CN101323971A - A kind of method that utilizes buffer layer to prepare high-quality ZnO film - Google Patents

A kind of method that utilizes buffer layer to prepare high-quality ZnO film Download PDF

Info

Publication number
CN101323971A
CN101323971A CNA2008100406397A CN200810040639A CN101323971A CN 101323971 A CN101323971 A CN 101323971A CN A2008100406397 A CNA2008100406397 A CN A2008100406397A CN 200810040639 A CN200810040639 A CN 200810040639A CN 101323971 A CN101323971 A CN 101323971A
Authority
CN
China
Prior art keywords
film
zno
substrate
minutes
adjust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100406397A
Other languages
Chinese (zh)
Inventor
王林军
唐可
黄健
赖建明
管玉兰
夏义本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CNA2008100406397A priority Critical patent/CN101323971A/en
Publication of CN101323971A publication Critical patent/CN101323971A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Crystals, And After-Treatments Of Crystals (AREA)
  • Surface Acoustic Wave Elements And Circuit Networks Thereof (AREA)

Abstract

本发明涉及一种利用缓冲层制备高质量ZnO薄膜的方法,该方法主要步骤:硅衬底预处理后放入热丝化学气相沉积装置的反应室内作为沉积衬底;在氢气和丙酮的混合反应气体中进行金刚石薄膜成核、生长,然后用HNO3与HF的混合溶液浸泡腐蚀掉硅衬底形成自支撑金刚石薄膜;再在自支撑金刚石膜上用直流磁控溅射法制备ZnO薄膜,先在Ar、O2气氛中溅射沉积ZnO缓冲层,然后进行ZnO主层的沉积。本发明制作工艺简化,成本低,有利于促进高质量ZnO薄膜器件的大规模应用。ZnO薄膜晶粒尺寸小,薄膜的晶体质量高,表面粗糙度低。

Figure 200810040639

The invention relates to a method for preparing a high-quality ZnO thin film by using a buffer layer. The main steps of the method are: putting the silicon substrate into the reaction chamber of a hot wire chemical vapor deposition device as a deposition substrate after pretreatment; mixing reaction of hydrogen and acetone The diamond film was nucleated and grown in gas, and then the silicon substrate was soaked and etched with a mixed solution of HNO 3 and HF to form a self-supporting diamond film; then a ZnO film was prepared on the self-supporting diamond film by DC magnetron sputtering. The ZnO buffer layer was sputter-deposited in an Ar, O2 atmosphere, followed by the deposition of the ZnO main layer. The invention has simplified manufacturing process and low cost, and is conducive to promoting large-scale application of high-quality ZnO thin film devices. The grain size of the ZnO film is small, the crystal quality of the film is high, and the surface roughness is low.

Figure 200810040639

Description

一种利用缓冲层制备高质量ZnO薄膜的方法 A kind of method that utilizes buffer layer to prepare high-quality ZnO film

技术领域 technical field

本发明涉及一种利用缓冲层制备高质量ZnO薄膜的方法,属于无机非金属材料制造工艺领域。The invention relates to a method for preparing a high-quality ZnO thin film by using a buffer layer, and belongs to the field of inorganic non-metallic material manufacturing technology.

背景技术 Background technique

随着第三代通讯技术的发展,声表面波(SAW)器件的使用频率不断提高,从最初的几MHz发展到现在的几GHz,如应用于1.9GHz的个人通讯服务系统,2.4GHz的无线局域网络系统及高于5GHz无线多端发送系统。这些高频应用系统的不断发展显著增大了高频声表面波器件的市场需求。而传统的SAW材料声速低,通常低于4000m/s,仅能制备频率相对低的器件。With the development of the third-generation communication technology, the frequency of use of surface acoustic wave (SAW) devices has been increasing, from the initial few MHz to the current few GHz, such as the personal communication service system applied to 1.9GHz, the wireless of 2.4GHz Local area network system and wireless multi-terminal transmission system higher than 5GHz. The continuous development of these high-frequency application systems has significantly increased the market demand for high-frequency surface acoustic wave devices. However, traditional SAW materials have a low sound velocity, usually lower than 4000m/s, and only devices with relatively low frequencies can be prepared.

金刚石具声波传播速度在所有材料中是最快的,因此,在工艺水平相同的条件下,金刚石材料可以制备出较高频率的器件。与此同时金刚石具有许多优异的电、光、热和机械性能及高的抗辐照强度和物理化学稳定性等。如低介电常数(5.7),高击穿电压(107V/cm),高电子、空穴迁移率(分别为1800cm2/V·S和1200cm2/V·S),高热导率(20W/cm·K)。这些独一无二的性能使器件即使身处高温、强辐射等恶劣的环境,在无任何保护的情况下也能安全稳定的工作。因此以金刚石为基底的声表面波器件受到了越来越多的关注。但是,由于金刚石本身并不是压电材料,无法激发和接收表面波,因此需要在其上面沉积一层压电薄膜制成多层的薄膜SAW器件。Diamond has the fastest sound wave propagation speed among all materials. Therefore, under the same technological level, diamond materials can produce devices with higher frequencies. At the same time, diamond has many excellent electrical, optical, thermal and mechanical properties, as well as high radiation resistance and physical and chemical stability. Such as low dielectric constant (5.7), high breakdown voltage (10 7 V/cm), high electron and hole mobility (1800cm 2 /V·S and 1200cm 2 /V·S respectively), high thermal conductivity ( 20W/cm·K). These unique properties enable the device to work safely and stably without any protection even in harsh environments such as high temperature and strong radiation. Therefore, surface acoustic wave devices based on diamond have received more and more attention. However, since diamond itself is not a piezoelectric material, it cannot excite and receive surface waves, so it is necessary to deposit a piezoelectric film on it to form a multilayer thin film SAW device.

ZnO作为一种压电材料,它具有较强的机电耦合系数,使其在超声换能器、Bragg偏转器、频谱分析器、高频滤波器、高速光开关及微机械上有相当广泛的应用。这些器件在大容量、高速率光纤通信的波分复用、光纤相位调制、反雷达动态测频、电子侦听、卫星移动通信、并行光信息处理等民用及军事领域的应用也非常广泛。随着通信技术的发展及通信流量的增加,在较低频率通信量已趋饱和,使得通信频率向高频发展,同时移动通信也要求具有更高的频率。在高于1.5GHz的频率范围内,具有低损耗的高频滤波器成为移动通信系统的最关键部件之一。而ZnO是制作这种高频表面声波器件的首选材料。As a piezoelectric material, ZnO has a strong electromechanical coupling coefficient, making it widely used in ultrasonic transducers, Bragg deflectors, spectrum analyzers, high-frequency filters, high-speed optical switches and micromachines. . These devices are also widely used in civil and military fields such as wavelength division multiplexing of high-capacity and high-speed optical fiber communication, optical fiber phase modulation, anti-radar dynamic frequency measurement, electronic interception, satellite mobile communication, and parallel optical information processing. With the development of communication technology and the increase of communication traffic, the traffic at lower frequencies has become saturated, which makes the communication frequency develop to high frequency. At the same time, mobile communication also requires a higher frequency. In the frequency range above 1.5GHz, high-frequency filters with low loss become one of the most critical components of mobile communication systems. ZnO is the material of choice for making such high-frequency surface acoustic wave devices.

目前,ZnO/diamond结构的声表面波器件的制备仍处于研发阶段。SAW器件所用的金刚石薄膜必须具有高成核密度、低表面粗糙度和高重复性,特别是对高频SAW器件,要求非常平整的金刚石表面来刻蚀亚微米的IDT电极图形,这样才能最大限度得提高器件得频率和减小插入损耗。At present, the preparation of SAW devices with ZnO/diamond structure is still in the research and development stage. The diamond film used in SAW devices must have high nucleation density, low surface roughness and high repeatability. Especially for high-frequency SAW devices, a very flat diamond surface is required to etch submicron IDT electrode patterns, so as to maximize It is necessary to increase the frequency of the device and reduce the insertion loss.

目前解决金刚石薄膜平整性问题主要有如下方法:1.机械抛光金刚石表面。这种方法目前正被使用,但抛光难度大且费时;2.生长纳米多晶金刚石(NCD)。这种方法具有一定的可行性,但是表面阻抗不适合在金刚石表面直接制作IDT。At present, there are mainly the following methods to solve the flatness problem of diamond film: 1. Mechanical polishing of the diamond surface. This method is currently being used, but polishing is difficult and time-consuming; 2. Growth of nano-polycrystalline diamond (NCD). This method has certain feasibility, but the surface impedance is not suitable for directly fabricating IDT on the diamond surface.

由此可以看到,传统方法都是以采用金刚石薄膜的生长面为前提的。但是测试发现金刚石薄膜的成核面即金刚石与Si衬底的结触面,很好的映射了Si衬底的表面形态。采用镜面Si衬底生长的自支撑金刚石薄膜成核面的金刚石晶粒尺寸还处在成核阶段的纳米级,因此表面粗糙度相当低。因此采用自支撑金刚石膜成核面作为生长ZnO薄膜的平台,能在表面粗糙度和薄膜质量方面都达到一个较高的标准,并保证薄膜厚度,满足SAW器件对金刚石薄膜衬底的要求。It can be seen from this that the traditional method is based on the premise of using the growth surface of the diamond film. However, the test found that the nucleation surface of the diamond film, that is, the contact surface between the diamond and the Si substrate, well maps the surface morphology of the Si substrate. The diamond grain size of the nucleation surface of the self-supporting diamond film grown on a mirror Si substrate is still at the nanometer level of the nucleation stage, so the surface roughness is quite low. Therefore, using the self-supporting diamond film nucleation surface as a platform for growing ZnO thin films can reach a high standard in terms of surface roughness and film quality, and ensure the film thickness to meet the requirements of SAW devices for diamond film substrates.

同时SAW器件所用的压电薄膜要求有高度的c轴取向,高度的表面平整性,还要有较高的电阻率和压电性,这样才能最大限度的提高器件的频率和减小插入损耗。薄膜中存在无取向的晶粒和其他缺陷均将降低器件的性能,增大插入损耗。如表面的缺陷散射会散射声波,产生能量损耗;除了表面的影响,晶界和空位也会产生类似的散射和能量损失,当晶粒的大小与声波波长在同一数量级时散射尤为严重。因此,控制压电薄膜ZnO表面及内部的微结构特性对制作高频低损的器件及优化器件性能也是十分关键的。为提高ZnO薄膜性能,本发明将同质缓冲层引入ZnO薄膜的生长过程,这一性能特别优良的薄层对薄膜生长提供缓和内应力和模板作用,使得高性能的ZnO薄膜被制备出来。At the same time, the piezoelectric film used in SAW devices requires high c-axis orientation, high surface flatness, high resistivity and piezoelectricity, so as to maximize the frequency of the device and reduce the insertion loss. Non-oriented crystal grains and other defects in the film will reduce the performance of the device and increase the insertion loss. For example, the scattering of surface defects will scatter sound waves and cause energy loss; in addition to the influence of the surface, grain boundaries and vacancies will also cause similar scattering and energy loss, and the scattering is particularly serious when the size of the grains is on the same order of magnitude as the wavelength of the sound wave. Therefore, controlling the microstructural properties of the surface and interior of the piezoelectric thin film ZnO is also critical to fabricating high-frequency and low-loss devices and optimizing device performance. In order to improve the performance of the ZnO thin film, the invention introduces a homogeneous buffer layer into the growth process of the ZnO thin film. This thin layer with particularly excellent performance provides relaxation of internal stress and template effect for the growth of the thin film, so that a high-performance ZnO thin film can be prepared.

发明内容 Contents of the invention

本发明的目的是提供一种利用缓冲层制备高质量ZnO薄膜的方法。The purpose of the present invention is to provide a method for preparing high-quality ZnO thin film by utilizing buffer layer.

本发明的目的是通过下述技术方案实现的。The purpose of the present invention is achieved through the following technical solutions.

一种利用缓冲层制备高质量ZnO薄膜的方法,其特征在于该工艺具有以下的过程和步骤:A kind of method that utilizes buffer layer to prepare high-quality ZnO film is characterized in that this technology has following process and step:

(一)自支撑金刚石薄膜的制备:(1) Preparation of self-supporting diamond film:

以Si片为衬底,采用热丝CVD法制备金刚石薄膜。然后采用化学剥蚀的方法去除Si衬底,获得自支撑金刚石薄膜。Using Si wafer as substrate, diamond film was prepared by hot filament CVD method. Then the Si substrate is removed by chemical ablation to obtain a self-supporting diamond film.

(1)钽丝预处理:(1) Tantalum wire pretreatment:

热丝化学气相沉积(HFCVD)方法中采用钽丝作为加热源,但钽丝的表面往往有氧化层及其它杂质,而且钽受热后也容易挥发,如直接使用会造成对衬底的污染,所以对钽丝的预处理是十分必要的。先用砂皮将钽丝表面打磨干净,抽真空完毕后,然后通入氢气和丙酮至4~6KPa,其中氢气与丙酮的比例为1∶1~5∶1,加热至420~450℃左右预处理20~30分钟。这样不仅去除了钽丝表面的氧化层杂质,还在钽丝表面形成了一层碳化物覆盖层,以抑制后续过程中钽的挥发,减少杂质的引入。Hot wire chemical vapor deposition (HFCVD) uses tantalum wire as a heating source, but the surface of tantalum wire often has oxide layers and other impurities, and tantalum is also easy to volatilize after being heated. If it is used directly, it will cause pollution to the substrate, so Pretreatment of tantalum wire is very necessary. First polish the surface of the tantalum wire with sand, after vacuuming, then pass in hydrogen and acetone to 4-6KPa, where the ratio of hydrogen to acetone is 1:1-5:1, heat to about 420-450°C Treat for 20-30 minutes. This not only removes the oxide layer impurities on the surface of the tantalum wire, but also forms a layer of carbide covering layer on the surface of the tantalum wire to inhibit the volatilization of tantalum in the subsequent process and reduce the introduction of impurities.

(2)衬底及其预处理(2) Substrate and its pretreatment

本发明中,金刚石膜的生长以p型1cm×1cm硅片为衬底,并用其镜面作为金刚石生长面,目的是为了降低金刚石表面粗糙度。生长前,硅衬底必须经过一定步骤的预处理,其目的是去除硅表面氧化层,清洗表面,并适当增加衬底表面的金刚石成核中心。In the present invention, the p-type 1cm×1cm silicon wafer is used as the substrate for the growth of the diamond film, and its mirror surface is used as the diamond growth surface, in order to reduce the roughness of the diamond surface. Before growth, the silicon substrate must undergo certain steps of pretreatment, the purpose of which is to remove the silicon surface oxide layer, clean the surface, and appropriately increase the diamond nucleation centers on the substrate surface.

采用超细金刚石粉手工研磨的新方法:即先置于HF溶液5~10分钟以去除Si表面氧化层,然后用颗粒度为100nm的超细金刚石粉与甘油混合液手工研磨10~15分钟,研磨时必须注意力度和均匀性,避免形成太深的划痕。研磨完毕后将衬底置于丙酮溶液中超声浴清洗10~15分钟,以除去衬底表面油污,然后置于去离子水中超声浴清洗10~15分钟,重复上述清洗步骤3~5次,直至表面非常洁净,最后取出衬底烘干。A new method of manual grinding with ultra-fine diamond powder: first place in HF solution for 5-10 minutes to remove the oxide layer on the Si surface, and then manually grind with a mixture of ultra-fine diamond powder and glycerin with a particle size of 100nm for 10-15 minutes. Attention must be paid to precision and uniformity when grinding to avoid forming too deep scratches. After grinding, place the substrate in an acetone solution for 10 to 15 minutes in an ultrasonic bath to remove oil stains on the surface of the substrate, then place it in deionized water for 10 to 15 minutes in an ultrasonic bath, and repeat the above cleaning steps 3 to 5 times until The surface is very clean, and finally the substrate is taken out and dried.

(3)金刚石膜的沉积(3) Deposition of diamond film

钽丝预处理及衬底预处理完成后,将硅片置于试样台上,镜面向上,然后进行金刚石膜的沉积,其操作步骤依次如下:After the tantalum wire pretreatment and substrate pretreatment are completed, the silicon wafer is placed on the sample stage with the mirror facing up, and then the diamond film is deposited. The operation steps are as follows:

(a)抽真空:利用真空泵依次对反应室、氢气支路和丙酮支路抽真空,最终使反应室本底真空<5Pa;(a) Vacuuming: use a vacuum pump to evacuate the reaction chamber, the hydrogen branch and the acetone branch in sequence, and finally make the background vacuum of the reaction chamber <5Pa;

(b)气体流量、气压调节:抽真空完毕后,依次打开质量流量计通入氢气和丙酮,氢气与丙酮的比例为1∶1~5∶1,再通过调节减压阀将反应室的气压稳定在设计值0.8~1.5Pa;(b) Adjustment of gas flow rate and air pressure: after vacuuming, turn on the mass flow meter to feed hydrogen and acetone in sequence. Stable at the design value of 0.8 ~ 1.5Pa;

(c)升温:气压稳定后,打开冷却水和加热电压,并以约1/2V/min的速率升高加热电压,最终使反应温度处于580~620℃,加偏流4A,成核30分钟;(c) Heating: After the air pressure is stable, turn on the cooling water and the heating voltage, and increase the heating voltage at a rate of about 1/2V/min, finally keep the reaction temperature at 580-620°C, add a bias current of 4A, and nucleate for 30 minutes;

(d)降温:维持工艺条件80~120小时,停止通入丙酮,并以约1/3V/min的速率降低电压以降低反应温度直至室温,最后关闭氢气和冷却水,取出样品;(d) Cooling: maintain the process conditions for 80-120 hours, stop feeding acetone, and reduce the voltage at a rate of about 1/3V/min to lower the reaction temperature to room temperature, finally turn off the hydrogen and cooling water, and take out the sample;

(4)硅衬底剥离(4) Silicon substrate peeling off

为了得到自支撑金刚石膜,在上述处理结束后,将制备的具有很大厚度的金刚石薄膜置于HF与HNO3摩尔浓度为1∶1的溶液中,在室温下腐蚀10~15小时,待Si衬底溶解后可得到所需的自支撑形金刚石薄膜;In order to obtain a self-supporting diamond film, after the above treatment, the prepared diamond film with a large thickness is placed in a solution with a molar concentration of HF and HNO3 of 1:1, etched at room temperature for 10 to 15 hours, and the Si After the substrate is dissolved, the required self-supporting diamond film can be obtained;

(二)直流磁控溅射法制备ZnO薄膜(2) Preparation of ZnO thin films by DC magnetron sputtering

一般说来,要形成重复性好、缺陷少、压电性能优良的ZnO薄膜并不容易,薄膜中存在的无取向晶粒,表面缺陷,晶界,空位等都会对器件性能产生不良影响。引入ZnO同质缓冲层对缓和薄膜与衬底间的应力,获得结晶性好、性能优良的薄膜起着很大的作用。Generally speaking, it is not easy to form ZnO thin films with good repeatability, few defects, and excellent piezoelectric properties. Non-oriented grains, surface defects, grain boundaries, and vacancies in the thin films will have a negative impact on device performance. The introduction of a ZnO homogeneous buffer layer plays a significant role in alleviating the stress between the film and the substrate and obtaining a film with good crystallinity and excellent performance.

本发明中,采用直流反应磁控溅射法制备ZnO薄膜,并以自支撑金刚石作为衬底,靶材为99.99%金属锌靶。沉积过程中,氢气(Ar)为溅射气体,氧气(O2)为反应气体。In the present invention, the ZnO thin film is prepared by a DC reactive magnetron sputtering method, and self-supporting diamond is used as a substrate, and the target material is a 99.99% metal zinc target. During the deposition process, hydrogen (Ar) is the sputtering gas, and oxygen (O 2 ) is the reaction gas.

(1)自支撑金刚石薄膜表面清洗(1) Surface cleaning of self-supporting diamond film

为消除表面污垢和微粒对薄膜沉积的影响,先把金刚石衬底置于丙酮中超声浴清洗10~15分钟,然后置于去离子水中超声浴清洗10~15分钟,重复上述清洗步骤3~5遍直至表面非常洁净,最后取出衬底烘干。In order to eliminate the influence of surface dirt and particles on film deposition, first place the diamond substrate in acetone for 10-15 minutes in an ultrasonic bath, then place it in deionized water for 10-15 minutes, and repeat the above cleaning steps 3-5 Repeat until the surface is very clean, and finally take out the substrate and dry it.

(2)在自支撑金刚石薄膜上制备ZnO缓冲层(2) Preparation of ZnO buffer layer on self-supporting diamond film

将自支撑金刚石衬底固定在磁控溅射腔体中,镜面向下,然后进行ZnO薄膜的沉积,其操作步骤依次如下:Fix the self-supporting diamond substrate in the magnetron sputtering chamber with the mirror facing down, and then deposit the ZnO thin film. The operation steps are as follows:

(a)抽真空:利用直联泵对反应室、Ar气和O2气管道抽真空,最终使反应室本底真空<5Pa;利用分子泵对反应室抽真空,最终使反应室本底真空<3×10-3Pa(a) Vacuuming: Use a direct-coupled pump to evacuate the reaction chamber, Ar gas and O2 gas pipelines, and finally make the background vacuum of the reaction chamber <5Pa; use a molecular pump to evacuate the reaction chamber, and finally make the background vacuum of the reaction chamber <3×10 -3 Pa

(b)启辉:抽真空完毕后,打开Ar质量流量计通入Ar气,并调节流量>150sccm(standard-state cubic centimeter per minute标况毫升每分钟),开稳流源启辉。(b) Start-up: After vacuuming, turn on the Ar mass flowmeter to feed Ar gas, and adjust the flow rate to >150 sccm (standard-state cubic centimeter per minute), and turn on the steady flow source for start-up.

(c)气体流量,工作气压调节:待辉光区稳定后,通入O2气,调节Ar,O2流量比Ar∶O2在1∶1~1∶3之间,调节工作气压0.2~0.9Pa。(c) Adjustment of gas flow rate and working air pressure: after the glow area is stabilized, introduce O 2 gas to adjust the Ar, O 2 flow ratio Ar:O 2 between 1:1 and 1:3, and adjust the working air pressure from 0.2 to 1:3. 0.9 Pa.

(d)溅射功率的调整:调整溅射功率50~100W,待各参数稳定后,保持溅射时间20~60分钟,沉积ZnO缓冲层。(d) Adjustment of sputtering power: adjust the sputtering power to 50-100 W, and after the parameters are stabilized, keep the sputtering time for 20-60 minutes to deposit the ZnO buffer layer.

(3)ZnO主层的沉积(3) Deposition of ZnO main layer

ZnO缓冲层制备结束后,调节气体流量调节Ar,O2流量比Ar∶O2在1∶2~1∶4之间,调节工作气压0.3~0.8Pa,调整溅射功率100~200W,开样品盘自转,衬底加热到200~250℃,沉积时间为3~5小时。After the preparation of the ZnO buffer layer, adjust the gas flow to adjust the Ar, O2 flow ratio Ar: O2 between 1:2 ~ 1:4, adjust the working pressure 0.3 ~ 0.8Pa, adjust the sputtering power 100 ~ 200W, open the sample The disk rotates, the substrate is heated to 200-250°C, and the deposition time is 3-5 hours.

同现有技术相比,本发明具有如下显著优点:Compared with the prior art, the present invention has the following significant advantages:

(1)采用自支撑金刚石膜的背面(成核面)作为后续ZnO薄膜的沉积面,能很好解决金刚石衬底厚度和表面粗糙度之间的矛盾。(1) The backside (nucleation surface) of the self-supporting diamond film is used as the deposition surface of the subsequent ZnO film, which can well solve the contradiction between the thickness of the diamond substrate and the surface roughness.

(2)采用两步法制备高度定向ZnO薄膜。采用直流溅射法,可以使用金属Zn靶,这种靶制造方便,可以实现高纯,价格低廉,成膜速率高。引入ZnO缓冲层,对于在金刚石薄膜上制备的ZnO具有重要的意义,很可能得到高c轴取向,结晶性好、性能优良的ZnO薄膜。(2) Highly oriented ZnO thin films were prepared by a two-step method. The direct current sputtering method can use metal Zn target, which is easy to manufacture, can achieve high purity, low price, and high film forming rate. The introduction of the ZnO buffer layer is of great significance to the ZnO prepared on the diamond film, and it is possible to obtain a ZnO film with high c-axis orientation, good crystallinity and excellent performance.

附图说明 Description of drawings

图1为本发明/ZnO同质缓冲层/自支撑金刚石薄膜结构示意图。Fig. 1 is a schematic diagram of the structure of the present invention/ZnO homogeneous buffer layer/self-supporting diamond film.

图2为本发明ZnO薄膜X射线衍射(XRD)图谱Fig. 2 is X-ray diffraction (XRD) pattern of ZnO film of the present invention

图3为本发明ZnO薄膜原子力显微镜(AFM)图Fig. 3 is ZnO thin film atomic force microscope (AFM) figure of the present invention

具体实施方式 Detailed ways

下面对本发明的具体实施例进行详细描述。Specific embodiments of the present invention are described in detail below.

实施例1Example 1

本实施例的工艺过程和步骤如下:The technological process and steps of the present embodiment are as follows:

(一)自支撑金刚石薄膜的制备:(1) Preparation of self-supporting diamond film:

(1)钽丝预处理:(1) Tantalum wire pretreatment:

用砂皮将钽丝表面打磨干净,抽真空到5Pa,然后通入氢气和丙酮分别为200sccm和50sccm,调整气压5KPa,加热至430℃,预处理30分钟。Grind the surface of the tantalum wire with a sandpaper, vacuumize to 5Pa, then pass in hydrogen and acetone at 200sccm and 50sccm respectively, adjust the air pressure to 5KPa, heat to 430°C, and pretreat for 30 minutes.

(2)衬底及其预处理(2) Substrate and its pretreatment

采用p型1cm×1cm硅片为衬底,并用其镜面作为金刚石生长面。将Si先置于HF溶液中10分钟,然后用颗粒度为100nm的超细金刚石粉与甘油混合液手工研磨15分钟。研磨完毕后将衬底置于丙酮溶液中超声浴清洗15分钟,然后置于去离子水中超声浴清洗15分钟,重复上述清洗步骤3次,最后取出衬底烘干。A p-type 1cm×1cm silicon wafer is used as the substrate, and its mirror surface is used as the diamond growth surface. Si was first placed in HF solution for 10 minutes, and then manually ground for 15 minutes with a mixture of ultrafine diamond powder and glycerin with a particle size of 100 nm. After grinding, the substrate was cleaned in an ultrasonic bath in acetone solution for 15 minutes, then placed in an ultrasonic bath of deionized water for 15 minutes, and the above cleaning steps were repeated 3 times, and finally the substrate was taken out and dried.

(3)金刚石膜的沉积(3) Deposition of diamond film

将硅片置于试样台上,镜面向上,然后进行金刚石膜的沉积,其操作步骤依次如下:Place the silicon wafer on the sample stage with the mirror facing up, and then deposit the diamond film. The operation steps are as follows:

(a)抽真空:利用真空泵依次对反应室、氢气支路和丙酮支路抽真空,最终使反应室本底真空4.5Pa;(a) Vacuuming: use a vacuum pump to evacuate the reaction chamber, the hydrogen branch and the acetone branch in sequence, and finally make the background vacuum of the reaction chamber 4.5Pa;

(b)气体流量、气压调节:抽真空完毕后,依次打开质量流量计通入氢气和丙酮,其中氢气和丙酮硫量分别为200sccm和65sccm,再通过调节减压阀将反应室的气压稳定在1Pa;(b) Gas flow and air pressure adjustment: after vacuuming, open the mass flow meter in turn to feed hydrogen and acetone, wherein the hydrogen and acetone sulfur content are respectively 200 sccm and 65 sccm, and then the pressure in the reaction chamber is stabilized by adjusting the pressure reducing valve. 1 Pa;

(c)升温:气压稳定后,打开冷却水和加热电压,并以1/2V/min的速率升高加热电压,最终使反应温度处于620℃,加偏流4A,成核30分钟。(c) Heating: After the air pressure is stable, turn on the cooling water and the heating voltage, and increase the heating voltage at a rate of 1/2V/min, finally keep the reaction temperature at 620°C, add a bias current of 4A, and nucleate for 30 minutes.

调整氢气和丙酮流量分别为200sccm和50sccm,反应温度为680℃,工作气压5Pa,沉积时间120小时;Adjust the flow rate of hydrogen and acetone to 200sccm and 50sccm respectively, the reaction temperature is 680°C, the working pressure is 5Pa, and the deposition time is 120 hours;

(d)降温:维持工艺条件至预定的时间后,先停止通入丙酮,并以约1/3V/min的速率降低电压,以降低反应温度直至室温,最后关闭氢气和冷却水,取出样品;(d) Cooling: After maintaining the process conditions for a predetermined time, first stop feeding acetone, and reduce the voltage at a rate of about 1/3V/min to reduce the reaction temperature to room temperature, and finally turn off the hydrogen and cooling water, and take out the sample;

(4)硅衬底剥离(4) Silicon substrate peeling off

制备的具有很大厚度的金刚石薄膜置于HF与HNO3摩尔浓度为1∶1的溶液中,在室温下腐蚀12小时,待Si衬底溶解后得到所需的自支撑形金刚石薄膜;The prepared diamond film with a large thickness is placed in a solution of 1:1 molar concentration of HF and HNO3 , etched at room temperature for 12 hours, and the required self-supporting diamond film is obtained after the Si substrate is dissolved;

(二)直流磁控溅射法制备ZnO薄膜:(2) Preparation of ZnO thin films by DC magnetron sputtering:

本发明中,采用直流反应磁控溅射法制备ZnO薄膜,并以自支撑金刚石作为衬底,其中自支撑金刚石厚度约400μm。所用锌靶的纯度为99.99%,靶直径120mm,厚度5mm,靶与基片的距离为80mm,反应沉积过程中,氢气(Ar)为溅射气体,氧气(O2)为反应气体,纯度均为99.99%。In the present invention, a ZnO thin film is prepared by a DC reactive magnetron sputtering method, and a self-supporting diamond is used as a substrate, wherein the thickness of the self-supporting diamond is about 400 μm. The purity of the zinc target used is 99.99%, the target diameter is 120 mm, the thickness is 5 mm, and the distance between the target and the substrate is 80 mm. During the reaction deposition process, hydrogen (Ar) is the sputtering gas, oxygen (O 2 ) is the reaction gas, and the purity is uniform. is 99.99%.

(1)自支撑金刚石薄膜表面清洗(1) Surface cleaning of self-supporting diamond film

先把金刚石衬底置于丙酮中超声浴清洗10分钟,然后置于去离子水中超声浴清洗15分钟,可重复上述清洗步骤3遍直至表面非常洁净,最后取出衬底烘干;First place the diamond substrate in acetone for 10 minutes in an ultrasonic bath, then place it in deionized water for 15 minutes, repeat the above cleaning steps 3 times until the surface is very clean, and finally take out the substrate and dry it;

(2)在自支撑金刚石薄膜上制备ZnO缓冲层(2) Preparation of ZnO buffer layer on self-supporting diamond film

将自支撑金刚石衬底固定在磁控溅射腔体中,镜面向下,然后进行ZnO薄膜的沉积,其操作步骤依次如下:Fix the self-supporting diamond substrate in the magnetron sputtering chamber with the mirror facing down, and then deposit the ZnO thin film. The operation steps are as follows:

(a)抽真空:利用直联泵对反应室、Ar气和O2气管道抽真空,最终使反应室本底真空为4.5Pa;利用分子泵对反应室抽真空,最终使反应室本底真空为2×10-3Pa(a) Vacuuming: Use a direct-coupled pump to evacuate the reaction chamber, Ar gas and O2 gas pipelines, and finally make the background vacuum of the reaction chamber 4.5Pa; use a molecular pump to evacuate the reaction chamber, and finally make the background vacuum of the reaction chamber The vacuum is 2×10 -3 Pa

(b)启辉:抽真空完毕后,打开Ar质量流量计通入Ar气,并调节流量160sccm,开稳流源启辉;(b) Start-up: After vacuuming, open the Ar mass flowmeter to feed Ar gas, adjust the flow rate to 160 sccm, and turn on the steady flow source to start the ignition;

(c)气体流量,工作气压调节:待辉光区稳定后,通入O2气,调节Ar,O2流量比Ar∶O2为1∶1,调节工作气压0.2Pa;(c) Adjustment of gas flow rate and working air pressure: after the glow area is stabilized, introduce O2 gas to adjust Ar, the flow ratio of O2 to Ar: O2 is 1:1, and adjust the working air pressure to 0.2Pa;

(d)溅射功率的调整:调整溅射功率100W,待各参数稳定后,保持溅射时间30分钟,沉积ZnO缓冲层;(d) Adjustment of the sputtering power: adjust the sputtering power to 100W, and after the parameters are stabilized, keep the sputtering time for 30 minutes, and deposit the ZnO buffer layer;

(3)ZnO主层的沉积(3) Deposition of ZnO main layer

ZnO缓冲层制备结束后,调节气体流量调节Ar,O2流量比为1∶3,调节工作气压0.5Pa,调整溅射功率200W,开样品盘自转,衬底加热到250℃,沉积时间为3小时。After the preparation of the ZnO buffer layer, adjust the gas flow rate to adjust the Ar, O2 flow ratio to 1:3, adjust the working pressure to 0.5Pa, adjust the sputtering power to 200W, turn on the sample plate to rotate, heat the substrate to 250 °C, and the deposition time is 3 Hour.

通过X射线衍射(XRD)图谱(附图2)上可以看出所制备的ZnO薄膜具有良好结晶质量和c轴取向性;原子力显微镜(AFM)(附图3)测试发现,ZnO薄膜晶粒尺寸小,薄膜的晶体质量高,表面粗糙度低。It can be seen that the prepared ZnO film has good crystalline quality and c-axis orientation by X-ray diffraction (XRD) pattern (accompanying drawing 2); atomic force microscope (AFM) (accompanying drawing 3) test finds that the ZnO film grain size is small , the crystal quality of the film is high and the surface roughness is low.

Claims (1)

1.一种利用缓冲层制备高质量ZnO薄膜的方法,其特征在于该方法具有以下的工艺过程和步骤:1. a kind of method utilizing buffer layer to prepare high-quality ZnO thin film is characterized in that the method has following technological process and step: (一)自支撑金刚石薄膜的制备(1) Preparation of self-supporting diamond film 1)钽丝预处理:热丝化学气相沉积方法中采用钽丝作为加热源,先用砂皮将钽丝表面打磨干净,抽真空完毕后,通入氢气和丙酮至4~6KPa,其中氢气与丙酮的比例为1∶1~5∶1,加热至420~450℃左右预处理20~30分钟;1) Pretreatment of tantalum wire: In the hot wire chemical vapor deposition method, tantalum wire is used as the heating source. Firstly, the surface of the tantalum wire is polished clean with sand leather. After vacuuming, hydrogen and acetone are introduced to 4-6KPa. The ratio of acetone is 1:1 to 5:1, heated to about 420 to 450°C for 20 to 30 minutes; 2)衬底预处理:先将p型1cm×1cm硅片置于HF溶液中5~10分钟,然后在颗粒度为100nm的超细金刚石粉与甘油混合液中手工研磨10~15分钟,将硅片置于丙酮溶液中超声浴清洗10~15分钟,然后置于去离子水中超声浴清洗10~15分钟,重复上述清洗步骤3~5次,直至表面非常洁净,最后取出硅片烘干;2) Substrate pretreatment: first place the p-type 1cm×1cm silicon wafer in HF solution for 5-10 minutes, then manually grind it in a mixture of ultrafine diamond powder and glycerin with a particle size of 100nm for 10-15 minutes, and place Place the silicon wafer in an acetone solution for 10-15 minutes in an ultrasonic bath, then place it in deionized water for 10-15 minutes, repeat the above cleaning steps 3-5 times until the surface is very clean, and finally take out the silicon wafer and dry it; 3)金刚石膜的沉积:将预处理后的硅片置于试样台上作为衬底,其镜面向上作为金刚石生长面,进行金刚石膜的沉积;(a)抽真空:利用真空泵依次对反应室、氢气支路和丙酮支路抽真空,最终使反应室本底真空<5Pa;(b)气体流量、气压调节:依次打开质量流量计通入氢气和丙酮,氢气与丙酮的比例为1∶1~5∶1,再通过调节减压阀将反应室气压稳定在0.8~1.5Pa;(c)升温:打开冷却水和加热电压开关,以约1/2V/min的速率升高加热电压,最终使反应温度处于580~620℃,加偏流4A,成核30分钟;(d)进行金刚石膜的沉积80~120小时,停止通入丙酮,并以约1/3V/min的速率降低电压以降低反应温度直至室温,最后关闭氢气和冷却水,取出样品;3) Deposition of diamond film: the pretreated silicon wafer is placed on the sample stage as a substrate, and its mirror surface is upward as a diamond growth surface, and the diamond film is deposited; (a) vacuuming: use a vacuum pump to sequentially vacuum the reaction chamber , the hydrogen branch and the acetone branch are vacuumed, and finally the background vacuum of the reaction chamber is <5Pa; (b) gas flow and air pressure adjustment: turn on the mass flow meter in turn to feed hydrogen and acetone, and the ratio of hydrogen to acetone is 1:1 ~5:1, and then adjust the pressure reducing valve to stabilize the pressure in the reaction chamber at 0.8~1.5Pa; (c) heating: turn on the cooling water and heating voltage switch, and increase the heating voltage at a rate of about 1/2V/min, and finally Keep the reaction temperature at 580-620°C, add a bias current of 4A, and nucleate for 30 minutes; (d) deposit the diamond film for 80-120 hours, stop feeding acetone, and reduce the voltage at a rate of about 1/3V/min to reduce Reaction temperature is up to room temperature, finally shut off hydrogen and cooling water, take out sample; 4)硅衬底剥离:将制备的金刚石薄膜置于HF与HNO3摩尔浓度为1∶1的溶液中,在室温下腐蚀10~15小时,待Si衬底溶解后得到所需的自支撑金刚石薄膜;4) Silicon substrate peeling: the prepared diamond film is placed in a solution of HF and HNO 3 with a molar concentration of 1:1, etched at room temperature for 10 to 15 hours, and the required self-supporting diamond film is obtained after the Si substrate is dissolved. film; (二)直流磁控溅射法制备ZnO薄膜(2) Preparation of ZnO thin films by DC magnetron sputtering 1)自支撑金刚石薄膜表面清洗:将金刚石衬底置于丙酮中超声浴清洗10~15分钟,然后置于去离子水中超声浴清洗10~15分钟,重复上述清洗步骤3~5次,直至表面非常洁净,最后取出衬底烘干;1) Surface cleaning of the self-supporting diamond film: place the diamond substrate in acetone for 10 to 15 minutes in an ultrasonic bath, then place it in deionized water for 10 to 15 minutes, repeat the above cleaning steps 3 to 5 times until the surface Very clean, finally take out the substrate and dry it; 2)在自支撑金刚石薄膜上制备ZnO缓冲层:将自支撑金刚石衬底固定在磁控溅射腔体中,镜面向下,然后进行ZnO薄膜的沉积;(a)抽真空:利用直联泵对反应室、Ar气和O2气管道抽真空,最终使反应室本底真空<5Pa;利用分子泵对反应室抽真空,最终使反应室本底真空<3×10-3Pa;(b)启辉:抽真空完毕后,通入Ar气,并调节流量>150标况毫升每分钟,开稳流源启辉;(c)气体流量,工作气压调节:待辉光区稳定后,通入O2气,调节Ar、O2流量比Ar∶O2在1∶1~1∶3之间,调节工作气压为0.2~0.9Pa;(d)溅射功率的调整:调整溅射功率50~100W,待各参数稳定后,保持溅射时间20~60分钟,沉积ZnO缓冲层;2) Prepare the ZnO buffer layer on the self-supporting diamond film: fix the self-supporting diamond substrate in the magnetron sputtering chamber with the mirror facing down, and then deposit the ZnO film; (a) vacuuming: use a direct pump Vacuumize the reaction chamber, Ar gas and O2 gas pipelines, and finally make the background vacuum of the reaction chamber <5Pa; use a molecular pump to evacuate the reaction chamber, and finally make the background vacuum of the reaction chamber <3×10 -3 Pa; (b ) Ignition: after the vacuuming is completed, introduce Ar gas, and adjust the flow rate > 150 ml per minute under standard conditions, and turn on the steady flow source to start the ignition; (c) gas flow and working pressure adjustment: after the glow area is stable, turn on Enter O2 gas, adjust the Ar and O2 flow ratio Ar: O2 between 1:1~1:3, adjust the working pressure to 0.2~0.9Pa; (d) Adjust the sputtering power: adjust the sputtering power to 50 ~100W, after the parameters are stable, keep the sputtering time for 20~60 minutes, and deposit the ZnO buffer layer; 3)ZnO主层的沉积:ZnO缓冲层制备结束后,调节气体流量调节Ar、O2流量比Ar∶O2在1∶2~1∶4之间,调节工作气压为0.3~0.8Pa,调整溅射功率100~200W,开样品盘自转,衬底加热到200~250℃,沉积时间为3~5小时。3) Deposition of the ZnO main layer: after the preparation of the ZnO buffer layer, adjust the gas flow rate to adjust the flow ratio of Ar and O2 to Ar: O2 between 1:2 and 1:4, and adjust the working pressure to 0.3 to 0.8Pa. The sputtering power is 100-200W, the sample disk is turned on and rotated, the substrate is heated to 200-250°C, and the deposition time is 3-5 hours.
CNA2008100406397A 2008-07-16 2008-07-16 A kind of method that utilizes buffer layer to prepare high-quality ZnO film Pending CN101323971A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100406397A CN101323971A (en) 2008-07-16 2008-07-16 A kind of method that utilizes buffer layer to prepare high-quality ZnO film

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100406397A CN101323971A (en) 2008-07-16 2008-07-16 A kind of method that utilizes buffer layer to prepare high-quality ZnO film

Publications (1)

Publication Number Publication Date
CN101323971A true CN101323971A (en) 2008-12-17

Family

ID=40187668

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100406397A Pending CN101323971A (en) 2008-07-16 2008-07-16 A kind of method that utilizes buffer layer to prepare high-quality ZnO film

Country Status (1)

Country Link
CN (1) CN101323971A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101866860A (en) * 2010-05-26 2010-10-20 上海大学 A kind of preparation method of ZnO thin film field effect transistor
CN102352484A (en) * 2011-09-13 2012-02-15 山东理工大学 Method for preparing titanium-doped zinc oxide transparent conductive film on polyethylene terephthalate (PET) flexible substrate
CN102699804A (en) * 2012-06-14 2012-10-03 北京科技大学 Method for leveling surface of diamond self-supporting membrane
CN101533876B (en) * 2009-04-14 2013-03-20 长春理工大学 Method for passivating amorphous InGaAs thin-film material
CN105951056A (en) * 2016-05-26 2016-09-21 无锡特固新材料有限公司 Preparation method of self-support ultrathin diamond single-crystal particles
CN106338347A (en) * 2016-11-02 2017-01-18 清华大学 Interdigital electrode material for high temperature surface acoustic wave sensor and the preparation method thereof
CN112430803A (en) * 2020-11-16 2021-03-02 北京科技大学 Preparation method of self-supporting ultrathin diamond film
CN112909281A (en) * 2021-01-21 2021-06-04 深圳大学 Stainless steel metal bipolar plate, preparation method thereof and fuel cell
CN118996343A (en) * 2024-07-12 2024-11-22 桂林电子科技大学 Preparation method of self-supporting flexible M-shaped hexagonal ferrite film

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101533876B (en) * 2009-04-14 2013-03-20 长春理工大学 Method for passivating amorphous InGaAs thin-film material
CN101866860A (en) * 2010-05-26 2010-10-20 上海大学 A kind of preparation method of ZnO thin film field effect transistor
CN102352484A (en) * 2011-09-13 2012-02-15 山东理工大学 Method for preparing titanium-doped zinc oxide transparent conductive film on polyethylene terephthalate (PET) flexible substrate
CN102699804A (en) * 2012-06-14 2012-10-03 北京科技大学 Method for leveling surface of diamond self-supporting membrane
CN102699804B (en) * 2012-06-14 2015-06-10 北京科技大学 Method for leveling surface of diamond self-supporting membrane
CN105951056A (en) * 2016-05-26 2016-09-21 无锡特固新材料有限公司 Preparation method of self-support ultrathin diamond single-crystal particles
CN106338347A (en) * 2016-11-02 2017-01-18 清华大学 Interdigital electrode material for high temperature surface acoustic wave sensor and the preparation method thereof
CN112430803A (en) * 2020-11-16 2021-03-02 北京科技大学 Preparation method of self-supporting ultrathin diamond film
CN112430803B (en) * 2020-11-16 2022-04-01 北京科技大学 Preparation method of self-supporting ultrathin diamond film
CN112909281A (en) * 2021-01-21 2021-06-04 深圳大学 Stainless steel metal bipolar plate, preparation method thereof and fuel cell
CN118996343A (en) * 2024-07-12 2024-11-22 桂林电子科技大学 Preparation method of self-supporting flexible M-shaped hexagonal ferrite film

Similar Documents

Publication Publication Date Title
CN101323971A (en) A kind of method that utilizes buffer layer to prepare high-quality ZnO film
CN102102220B (en) Preparation method of graphene on diamond (111) surface
CN104805405B (en) A kind of aluminum nitride piezoelectric thin film and preparation method thereof
CN106011759B (en) A kind of high c-axis orientation AlN films and the preparation method and application thereof
CN106244984B (en) Enhanced AlN films of a kind of a axis orientation and preparation method thereof
CN104862659B (en) A kind of medium frequency magnetron reaction sputtering method of aluminium nitride film
CN101323982B (en) A kind of preparation method of high quality cubic boron nitride film
CN114717534B (en) Preparation method of large-area ultrahigh-hardness diamond film
CN104947068A (en) Preparation method of diamond heat sink piece
JP2020073433A (en) Substrate comprising a silicon layer and a diamond layer having an optically finished (or dense) silicon-diamond interface
CN103628036B (en) The preparation method of cubic boron nitride coated cutting tool
Luo et al. Filtering performance improvement in V-doped ZnO/diamond surface acoustic wave filters
CN101451232B (en) Method for preparing nano composite multiple layer hard film
CN114921773A (en) A kind of preparation method of diamond-based rare earth doped single-layer or multi-layer functional film
CN101805894B (en) Preparation method for hydrogenated crystalline state nanometer carborundum films under low temperature
CN101671846A (en) Method for reducing stress of cubic boron nitride thin film
CN101303973A (en) A preparation method of n-ZnO/p-self-supporting diamond film heterojunction
CN102611405A (en) Zinc oxide piezoelectric film for SAW (Surface Acoustic Wave) device and manufacturing method thereof
CN106498395A (en) High-quality a faces aluminium nitride film and preparation method and application
CN111676450B (en) Hexagonal boron nitride thick film based on ion beam sputtering deposition and preparation method and application
CN111232972B (en) Preparation method of high-performance boron-doped diamond nanowire
CN113529166B (en) Method for growing large-area diamond single crystal
CN105755449A (en) Method for preparing nanocrystalline diamond film by adopting helicon wave plasma technology
CN102286722B (en) Preparation method of zinc oxide/diamond-like carbon surface acoustic wave device composite film
CN102386281B (en) Manufacturing method for zinc oxide (ZnO)/nanocrystalline-diamond-thin-film-based hetero junction photoelectric detector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081217