CN101368648B - Underwater pipe device and method thereof - Google Patents

Underwater pipe device and method thereof Download PDF

Info

Publication number
CN101368648B
CN101368648B CN200810200946A CN200810200946A CN101368648B CN 101368648 B CN101368648 B CN 101368648B CN 200810200946 A CN200810200946 A CN 200810200946A CN 200810200946 A CN200810200946 A CN 200810200946A CN 101368648 B CN101368648 B CN 101368648B
Authority
CN
China
Prior art keywords
parts
water
steel pipe
under water
welded steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200810200946A
Other languages
Chinese (zh)
Other versions
CN101368648A (en
Inventor
许嘉炯
雷挺
沈裘昌
郑国兴
王作民
陈宝书
芮旻
范玉柱
汤剑青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN200810200946A priority Critical patent/CN101368648B/en
Publication of CN101368648A publication Critical patent/CN101368648A/en
Application granted granted Critical
Publication of CN101368648B publication Critical patent/CN101368648B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses an underwater pipe arranging device which is characterized in that a roadbed pipe-jacking fixing part is provided with a jack group which is connected with an underwater injection digging part through a welded steel pipe part; the underwater injection digging part is connected with an overwater positioning part through a connecting steel cable; a bank water pumping part is connected with the welded pipeline part through the pipeline. The invention ensures all the welding work to be finished on bank and adopts the pressure water injection and the buoyancy of the steel pipe to finish the ditch groove digging and the positioning work so that the water flow resistance and the wind wave resistance are strong; the influence of the variable water level is small; the climatic adaptation is strong. The water quantity in the welded steel pipe part can be controlled through the water depth scale, a jet flow water-supply pump and a temporal water-pumping and diving pump; the depth of the ditch groove can be accurately controlled through the buoyancy of the welded steel pipe part; the welded steel pipe part and the underwater injection digging part can be sunk into the ditch groove to reduce the influence on the pipeline from the water flow when the construction is temporally paused. The overwater positioning part is not only used for ensuring the power supply and control of the jet flow water-supply pump, but also used for the deviation correction when the pipe position has deviation.

Description

A kind of equipment of comb under water and comb method under water thereof
Technical field:
The present invention relates to a kind of engineering equipment of comb under water, the specifically a kind of equipment of comb under water and comb method under water thereof of heavy caliber supplying drainage during excavation row establishes in the riverbed of water body in large such as rivers and lakes.
Background technique:
At present; In water body in large such as rivers and lakes the waterworks water intake engineering of bank water intaking far away and in water body in large the urban sewage engineering of bank draining far away all need in the riverbed, arrange and establish middle large diameter pipeline; Consider safety and maintenance inconvenience, pipe material generally adopts steel pipe.The comb main difficulty is to adopt large-scale special machinery underwater excavation workload big under the traditional water; The difficult control of groove position and absolute altitude; Pipeline water transportation difficulty; The pipeline Placement is if adopt welding waterborne then need utilize large-scale hauling operation ship aquatic work amount such as barge big, and then joint itself is costly if adopt the Hough joint.In addition water body in large such as rivers and lakes toward former years SEA LEVEL VARIATION big, the comb engineering is subject to factor affecting such as current, stormy waves, often can only be in 1 year dry season and stormy waves less in construction, the construction restriction is more.
Summary of the invention:
The purpose of this invention is to provide the strong equipment of comb under water of a kind of climate adaptability.It is placed on the work of all welding on the bank and accomplishes, and utilizes press water to spray and the buoyancy completion channel excavation of steel pipe itself and the work of location, and anti-current and stormy waves property are strong, and it is little influenced by SEA LEVEL VARIATION, and climate adaptability is strong.
To achieve these goals; Technological scheme of the present invention is: a kind of equipment of comb under water; It mainly comprises continental rise push pipe fixed component, it is characterized in that continental rise push pipe fixed component is provided with the jack group, and the jack group is excavated parts through the welded steel pipe parts with injection under water and is connected; Spray the excavation parts under water and be connected the wirerope connection with positioning element employing waterborne, bank water intaking parts are through rising pipe and welded steel pipe members.Wherein continental rise push pipe fixed component is included in the back baffle plate that the bank fixedly installs, and the back baffle plate is provided with the jack group, the jack group through the power transmission baffle plate be connected with the welded steel pipe parts, the power transmission baffle plate is provided with clip and is connected with the welded steel pipe parts.The welded steel pipe parts comprise at least two joint steel pipes.Spray the excavation parts under water and comprise fixed frame, the fixed frame bottom is provided with the slip baffle plate, and fixed frame top is provided with depth of water scale, fixed frame is provided with the high-pressure spray shower nozzle, and the high-pressure spray shower nozzle is connected with the jet raw water service pump through supporting pipeline.Positioning element waterborne comprises hull, and hull is provided with jet raw water service pump power distribution control system, and jet raw water service pump power distribution control system excavates parts through conjunction cable with injection under water and is connected.Bank water intaking parts comprise interim water intaking submersible pump and the supporting rising pipe that the bank is provided with.
Another object of the present invention is to the method for comb under water that provides a kind of climate adaptability strong.
To achieve these goals, technological scheme of the present invention is: a kind of method of comb under water may further comprise the steps: A, the initial riverbed of excavation groove; B, on the bank fixing continental rise push pipe fixed component and water intaking parts in bank are set; C, roadbed push pipe fixed component are provided with the jack group; The jack group is connected with welded steel pipe parts front end; The welded steel pipe component ends is excavated parts with injection under water and is connected; The welded steel pipe parts are fetched water with the bank and are communicated with through rising pipe between the parts, will spray the excavation parts under water and push in the water, spray the excavation parts under water and are connected the wirerope connection with positioning element employing waterborne; D, spray under water through bank water intaking parts that water filling sinks down in the riverbed groove it in excavation parts and the welded steel pipe parts; Welded steel pipe parts front end adds the welding steel pipe; And will spray the excavation parts under water through continental rise push pipe fixed component and be pushed into the terminal E of riverbed groove, utilize and spray excavation parts excavation riverbed groove under water; Push away before utilizing the thrust of jack group on the continental rise push pipe fixed component will spray excavation parts and the continuation of welded steel pipe parts under water simultaneously; F, add the welding steel pipe, and repeat D~F, until final completion channel excavation and comb at welded steel pipe parts front end.
The present invention pushes away with the welded steel pipe parts with before spraying the excavation parts under water through the jack group; And utilize and spray excavation parts excavation riverbed groove under water; Add the welding steel pipe at welded steel pipe parts front end then, repeat above-mentioned steps, until final completion channel excavation and comb.Like this, the work of all welding is placed on the bank accomplishes in the present invention, and utilize press water to spray and the buoyancy completion channel excavation of steel pipe itself and the work of location, and anti-current and stormy waves property are strong, it is little influenced by SEA LEVEL VARIATION, and climate adaptability is strong.Can control the water yield in the welded steel pipe parts through depth of water scale, jet raw water service pump and the submersible pump of fetching water temporarily; Utilize welded steel pipe parts buoyancy to control groove depth comparatively exactly; Also can be when construction suspends with the welded steel pipe parts with spray the excavation parts under water and sink to groove, the minimizing current influence pipeline.Positioning element waterborne is guaranteed power supply of jet raw water service pump and the control except that being used to, and also can when biased the moving of pipe, play traction correction effect.
Description of drawings:
Fig. 1 is the elevational schematic view of one embodiment of the invention.
Fig. 2 is the sectional drawing along A-A line among Fig. 1.
Fig. 3 is for spraying excavation parts front view under water.
Fig. 4 is for spraying excavation component side view under water.
Fig. 5 is for spraying excavation parts sectional side view under water.
Embodiment:
Below in conjunction with accompanying drawing and embodiment the present invention is done further description.
The present invention is a kind of equipment of comb under water; Shown in Fig. 1~5; It mainly comprises continental rise push pipe fixed component 1, welded steel pipe parts 2, sprays excavation parts 3, positioning element waterborne 4 and bank water intaking parts 5 under water, it is characterized in that fixedly wirerope 11 compositions of back baffle plate 6, jack group 7, power transmission baffle plate 8, clip 9, orienting roll wheels 10 and pipeline that continental rise push pipe fixed component 1 is included in the bank and fixedly installs; Welded steel pipe parts 2 excavate parts 3 with continental rise push pipe fixed component 1 with injection under water and are connected; Spray excavation parts 3 under water and comprise fixed frame 12, slip baffle plate 13, depth of water scale 14, high-pressure spray shower nozzle 15, jet raw water service pump 16 and supporting pipeline; Positioning element 4 waterborne comprises hull 17, jet raw water service pump power distribution control system 18 and is connected wirerope 19; Bank water intaking parts 5 comprise interim water intaking submersible pump 20 and the supporting rising pipe 21 that the bank is provided with.Continental rise push pipe fixed component 1 leans against bank undisturbed soil, be fixed on the seashore through clip 9 and pipeline fixedly wirerope 11 be connected with welded steel pipe parts 2; Spray excavation parts 3 under water and be connected with welded steel pipe parts 2, be connected with positioning element 4 waterborne through connecting wirerope 19 through Hough joint 22; The rising pipe 21 of bank water intaking parts 20 passes from power transmission baffle plate 8 centers of continental rise push pipe fixed component 1.All need consider the preservative treatment measure inside and outside the welded steel pipe parts 2, pipeline fixedly wirerope 11 needs outsourcing protection rubber.
When using, the present invention at first should carry out bathymetric surveying and pipeline location and riverbed excavation initial trench on the bank and under water; Secondly the fixing continental rise push pipe the fixed component 1 and bank parts 5 of fetching water are set and on the bank; Be fixed on the continental rise push pipe fixed component 1 after then the initial segment of welded steel pipe parts 2 being shipped and at its terminal fixing excavation parts 3 that spray under water; To spray excavation parts 3 under water through the thrust of jack group 7 on the continental rise push pipe fixed component 1 and push in the water, and be connected wirerope 19 connections with positioning element 4 employings waterborne.Through the water filling in spraying excavation parts 3 and welded steel pipe parts 2 under water of bank water intaking parts 5 it is sunk down in the riverbed groove during construction; Constantly weld lengthening welded steel pipe parts 2 and will spray excavation parts 3 under water and be pushed into the groove end through continental rise push pipe fixed component 1; Open jet raw water service pump 16 through high-pressure spray shower nozzle 15 and utilize welded steel pipe parts 2 buoyancy change to move up and down to wash away excavation riverbed groove; Utilizing the thrust of jack group 7 on the continental rise push pipe fixed component 1 to spray simultaneously under water pushes away before excavation parts 3 continue with welded steel pipe parts 2; On continental rise push pipe fixed component 1, fixedly add next joint steel pipe of weldering and repeat said process once more; The welded steel pipe parts 2 that constantly extend are by that analogy finally accomplished channel excavation and comb.The channel excavation mud extraction is piled up in the pipe trench both sides, is convenient to behind the comb reply.Can control the water yield in the welded steel pipe parts through depth of water scale 14, jet raw water service pump 16 and the submersible pump 20 of fetching water temporarily; Utilize welded steel pipe parts 2 buoyancy to control groove depth comparatively exactly; Also can be when construction suspends with welded steel pipe parts 2 with spray excavation parts 3 under water and sink to groove, the minimizing current influence pipeline.Positioning element 4 waterborne is guaranteed also can when pipeline squints, play traction correction effect 16 power supplies of jet raw water service pump and the control except that being used to.23 is groove bottom among the figure, and 24 is the riverbed.

Claims (9)

1. comb equipment under water; It mainly comprises continental rise push pipe fixed component; It is characterized in that continental rise push pipe fixed component is provided with the jack group, the jack group is connected with welded steel pipe parts front end, and the welded steel pipe component ends is excavated parts with injection under water and is connected; Spray the excavation parts under water and be connected the wirerope connection with positioning element employing waterborne, bank water intaking parts are through rising pipe and welded steel pipe members.
2. the described a kind of equipment of comb under water of claim 1 is characterized in that the welded steel pipe parts comprise interconnected at least two joint steel pipes.
3. the described a kind of equipment of comb under water of claim 1; It is characterized in that continental rise push pipe fixed component is included in the back baffle plate that the bank fixedly installs; The back baffle plate is provided with the jack group; The jack group is through power transmission baffle plate and welded steel pipe members, and the power transmission baffle plate is provided with clip and is connected with the welded steel pipe parts.
4. the described a kind of equipment of comb under water of claim 1 is characterized in that the rising pipe of bank water intaking parts passes from the power transmission baffle plate center of continental rise push pipe fixed component, then with the welded steel pipe members.
5. the described a kind of equipment of comb under water of claim 3 is characterized in that the back baffle plate is provided with the orienting roll wheels, steel pipe through pipeline fixedly wirerope be connected with the orienting roll wheels.
6. the described a kind of equipment of comb under water of claim 1; It is characterized in that spraying the excavation parts under water and comprise fixed frame; The fixed frame bottom is provided with the slip baffle plate; Fixed frame top is provided with depth of water scale, fixed frame is provided with the high-pressure spray shower nozzle, and the high-pressure spray shower nozzle is connected with the jet raw water service pump through supporting pipeline.
7. the described a kind of equipment of comb under water of claim 1 is characterized in that positioning element waterborne comprises hull, and hull is provided with jet raw water service pump power distribution control system, and jet raw water service pump power distribution control system excavates parts through conjunction cable with injection under water and is connected.
8. the described a kind of equipment of comb under water of claim 1 is characterized in that bank water intaking parts comprise interim water intaking submersible pump and the supporting rising pipe thereof that the bank is provided with.
9. a comb method under water may further comprise the steps: A, the initial riverbed of excavation groove; B, on the bank fixing continental rise push pipe fixed component and water intaking parts in bank are set; C, continental rise push pipe fixed component are provided with the jack group; The jack group is connected with welded steel pipe parts front end; The welded steel pipe component ends is excavated parts with injection under water and is connected; The welded steel pipe parts are fetched water with the bank and are communicated with through rising pipe between the parts, will spray the excavation parts under water and push in the water, spray the excavation parts under water and are connected the wirerope connection with positioning element employing waterborne; D, spray under water through bank water intaking parts that water filling sinks down in the riverbed groove it in excavation parts and the welded steel pipe parts; Welded steel pipe parts front end adds the welding steel pipe, and will spraying the excavation parts under water through continental rise push pipe fixed component, to be pushed into the riverbed groove terminal; E, utilize and to spray excavation parts excavation riverbed groove under water, push away before utilizing the thrust of jack group on the continental rise push pipe fixed component will spray excavation parts and the continuation of welded steel pipe parts under water simultaneously; F, add the welding steel pipe, and repeat D~F, until final completion channel excavation and comb at welded steel pipe parts front end.
CN200810200946A 2008-10-09 2008-10-09 Underwater pipe device and method thereof Active CN101368648B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810200946A CN101368648B (en) 2008-10-09 2008-10-09 Underwater pipe device and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810200946A CN101368648B (en) 2008-10-09 2008-10-09 Underwater pipe device and method thereof

Publications (2)

Publication Number Publication Date
CN101368648A CN101368648A (en) 2009-02-18
CN101368648B true CN101368648B (en) 2012-10-17

Family

ID=40412593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810200946A Active CN101368648B (en) 2008-10-09 2008-10-09 Underwater pipe device and method thereof

Country Status (1)

Country Link
CN (1) CN101368648B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561454B (en) * 2010-12-30 2014-02-12 上海市基础工程集团有限公司 Water intake method utilizing pipe jacking vertically
CN103148285B (en) * 2013-03-05 2014-12-10 辽河石油勘探局油田建设工程一公司 Pipeline self-locking, clasping and pushing device and usage method thereof
CN106247012B (en) * 2016-08-16 2018-03-30 青岛理工大学 Pneumatic pressure access device for submarine pipeline
CN112361080A (en) * 2020-09-28 2021-02-12 中交第三航务工程局有限公司江苏分公司 Special ship for laying pipeline in shoal area
CN112913736B (en) * 2021-03-31 2024-09-03 曹樱霏 Marine product aquaculture worker ship
CN114923032B (en) * 2022-04-08 2024-06-14 淮安市水利勘测设计研究院有限公司 Construction method for integrally installing large-diameter long-distance river-crossing pipeline

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4676695A (en) * 1985-11-01 1987-06-30 Union Oil Company Of California Method for preventing thaw settlement along offshore artic pipelines

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4676695A (en) * 1985-11-01 1987-06-30 Union Oil Company Of California Method for preventing thaw settlement along offshore artic pipelines

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开平8-14441A 1996.01.16

Also Published As

Publication number Publication date
CN101368648A (en) 2009-02-18

Similar Documents

Publication Publication Date Title
CN101368648B (en) Underwater pipe device and method thereof
CN1696415B (en) Process and apparatus for producing an immersed tunnel on subsea ground
CN107806108A (en) Three floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
WO2010093259A2 (en) Offshore wind turbine
CN107653895A (en) Six floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN107630461A (en) Four floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN104503060B (en) The optical cable of vibration jet synergy buries underwater robot
CN109295980A (en) Stake method jacket underwater grouting pipeline system and grout sealing method after one kind
CN104975612A (en) Novel water open caisson construction technology
CN209066440U (en) Stake method jacket underwater grouting pipeline system after one kind
CN103031853B (en) Seabed oil storage system
CN206233277U (en) A kind of Amphibious digging machine that pilework is positioned based on hydraulic pressure
CN100485138C (en) Suspended submarine tunnel
CN215252971U (en) Underground water discharge system for assisting in mounting ground anchor
CN113070258B (en) Pile-washing and seawater taking device
CN110144930A (en) A kind of offshore boosting station foundation structure and construction method with novel sea cable arrangement with negative pressure cartridge type
CN202790907U (en) High-pressure water jet and gas lift pipeline sinking machine tool
CN109898558B (en) Flushing and sinking device and flushing and sinking method for immersed tube
CN110489840B (en) Structure final settlement method considering immersed tube tunnel special process
CN109795636B (en) Caisson type drilling platform
CN202451974U (en) Anti-floating structure of buried pipeline
CN208844617U (en) Half floatation type immersed tube tunnel of underwater support
CN101255688B (en) Directly ventilated type non-subcrust vacuum prepressing ground strengthening method
GB2388164A (en) Intermediate booster pumping station
CN108193713A (en) Large-diameter Steel pipeline Immersed tunnel technique under a kind of no precipitation condition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant