining pipe as claimed in claim 1 is characterized in that: the enhancement Layer of common prefabricated lining pipe fitting and permeable prefabricated lining pipe fitting, reinforcement column are the ordinary reinforced concrete structure of cement, sand, stone mixing cast; The permeable district of permeable prefabricated lining pipe fitting is the permeable reinforced concrete structure that cement, stone mix cast.
3, civilian prefabricated lining pipe as claimed in claim 1 or 2 is characterized in that: the height of each prefabricated lining pipe fitting is 800~1500mm, and internal diameter is 800~1500mm, and wall thickness is 80~150mm.
CN 89106823 1989-09-22 1989-09-22 Wall fabricated side-wall tube Expired CN1013786B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 89106823 CN1013786B (en) 1989-09-22 1989-09-22 Wall fabricated side-wall tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 89106823 CN1013786B (en) 1989-09-22 1989-09-22 Wall fabricated side-wall tube

Publications (2)

Publication Number Publication Date
CN1039871A CN1039871A (en) 1990-02-21
CN1013786B true CN1013786B (en) 1991-09-04

Family

ID=4856897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 89106823 Expired CN1013786B (en) 1989-09-22 1989-09-22 Wall fabricated side-wall tube

Country Status (1)

Country Link
CN (1) CN1013786B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101344004B (en) * 2008-08-22 2010-10-06 陈定平 Mounting method of deep well high pressure aeration reactor steel drum

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101293703B (en) * 2008-05-23 2010-12-01 上海广联建设发展有限公司 Apparatus for treating reinforced concrete structure deep well aeration waste water and prepraring method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101344004B (en) * 2008-08-22 2010-10-06 陈定平 Mounting method of deep well high pressure aeration reactor steel drum

Also Published As

Publication number Publication date
CN1039871A (en) 1990-02-21

Similar Documents

Publication Publication Date Title
CN104846810B (en) Self-circulating posterior grouting bored pile construction method
CN108842791B (en) Detachable load pile anchor multistage supporting structure and construction method
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN105804089B (en) Locally increase deep support system and its construction method after a kind of former deep foundation pit construction
CN110485430A (en) A kind of interlocking pile combines foundation pit supporting method with ground-connecting-wall
CN110700248A (en) Miniature steel pipe pile for grouting small and medium-sized span bridge, pile foundation and construction method
CN104775440A (en) Mineshaft-type underground garage deep foundation pit supporting structure
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN1279319A (en) Full-reverse construction technology for basement
CN110485431A (en) A kind of interlocking pile combines foundation pit supporting construction with ground-connecting-wall
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN104131566A (en) Method for constructing basement foundation pit without horizontal braces
CN110080779A (en) Tunnel tunnel bottom karst cave treatment construction method
CN113235638A (en) Construction method of composite pile foundation with long pile and short pile integrated
CN210263075U (en) Arrange bars formula tubular pile post back slip casting internal anchor outer stagnant water support system
CN1013786B (en) Wall fabricated side-wall tube
CN201078234Y (en) Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed
CN205804383U (en) A kind of Whirlwind tank water-stop curtain
CN115198759A (en) Supporting pile and vibration isolation barrier structure, design and construction method
CN212129204U (en) Precast pier foundation of slip casting type recycled concrete
CN209584855U (en) Bridge major diameter precast concrete tubular column basis
CN1021707C (en) Complete set of pipe pile
CN106049516A (en) Corrugated steel cofferdam hollow digging pile and manufacturing technique thereof
CN109306712A (en) Upper pipe working well is inverse to build construction
CN111254965A (en) Grouting type recycled concrete prefabricated pier foundation and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C13 Decision
GR02 Examined patent application
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee