CN101333094B CN2008100486283A CN200810048628A CN101333094B CN 101333094 B CN101333094 B CN 101333094B CN 2008100486283 A CN2008100486283 A CN 2008100486283A CN 200810048628 A CN200810048628 A CN 200810048628A CN 101333094 B CN101333094 B CN 101333094B
Authority
CN
China
Prior art keywords
phase change
phase
preparation
asphalt pavement
pitch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008100486283A
Other languages
Chinese (zh)
Other versions
CN101333094A (en
Inventor
胡曙光
丁庆军
李潜
黄绍龙
谢先启
邓利明
黄小霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Municipal Construction Group Co Ltd
Original Assignee
Wuhan University of Technology WUT
Wuhan Municipal Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT, Wuhan Municipal Construction Group Co Ltd filed Critical Wuhan University of Technology WUT
Priority to CN2008100486283A priority Critical patent/CN101333094B/en
Publication of CN101333094A publication Critical patent/CN101333094A/en
Application granted granted Critical
Publication of CN101333094B publication Critical patent/CN101333094B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Compositions Of Macromolecular Compounds (AREA)

Abstract

The invention relates to a preparation method for phase-change asphalt pavement material and is characterized in that the method comprises the following steps: (1), the preparation of phase-change asphalt modifier: firstly, selecting the materials based on the mass ratio among phase change material, coagulant, support material and coupling agent which is equal to 100:1-5:10-50:1-5; secondly, adding the phase change material into the silica sol, and then adding the coagulant dropwise to form gel; drying the gel, cooling the gel to room temperature and then taking out and mashing the gel to get powder through mixing; vacuuming the powder at 30-50 DEG C for 2-4 hours, then adding the support material under the protection of shielding gas; at 80-100 DEG C, adding the coupling agent for hydrophobic modification; then granulating to get the phase-change asphalt modifier; (2), the preparation of phase-change asphalt pavement material: firstly, selecting the materials based on the mass ratio among coarse aggregate: fine aggregate: filler, asphalt, fiber and phase change asphalt modifier which is equal to 100:10-20:1-8:2-6:0.2-0.5:2-10; then stirring the materials to get the phase-change asphalt pavement material. The phase-change asphalt pavement material prepared through the invention can improve the high temperature stability of pavement surface.

Description

A kind of preparation method of phase change asphalt pavement material
Technical field
The present invention relates to the preparation method of phase change asphalt pavement material.
Technical background
Bituminous concrete is a kind of viscoelastic material, and its physical and mechanical property and temperature and loading action time are closely related.Bituminous pavement stands the test from low temperature to high temperature varying environment condition during use." high temperature " condition of usually said " high-temperature stability " is meant the effect repeatedly that in use receives traffic loading, is easy to generate rut, passes, gathers around the TR of permanent deformations (also comprising bellding) such as bag.The practice that road uses shows; Under common carload condition; Nonvolatil distortion mainly is at summer temperature more than 25, and promptly table temperature in the road of bituminous pavement reaches 40~70 ℃, has has met or exceeded under the situation of softening point temperature of road bitumen to be easy to generate; And along with increasing the weight of of temperature rising and load, distortion is bigger.Be lower than this temperature on the contrary, just can not produce serious deformation.In China, most of areas all can have tens of day and even day surpass this temperature surplus in the of 100 among 1 year, reach such temperature condition although perhaps some only have only several days among local 1 year, also is unable to escape high temperature deformation destructive misfortune.
Bituminous pavement is the bearing load effect under hot conditions, and asphalt can produce distortion significantly, and wherein irreclaimable tension set just becomes rut.The existence of rut has reduced the use properties on road surface, jeopardizes traffic safety, thereby shortens the work-ing life of bituminous pavement; The rut of motorway be bituminous pavement one of collapse mode of harm arranged most.In addition, in the pavement process of steel case beam,, seriously influence road surface situation and construction effect because phenomenons such as bag can appear pushing, gather around in asphalt under hot conditions.
For the insufficient situation of above stability at high temperature of asphalt mixture, the someone has invented products such as anti-rut agent in succession, through increasing the viscoelastic way of pitch, improves the bituminous concrete high-temperature stability.
Summary of the invention
The object of the present invention is to provide a kind of preparation method of phase change asphalt pavement material, the phase change asphalt pavement material of this method preparation can improve the high-temperature stability on road surface.
To achieve these goals, technical scheme of the present invention is: a kind of preparation method of phase change asphalt pavement material is characterized in that it comprises the steps:
1), the preparation of phase transformation asphalt modifier: be phase change material 1.: setting accelerator: propping material by mass ratio: coupling agent=100: 1~5: 10~50: 1~5, choose phase change material, setting accelerator, propping material and coupling agent, subsequent use;
Described phase change material is polyoxyethylene glycol (1000,2000), Vilaterm (carbon chain lengths 20~30) or paraffin (carbon chain lengths 16~20);
Described setting accelerator is CaCl 2Or MgCl 2
Described propping material is silicon-dioxide or Z 150PH;
Described coupling agent is 1,4-butyleneglycol or metatitanic acid vinegar;
2. phase change material being joined mass concentration is that silicon sol and phase change material mass ratio are 100: 10~20 in 20%~40% the silicon sol, treats that phase change material is all after the dissolving; Drip setting accelerator; Under agitation, make it that gelation reaction take place, leave standstill the back and form the two-dimensional network structural gel; With gel forced air drying 24~48h in 70~90 ℃ of baking ovens, be cooled to room temperature and take out and to smash to pieces, and stir powder (particle diameter≤0.1mm); Vacuumize 2~4h with under 30~50 ℃ of the powders, under the protection of shielding gas, add propping material then, under 80~100 ℃ of temperature, add coupling agent hydrophobically modified 2~6h; Granulation then gets the phase transformation asphalt modifier;
2) preparation of phase change asphalt pavement material: be coarse aggregate 1.: fine aggregate: filler: pitch: fiber: phase transformation asphalt modifier=100: 10~20: 1~8: 2~6: 0.2~0.5: 2~10 by mass ratio; Choose coarse aggregate, fine aggregate, filler, pitch, fiber and phase transformation asphalt modifier, subsequent use;
2. coarse aggregate, fine aggregate and fiber are stirred 30~60s in agitator kettle; Add the phase transformation asphalt modifier and continue to stir 60~90s, add pitch restir 60~90s, add filler at last and mix and stir 60~90s; Wherein coarse aggregate, fine aggregate and filler are heated to 150~190 ℃; 150~170 ℃ of pitch Heating temperatures, 160~180 ℃ of agitator kettle design temperatures get phase change asphalt pavement material.
Described shielding gas is nitrogen or argon gas.
Described coarse aggregate, fine aggregate are Irish touchstone, diabase or ls.
Described filler is a limestone dust.
Described pitch is road 70# pitch or SBS modifying asphalt (SBS is a styrene-butadiene rubber(SBR)).
Described fiber is selected trevira, lignin fibre or mineral fibre for use.
The invention has the beneficial effects as follows: adopt the phase transformation asphalt modifier the asphalt pavement material modification; Heat absorption delays the rising of temperature in the high temperature period to make the road surface; Thereby reduce the temperature sensitivity of bituminous material in low temperature period release of heat; Dwindle the variation range of pavement temperature, improve the high-temperature stability on road surface, prolong pavement life.The fluid seepage problem that the present invention has adopted solid-liquid phase change material setting technology to solve in phase transition process, to occur also and selects for use polyoxyethylene glycol, Vilaterm, phase change materials such as paraffin to solve solid-liquid phase change material seepage liquid and the bituminous problem of dissolving each other.The phase change asphalt pavement material of the present invention's preparation can reduce pavement temperature more than 2~10 ℃, effectively slows down the destruction of high temperature road pavement, strengthens the high temperature resistant property on road surface.
Description of drawings
Fig. 1 is a temperature under the summer high temperature condition, the temperature and time variation relation figure of plain asphalt ground surface material and phase change asphalt pavement material.
Embodiment
In order to understand the present invention better, further illustrate content of the present invention below in conjunction with embodiment, but content of the present invention not only is confined to following embodiment.
Embodiment 1
A kind of preparation method of phase change asphalt pavement material, it comprises the steps:
1), the preparation of phase transformation asphalt modifier: be phase change material 1.: setting accelerator: propping material: coupling agent=100: 2: 20 by mass ratio: 2.4, choose phase change material, setting accelerator, propping material and coupling agent, subsequent use;
Described phase change material is polyoxyethylene glycol (1000,2000);
Described setting accelerator is CaCl 2
Described propping material is a Z 150PH;
Described coupling agent is a metatitanic acid vinegar;
2. phase change material being joined mass concentration is that silicon sol and phase change material mass ratio are 100: 12 in 25% the silicon sol, treats that phase change material is all after the dissolving; Drip setting accelerator; Under brute force stirs, make it that gelation reaction take place, leave standstill the back and form the two-dimensional network structural gel; With gel forced air drying 30h in 80 ℃ of baking ovens, be cooled to room temperature and take out and to smash to pieces, and brute force stir powder (particle diameter≤0.1mm); Vacuumize 3h with under 40 ℃ of the powders,, under the protection of shielding gas, add propping material then, under 90 ℃ of temperature, add coupling agent hydrophobically modified 2~6h to remove most moisture; Process the particle that radius is 1~2mm through the forcing machine extruding pelletization, get the phase transformation asphalt modifier; Described shielding gas is a nitrogen;
2) preparation of phase change asphalt pavement material: be coarse aggregate 1.: fine aggregate: filler: pitch: fiber: phase transformation asphalt modifier=100: 11: 1.5: 4: 0.3: 4 by mass ratio; Choose coarse aggregate, fine aggregate, filler, pitch, fiber and phase transformation asphalt modifier, subsequent use;
Described coarse aggregate, fine aggregate are Irish touchstone, nominal maximum aggregate size 9.5mm;
Described filler is a limestone dust;
Described pitch is SBS modifying asphalt (SBS is a styrene-butadiene rubber(SBR));
Described fiber is selected trevira for use;
2. coarse aggregate, fine aggregate and fiber are stirred 50s in agitator kettle; Add the phase transformation asphalt modifier and continue to stir 70s, add pitch restir 70s, add filler at last and mix and stir 70s; Wherein coarse aggregate, fine aggregate and filler are heated to 180 ℃; 160 ℃ of pitch Heating temperatures, 170 ℃ of agitator kettle design temperatures get phase change asphalt pavement material.
The phase change asphalt pavement material of preparation can reduce by 5 ℃ on road surface.Dynamic stability can reach 7900 times/mm.
Embodiment 2:
A kind of preparation method of phase change asphalt pavement material, it comprises the steps:
1), the preparation of phase transformation asphalt modifier: be phase change material 1.: setting accelerator: propping material: coupling agent=100: 3: 20 by mass ratio: 3.2, choose phase change material, setting accelerator, propping material and coupling agent, subsequent use;
Described phase change material is Vilaterm (carbon chain lengths 20~30);
Described setting accelerator is MgCl 2
Described propping material is a Z 150PH;
Described coupling agent is 1, the 4-butyleneglycol;
2. phase change material being joined mass concentration is that silicon sol and phase change material mass ratio are 100: 15 in 30% the silicon sol, treats that phase change material is all after the dissolving; Drip setting accelerator; Under brute force stirs, make it that gelation reaction take place, leave standstill the back and form the two-dimensional network structural gel; With gel forced air drying 30h in 80 ℃ of baking ovens, be cooled to room temperature and take out and to smash to pieces, and brute force stir powder (particle diameter≤0.1mm); Vacuumize 3h with under 40 ℃ of the powders,, under the protection of shielding gas, add propping material then, under 90 ℃ of temperature, add coupling agent hydrophobically modified 4h to remove most moisture; Make the particle that radius is 1~2mm through the tabletting machine compressing tablet, get the phase transformation asphalt modifier; Described shielding gas is an argon gas;
2) preparation of phase change asphalt pavement material: be coarse aggregate 1.: fine aggregate: filler: pitch: fiber: phase transformation asphalt modifier=100: 14: 3: 4.5: 0.3: 4 by mass ratio; Choose coarse aggregate, fine aggregate, filler, pitch, fiber and phase transformation asphalt modifier, subsequent use;
Described gathering materials is that diabase, nominal maximum aggregate size are 16mm;
Described filler is a limestone dust;
Described pitch is road 70# pitch;
Described fiber is selected lignin fibre for use;
2. coarse aggregate, fine aggregate and fiber are stirred 60s in agitator kettle; Add the phase transformation asphalt modifier and continue to stir 80s, add pitch restir 80s, add filler at last and mix and stir 80s; Wherein coarse aggregate, fine aggregate and filler are heated to 190 ℃; 170 ℃ of pitch Heating temperatures, 180 ℃ of agitator kettle design temperatures get phase change asphalt pavement material.
The phase change asphalt pavement material of preparation can reduce by 7 ℃ on road surface, and dynamic stability can reach 9000 times/mm.
Embodiment 3:
A kind of preparation method of phase change asphalt pavement material, it comprises the steps:
1), the preparation of phase transformation asphalt modifier: be phase change material 1.: setting accelerator: propping material: coupling agent=100: 1: 10 by mass ratio: 1, choose phase change material, setting accelerator, propping material and coupling agent, subsequent use;
Described phase change material is paraffin (carbon chain lengths 16~20);
Described setting accelerator is CaCl 2
Described propping material is a silicon-dioxide;
Described coupling agent is 1, the 4-butyleneglycol;
2. phase change material being joined mass concentration is that silicon sol and phase change material mass ratio are 100: 10 in 20% the silicon sol, treats that phase change material is all after the dissolving; Drip setting accelerator; Under brute force stirs, make it that gelation reaction take place, leave standstill the back and form the two-dimensional network structural gel; With gel forced air drying 24h in 70 ℃ of baking ovens, be cooled to room temperature and take out and to smash to pieces, and brute force stir powder (particle diameter≤0.1mm); Vacuumize 2h with under 30 ℃ of the powders,, under the protection of shielding gas, add propping material then, under 80 ℃ of temperature, add coupling agent hydrophobically modified 4h to remove most moisture; Process the particle that radius is 1~2mm through the forcing machine extruding pelletization, get the phase transformation asphalt modifier; Described shielding gas is a nitrogen;
2) preparation of phase change asphalt pavement material: be coarse aggregate 1.: fine aggregate: filler: pitch: fiber: phase transformation asphalt modifier=100: 16: 2: 4.8: 0.2: 3 by mass ratio; Choose coarse aggregate, fine aggregate, filler, pitch, fiber and phase transformation asphalt modifier, subsequent use;
Described coarse aggregate, fine aggregate are ls;
Described filler is a limestone dust;
Described pitch is road 70# pitch;
Described fiber is selected mineral fibre for use;
2. coarse aggregate, fine aggregate and fiber are stirred 30s in agitator kettle; Add the phase transformation asphalt modifier and continue to stir 60s, add pitch restir 60s, add filler at last and mix and stir 60s; Wherein coarse aggregate, fine aggregate and filler are heated to 150 ℃; 150 ℃ of pitch Heating temperatures, 160 ℃ of agitator kettle design temperatures get phase change asphalt pavement material.
The phase change asphalt pavement material of preparation can reduce by 6 ℃ on road surface.Dynamic stability can reach 8400 times/mm.
Embodiment 4:
A kind of preparation method of phase change asphalt pavement material, it comprises the steps:
1), the preparation of phase transformation asphalt modifier: be phase change material 1.: setting accelerator: propping material: coupling agent=100: 5: 50 by mass ratio: 5, choose phase change material, setting accelerator, propping material and coupling agent, subsequent use;
Described phase change material is polyoxyethylene glycol (1000,2000);
Described setting accelerator is MgCl 2
Described propping material is a Z 150PH;
Described coupling agent is a metatitanic acid vinegar;
2. phase change material being joined mass concentration is that silicon sol and phase change material mass ratio are 100: 18 in 30% the silicon sol, treats that phase change material is all after the dissolving; Drip setting accelerator; Under brute force stirs, make it that gelation reaction take place, leave standstill the back and form the two-dimensional network structural gel; With gel forced air drying 48h in 90 ℃ of baking ovens, be cooled to room temperature and take out and to smash to pieces, and brute force stir powder (particle diameter≤0.1mm); Vacuumize 4h with under 50 ℃ of the powders,, under the protection of shielding gas, add propping material then, under 100 ℃ of temperature, add coupling agent hydrophobically modified 5h to remove most moisture; Process the particle that radius is 1~2mm through the forcing machine extruding pelletization, get the phase transformation asphalt modifier; Described shielding gas is an argon gas;
2) preparation of phase change asphalt pavement material: be coarse aggregate 1.: fine aggregate: filler: pitch: fiber: phase transformation asphalt modifier=100: 18: 9: 6: 0.5: 12 by mass ratio; Choose coarse aggregate, fine aggregate, filler, pitch, fiber and phase transformation asphalt modifier, subsequent use;
Described coarse aggregate, fine aggregate are Irish touchstone;
Described filler is a limestone dust;
Described pitch is road 70# pitch;
Described fiber is selected trevira for use;
2. coarse aggregate, fine aggregate and fiber are stirred 40s in agitator kettle; Add the phase transformation asphalt modifier and continue to stir 90s, add pitch restir 90s, add filler at last and mix and stir 90s; Wherein coarse aggregate, fine aggregate and filler are heated to 190 ℃; 170 ℃ of pitch Heating temperatures, 180 ℃ of agitator kettle design temperatures get phase change asphalt pavement material.The phase change asphalt pavement material of preparation can reduce by 5 ℃ on road surface.Dynamic stability can reach 6300 times/mm.

Claims (6)

1. the preparation method of a phase change asphalt pavement material is characterized in that it comprises the steps:
1), the preparation of phase transformation asphalt modifier: be phase change material 1.: setting accelerator: propping material by mass ratio: coupling agent=100: 1~5: 10~50: 1~5, choose phase change material, setting accelerator, propping material and coupling agent, subsequent use;
Described phase change material is polyoxyethylene glycol, Vilaterm or paraffin;
Described setting accelerator is CaCl 2Or MgCl 2
Described propping material is silicon-dioxide or Z 150PH;
Described coupling agent is 1,4-butyleneglycol or metatitanic acid vinegar;
2. phase change material being joined mass concentration is that silicon sol and phase change material mass ratio are 100: 10~20 in 20%~40% the silicon sol, treats that phase change material is all after the dissolving; Drip setting accelerator; Under agitation, make it that gelation reaction take place, leave standstill the back and form the two-dimensional network structural gel; With gel forced air drying 24~48h in 70~90 ℃ of baking ovens, be cooled to room temperature and take out and to smash to pieces, and stir powder, the particle diameter≤0.1mm of powder; Vacuumize 2~4h with under 30~50 ℃ of the powders, under the protection of shielding gas, add propping material then, under 80~100 ℃ of temperature, add coupling agent hydrophobically modified 2~6h; Granulation then gets the phase transformation asphalt modifier;
2) preparation of phase change asphalt pavement material: 1. by mass ratio for being coarse aggregate by mass ratio: fine aggregate: filler: pitch: fiber: phase transformation asphalt modifier=100: 10~20: 1~8: 2~6: 0.2~0.5: 2~10; Choose coarse aggregate, fine aggregate, filler, pitch, fiber and phase transformation asphalt modifier, subsequent use;
2. coarse aggregate, fine aggregate and fiber are stirred 30~60s in agitator kettle; Add the phase transformation asphalt modifier and continue to stir 60~90s, add pitch restir 60~90s, add filler at last and mix and stir 60~90s; Wherein coarse aggregate, fine aggregate and filler are heated to 150~190 ℃; 150~170 ℃ of pitch Heating temperatures, 160~180 ℃ of agitator kettle design temperatures get phase change asphalt pavement material.
2. the preparation method of a kind of phase change asphalt pavement material according to claim 1, it is characterized in that: described shielding gas is nitrogen or argon gas.
3. the preparation method of a kind of phase change asphalt pavement material according to claim 1, it is characterized in that: described coarse aggregate, fine aggregate are Irish touchstone, diabase or ls.
4. the preparation method of a kind of phase change asphalt pavement material according to claim 1, it is characterized in that: described filler is a limestone dust.
5. the preparation method of a kind of phase change asphalt pavement material according to claim 1, it is characterized in that: described pitch is road 70# pitch or SBS modifying asphalt.
6. the preparation method of a kind of phase change asphalt pavement material according to claim 1, it is characterized in that: described fiber is selected trevira, lignin fibre or mineral fibre for use.
CN2008100486283A 2008-07-29 2008-07-29 Method for preparing phase change asphalt pavement material Active CN101333094B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100486283A CN101333094B (en) 2008-07-29 2008-07-29 Method for preparing phase change asphalt pavement material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100486283A CN101333094B (en) 2008-07-29 2008-07-29 Method for preparing phase change asphalt pavement material

Publications (2)

Publication Number Publication Date
CN101333094A CN101333094A (en) 2008-12-31
CN101333094B true CN101333094B (en) 2012-03-07

Family

ID=40196016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100486283A Active CN101333094B (en) 2008-07-29 2008-07-29 Method for preparing phase change asphalt pavement material

Country Status (1)

Country Link
CN (1) CN101333094B (en)

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649187B (en) * 2009-09-03 2011-05-18 宁波博浪热能设备有限公司 Phase change material applied to water heater and preparation method thereof
CN102093725B (en) * 2009-12-09 2013-06-12 济南开发区星火科学技术研究院 Modified road asphalt and preparation method thereof
CN102030490B (en) * 2010-11-02 2012-08-29 北京厚德交通科技有限公司 Granular cellulose fibers for road construction and preparation method thereof
CN102153315A (en) * 2010-12-27 2011-08-17 湖北环宇化工有限公司 Preventive maintenance material for asphalt pavement
CN102134829B (en) * 2011-02-21 2012-09-05 武汉理工大学 Self temperature adjustment cold mixing bituminous concrete and preparation method thereof
CN102703035A (en) * 2012-05-26 2012-10-03 长安大学 Road phase-change temperature regulator and preparation method thereof
CN103508702B (en) * 2012-06-17 2016-03-16 唐伯明 A kind of Cold-mix phase change type asphalt mixture for thermal energy storage
CN103508701B (en) * 2012-06-17 2016-05-25 朱洪洲 A kind of composite phase-change cooling asphalt pavement material
CN102702759A (en) * 2012-06-27 2012-10-03 哈尔滨工业大学 Phase change modified asphalt and preparation method thereof
CN104974535B (en) * 2015-06-25 2017-07-18 河北建筑工程学院 Salt particle is stored from snow melt composite modified asphalt mixture and preparation method thereof
CN105330202B (en) * 2015-11-04 2017-11-10 同济大学 A kind of preparation method of modified asphalt mixture
CN105825783B (en) * 2016-04-29 2019-12-27 Oppo广东移动通信有限公司 Display screen support and terminal
CN105873357B (en) * 2016-04-29 2019-03-01 Oppo广东移动通信有限公司 Circuit board and mobile terminal
CN105916350B (en) * 2016-04-29 2018-05-29 广东欧珀移动通信有限公司 A kind of terminal device and associated method
CN106477975B (en) * 2016-09-30 2019-02-19 长安大学 A kind of enhanced asphalt preparation method of premixing
CN106517894B (en) * 2016-11-09 2019-04-02 王丽丽 A kind of traffic phase-changing and temperature-regulating pitch composite material and preparation method
CN107142089A (en) * 2017-07-10 2017-09-08 江苏启能新能源材料有限公司 A kind of composite phase-change energy storage material
CN107473623A (en) * 2017-09-22 2017-12-15 浙江海洋大学 A kind of ground surface material of wide transition temperature area and preparation method thereof
CN107794821B (en) * 2017-09-29 2020-09-29 河海大学 Asphalt pavement with heat transfer directivity and heat conduction effect testing method thereof
CN108191302A (en) * 2018-03-20 2018-06-22 和县祥龙沥青混凝土有限公司 A kind of preparation method of multifunctional mineral asphalt concrete pavement material
CN108546002A (en) * 2018-06-27 2018-09-18 长安大学 A kind of phase-transition heat-preserving asphalt and preparation method thereof
CN111499245B (en) * 2020-04-29 2023-11-10 广西交科集团有限公司 Preparation method of composite shaping phase thinned aggregate for asphalt mixture
CN112608072B (en) * 2020-12-17 2022-05-20 江苏长路智造科技有限公司 Asphalt mixture capable of automatically adjusting temperature diseases and preparation method thereof
CN112853863A (en) * 2021-01-25 2021-05-28 中南大学 Bridge deck temperature control method for preventing ice and snow
CN114751679B (en) * 2022-06-16 2022-09-27 长沙学院 Asphalt mixture for composite phase-change pavement and preparation method thereof
CN115353327A (en) * 2022-07-29 2022-11-18 华邦信尔达科技检测有限公司 Novel asphalt mixture for roads

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101172810A (en) * 2007-10-19 2008-05-07 武汉理工大学 Method for producing conductive SMA mixture

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101172810A (en) * 2007-10-19 2008-05-07 武汉理工大学 Method for producing conductive SMA mixture

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王维龙等.聚乙二醇/二氧化硅定形相变材料的制备.化工学报.2007,58(10),1.2样品制备部分. *

Also Published As

Publication number Publication date
CN101333094A (en) 2008-12-31

Similar Documents

Publication Publication Date Title
CN101333094B (en) Method for preparing phase change asphalt pavement material
Wu et al. Study on a PEG/epoxy shape-stabilized phase change material: preparation, thermal properties and thermal storage performance
CN106517894B (en) A kind of traffic phase-changing and temperature-regulating pitch composite material and preparation method
CN109503032B (en) A kind of asphalt and preparation method thereof of physical modification red mud substitution miberal powder
CN103508701A (en) Composite phase transition cooling bituminous paving material
CN101786834B (en) Porous salt storage aggregate and preparation method thereof
CN110655349A (en) Asphalt pavement pit repairing capsule and preparation and construction method thereof
CN103508702B (en) A kind of Cold-mix phase change type asphalt mixture for thermal energy storage
CN104311943B (en) A kind of rubber modifier, rubber modified mixes and preparation method thereof
CN103360773B (en) A kind of composite asphalt modifier and preparation method thereof and application
CN101838468A (en) Nanometer silicon powder compound modified bitumen composition and method for preparing same
CN102603230B (en) High-concentration rubber powder modified asphalt mixture and preparation method thereof
CN104559245A (en) Warm mix asphalt and preparation method thereof
CN108033711A (en) A kind of emulsified asphalt cold-repairing material
CN112608072B (en) Asphalt mixture capable of automatically adjusting temperature diseases and preparation method thereof
CN110028802A (en) A kind of asphalt modifier and preparation method thereof and the application in bituminous composition
Zhao et al. Preparation and characterization of phase change capsules containing waste cooking oil for asphalt binder thermoregulation
CN110317003A (en) Saturated hydrocarbons and butylbenzene liquid rubber composite modified asphalt cold-repairing material and preparation method thereof
CN102558879A (en) Compound asphalt mixture wet-mixing additive and preparation method thereof
Ding et al. Multiscale evaluation on temperature adjusting performance and road performance of asphalt mixture containing dual phase change materials
CN107056138A (en) A kind of modified asphalt mixture
CN104276786B (en) A kind of method that premixing bitumastic prepares self-compaction bituminous concrete
CN107032665B (en) A kind of bionical self-healing property asphalt and preparation method thereof
CN103553442B (en) Modified bituminous concrete with cooling and emission-reducing functions
CN102173696A (en) Pavement permeable stress absorption layer and preparation process thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160429

Address after: 430056 Hubei city of Wuhan Province Economic and Technological Development Zone Chunxiao Road No. 6

Patentee after: Wuhan Municipal Construction Group Co., Ltd.

Address before: 430070 Hubei Province, Wuhan city Hongshan District Luoshi Road No. 122

Patentee before: Wuhan University of Technology

Patentee before: Wuhan Municipal Construction Group Co., Ltd.