CN101343876A - 水工岩锚注浆电测监控方法 - Google Patents

水工岩锚注浆电测监控方法 Download PDF

Info

Publication number
CN101343876A
CN101343876A CNA2008100489489A CN200810048948A CN101343876A CN 101343876 A CN101343876 A CN 101343876A CN A2008100489489 A CNA2008100489489 A CN A2008100489489A CN 200810048948 A CN200810048948 A CN 200810048948A CN 101343876 A CN101343876 A CN 101343876A
Authority
CN
China
Prior art keywords
slip casting
node electrodes
rock anchor
prap
hydraulic rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100489489A
Other languages
English (en)
Other versions
CN101343876B (zh
Inventor
陈磊
张建清
张智
刘方文
陆二男
余才盛
熊永红
刘润泽
李文忠
况碧波
胡志虎
喻维钢
文志祥
吴礼松
马冠群
赵凌
程含发
金润新
李道永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Geophysical Exploration & Testing (Wuhan) Co.,Ltd.
Original Assignee
CHANGJIANG ENGINEERING GEOPHYSICAL EXPLORATION WUHAN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGJIANG ENGINEERING GEOPHYSICAL EXPLORATION WUHAN Co Ltd filed Critical CHANGJIANG ENGINEERING GEOPHYSICAL EXPLORATION WUHAN Co Ltd
Priority to CN2008100489489A priority Critical patent/CN101343876B/zh
Publication of CN101343876A publication Critical patent/CN101343876A/zh
Application granted granted Critical
Publication of CN101343876B publication Critical patent/CN101343876B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种水工岩锚注浆电测监控方法,具体的说是一种用于观测岩锚注浆过程的测量方法。它通过观测多个节点电极和长通电极之间的导通和断开来监测锚索注浆的全过程。本发明的水工岩锚注浆电测监控方法,可灵活根据注浆深度的需要选定多个测量点,实际观测和注浆施工可同步进行,多点观测还可起到预警施工作用,该测量方法中采用的波段开关是方便进行多点观测。本发明的监控方法简单,可靠性好、费用低、安装使用方便,测量效果直观,效率高。

Description

水工岩锚注浆电测监控方法
技术领域
本发明涉及一种水工岩锚注浆电测监控方法,具体的说是一种用于观测锚索注浆过程的测量方法。
背景技术
目前在国内大中型水利枢纽中,大吨位预应力锚索在基础处理和岩体边坡支护中的应用已经非常普遍,其中使用最多的形式为二次水泥灌浆锚索,即一次灌浆形成内锚段,张拉后再对锚身段进行二次灌浆,以达到长期保护的目的。一次灌浆时一般需在内锚段外端设置定位止浆环,以确保内锚段的形成。止浆环大致分为简易布袋式(止浆包)或橡胶气囊式。不论哪种形式的止浆环,施工中都难免出现擦坏、破漏、堵塞等现象,处理起来既费工又费时。即使施工中止浆环本身不出问题,仍然存在内锚段浆液透过孔壁裂隙串到止浆环以外的可能。另外,由于止浆环与孔壁之间的间隙较锚索中任何断面都小,无疑给穿索就位增加了很大难度。为了保障内锚段的注浆效果,需要对孔内注浆进行观测,目前使用的电测法是采用电极和电法测井仪对注浆进行观测,通常只能对注浆过程中的一个点进行观测,还需预先对现场水泥浆进行量测,操作复杂,无法观测到注浆全过程,且电法测井仪的成本高费用大,不利于现场的使用。
发明内容
针对上述存在问题,本发明的目的在于提供一种可对岩锚注浆全过程进行监控的测量方法。
其技术解决方案如下:
水工岩锚注浆电测监控方法按以下步骤实施完成。
①将节点电极按序排列分别通过导线连接到波段开关的接线柱,再将波段开关由导线连接到测量仪器的一个接线柱上;
②将电极通过导线连接到测量仪器的另一个接线柱上;
③选定标志物,将节点电极按序排列分别固定安装在标志物设定位置上;
④将标志物送入钻孔中;
⑤将电极送入钻孔中,其位置位于固定在标志物上的第一个节点电极前方;
⑥对钻孔进行注浆;
⑦观察测量仪器的指针变化,即电极分别和各个节点电极之间的导通状况;
⑧当注浆液面到达第一个节点电极位置时,经观察完毕后,调整波段开关对第二个节点电极的位置进行观测。
测量仪器为万用电表或欧姆表。
由于采用了以上技术方案,本发明的水工岩锚注浆电测监控方法,可灵活根据注浆深度的需要选定多个测量点,实际观测和注浆施工可同步进行,多点观测还可起到预警施工作用,该测量方法中采用的波段开关是方便进行多点观测,而万用电表和欧姆表的成本低、易于购置,且使用携带方便,易于推广。
本发明的测量方法简单,可靠性好、费用低、安装使用方便,测量效果直观,效率高。
附图说明
附图为本发明的测量装置安装使用示意图。
具体实施方式
下面结合附图及具体实例对本发明的测量方法作进一步详细说明。
水工岩锚注浆电测监控方法,其监控方法包括测量准备和测量两个部分。
测量准备:
①将节点电极4按序排列分别通过导线连接到波段开关2的接线柱,再将波段开关2由导线连接到测量仪器1的一个接线柱上;
②将电极3通过导线连接到测量仪器1的另一个接线柱上;
③选定标志物6,将节点电极4按序排列分别固定安装在标志物6设定位置上;
④将标志物6送入钻孔7中;
⑤将电极3送入钻孔7中,其位置位于固定在标志物6上的第一个节点电极4前方;
测量:
①对钻孔7进行注浆;
②观察测量仪器1的指针变化,即电极3分别和各个节点电极4之间的导通和断开状况;
③当注浆液面到达第一个节点电极4位置时,经观察完毕后,调整波段开关2对第二个节点电极4的位置进行观测。
本发明测量方法的工作原理是根据两电极之间导通需经导电介质连通形成通路,而空气是绝缘介质,水泥浆液为导电介质,当水泥浆液面未到节点电极4时,电表指针指向无穷大,当水泥浆液面到达节点电极4时,由该节点电极4与长通电极形成通路,电表指针向小阻值方向偏转,即浆液面到达被测点位置。
具体实施例1
测量仪器1采用万用电表,被测节点定为两个,标志物6采用锚索。将两个节点电极4通过导线分别按序排列接到波段开关2的接线柱上,再将波段开关2接到万用电表的一个接线柱上,万用电表打到电阻档上,同时将两个节点电极4按序排列固定在锚索上并确定位置,由于锚索为导电体,在节点电极4和锚索的接触面上设有绝缘层5,把电极3通过导线连接到万用电表的另一个接线柱上,再将电极3送入钻孔7内,其位置置于固定在锚索最前端的节点电极4的下方。电极3采用铜质材料,准备工作完毕后,即可对锚孔内注浆,先将波段开关2接到按序排列的第一个接线柱上,同时观察和监测万用电表的指针变化,通过灌浆管向孔底缓慢注浆,当浆液面到达第一个节点电极4位置时,第一个节点电极4和电极3形成通路,万用电表指针向小阻值方向偏转,说明浆液面已到指定位置。然后再将波段开关2打到第二个接线柱上进行下一步的观测。
具体实施例2
测量仪器1采用欧姆表,被测节点定为四个,标志物6采用锚索。将四个节点电极4通过导线分别按序排列接到波段开关2的接线柱上,再将波段开关2接到欧姆表的一个接线柱上,同时将两个节点电极4按序固定在锚索上并确定位置,由于锚索为导电体,在节点电极4和锚索的接触面上设有绝缘层5,把电极3通过导线连接到欧姆表的另一个接线柱上,再将电极3送入锚孔内,其位置置于固定在锚索最前端的节点电极4的下方。准备工作完毕后,即可对锚孔内注浆,先将波段开关2接到按序排列的第一个接线柱上,同时观测欧姆表的指针变化,通过灌浆管向孔底缓慢注浆,当浆液面到达第一个节点电极4位置时,第一个节点电极4和电极3形成通路,欧姆表指针向小阻值方向偏转,说明浆液面已到指定位置。再将波段开关2打到第二个接线柱上进行下一步的观测,以此类推。

Claims (4)

1水工岩锚注浆电测监控方法,其特征在于:监控方法包括测量准备和测量两个部分,
测量准备:
①将节点电极(4)按序排列分别通过导线连接到波段开关(2)的接线柱上,再将波段开关(2)由导线连接到测量仪器(1)的一个接线柱上;
②将电极(3)通过导线连接到测量仪器(1)的另一个接线柱上;
③选定标志物,将节点电极(4)按序排列分别固定安装在标志物(6)设定位置上;
④将标志物(6)送入钻孔(7)中;
⑤将电极(3)送入钻孔(7)中,其位置位于固定在标志物(6)上的第一个节点电极(4)前方;
测量:
①对钻孔进行注浆;
②观察测量仪器(1)的指针变化,即电极(3)分别和各个节点电极(4)之间的导通和断开状况;
③当注浆液面到达第一个节点电极(4)位置时,经观察完毕后,调整波段开关(2)对第二个节点电极(4)的位置进行观测。
2如权利要求1所述的水工岩锚注浆电测监控方法,其特征在于:所述的节点电极(4)为两个以上,节点电极(4)按序排列分别通过导线连接到波段开关(2)的接线柱上。
3如权利要求1所述的水工岩锚注浆电测监控方法,其特征在于:所述的测量仪器(1)为万用电表。
4如权利要求1所述的水工岩锚注浆电测监控方法,其特征在于:所述的测量仪器(1)为欧姆表。
CN2008100489489A 2008-08-22 2008-08-22 水工岩锚注浆电测监控方法 Active CN101343876B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100489489A CN101343876B (zh) 2008-08-22 2008-08-22 水工岩锚注浆电测监控方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100489489A CN101343876B (zh) 2008-08-22 2008-08-22 水工岩锚注浆电测监控方法

Publications (2)

Publication Number Publication Date
CN101343876A true CN101343876A (zh) 2009-01-14
CN101343876B CN101343876B (zh) 2010-04-21

Family

ID=40245983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100489489A Active CN101343876B (zh) 2008-08-22 2008-08-22 水工岩锚注浆电测监控方法

Country Status (1)

Country Link
CN (1) CN101343876B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102628283A (zh) * 2012-04-25 2012-08-08 重庆城建控股(集团)有限责任公司 锚杆套筒埋置深度检测装置
CN103940853A (zh) * 2014-04-30 2014-07-23 湖南城市学院 注浆联合化学电渗散体材料桩模型试验装置和试验方法
WO2015128831A1 (en) * 2014-02-28 2015-09-03 BARNARD, Andries Jacobus Grouted rock support testing apparatus and method
CN106770471A (zh) * 2017-02-22 2017-05-31 中国铁道科学研究院铁道建筑研究所 隧道注浆空洞检查装置
CN108802110A (zh) * 2018-05-31 2018-11-13 宁波联城住工科技有限公司 用于测量灌浆套筒灌浆密实度的检测装置及其检测方法
WO2020095134A1 (en) * 2018-11-07 2020-05-14 MUGERI, Frederick Livhuwani Apparatus and method for testing installation of a reinforcing anchor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1155808C (zh) * 2001-12-06 2004-06-30 王继成 预应力张拉锚固自动控制综合测试仪
CN2532119Y (zh) * 2002-03-29 2003-01-22 长江水利委员会长江科学院 预应力锚索定位止浆环
AU2007203409B2 (en) * 2006-07-20 2009-10-22 Fci Holdings Delaware, Inc. Rock bolt
CN200982967Y (zh) * 2006-12-12 2007-11-28 上海市第二市政工程有限公司 模拟水平定向钻孔施工中能预测泥浆性能的实验装置

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102628283A (zh) * 2012-04-25 2012-08-08 重庆城建控股(集团)有限责任公司 锚杆套筒埋置深度检测装置
WO2015128831A1 (en) * 2014-02-28 2015-09-03 BARNARD, Andries Jacobus Grouted rock support testing apparatus and method
CN103940853A (zh) * 2014-04-30 2014-07-23 湖南城市学院 注浆联合化学电渗散体材料桩模型试验装置和试验方法
CN103940853B (zh) * 2014-04-30 2016-04-27 湖南城市学院 注浆联合化学电渗散体材料桩模型试验装置和试验方法
CN106770471A (zh) * 2017-02-22 2017-05-31 中国铁道科学研究院铁道建筑研究所 隧道注浆空洞检查装置
CN108802110A (zh) * 2018-05-31 2018-11-13 宁波联城住工科技有限公司 用于测量灌浆套筒灌浆密实度的检测装置及其检测方法
WO2020095134A1 (en) * 2018-11-07 2020-05-14 MUGERI, Frederick Livhuwani Apparatus and method for testing installation of a reinforcing anchor

Also Published As

Publication number Publication date
CN101343876B (zh) 2010-04-21

Similar Documents

Publication Publication Date Title
CN101343876B (zh) 水工岩锚注浆电测监控方法
JP2017534783A (ja) セメント攪拌杭体のセメント含有量のリアルタイムテストシステム及びテスト方法
CN103575769B (zh) 一种用于钢筋锈蚀监测的压电传感器及钢筋锈蚀监测方法
CN108802110B (zh) 用于测量灌浆套筒灌浆密实度的检测装置及其检测方法
CN103644997A (zh) 一种基于压电智能材料的螺栓预紧力传感器
CN201258486Y (zh) 水工岩锚注浆测量装置
CN112782239A (zh) 智能灌浆套筒及其饱和度和损伤位置检测装置与方法
CN202548085U (zh) 堤坝防渗墙埋深的检测装置
CN103290827B (zh) 一种多点位移计安装埋设注浆方法
CN214277982U (zh) 智能灌浆套筒及其饱和度和损伤位置检测装置
CN202256507U (zh) 接地电阻监测装置
CN206074475U (zh) 基于射频法的原油含水率测量装置
RU2407824C1 (ru) Устройство горизонтального анодного заземления в грунтах с высоким электрическим сопротивлением
CN106932319B (zh) 一种充填膏体中骨料沉降的测试装置及方法
CN101082598B (zh) 油垫界面检测仪
CN104345216A (zh) 测量水泥电阻率和水泥28天强度的方法和装置
CN203642914U (zh) 一种钢管结构简易隧洞断面仪
CN201347454Y (zh) 混凝土管阴极保护测试探头
CN209292487U (zh) 一种测量断电电位的电极
CN103076118B (zh) 砼构件工作应力的环切检测方法
CN210140629U (zh) 电位检测装置
CN102621191B (zh) 一种检测高聚物防渗墙的电测量方法及装置
CN107505357A (zh) 一种碱骨料反应程度测试方法及测试装置
CN104215214B (zh) 长度可调节的煤矿巷道应变采集装置
CN203298746U (zh) 一种岩土工程安全监测垂直多点位移计装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 430010 Yangtze River Water Conservancy Commission Design Building 2206, 1863 Jiefang Avenue, Wuhan City, Hubei Province

Patentee after: Changjiang Geophysical Exploration & Testing (Wuhan) Co.,Ltd.

Address before: 430010 Hubei city of Wuhan province Zhao Jiang'an District No. 27

Patentee before: CHANGJIANG ENGINEERING GEOPHYSICAL SURVEY WUHAN Co.,Ltd.

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Guo Bi Bo

Document name: Notice of conformity