CN101324070A - 地下连续墙成形槽方锤施工工艺及设备 - Google Patents

地下连续墙成形槽方锤施工工艺及设备 Download PDF

Info

Publication number
CN101324070A
CN101324070A CNA2008100486508A CN200810048650A CN101324070A CN 101324070 A CN101324070 A CN 101324070A CN A2008100486508 A CNA2008100486508 A CN A2008100486508A CN 200810048650 A CN200810048650 A CN 200810048650A CN 101324070 A CN101324070 A CN 101324070A
Authority
CN
China
Prior art keywords
wall
construction
hammer
shape
continuous wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100486508A
Other languages
English (en)
Inventor
曹得占
黄涛
刘兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING Co
Original Assignee
CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING Co filed Critical CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING Co
Priority to CNA2008100486508A priority Critical patent/CN101324070A/zh
Publication of CN101324070A publication Critical patent/CN101324070A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

一种地下连续墙成形槽方锤施工工艺及设备,利用方形锤反复冲击槽壁的上的“死角区”,使连续墙上部成槽形状和抓斗相同。其优点是:由于方形锤的形状与连续墙上部抓斗成槽形状相同,因此在圆锥形钻头冲击施工后剩余岩墙过程中不易产生滑移,保证了槽壁垂直度,使得浇灌砼时浪费现象得到有效控制;由于方形锤的形状与连续墙上部抓斗成槽形状相同、锤体重量较大及方形锤长度优势,使得圆锥形钻头冲击施工后剩余岩墙能够清除干净,从而保证了钢筋笼的顺利安装;由于方形锤在施工过程中不易产生滑移,减少了重复施工现象的出现,有效的保证了工期。

Description

地下连续墙成形槽方锤施工工艺及设备
技术领域
本发明涉及建筑地下基础施工技术领域,具体的说是一种地下连续墙成形槽方锤施工工艺及设备。
背景技术
地下连续墙施工过程中,当墙体进入基岩后,尤其是进入硬质岩的中风化以后,常用的施工方法采用冲击钻进行冲击成槽。施工过程为每幅槽段在冲击钻施工之前由测量工程师按照槽段长度进行主、副孔分区,并在导墙上用红油漆作好标记,之后按照标记利用冲击钻进行成槽。在施工过程有两处无法有效解决:(1)冲击钻常规钻头为圆锥形,在冲击基岩过程中由于受力不均容易造成斜孔现象;(2)圆锥形钻头在冲击成槽过程中,因为钻头本身形状的限制,在两个孔之间有死角区。
由于以上两个问题未解决,给连续墙施工带来的直接影响如下:
一、由于斜孔现象使成槽时间长,从而影响整个工程进展;
二、因为孔壁倾斜易使连续墙在基岩段体积扩大,在浇筑过程中从而造成砼的浪费;
三、圆锥形钻头在成槽过程中有死角区,无法保证基岩段连续墙形状,可能导致钢筋笼无法安装到位,从而影响连续墙墙体质量。
发明内容
本发明的目的是研制一种利用冲击钻在基岩中成槽,既保证槽壁不发生倾斜,同时又能消除因为圆锥形钻头在成槽过程中的死角区,使连续墙的墙体质量得到保证的地下连续墙成形槽方锤施工工艺及设备。
本发明地下连续墙成形槽方锤施工工艺,其过程如下:
1、每幅槽段在冲击钻施工之前由测量工程师按照槽段长度进行主、副孔分区,并在导墙上用红油漆作好标记;
2、按照标记用锥形钻头进行钻孔成槽;
3、利用方形锤反复冲击槽壁的上的“死角区”,使连续墙上部成槽形状和抓斗相同;
4、抓斗清除成形槽内的多余石渣;
5、连续墙的成形槽完成。
本发明地下连续墙成形槽方锤施工设备,包括:采用耐磨、耐高温的钢材焊接成一个内部是方孔的长方箱体1,箱体1各面都开有排浆口2,箱体1下部为敞口,上顶部的板上装有吊环3。
地下连续墙成形槽方锤施工设备,重量与圆锥形钻头相当,重量约为4吨,尺寸为长1.20m、宽1.20m、厚0.60m。
本发明地下连续墙成形槽方锤施工工艺及设备的优点在于:由于方形锤的形状与连续墙上部抓斗成槽形状相同,因此在圆锥形钻头冲击施工后剩余岩墙过程中不易产生滑移,保证了槽壁垂直度,使得浇灌砼时浪费现象得到有效控制;由于方形锤的形状与连续墙上部抓斗成槽形状相同、锤体重量较大及方形锤长度优势,使得圆锥形钻头冲击施工后剩余岩墙能够清除干净,从而保证了钢筋笼的顺利安装;由于方形锤在施工过程中不易产生滑移,减少了重复施工现象的出现,有效的保证了工期及成槽质量。
附图说明
图1为圆锥形钻头分段成孔示意图。
图2为地下连续墙成形槽方锤施工设备的结构示意图。
具体实施方式:
根据图1所示,一种地下连续墙成形槽方锤施工工艺,其过程如下:
1、每幅槽段在冲击钻施工之前由测量工程师按照槽段长度进行主、副孔分区,并在导墙上用红油漆作好标记;
2、按照标记用锥形钻头进行钻孔成槽;
3、利用方形锤反复冲击槽壁的上的“死角区”,使连续墙上部成槽形状和抓斗相同;
4、抓斗清除成形槽内的多余石渣;
5、连续墙的成形槽完成。
根据图2所示,一种地下连续墙成形槽方锤施工设备,包括:采用耐磨、耐高温的钢材焊接成一个内部是方孔的长方箱体1,箱体1各面都开有排浆口2,箱体1下部为敞口,上顶部的板上装有吊环3。

Claims (2)

1、一种地下连续墙成形槽方锤施工工艺,其特征在于:其过程如下:
(1)每幅槽段在冲击钻施工之前由测量工程师按照槽段长度进行主、副孔分区,并在导墙上用红油漆作好标记;
(2)按照标记用锥形钻头进行钻孔成槽;
(3)利用方形锤反复冲击槽壁的上的“死角区”,使连续墙上部成槽形状和抓斗相同;
(4)抓斗清除成形槽内的多余石渣;
(5)连续墙的成形槽完成。
2、一种地下连续墙成形槽方锤施工设备,其特征在于:包括:采用耐磨、耐高温的钢材焊接成一个内部是方孔的长方箱体(1),箱体(1)各面都开有排浆口(2),箱体(1)下部为敞口,上顶部的板上装有吊环(3)。
CNA2008100486508A 2008-07-31 2008-07-31 地下连续墙成形槽方锤施工工艺及设备 Pending CN101324070A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100486508A CN101324070A (zh) 2008-07-31 2008-07-31 地下连续墙成形槽方锤施工工艺及设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100486508A CN101324070A (zh) 2008-07-31 2008-07-31 地下连续墙成形槽方锤施工工艺及设备

Publications (1)

Publication Number Publication Date
CN101324070A true CN101324070A (zh) 2008-12-17

Family

ID=40187760

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100486508A Pending CN101324070A (zh) 2008-07-31 2008-07-31 地下连续墙成形槽方锤施工工艺及设备

Country Status (1)

Country Link
CN (1) CN101324070A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437341A (zh) * 2013-07-29 2013-12-11 中铁十六局集团北京轨道交通工程建设有限公司 上覆砂土微风化石灰岩中地下连续墙的有效成槽施工方法
CN103628500A (zh) * 2013-11-14 2014-03-12 广东华隧建设股份有限公司 富水圆砾地层中地下连续墙成槽施工方法
CN103967024A (zh) * 2013-01-25 2014-08-06 深圳市勘察测绘院有限公司 一种在深厚砂卵石地层中成孔成槽的联合施工方法
CN109537669A (zh) * 2018-12-06 2019-03-29 陶德明 连续墙组合矩形锤
CN113202158A (zh) * 2021-05-31 2021-08-03 中国水利水电第十一工程局有限公司 一种复杂地层地下连续墙快速施工方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967024A (zh) * 2013-01-25 2014-08-06 深圳市勘察测绘院有限公司 一种在深厚砂卵石地层中成孔成槽的联合施工方法
CN103437341A (zh) * 2013-07-29 2013-12-11 中铁十六局集团北京轨道交通工程建设有限公司 上覆砂土微风化石灰岩中地下连续墙的有效成槽施工方法
CN103437341B (zh) * 2013-07-29 2015-08-26 中铁十六局集团北京轨道交通工程建设有限公司 上覆砂土微风化石灰岩中地下连续墙的有效成槽施工方法
CN103628500A (zh) * 2013-11-14 2014-03-12 广东华隧建设股份有限公司 富水圆砾地层中地下连续墙成槽施工方法
CN109537669A (zh) * 2018-12-06 2019-03-29 陶德明 连续墙组合矩形锤
CN109537669B (zh) * 2018-12-06 2023-08-11 陶德明 连续墙组合矩形锤
CN113202158A (zh) * 2021-05-31 2021-08-03 中国水利水电第十一工程局有限公司 一种复杂地层地下连续墙快速施工方法

Similar Documents

Publication Publication Date Title
CN104929123B (zh) 一种沉桩扩孔机
CN104120716A (zh) 一种泥浆护壁钻孔灌注桩施工方法
CN110043190B (zh) 一种垂直井大直径腔室的建造方法
CN108222843B (zh) 一种防止钻孔灌注桩卡钻的施工方法
CN101324070A (zh) 地下连续墙成形槽方锤施工工艺及设备
CN101270577A (zh) 大直径超深入岩钻孔扩底灌注桩施工方法
CN106948354A (zh) 一种水电站防渗墙施工方法
CN110318393A (zh) 一种复合桩的施工方法
CN104947690A (zh) 地下连续墙入岩成槽施工方法
WO2022227725A1 (zh) 成槽施工方法
WO2023207250A1 (zh) 一种斜基面裸岩上栈桥钢管桩快速植桩工法
CN101503878B (zh) 用薄壁筒桩作围护桩的建筑物基坑围护结构的施工方法
CN102383731A (zh) 高压水射流成孔工具、装置以及灌注桩施工方法
CN114045854A (zh) 一种复杂地质条件下桥梁桩基复合施工方法
CN105804060A (zh) 一种人工挖桩基孔施工方法
CN110258558B (zh) 一种钻机上设置的防翻机构
CN106013096A (zh) 一种建筑基础施工方法
CN203247580U (zh) 深厚软土地基桥梁混凝土灌注桩施工结构
CN215443942U (zh) 一种深厚流沙层切削辅助装置
CN100453744C (zh) 水下密实混凝土的施工方法
CN108035357A (zh) 灌注桩施工方案及其漏斗
CN110331736B (zh) 一种用于水中桩基施工的泥浆循环装置及相应施工工法
CN110273417B (zh) 一种建筑工程灌注桩施工方法
CN110005377B (zh) 一种垂直井井底腔室的建造方法
CN111705790A (zh) 一种坚固岩体机械大直径扩底施工工法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081217