CN101363245A - Unidirectional double-layer cable curtain wall - Google Patents

Unidirectional double-layer cable curtain wall Download PDF

Info

Publication number
CN101363245A
CN101363245A CNA2008101188879A CN200810118887A CN101363245A CN 101363245 A CN101363245 A CN 101363245A CN A2008101188879 A CNA2008101188879 A CN A2008101188879A CN 200810118887 A CN200810118887 A CN 200810118887A CN 101363245 A CN101363245 A CN 101363245A
Authority
CN
China
Prior art keywords
cable
anchor clamps
steel cable
curtain wall
wire anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101188879A
Other languages
Chinese (zh)
Inventor
熊再勇
闫忠云
熊楚臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jangho Curtain Wall Co Ltd
Original Assignee
Beijing Jangho Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jangho Curtain Wall Co Ltd filed Critical Beijing Jangho Curtain Wall Co Ltd
Priority to CNA2008101188879A priority Critical patent/CN101363245A/en
Publication of CN101363245A publication Critical patent/CN101363245A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention relates to a glass curtain wall with a steel cable braced structure, in particular to a unidirectional double-layer cable curtain wall. Each set of the steel cables of the glass curtain wall comprises an outer steel cable and an inner steel cable, wherein, the inner steel cable and the outer steel cable are respectively clamped by an inner steel cable clamp and an outer steel cable clamp; the inner steel cable clamp and the outer steel cable clamp are connected into a whole by a connecting rod, and tightly fixed with a glass press plate. By adopting the braced structure, glass panels are fixedly connected into a whole by the inner steel cable and the outer steel cable under the effect of the glass press plate, thus forming a whole glass curtain wall. Owing to the arrangement of the double cable net, the bearing capacity and stability of the cable net are improved. For large-span curtain walls, the glass curtain wall can solve the problems of a single cable net, such as large deformation, inadequate bearing capacity, low permeability resulting from a space cable net structure, etc. By using the double-layer cable net brace structure, a concise and permeable, large-span and huge glass curtain wall is established without adding structural elements in the space.

Description

Unidirectional double-layer cable curtain wall
Technical field
The invention belongs to a kind of curtain wall construction, belong to a kind of rope architecture curtain wall of simplification especially.
Background technology
Rope reticulated glass curtain wall comprises Spatial Cable net curtain wall and monolayer cable net curtain wall at present.Adopt the Spatial Cable web frame, though can solve the large span problem, the transparent performance of overall space also can be subjected to certain influence.Though single rope is glass curtain wall supported the good advantage of permeability is arranged, for the excessive building of structure clearance, adopt single rope in the space of large span in, the distortion of rope web frame will be very big, and influence is use normally.If reduce the distortion of rope net by adding hawser prestressing force, then the intensity of cable wire will be not enough when being subjected to the external load effect, be difficult to satisfy force request.So prior art must adopt other structure that the space is separated, in the space of separating, adopt single rope web frame form, do the transparent performance and the effect that certainly will have influence on overall space like this.How both to have satisfied the curtain wall large span, and satisfied the penetrating effect of curtain wall again, be the target that architectural design person pursues always.
Summary of the invention
Support the defective that the large span curtain wall exists in order to solve single stayed structure, the object of the present invention is to provide a kind of more efficiently braced structures, it distributes and the drag-line anchor clamps by improved drag-line, two vertical single ropes along the span direction are coupled together, play effect stressed jointly, that the net loaded power of rope improves, distortion is little, in large span space, do not need to increase structural element, ensure the permeability of structure to greatest extent.
The object of the present invention is achieved like this:
A kind of unidirectional double-layer cable curtain wall, include steel cable, face glass, cable wire anchor clamps, be positioned at the inboard or the outside of the curtain wall of forming by face glass, move towards to arrange one group of vertical steel cable that group is strained from top to bottom along the level of curtain wall, each group steel cable all comprises an outer steel cable and an interior steel cable, and the two ends of outer steel cable and interior steel cable are fixed on the fixed structure of the civil engineering structure beam of bottom and top layer or girder steel separately; The plane that forms between outer steel cable and the interior steel cable is vertical with face glass, and and two file face glasss between seam coincide; Each clamping has outer cable wire anchor clamps and interior cable wire anchor clamps on steel cable and the interior steel cable outside; Be connected with a connecting rod between cable wire anchor clamps and the interior cable wire anchor clamps outside, outer cable wire anchor clamps and interior cable wire anchor clamps are connected and fixed by connecting rod and are one.
Utilize the braced structures of above-mentioned unidirectional double-layer cable curtain wall, inside and outside two steel cables fuse face glass securely by the effect of flat, form unidirectional double-layer cable formula curtain wall system.The structure of drag-line anchor clamps and and the joint construction of vertical drag-line, the arrangement form of two rustling sound nets has improved net loaded power of rope and stability.For large-span cable net curtain wall, the distortion of adopting two Cable Structure can well solve single rope net curtain wall is big, and bearing capacity is not enough, and problem such as the permeability that brings of Spatial Cable web frame is not high.Use this double-deck rope net braced structures, can break through the restriction of prior art, do not increase succinct, penetrating, the huge curtain wall that span is bigger of structural element in the construction space; Because the drag-line rod member is few, good looking appearance, architectural effect is desirable more.
Description of drawings
Fig. 1 is the structural representation of side direction of the present invention.
Fig. 2 is the transverse sectional view of Fig. 1.
Fig. 3 flat is pressed in the schematic diagram on the face glass.
Fig. 4 is that flat is clamped in the interconnective thin nodal plane figure of portion on the face glass.
Among the figure: 1 face glass, 2 outer steel cables, 3 interior steel cables, 4 outer cable wire anchor clamps, 5 interior cable wire anchor clamps, 6 anchor clamps bolts, 7 connecting rods, 8 flats, 9 pads, 10 bridge screws.
The specific embodiment
See figures.1.and.2, the present invention adopts a kind of unidirectional double-layer cable curtain wall: in the inboard that is positioned at the curtain wall of being made up of face glass 1 or the outside, move towards to arrange one group of vertical steel cable that group is strained from top to bottom along the level of curtain wall, vertically steel cable can adopt stainless steel cable, and each group steel cable all comprises an outer steel cable 2 and an interior steel cable 3.The two ends of outer steel cable 2 and interior steel cable 3 are fixed on the upper and lower fixed structure separately.Fixed structure is truss or steelframe or concrete structure or major structure of construction or ground embedded part (be the general basic equipment of curtain buildings, be arranged in the upper and lower position of Fig. 1, do not draw among the figure).The geometrical plane that forms between outer steel cable 2 and the interior steel cable 3 is vertical with curtain wall, and and two file face glasss 1 between seam coincide.Each clamping has stainless outer cable wire anchor clamps 4 and interior cable wire anchor clamps 5 on steel cable 2 and the interior steel cable 3 outside, passes in the perforation that outer steel cable 2 and interior steel cable 3 fasten in the middle of cable wire anchor clamps 4 and the interior cable wire anchor clamps 5 respectively outside and clamped.As a specific embodiment of the present invention, on outer cable wire anchor clamps 4 and the interior cable wire anchor clamps 5 stainless anchor clamps bolt 6 is installed, the steel cable in the perforation is fastened in the cable wire anchor clamps by anchor clamps bolt 6.The mode that clamps is not limited to the anchor clamps bolt, also can adopt other the fastening cable wire anchor clamps of method of clamping, as docking with the mode of clamping or the mode of flange or the like.Outside between cable wire anchor clamps 4 and the interior cable wire anchor clamps 5 to being connected to a stainless connecting rod 7, outer cable wire anchor clamps 4 and interior cable wire anchor clamps 5 are connected and fixed by connecting rod 7 and are one.In an embodiment of the present invention, connecting rod 7 two ends have reverse internal thread, outer cable wire anchor clamps 4 and the end that interior cable wire anchor clamps 5 are connected with connecting rod 7 have with connecting rod 7 on the external screw thread that is complementary of internal thread, adopt the mode of spiral shell button to link together between inside and outside cable wire anchor clamps and the connecting rod 7.Also the mode of available butt joint links together.Referring to Fig. 3, the joint cord clip point between adjacent glass panel 1 is equipped with the flat 8 that is made of inside and outside two boards.Flat 8 adopts the stainless steel manufacturing, the visible Fig. 1 of the form of structure of flat 8 in entire equipment and Fig. 2, and flat 8 can be referring to Fig. 4 with the clamping illustration of face glass.Be lined with pad 9 between the contact surface of flat 8 and face glass 1, pad is nylon spacer or rubber sheet gasket, and the effect of pad 9 is to be soft contact when making flat 8 be clamped on the face glass 1, and face glass 1 is unlikely to make impaired breaking.Each adjacent face glass 1 is spliced together by several flats 8.Be installed with the bridge screw 10 of a stainless steel at flat 8 centers, bridge screw 10 is fastened on flat 8 on the interior cable wire anchor clamps 5.Like this, above-mentioned inside and outside two steel cables, cable wire anchor clamps, connecting rod and flat just are connected to one group of system that firmly is fixed together.
Utilize said structure, by the support of inside and outside steel cable and the effect of flat, face glass just is bolted together securely, has formed all-in-one-piece curtain wall.Wherein face glass can adopt various forms of glass.Because the screw thread at connecting rod 7 two ends is left-hand thread each other, the installation of wireline system and regulate just very convenient: connecting rod 7 during towards a certain direction rotation cable wire be tightened up, and when other direction rotate, cable wire was relaxed.Like this, utilize the rotation of connecting rod 7 not only can regulate the support strength of steel cable to flat 8, regulate the tension force between two steel cables, and can regulate respectively to organize and support equilibrium of forces between the steel cable, whole baffle wall is in the support system of equilibrium and insurance.
Before glass is installed, earlier cable wire is fixed on the civil engineering structure beam fixed structures such as (or girder steels) of bottom and top layer, described fixed structure is truss or steelframe or concrete structure or major structure of construction or ground embedded part.Then cable wire is carried out stretch-draw, apply certain prestressing force, make it to bear all loads (stress that produces as wind load, from heavy load, seismic load, variations in temperature etc.) from the outside.After finishing Deng stretch-draw, earlier interior steel cable 3 is fixed on the inhaul anchor clamps 5, uses the bolt secure fixation, the middle connecting rod of drag-line anchor clamps is installed again, at last outer steel cable 2 is fixed on the outer drag-line anchor clamps 4, such connection can make 2 steel cables at node place stressed jointly.

Claims (8)

1, a kind of unidirectional double-layer cable curtain wall, include steel cable, face glass, cable wire anchor clamps, it is characterized in that: the inboard or the outside that are positioned at the curtain wall of forming by face glass, move towards to arrange one group of vertical steel cable that group is strained from top to bottom along the level of curtain wall, each group steel cable all comprises an outer steel cable and an interior steel cable, and the two ends of outer steel cable and interior steel cable are fixed on the fixed structure of the civil engineering structure beam of bottom and top layer or girder steel separately; The plane that forms between outer steel cable and the interior steel cable is vertical with face glass, and and two file face glasss between seam coincide; Each clamping has outer cable wire anchor clamps and interior cable wire anchor clamps on steel cable and the interior steel cable outside; Be connected with a connecting rod between cable wire anchor clamps and the interior cable wire anchor clamps outside, outer cable wire anchor clamps and interior cable wire anchor clamps are connected and fixed by connecting rod and are one.
2, unidirectional double-layer cable curtain wall according to claim 1 is characterized in that: pass in the perforation that outer steel cable and interior steel cable fasten in the middle of cable wire anchor clamps and the interior cable wire anchor clamps respectively outside and clamped.
3, according to claim 1,2 described unidirectional double-layer cable curtain walls, it is characterized in that: on outer cable wire anchor clamps and the interior cable wire anchor clamps anchor clamps bolt is installed, outer steel cable and interior steel cable respectively by the anchor clamps bolton in the cable wire anchor clamps.
4, unidirectional double-layer cable curtain wall according to claim 1 is characterized in that: adopt the connected mode of spiral shell button or butt joint to connect between inside and outside cable wire anchor clamps and the connecting rod.
5, unidirectional double-layer cable curtain wall according to claim 1 is characterized in that: the joint between the adjacent glass panel, the flat that is made of inside and outside two boards is installed, and flat is adjacent face glass clamping together; Be installed with a bridge screw at the flat center, bridge screw is fastened on flat on the interior cable wire anchor clamps.
6, according to claim 1,5 described unidirectional double-layer cable curtain walls, it is characterized in that: between the contact surface of flat and face glass, be lined with pad.
7, according to claim 1,3,5 described unidirectional double-layer cable curtain walls, it is characterized in that: described vertical steel cable, inside and outside cable wire anchor clamps, connecting rod, bridge screw and anchor clamps bolt all are stainless.
8, unidirectional double-layer cable curtain wall according to claim 1 is characterized in that: described fixed structure is truss or steelframe or concrete structure or major structure of construction or ground embedded part.
CNA2008101188879A 2008-08-26 2008-08-26 Unidirectional double-layer cable curtain wall Pending CN101363245A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101188879A CN101363245A (en) 2008-08-26 2008-08-26 Unidirectional double-layer cable curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101188879A CN101363245A (en) 2008-08-26 2008-08-26 Unidirectional double-layer cable curtain wall

Publications (1)

Publication Number Publication Date
CN101363245A true CN101363245A (en) 2009-02-11

Family

ID=40389827

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101188879A Pending CN101363245A (en) 2008-08-26 2008-08-26 Unidirectional double-layer cable curtain wall

Country Status (1)

Country Link
CN (1) CN101363245A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213018A (en) * 2010-04-08 2011-10-12 叶芸 Novel adjustable double-layer glass curtain wall
CN102296829A (en) * 2011-06-03 2011-12-28 中国建筑第八工程局有限公司 Method for constructing three-dimensional cable net curtain wall and node connection member used in same
CN102383514A (en) * 2011-11-01 2012-03-21 无锡金城幕墙装饰工程有限公司 Cable system for circular lighting roof
CN103883048A (en) * 2014-02-25 2014-06-25 北京市建筑工程研究院有限责任公司 Cable force compensation device applicable to service-period curtain wall cable net
CN104831844A (en) * 2015-04-02 2015-08-12 中国建筑第八工程局有限公司 Arc-shaped one-way double-cable inverted-cone cable curtain wall construction method
CN105275118A (en) * 2015-11-03 2016-01-27 山西省第三建筑工程公司 Ultra-high one-way steel cable point support curved unit glass curtain wall
CN105464265A (en) * 2016-01-29 2016-04-06 金粤幕墙装饰工程有限公司 Pressed-connection unit type curtain wall and sealing part
CN105780986A (en) * 2016-04-29 2016-07-20 中国华西企业股份有限公司 Prestressed cable point-supporting curtain wall structure and construction method
CN105979837A (en) * 2014-01-23 2016-09-28 瓦斯菲·阿希达法特 Safety/stability tool for facade cleaner machine
WO2017108402A1 (en) 2015-12-23 2017-06-29 Universita' Politecnica Delle Marche System for making building façades.
CN107747370A (en) * 2017-10-25 2018-03-02 苏州金螳螂幕墙有限公司 A kind of concealed single cord clip tool of full glass curtain wall
CN109339300A (en) * 2018-11-12 2019-02-15 华侨大学 A kind of drag-line Glass Rib curtain wall system
CN109339299A (en) * 2018-11-12 2019-02-15 深圳市建艺装饰集团股份有限公司 Curtain wall installs system and its construction method
CN109944371A (en) * 2019-04-02 2019-06-28 中国建筑第八工程局有限公司 Double rope net steel-beam combination structures of Super High macroplate curtain wall
CN114482348A (en) * 2022-01-12 2022-05-13 浙江精工钢结构集团有限公司 Straight-through double-pull-rod steel frame supported long-span glass curtain wall system
CN114482349A (en) * 2022-01-12 2022-05-13 浙江精工钢结构集团有限公司 Construction method of straight-through double-pull-rod steel frame supported long-span glass curtain wall system

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213018A (en) * 2010-04-08 2011-10-12 叶芸 Novel adjustable double-layer glass curtain wall
CN102213018B (en) * 2010-04-08 2015-06-10 叶芸 Novel adjustable double-layer glass curtain wall
CN102296829A (en) * 2011-06-03 2011-12-28 中国建筑第八工程局有限公司 Method for constructing three-dimensional cable net curtain wall and node connection member used in same
CN102296829B (en) * 2011-06-03 2013-04-17 中国建筑第八工程局有限公司 Method for constructing three-dimensional cable net curtain wall
CN102383514A (en) * 2011-11-01 2012-03-21 无锡金城幕墙装饰工程有限公司 Cable system for circular lighting roof
CN105979837A (en) * 2014-01-23 2016-09-28 瓦斯菲·阿希达法特 Safety/stability tool for facade cleaner machine
CN103883048B (en) * 2014-02-25 2016-04-20 北京市建筑工程研究院有限责任公司 A kind of rope force compensating device being applicable to military service phase curtain-wall cable-net
CN103883048A (en) * 2014-02-25 2014-06-25 北京市建筑工程研究院有限责任公司 Cable force compensation device applicable to service-period curtain wall cable net
CN104831844A (en) * 2015-04-02 2015-08-12 中国建筑第八工程局有限公司 Arc-shaped one-way double-cable inverted-cone cable curtain wall construction method
CN105275118A (en) * 2015-11-03 2016-01-27 山西省第三建筑工程公司 Ultra-high one-way steel cable point support curved unit glass curtain wall
CN105275118B (en) * 2015-11-03 2017-06-13 山西省第三建筑工程公司 The unidirectional steel cable dot point arc unit glass curtain wall of superelevation
WO2017108402A1 (en) 2015-12-23 2017-06-29 Universita' Politecnica Delle Marche System for making building façades.
CN105464265A (en) * 2016-01-29 2016-04-06 金粤幕墙装饰工程有限公司 Pressed-connection unit type curtain wall and sealing part
CN105780986A (en) * 2016-04-29 2016-07-20 中国华西企业股份有限公司 Prestressed cable point-supporting curtain wall structure and construction method
CN107747370A (en) * 2017-10-25 2018-03-02 苏州金螳螂幕墙有限公司 A kind of concealed single cord clip tool of full glass curtain wall
CN109339300A (en) * 2018-11-12 2019-02-15 华侨大学 A kind of drag-line Glass Rib curtain wall system
CN109339299A (en) * 2018-11-12 2019-02-15 深圳市建艺装饰集团股份有限公司 Curtain wall installs system and its construction method
CN109339299B (en) * 2018-11-12 2023-12-26 深圳市建艺装饰集团股份有限公司 Curtain wall installation system and construction method thereof
CN109944371A (en) * 2019-04-02 2019-06-28 中国建筑第八工程局有限公司 Double rope net steel-beam combination structures of Super High macroplate curtain wall
CN114482348A (en) * 2022-01-12 2022-05-13 浙江精工钢结构集团有限公司 Straight-through double-pull-rod steel frame supported long-span glass curtain wall system
CN114482349A (en) * 2022-01-12 2022-05-13 浙江精工钢结构集团有限公司 Construction method of straight-through double-pull-rod steel frame supported long-span glass curtain wall system
CN114482349B (en) * 2022-01-12 2023-06-27 浙江精工钢结构集团有限公司 Construction method for supporting large-span glass curtain wall system by using through double-pull-rod steel frame

Similar Documents

Publication Publication Date Title
CN101363245A (en) Unidirectional double-layer cable curtain wall
CN105155685B (en) A kind of assembled beam-column node and its construction method
CN102251615B (en) Prestressed metal sheet structural system and construction method thereof
CN104110086A (en) Suspended dome and plane prestress combined structure, tensioning tool and construction method
CN111236045B (en) Corrugated steel web group for prestressed combined box girder bridge
CN101597918A (en) A kind of prestressed giant brace-frame structure
US10787811B2 (en) Prefabricated structural bamboo system for slabs and roofs
CN114517532A (en) Spatial structure of one-way tensioned metal sheet and construction method
CN114856067A (en) Building roof truss supporting structure based on structural mechanics and construction method
CN201254770Y (en) One-way double-layer stay curtain wall
CN100476097C (en) Single-layer bidirectional double-rope curtain wall support structure and installing method thereof
CN111809726A (en) Truss structure and building structure
KR20120013740A (en) Partially earth-anchored cable-stayed bridge using hinge connection parts and construction method for the same
KR100904880B1 (en) The long span structure and this construction technique which synthesized an arch and a under tension
CN215593681U (en) Built-in steel strand wires-vaulting pole cable-stay bridge cable tower anchor structure
CN201835509U (en) Supporting platform for closing of large-span building roof
CN212427531U (en) Steel-aluminum alloy composite structure system
CN213014697U (en) Corner structure of encorbelmenting and building structure
CN113047171A (en) Built-in steel strand wires-vaulting pole cable-stay bridge cable tower anchor structure
CN216948758U (en) Framework type hanging film structure
CN108365798B (en) Cable truss type flexible photovoltaic support unit and photovoltaic support
CN101949209A (en) Supporting platform for sealing large-span building roofs
CN114250909A (en) Quick-mounting low-level prestressed rigid frame beam
CN112962823A (en) Double-steel-plate shear wall with replaceable inclined struts and construction method thereof
CN206800797U (en) A kind of securable column braces system of industrialized production

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20090211