CN201258486Y - 水工岩锚注浆测量装置 - Google Patents
水工岩锚注浆测量装置 Download PDFInfo
- Publication number
- CN201258486Y CN201258486Y CNU2008201904431U CN200820190443U CN201258486Y CN 201258486 Y CN201258486 Y CN 201258486Y CN U2008201904431 U CNU2008201904431 U CN U2008201904431U CN 200820190443 U CN200820190443 U CN 200820190443U CN 201258486 Y CN201258486 Y CN 201258486Y
- Authority
- CN
- China
- Prior art keywords
- measuring device
- measuring
- node electrodes
- leads
- rock anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
本实用新型涉及一种水工岩锚注浆测量装置,属工程检测仪器设备类,水工岩锚注浆测量装置,包括电极、节点电极、导线、波段开关、测量仪器,电极通过导线连接到测量仪器的一个接线柱上,节点电极按序排列分别通过导线连接到波段开关的接线柱上,波段开关由导线连接到测量仪器的另一个接线柱上。测量仪器采用为万用电表或欧姆表。本实用新型的测量装置可灵活根据注浆深度的需要选定多个测量点,实际观测和注浆施工可同步进行,多点观测还可起到预警施工作用,该装置的波段开关作用是实现多点观测,且万用电表和欧姆表因其成本低、购置、使用、携带方便,易于推广。本实用新型的测量装置,结构合理,安装使用方便,测量效果直观,效率高。
Description
技术领域
本实用新型涉及一种水工岩锚注浆测量装置,属工程检测仪器设备类。
背景技术
目前在国内大中型水利枢纽中,大吨位预应力锚索在基础处理和岩体边坡支护中的应用已经非常普遍,其中使用最多的形式为二次水泥灌浆锚索,即一次灌浆形成内锚段,张拉后再对锚身段进行二次灌浆,以达到长期保护的目的。一次灌浆时一般需在内锚段外端设置定位止浆环,以确保内锚段的形成。止浆环大致分为简易布袋式(止浆包)或橡胶气囊式。不论哪种形式的止浆环,施工中都难免出现擦坏、破漏、堵塞等现象,处理起来既费工又费时。即使施工中止浆环本身不出问题,仍然存在内锚段浆液透过孔壁裂隙串到止浆环以外的可能。另外,由于止浆环与孔壁之间的间隙较锚索中任何断面都小,无疑给穿索就位增加了很大难度。为了保障内锚段的注浆效果,需要对孔内注浆进行观测,目前使用的电测法是采用电极和电法测井仪对注浆进行观测,通常只能对注浆过程中的一个点进行观测,且电法测井仪的成本高费用大,不利于现场的使用。
发明内容
针对上述存在问题,本实用新型的目的在于提供一种成本低、结构简单、使用方便的水工岩锚注浆的测量装置。
其技术解决方案如下:
水工岩锚注浆的测量装置,包括电极、节点电极、导线、波段开关、测量仪器,电极通过导线连接到测量仪器的一个接线柱上,节点电极为两个以上,节点电极按序排列分别通过导线连接到波段开关的接线柱上,波段开关由导线连接到测量仪器的另一个接线柱上。测量仪器采用为万用电表或欧姆表。
由于采用了以上技术方案,本实用新型的水工岩锚注浆的测量装置,可灵活根据注浆深度的需要选定多个测量点,实际观测和注浆施工可同步进行,多点观测还可起到预警施工作用,该装置的波段开关作用是实现多点观测,而万用电表和欧姆表的成本低、易于购置,其使用携带方便,易于推广。
本实用新型的测量装置,结构合理,安装使用方便,测量效果直观,效率高。
附图说明
附图为本实用新型的结构及安装使用示意图。
具体实施方式
本实用新型的具体实例结合附图说明如下。
水工岩锚注浆的测量装置,该装置由电极3、节点电极4、导线、波段开关2、测量仪器1构成。测量仪器1采用欧姆表或万用电表,电极3通过导线连接到测量仪器1的一个接线柱上,节点电极4为两个以上,两个以上的节点电极4通过导线分别按序排列连接到波段开关2的接线柱上,波段开关2通过导线连接到测量仪器1的另一个接线柱上。
本实用新型测量装置的工作原理是根据不同介质的导电性能的差异来确定和判断某一介质的位置和变化。向锚孔内进行注浆的过程也就是三种介质—空气、水和水泥浆交替变化的过程。这三种介质的电阻率差异很大,锚索孔内积水的电阻率约n×102Ω·m,而水泥浆的电阻率为n×100Ω·m,因而很容易区分和判别。
具体实施例1
测量仪器1采用万用电表,被测节点定为2个,标志物采用锚索。将两个节点电极4通过导线分别按序排列接到波段开关2的接线柱上,再将波段开关2接到万用电表的一个接线柱上,同时将两个节点电极4按序固定在锚索上并确定位置,在节点电极4和锚索的接触面上设有绝缘层,把电极3通过导线连接到万用电表的另一个接线柱上,再将电极3送入锚孔内,其位置置于固定在锚索最前端的节点电极4的下方。电极3采用铜质材料,准备工作完毕后,即可对锚孔内注浆,先将波段开关2接到按序排列的第一个接线柱上,同时观察和监测万用电表的读数变化,通过灌浆管向孔底缓慢注浆,仪器开始显示的值为空气值,数值较大。当被浆液抬上来的孔内残余水到节点电极3位置时,仪器数据会立即变为水样值。当仪器数据再次陡变为浆液值时,则说明浆液面已到指定位置。然后再将波段开关2打到第二个接线柱上进行下一步的观测。
具体实施例2
测量仪器1采用欧姆表,被测节点定为四个,标志物采用锚索。将四个节点电极4通过导线分别按序排列接到波段开关2的接线柱上,再将波段开关2接到欧姆表一个接线柱上,同时将两个节点电极4按序固定在锚索上并确定位置,在节点电极4和锚索的接触面上设有绝缘层,把电极3通过导线连接到欧姆表的另一个接线柱上,再将电极3送入锚孔内,其位置置于固定在锚索最前端的节点电极4的下方。准备工作完毕后,即可对锚孔内注浆,先将波段开关2接到按序排列的第一个接线柱上,同时观察和监测欧姆表的读数变化,通过灌浆管向孔底缓慢注浆,仪器开始显示的值为空气值,数值较大。当被浆液抬上来的孔内残余水到节点电极位置时,仪器数据会立即变为水样值,当仪器数据再次陡变为浆液值时,则说明浆液面已到指定位置;再将波段开关2打到第二个接线柱上进行下一步的观测,以此类推。
Claims (5)
1 水工岩锚注浆的测量装置,包括电极、导线、波段开关、测量仪器,其特征在于:电极(3)通过导线连接到测量仪器(1)的一个接线柱上,节点电极(4)通过导线连接到波段开关(2)的接线柱上,波段开关(2)由导线连接到测量仪器(1)的另一个接线柱上。
2 如权利要求1所述的水工岩锚注浆的测量装置,其特征在于:所述的节点电极(4)为两个以上,节点电极(4)按序排列分别通过导线连接到波段开关(2)的接线柱上。
3 如权利要求1所述的水工岩锚注浆的测量装置,其特征在于:所述的测量仪器(1)为万用电表。
4 如权利要求1所述的水工岩锚注浆的测量装置,其特征在于:所述的测量仪器(1)为欧姆表。
5 如权利要求1所述的水工岩锚注浆的测量装置,其特征在于:节点电极(4)按序排列分别固定在标志物上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201904431U CN201258486Y (zh) | 2008-08-25 | 2008-08-25 | 水工岩锚注浆测量装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201904431U CN201258486Y (zh) | 2008-08-25 | 2008-08-25 | 水工岩锚注浆测量装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201258486Y true CN201258486Y (zh) | 2009-06-17 |
Family
ID=40772720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201904431U Expired - Lifetime CN201258486Y (zh) | 2008-08-25 | 2008-08-25 | 水工岩锚注浆测量装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201258486Y (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106124569A (zh) * | 2016-08-30 | 2016-11-16 | 北京智博联科技股份有限公司 | 一种用于测量钢筋套筒灌浆饱满度的探头及方法 |
CN106198641A (zh) * | 2016-08-30 | 2016-12-07 | 北京智博联科技股份有限公司 | 测量装配式混凝土结构钢筋套筒内介质电阻率的探头 |
CN108368684A (zh) * | 2015-12-03 | 2018-08-03 | 韩国地质资源研究院 | 利用电阻率的基岩灌浆监视方法 |
CN110095073A (zh) * | 2019-04-03 | 2019-08-06 | 中铁十六局集团第一工程有限公司 | 一种边坡安全监测系统和方法 |
-
2008
- 2008-08-25 CN CNU2008201904431U patent/CN201258486Y/zh not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108368684A (zh) * | 2015-12-03 | 2018-08-03 | 韩国地质资源研究院 | 利用电阻率的基岩灌浆监视方法 |
CN108368684B (zh) * | 2015-12-03 | 2021-01-08 | 韩国地质资源研究院 | 利用电阻率的基岩灌浆监视方法 |
CN106124569A (zh) * | 2016-08-30 | 2016-11-16 | 北京智博联科技股份有限公司 | 一种用于测量钢筋套筒灌浆饱满度的探头及方法 |
CN106198641A (zh) * | 2016-08-30 | 2016-12-07 | 北京智博联科技股份有限公司 | 测量装配式混凝土结构钢筋套筒内介质电阻率的探头 |
CN110095073A (zh) * | 2019-04-03 | 2019-08-06 | 中铁十六局集团第一工程有限公司 | 一种边坡安全监测系统和方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101343876B (zh) | 水工岩锚注浆电测监控方法 | |
JP6437645B2 (ja) | セメント攪拌杭体のセメント含有量のリアルタイムテストシステム及びテスト方法 | |
CN201258486Y (zh) | 水工岩锚注浆测量装置 | |
CN108802110B (zh) | 用于测量灌浆套筒灌浆密实度的检测装置及其检测方法 | |
CN104631517A (zh) | 钻孔灌注桩混凝土界面监测装置及方法 | |
CN103134855A (zh) | 地下储气井井壁自动化综合检测系统及检测方法 | |
CN101149302A (zh) | 一种用于监测/测量应力/应变的传感器 | |
CN103630480A (zh) | 一种剥离涂层下缝隙内金属腐蚀试验装置 | |
CN103524083A (zh) | 一种内掺纳米导电材料的水泥基砂浆传感电极及其制备方法与应用 | |
CN202083507U (zh) | 一种土压平衡盾构渣土压力控制模型试验装置 | |
CN104391328B (zh) | 可用于tbm动态自适应固体不极化电极及使用方法 | |
CN202548085U (zh) | 堤坝防渗墙埋深的检测装置 | |
CN106123846B (zh) | 一种测试充填膏体中骨料沉降的装置及方法 | |
CN202744629U (zh) | 一种剥离涂层下缝隙内金属腐蚀试验装置 | |
CN108828197B (zh) | 通过检测灌浆料ph值检测灌浆料是否达到饱满度的方法 | |
CN202281762U (zh) | 一种桩基施工质量检测装置 | |
CN105716954B (zh) | 面向水力压裂模拟试验的裂缝形态电学监测方法 | |
CN201672977U (zh) | 大体积混凝土无线测温装置 | |
CN106932319B (zh) | 一种充填膏体中骨料沉降的测试装置及方法 | |
CN207123442U (zh) | 一种通过千分表测量深部岩体变形的试验装置 | |
CN104345216A (zh) | 测量水泥电阻率和水泥28天强度的方法和装置 | |
CN209292487U (zh) | 一种测量断电电位的电极 | |
CN102621191B (zh) | 一种检测高聚物防渗墙的电测量方法及装置 | |
CN202596713U (zh) | 旋挖钻机及其测深装置 | |
CN204633793U (zh) | 电力通信机房数据通道测试连接线 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20090617 |