CN101324088A - 钢筋混凝土建筑物逆作法施工工艺 - Google Patents
钢筋混凝土建筑物逆作法施工工艺 Download PDFInfo
- Publication number
- CN101324088A CN101324088A CNA2008100700412A CN200810070041A CN101324088A CN 101324088 A CN101324088 A CN 101324088A CN A2008100700412 A CNA2008100700412 A CN A2008100700412A CN 200810070041 A CN200810070041 A CN 200810070041A CN 101324088 A CN101324088 A CN 101324088A
- Authority
- CN
- China
- Prior art keywords
- concrete post
- concrete column
- concrete
- intermediate supports
- supporting concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了钢筋混凝土建筑物逆作法施工工艺,包括:1.进行基础、地基、独立柱基施工;2.建造钢屋架的左、右支撑砼柱和中间支撑砼柱;3.将左支撑砼柱和中间支撑砼柱之间的区域,以及右支撑砼柱和中间支撑砼柱之间的区域,作为吊装钢屋架的吊装通道,将每榀钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上;4.将全部的钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上,连接、固定后,作为钢筋混凝土建筑物的屋顶;5.在上述屋顶内,建造室内砼框架结构。本发明的方法,先施工边框架及中部屋架柱结构,而后进行钢屋架吊装,达成屋面断水后再施工洁净区的钢筋砼结构,从而节省工期、降低成本、确保吊装安全,能克服天气影响,保证施工期及施工质量。
Description
技术领域
本发明涉及一种钢筋混凝土建筑物的建造施工工艺,尤其是建造微电子工业厂房的钢筋混凝土建筑物逆作法施工工艺。
背景技术
微电子工业厂房是生产电子芯片的工业厂房,主厂房基础采用独立柱基础、条形基础及筏板式基础的复合地基基础;上部结构形式为钢筋砼框架剪力墙结构,屋面为钢桁架屋面,楼层为3、4、5层,一般不超过30米高。主厂房为超长超宽无缝结构,该厂房中设洁净室厂房,洁净室的洁净度为10万级,即每立方米空气中含1μm粒子数不超过3×106;洁净方式为垂直层流,洁净室的楼板设计为多孔密肋梁、板结构,洁净室内保持一定的正压力,通过顶棚风机向下送风,空气通过多孔楼板流动,将灰尘吸走,以达到需要的洁净度。除了上述洁净度要求以外,对砼的质量要求很严格,砼柱、梁、板为普通清水砼,砼的等级为C40。如果采用现有技术的顺作法工艺施工,主要存在三个不利点:一、结构从下至上逐层流水工程,每层的施工期的累加为结构的总工期,因此工期较长,因此顺作法不能保证本工程主厂房如工期完成。二、钢屋架只能采取跨外的吊装形式,且单榀半屋架的重量达40多吨,高度达8米,吊装半径达50米,如采取在厂房外端点吊装的方法,即在楼面上搭设滑移平台,滑移平台底面要高于柱顶,将吊装设备置于厂房的一端,将两个半榀屋架吊至滑移平台上,安装好其间的杆件,组成一个稳定体,移位滑动平台至柱处下落就位固定;依此法逐次地将钢屋架吊装就位。这种方法在楼面上平移大型屋架的作业安全管理难度大,费时费工,且吊装费用高昂。三、结构施工期间受天气影响较大,本工程要求为清水砼,特别是洁净室区域,施工期间如遇降雨,因砼浇注面积较大,防雨措施不宜得到保证,将直接影响到砼的成品质量。显然,现有技术的顺作法工艺施工方法,以及如名称为“建筑物的逆作施工方法”、专利号为ZL200510134291.4的中国发明专利所公开的逆作施工法,都不能适用于建造微电子工业厂房,不能满足设计及规范要求。
发明内容
本发明针对现有技术的顺作法工艺施工方法以及逆作施工方法,都不能适用于建造微电子工业厂房、不能满足设计及规范要求的不足,提供一种能满足微电子工业厂房设计及规范要求、有效缩短工期、大幅度降低工程造价的钢筋混凝土建筑物逆作法施工工艺。
本发明的技术方案:钢筋混凝土建筑物逆作法施工工艺,包括如下步骤:
1、按照设计及规范要求,进行基础、地基、独立柱基施工;
2、按照设计及规范要求,建造钢屋架的左、右支撑砼柱和中间支撑砼柱,左、右支撑砼柱和中间支撑砼柱的高度达到设计标高;
3、将左支撑砼柱和中间支撑砼柱之间的区域,以及右支撑砼柱和中间支撑砼柱之间的区域,作为吊装钢屋架的吊装通道,将每榀钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上,连接、固定;
4、按照上述方法,将全部的钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上,连接、固定后,作为钢筋混凝土建筑物的屋顶;
5、在上述屋顶内,按照设计及规范要求,建造室内砼框架结构,如一层楼板结构、二层楼板结构和/或三层楼板结构。
本发明的钢筋混凝土建筑物逆作法施工工艺,相对于现有技术,具有如下特点:
1、将洁净区区域结构改在钢屋架吊装完后施工,即先施工边框架及中部屋架柱结构,而后进行钢屋架吊装,并进行钢承板安装,达成屋面断水,再施工洁净区的钢筋砼结构。将其由原顺作法施工工艺时关键工序变为逆作法施工工艺中的非关键工序,从而节省工期,并达到平衡砼供应量的高峰期,做到砼量的均衡施工,保证按照工期要求完成主厂房的结构施工。
2、由于洁净室区域是断水环境施工,可以避免雨天对施工期的影响,从而保证了其施工期及施工质量。
3、逆作法施工可在厂房内预留吊装通道,可以使每榀钢屋架达到可在跨内靠柱吊装的环境,实施常规吊装施工,减小吊装的难度及吊装费用,简化了钢屋架的吊装工艺,创造了土建室内施工环境提高了施工效率和质量,确保了本工程合同工期,经济效益显著。
4、逆作法的工艺可达到缩短工期、降低成本、确保吊装安全、克服天气影响。
附图说明
图1是发明建筑物结构示意图;
图2是本发明三层楼板的密肋梁用模板结构示意图。
具体实施方式
本发明的钢筋混凝土建筑物逆作法施工工艺,包括如下步骤:
1、按照设计及规范要求,进行基础、地基、独立柱基施工;
2、按照设计及规范要求,建造钢屋架的左、右支撑砼柱和中间支撑砼柱,左、右支撑砼柱和中间支撑砼柱的高度达到设计标高;
3、将左支撑砼柱和中间支撑砼柱之间的区域,以及右支撑砼柱和中间支撑砼柱之间的区域,作为吊装钢屋架的吊装通道,将每榀钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上,连接、固定;
4、按照上述方法,将全部的钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上,连接、固定后,作为钢筋混凝土建筑物的屋顶;
5、在上述屋顶内,按照设计及规范要求,建造室内砼框架结构,如一层楼板结构、二层楼板结构和/或三层楼板结构。
每榀钢屋架分为左、右两块,左、右两块钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上后,焊接成一个整体。
吊装钢屋架可以采用常用的履带式吊装车,如150t、300t的履带式吊车。具体吊装时可用多台履带式吊车同时施工,以满足工期要求。
如图1中,1-右支撑砼柱,2-左支撑砼柱,3-中间支撑砼柱,4-钢屋架,5-一层楼板,6-二层楼板,7-三层楼板;
本发明所示的是微电子工业厂房,是钢筋混凝土建筑物,按照设计及规范要求,进行基础、地基、独立柱基施工;按照要求建造好支撑砼柱1,左支撑砼柱2和中间支撑砼柱3,右支撑砼柱1、左支撑砼柱2和中间支撑砼柱3构成钢屋架4的支撑,钢屋架4从左支撑砼柱2和中间支撑砼柱3之间的区域,以及右支撑砼柱1和中间支撑砼柱3之间的区域吊装到位,经连接、固定后,作为本钢筋混凝土建筑物的屋顶。在钢屋架4内,按照设计要求,建造一层楼板5、二层楼板6和三层楼板7,或其他楼层的楼板或其他建筑附属物,图中以三层楼房为例进行说明,不应视为对本发明的限制。
制作时,将每榀钢屋架4分为左、右两块,左、右两块钢屋架4分别吊装到左支撑砼柱2、右支撑砼柱1和中间支撑砼柱3上后,焊接成一个整体。使吊装方便,能够用普通的履带式吊装车、在左支撑砼柱2和中间支撑砼柱3之间的区域,以及右支撑砼柱1和中间支撑砼柱3之间的区域吊装到位。
在钢屋架4内,建造一层楼板5、二层楼板6和三层楼板7,或其他楼层的楼板或其他建筑附属物,能够满足洁净室区域的断水环境施工,可以避免雨天对施工期的影响,缩短工期。
三层楼板7上的区域为洁净室厂房,洁净室的洁净度为10万级,即每立方米空气中含1μm粒子数不超过3×106;洁净方式为垂直层流,洁净室的楼板设计为多孔密肋梁、板结构,洁净室内保持一定的正压力,通过顶棚风机向下送风,空气通过多孔楼板流动,将灰尘吸走,以达到需要的洁净度。三层楼板7为多孔密肋梁、板结构,建造多孔密肋梁。
如图2中,10-模板本体,11-下模板,12-上模板,13-连接台,14-地板孔;
本发明的密肋梁用模板,包括模板本体10,模板本体10由下模板11和上模板12组成,下模板11和上模板12的连接部位对应设置有连接台13,经连接台13将下模板11和上模板12扣合连接,下模板11和上模板12的连接部位的外型自然过渡,满足设计及规范要求。连接台13除了图示的结构以外,可以采用凸块与凹槽配合的形式,或相互扣合的其他结构形式。
图示的模板本体10呈方形结构,下模板11和上模板12也呈方形结构,具有脱模需要的脱模斜度。模板本体10也可以是需要的圆台形状,或其他的形状。
在需要在楼板上设置多个通风孔时,就相应在上模板12上设置一个或一个以上的多个地板孔14,在浇注时地板孔14的位置就形成楼板上的通风孔。
Claims (3)
1、钢筋混凝土建筑物逆作法施工工艺,其特征在于包括如下步骤:
一、按照设计及规范要求,进行基础、地基、独立柱基施工;
二、按照设计及规范要求,建造钢屋架的左、右支撑砼柱和中间支撑砼柱,左、右支撑砼柱和中间支撑砼柱的高度达到设计标高;
三、将左支撑砼柱和中间支撑砼柱之间的区域,以及右支撑砼柱和中间支撑砼柱之间的区域,作为吊装钢屋架的吊装通道,将每榀钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上,连接、固定;
四、按照上述方法,将全部的钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上,连接、固定后,作为钢筋混凝土建筑物的屋顶;
五、在上述屋顶内,按照设计及规范要求,建造室内砼框架结构,如一层楼板结构、二层楼板结构和/或三层楼板结构。
2、根据权利要求1所述的钢筋混凝土建筑物逆作法施工工艺,其特征在于:每榀钢屋架分为左、右两块,左、右两块钢屋架吊装到左、右支撑砼柱和中间支撑砼柱上后,焊接成一个整体。
3、一种实现权利要求1所述的钢筋混凝土建筑物逆作法施工工艺的模板,其特征在于:模板本体(10)由下模板(11)和上模板(12)组成,下模板(11)和上模板(12)的连接部位对应设置有连接台(13),经连接台(13)将下模板(11)和上模板(12)扣合连接,在上模板(12)上设置一个或一个以上的地板孔(14)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100700412A CN101324088B (zh) | 2008-07-25 | 2008-07-25 | 钢筋混凝土建筑物逆作法施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100700412A CN101324088B (zh) | 2008-07-25 | 2008-07-25 | 钢筋混凝土建筑物逆作法施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101324088A true CN101324088A (zh) | 2008-12-17 |
CN101324088B CN101324088B (zh) | 2010-10-20 |
Family
ID=40187778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100700412A Expired - Fee Related CN101324088B (zh) | 2008-07-25 | 2008-07-25 | 钢筋混凝土建筑物逆作法施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101324088B (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101845882A (zh) * | 2010-05-15 | 2010-09-29 | 陈永生 | 高层楼房托吊浇灌水泥模架和建材吊运与吊箱的组合装置 |
CN104179253A (zh) * | 2014-08-21 | 2014-12-03 | 上海建工五建集团有限公司 | 先上后下的售楼处结构施工方法 |
CN104878838A (zh) * | 2015-03-24 | 2015-09-02 | 刘贻鹏 | 一种支承换升托钢筋砼楼房建造方法 |
CN108979205A (zh) * | 2018-08-21 | 2018-12-11 | 上海斐晟企业管理有限公司 | 超高层住宅结构错层流水施工方法 |
CN109036613A (zh) * | 2018-07-11 | 2018-12-18 | 中国核电工程有限公司 | 一种砼内衬钢覆面水箱及其施工方法 |
CN110409624A (zh) * | 2019-08-02 | 2019-11-05 | 山东金城建设有限公司 | 一种大型设备安装与主体结构逆作计算与施工方法 |
CN110700417A (zh) * | 2019-10-20 | 2020-01-17 | 中建四局第六建筑工程有限公司 | 一种水平预制楼板反向吊装的施工方法 |
CN110847648A (zh) * | 2019-11-29 | 2020-02-28 | 上海市机械施工集团有限公司 | 一种多层厂房施工方法 |
CN111663779A (zh) * | 2020-06-29 | 2020-09-15 | 中国二十冶集团有限公司 | 冶金工业厂房闭口施工方法 |
CN111749474A (zh) * | 2020-07-02 | 2020-10-09 | 上海建工四建集团有限公司 | 洁净厂房的施工方法 |
CN112431416A (zh) * | 2020-12-22 | 2021-03-02 | 中建一局集团建设发展有限公司 | 一种有效缩短工期的厂房建造方法及采用该法建造的厂房 |
-
2008
- 2008-07-25 CN CN2008100700412A patent/CN101324088B/zh not_active Expired - Fee Related
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101845882A (zh) * | 2010-05-15 | 2010-09-29 | 陈永生 | 高层楼房托吊浇灌水泥模架和建材吊运与吊箱的组合装置 |
CN101845882B (zh) * | 2010-05-15 | 2013-06-12 | 陈永生 | 高层楼房托吊浇灌水泥模架和建材吊运与吊箱的组合装置 |
CN104179253A (zh) * | 2014-08-21 | 2014-12-03 | 上海建工五建集团有限公司 | 先上后下的售楼处结构施工方法 |
CN104878838A (zh) * | 2015-03-24 | 2015-09-02 | 刘贻鹏 | 一种支承换升托钢筋砼楼房建造方法 |
CN104878838B (zh) * | 2015-03-24 | 2017-12-15 | 刘贻鹏 | 一种支承换升托钢筋砼楼房建造方法 |
CN109036613A (zh) * | 2018-07-11 | 2018-12-18 | 中国核电工程有限公司 | 一种砼内衬钢覆面水箱及其施工方法 |
CN108979205A (zh) * | 2018-08-21 | 2018-12-11 | 上海斐晟企业管理有限公司 | 超高层住宅结构错层流水施工方法 |
CN110409624A (zh) * | 2019-08-02 | 2019-11-05 | 山东金城建设有限公司 | 一种大型设备安装与主体结构逆作计算与施工方法 |
CN110700417A (zh) * | 2019-10-20 | 2020-01-17 | 中建四局第六建筑工程有限公司 | 一种水平预制楼板反向吊装的施工方法 |
CN110847648A (zh) * | 2019-11-29 | 2020-02-28 | 上海市机械施工集团有限公司 | 一种多层厂房施工方法 |
CN111663779A (zh) * | 2020-06-29 | 2020-09-15 | 中国二十冶集团有限公司 | 冶金工业厂房闭口施工方法 |
CN111749474A (zh) * | 2020-07-02 | 2020-10-09 | 上海建工四建集团有限公司 | 洁净厂房的施工方法 |
CN111749474B (zh) * | 2020-07-02 | 2021-10-08 | 上海建工四建集团有限公司 | 洁净厂房的施工方法 |
CN112431416A (zh) * | 2020-12-22 | 2021-03-02 | 中建一局集团建设发展有限公司 | 一种有效缩短工期的厂房建造方法及采用该法建造的厂房 |
Also Published As
Publication number | Publication date |
---|---|
CN101324088B (zh) | 2010-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101324088B (zh) | 钢筋混凝土建筑物逆作法施工工艺 | |
CN202346540U (zh) | 一种采用组合式井架组装的电梯井道壁 | |
CN101886468B (zh) | 高位连体结构悬挂式模板支撑施工方法 | |
CN104499413B (zh) | 模块化钢模‐混凝土组合拱桥及其悬索吊挂施工方法 | |
CN103628680A (zh) | 大面积钢结构吊挂层施工方法 | |
CN104195946B (zh) | 多层桥面公轨两用悬索桥的分期实施方法 | |
CN114770706B (zh) | 一种轻型t梁预制装备及预制安装施工方法 | |
CN114232805A (zh) | 一种超高度大跨度钢混凝土梁吊挂结构的施工方法 | |
CN102767282B (zh) | 一种超大异型转换层悬挑梁可装配式高支模施工方法 | |
CN105804232A (zh) | 一种空间模块建筑 | |
CN216042835U (zh) | 一种具有轻质墙板的挑高框架结构的加层装置 | |
CN101298796A (zh) | 自承式预加工构件、自承式预加工混凝土结构及其施工方法 | |
CN102409848A (zh) | 一种轻质密肋楼板和轻质密肋楼盖的施工成型方法 | |
CN108004932A (zh) | 利用梁下运梁方式施工钢混组合梁的方法 | |
CN109267439B (zh) | 一种高效、稳定型三层高架桥及其施工工艺 | |
CN210737607U (zh) | 一种用于逆作法梁板施工的悬挂支撑体系 | |
CN208430715U (zh) | 一种插孔焊接预制装配式钢架混凝土楼梯 | |
CN102619335A (zh) | 大高度小型现浇混凝土梁板的施工方法 | |
CN215212427U (zh) | 一种可调式建筑用钢结构卸料平台 | |
CN111608270B (zh) | 一种预制通长柱混凝土装配式框架结构及其施工方法 | |
CN111172856B (zh) | 中承式纵向分块预制箱梁 | |
CN211143319U (zh) | 一种用于多层钢结构建筑物的由梁柱骨架组成的建筑结构 | |
CN102296734A (zh) | 一种组合网架 | |
CN202131699U (zh) | 一种组合网架 | |
CN220166688U (zh) | 一种楼承板桥面板悬臂吊模支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101020 Termination date: 20140725 |
|
EXPY | Termination of patent right or utility model |