CN101333827A - Process for preventing crack of frame, bent and short-leg shear wall filler wall - Google Patents

Process for preventing crack of frame, bent and short-leg shear wall filler wall Download PDF

Info

Publication number
CN101333827A
CN101333827A CNA2007101231037A CN200710123103A CN101333827A CN 101333827 A CN101333827 A CN 101333827A CN A2007101231037 A CNA2007101231037 A CN A2007101231037A CN 200710123103 A CN200710123103 A CN 200710123103A CN 101333827 A CN101333827 A CN 101333827A
Authority
CN
China
Prior art keywords
wall
short
bent
shear wall
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101231037A
Other languages
Chinese (zh)
Inventor
谢良波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGTAI CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHONGTAI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGTAI CONSTRUCTION GROUP CO Ltd filed Critical ZHONGTAI CONSTRUCTION GROUP CO Ltd
Priority to CNA2007101231037A priority Critical patent/CN101333827A/en
Publication of CN101333827A publication Critical patent/CN101333827A/en
Pending legal-status Critical Current

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Finishing Walls (AREA)

Abstract

The invention belongs to the industrial and civil construction forming field, in particular relates to the connection-formation field of the light material applied in the building wall body; the improvements of a prevention frame, a bent, a short-leg shear wall and the wall crack filling process method thereof include that the work procedures are as follows: (1) the line-putting in the construction; (2) the reinforced bars planting; (3) the substrate layer cleaning; (4) the polystyrene board cutting; (5) the mortar mixing of the polymers; (6) the polystyrene board sticking and (7) the net addition. when the decoration construction of the processed frame, the bent and the short-leg shear wall and the filling of the wall body are finished, the temperature crack is controlled effectively; the method is popularized and used completely in the group company; not only the engineering quality is improved comprehensively, but also the general quality problem that the cracks occur in the guard wall body so that good social and economic benefits are obtained.

Description

Prevention framework, framed bent and its infilled wall crack process of shear wall with short piers
Technical field
The invention belongs to Industrial and Civil Engineering shaping field, particularly relate to the light material connection shaping field that construction wall uses.
Background technology
The interior exterior wall floated coat of light material body of wall and concrete frame trestle, wall, beam junction, with the variation of seasonal temperature produce laterally, vertical crack or irregular drawing crack, influence the presentation quality of construction work, have rainy the time seepage also influence function of use; Not only increase maintenance load and waste material, but also caused customer complaint, all brought harmful effect for society and enterprise.All the time, builing industry people from all walks of life make suggestions to try every possible means for it, but can not get effective control all the time.
Summary of the invention
Purpose of the present invention just provides its infilled wall crack process of a kind of prevention framework, framed bent and shear wall with short piers.Have and effectively to prevent and treat its infilled wall of framework, framed bent and shear wall with short piers and produces the characteristics of being out of shape because of seasonal temperature changes.
For achieving the above object, the present invention adopts following technical scheme: its infilled wall crack process of this prevention framework, framed bent and shear wall with short piers, and its improvements are: it is provided with following operation: (1) unwrapping wire; (2) bar planting; (3) base cleaning; (4) cut out polyphenyl plate; (5) polymer mortar is mixed system; (6) paste polyphenyl plate; (7) additional net sheet.
Further improvement in the technical proposal is: described operation (5) polymer mortar is mixed system, and the mortar viscosity that its viscosity mixes the usefulness of plastering gets final product, and duration of mixing is no less than 5 minutes.
Further improvement in the technical proposal is: in the additional net sheet of described operation (7), additional net sheet is to be no less than the wide alkali prevention glass fiber reticular cloth of 300mm.
After its filled wall decoration construction of framework through handling like this, framed bent and shear wall with short piers was intact, its thermal cracking had obtained effective control.This way is promoted the use of in my group company comprehensively, it not only makes workmanship obtain comprehensive lifting, and has solved this common quality defect that the crack appears in retaining wall easily, has more obtained good social benefit and economic benefit.
The specific embodiment
Below the present invention is described in further detail.
(1) before building a wall, earlier the plane of body of wall and vertical axis are put well; The body of wall lacing wire is planted muscle with construction structure glue; Or body of wall lacing wire and pre-embedded steel slab welded; And through being up to the standards.
(2) the concrete surface attachment is cleaned out.
(3) polymer mortar is mixed system: make the final polymer mortar that is packed in bag, pour in the container, then mix system with clear water and electric blender, the mortar viscosity that its viscosity mixes the usefulness of plastering gets final product, and duration of mixing is no less than 5 minutes.
(4) thick 30mm-40mm, unit weight is the 25kg/m3 polyphenyl plate, is pasted with polymer mortar on the concrete column, wall, beam of lightweight allowable ratio of height to sectional thickness of masonry wall or column junction, and its width and build a wall are with wide.
(5) after treating on its adhesion strength, carry out building by laying bricks or stones of lightweight body of wall, its masonry and polyphenyl plate intersection are used masonry mortar and are close to firmly.
(6) plaster before, be no less than the stickfast of 150mm gauze wire cloth in concrete column, wall, beam and lightweight wall junction with every edge lap is wide; Or when plastering, directly be bumped in the floated coat with being no less than the wide alkali prevention glass fiber reticular cloth of 300mm, both sides respectively are pressed into the wide 150mm of being no less than, and should use polymer bonding mortar.

Claims (3)

1, its infilled wall crack process of a kind of prevention framework, framed bent and shear wall with short piers, it is characterized in that: it is provided with following operation: (1) unwrapping wire; (2) bar planting; (3) base cleaning; (4) cut out polyphenyl plate; (5) polymer mortar is mixed system; (6) paste polyphenyl plate; (7) additional net sheet.
2, its infilled wall crack process of prevention framework as claimed in claim 1, framed bent and shear wall with short piers, it is characterized in that: described operation (5) polymer mortar is mixed system, the mortar viscosity that its viscosity mixes the usefulness of plastering gets final product, and duration of mixing is no less than 5 minutes.
3, its infilled wall crack process of prevention framework as claimed in claim 1, framed bent and shear wall with short piers is characterized in that: in the additional net sheet of described operation (7), additional net sheet is to be no less than the wide alkali prevention glass fiber reticular cloth of 300mm.
CNA2007101231037A 2007-06-28 2007-06-28 Process for preventing crack of frame, bent and short-leg shear wall filler wall Pending CN101333827A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101231037A CN101333827A (en) 2007-06-28 2007-06-28 Process for preventing crack of frame, bent and short-leg shear wall filler wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101231037A CN101333827A (en) 2007-06-28 2007-06-28 Process for preventing crack of frame, bent and short-leg shear wall filler wall

Publications (1)

Publication Number Publication Date
CN101333827A true CN101333827A (en) 2008-12-31

Family

ID=40196678

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101231037A Pending CN101333827A (en) 2007-06-28 2007-06-28 Process for preventing crack of frame, bent and short-leg shear wall filler wall

Country Status (1)

Country Link
CN (1) CN101333827A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322143A (en) * 2011-06-20 2012-01-18 山东宁建建设集团有限公司 Anti-crack construction method for junction of concrete shear wall and aerated concrete building block
CN102330477A (en) * 2010-07-13 2012-01-25 四川海特尔复合材料有限公司 Paper honeycomb light wallboard joint treatment method
CN102477797A (en) * 2010-11-24 2012-05-30 五冶集团上海有限公司 Construction method for preventing crack of infilled wall
CN102808513A (en) * 2012-07-05 2012-12-05 江苏武进建筑安装工程有限公司 Crack controlling construction method for lightweight wall
CN103498557A (en) * 2013-09-29 2014-01-08 范洁群 Method for controlling crack of fiber reinforced concrete wall
CN112411805A (en) * 2020-11-27 2021-02-26 上海宝冶集团有限公司 Heat-insulation building method for shear wall and filler wall of heat-insulation integrated system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330477A (en) * 2010-07-13 2012-01-25 四川海特尔复合材料有限公司 Paper honeycomb light wallboard joint treatment method
CN102330477B (en) * 2010-07-13 2013-04-24 四川海特尔复合材料有限公司 Paper honeycomb light wallboard joint treatment method
CN102477797A (en) * 2010-11-24 2012-05-30 五冶集团上海有限公司 Construction method for preventing crack of infilled wall
CN102477797B (en) * 2010-11-24 2016-06-01 五冶集团上海有限公司 A kind of construction method preventing infilled wall crack
CN102322143A (en) * 2011-06-20 2012-01-18 山东宁建建设集团有限公司 Anti-crack construction method for junction of concrete shear wall and aerated concrete building block
CN102808513A (en) * 2012-07-05 2012-12-05 江苏武进建筑安装工程有限公司 Crack controlling construction method for lightweight wall
CN102808513B (en) * 2012-07-05 2013-03-27 江苏武进建筑安装工程有限公司 Crack controlling construction method for lightweight wall
CN103498557A (en) * 2013-09-29 2014-01-08 范洁群 Method for controlling crack of fiber reinforced concrete wall
CN112411805A (en) * 2020-11-27 2021-02-26 上海宝冶集团有限公司 Heat-insulation building method for shear wall and filler wall of heat-insulation integrated system

Similar Documents

Publication Publication Date Title
CN108824812A (en) A kind of cast-in-place fair-faced concrete wall pours and maintenance process
CN101333827A (en) Process for preventing crack of frame, bent and short-leg shear wall filler wall
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN102806592B (en) Manufacturing method for demolition-free textile fiber web reinforced concrete formwork
CN103826842A (en) Laminated product produced by placing one layer onto semi set partially cured base layer.
CN108612233A (en) A kind of cast-in-place fair-faced concrete wall construction method
CN104110082B (en) The built-in composite insulation boards Cast-in-place concrete integration wall body structure of external mold and manufacture method thereof
CN106869502A (en) The accurate building block method for controlling crack of steam pressure sand aerated concrete
CN104947934A (en) Floor layer manufacturing method
CN106278065A (en) Imitative stone decoration element and production method thereof
KR100974424B1 (en) A Panel block
CN110593597A (en) Method for repairing wall crack
CN100453755C (en) Polyurethane composite board and its application
US20120167801A1 (en) Mixture for slab production
CN104446634A (en) Aerated concrete insulation block and production method thereof
CN208870274U (en) Concrete prefabricated board and concrete folding plate
CN108824810B (en) Laying construction process for steel skeleton composite building top plate
CN104389362B (en) The implementation that clear-water concrete shear wall is constructed with interior filling wall junction
CN103286854A (en) Manufacturing and lap construction methods of ultra-wide autoclaved aerated concrete cantilever slabs
WO2018126950A1 (en) Modular stairway
CN102767284B (en) Semi-prefabricating construction process for concrete thin-wall lower return eave
CN109057343A (en) A kind of building concrete pouring procedure
CN108018986A (en) A kind of structure and half prefabricated Side fascia of energy saving integrated and its construction method
CN113323314A (en) External wall paving construction method for sintered ceramic tiles in freeze-thaw environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081231