CN101320268A - Relay protection inspection standardization operation and management system - Google Patents

Relay protection inspection standardization operation and management system Download PDF

Info

Publication number
CN101320268A
CN101320268A CNA2008101235827A CN200810123582A CN101320268A CN 101320268 A CN101320268 A CN 101320268A CN A2008101235827 A CNA2008101235827 A CN A2008101235827A CN 200810123582 A CN200810123582 A CN 200810123582A CN 101320268 A CN101320268 A CN 101320268A
Authority
CN
China
Prior art keywords
module
management
data
relay protection
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101235827A
Other languages
Chinese (zh)
Other versions
CN101320268B (en
Inventor
蒯狄正
陈泾生
陈久林
殷伟
郑海雁
林世隆
黄浩声
潘琪
伍雪峰
蒋一泉
邓洁清
汝泰来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Jiangsu Fangtian Power Technology Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Jiangsu Fangtian Power Technology Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Fangtian Power Technology Co Ltd, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical Jiangsu Fangtian Power Technology Co Ltd
Priority to CN2008101235827A priority Critical patent/CN101320268B/en
Publication of CN101320268A publication Critical patent/CN101320268A/en
Application granted granted Critical
Publication of CN101320268B publication Critical patent/CN101320268B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The present invention discloses an integrated standardized relay protection test operation and management system, which comprises an advanced management station and an on-spot operation substation and adopts a dual-platform structure with a main web station end and an on-spot operation end; wherein, the main web station end is provided with a standard management module; the operation end is provided with a standardized operation platform; the assignment of a test task and the uploading of test data can be fulfilled by the data synchronization function between the two platforms in order to realize the centralized management and the unification of distributed operations; therefore the integrated relay protection test management and implementation system is formed. The standardized relay protection test operation and management system can ensure that all units can share an unified standard and expert knowledge, and can be flexibly and conveniently applied, thus increasing the integral level of the relay protection test operation.

Description

Relay protection inspection standardization operation and management system
Technical field
The present invention relates to a kind of incorporate relay protection inspection standardization operation and management system.
Background technology
At present, relay protection check operation and management work, some auto testing instruments and scattered management software are arranged, but there are not the technology platform of system and means that effective architecture technical support is provided, there are the following problems: the safety guarantee of operation and standardization control aspect at the scene, though the standardized work guiding book is arranged, lacks technology platform and means and solidified and field control; The quality control aspect of operation at the scene, check data, result lack automatic check and intellectual analysis, judge that by the site work personnel it is bigger that quality inspection is influenced by human factor; Aspect work for inspection efficient, the home and abroad has some relay protection auto testing instruments to realize the automatic test of protective device partial function, but improve from task assign, operation preparation, safety practice, comprise external loop the check of a whole set of protection system to whole process automation levels such as report establishment, inspection management, check accumulation, still blank at present; Aspect the relay protection human resources configuration; the site work personnel need to be grasped relay protection device various rules, standard, regulation, instead arrange, a large amount of related datas such as technical specification of job instruction and various protective devices; also quite familiar to the concrete condition and the operation process of field apparatus, could be competent at on-the-spot work for inspection.Information management and information-based aspect, to the problem of running in the relay protection work for inspection and solution process lack accumulation and share, the approach of study, relevant rules, counter arrange and the accumulation and the precipitation of expertise lack technology platform.IT application in management degree to debug process and result is not enough, lacks to improve verification management and value-added advanced technology means thereof.
Summary of the invention
The objective of the invention is to set up incorporate relay protection standardization check and management system; for field test work provides standardization, intellectuality, robotization and information-based job platform, provide curing platform and the unified management and the in-depth application platform of standard, rules for inspection management work.
In order to realize above-mentioned purpose, the present invention takes following technical scheme to realize:
Native system is divided into higher management main website and site work substation.Adopt the two platform structures of web main website end and site work end; the main website end is provided with the standard management module; the operation end is provided with the standardized work platform; finish assigning of inspection task and uploading of test figure by the data sync function between two platforms; realize the unification of centralized management and distribution operation, form incorporate relay protection inspection management and executive system.
By relay protection inspection standardization operation of the present invention and management system, make constituent parts share unified standard, share expertise, can use flexibly and easily again, promote whole relay protection work for inspection level.
Description of drawings
Fig. 1 is relay protection inspection standardization operation and management system hardware configuration synoptic diagram;
Fig. 2 is relay protection inspection standardization operation and management system software function and logical organization synoptic diagram.
Embodiment
Below the concrete functional module of higher management main website and site work substation is described.
1. higher management main website
Realize with the Web form of websites, the main configuration of being responsible for system, professional function of browse is handled and is provided in task and equipment control professional early stage.By operation is prepared, form complete task, for the site work client downloads.Main functional modules is as follows:
2) task module: task that management system is assigned and operation, realize that the field personnel removes the configuration operation of on-the-spot preceding relevant preliminary work.And remind the task arrangement of the equipment that expires by deciding the school cycle management.
2) machine account module: management secondary device machine account, up-to-date fixed value list, apparatus information such as protection philosophy figure, secondary connection diagram, its data can be passed through the external system data importing, safeguard by native system.
3) operation configuration module: formulate different normal processs by dissimilar equipment, and the help informations such as technical standard of operation, providing unified operation or work standard to the operating personnel, the operating process of normative operation improves the job safety reliability.
4) system management module: by the purpose that user and authority reach reasonable distribution personnel work is set, and safeguard that the safety of main station system self normally moves.
2. site work substation
Realize with the private client form of software, be installed on this machine of user, use for the field personnel.Major function is to guarantee that by preparing the order that defines site work carries out in order, the complete workflow of finish slave unit handing-over, safety practice, fill in test figure, arrive examination, automatic generation debugging being reported.Senior functions such as online help, automatic test are provided simultaneously.The site work substation has online and two kinds of mode of operations of off-line, when moving with online mode, can partly carry out exchanges data by electric power LAN (Local Area Network) and Web; Off-line mode allows the operating personnel not have at the scene under the environment of network can guarantee workflow equally.
Mainly comprise following functional module:
1) operation configuration download module.The line model operation, after the login system, client will be downloaded the operational data that had before configured by web, comprise unit type; software version, fixed value list, defect information, protection philosophy figure; secondary connection diagram has historical peace to arrange card, downloads historical the peace simultaneously and arranges card.
2) peace arranges report to formulate module.Have historical peace to arrange card, the history peace of directly calling download is arranged card, if there is not historical peace to arrange card, then historical peace of hand filling arranges the card, system's preservation to pacify to arrange card.
3) Analysis about Dangerous Point and pre-control prompting module.Some danger before the operation are reminded one by one, improved the operating personnel and watch out for.
4) job step process module.Work flow according to formulating instructs the operating personnel to carry out operation, prevents lacuna, prevents maloperation, forms Operation Log simultaneously.
5) data recording field module: test figure is carried out record, and data are recorded in local data base, and data are checked automatically, and deviation data is reminded.
6) help function module: in the operation process, the operation that the operating personnel can call download helps, and comprises expert opinion, technical standard, and the contact method of some equipment vendors.
7) test report module: after operation is finished, generate test report automatically
8) transmission module on the work data: upload the peace of having filled in and arrange card, test figure and debugging report.
Use this system platform can make units at different levels share unified standard, share expertise, can adapt to different field condition flexible Application again.Adopt tertiary level effectively to dispose the human resources of relay protection operation on the platform of this system structure design, that is: top management organization of unity expert works out and the authorization standard, and cure shedule and operation or work standard incorporate expertise; Specialty leader of basic unit and full-time configuration operation module are provided with operation, assign a task; The site work personnel by standard and expertise online help, reach intelligent, automation function, the controlled process that fulfils assignment under the guiding of platform task.
The job platform that this system provides adopts forces Analysis about Dangerous Point, Working Procedure Controlling and result's identification to carry out relay protection test safety, quality Pre-control and On-line Control.System can protect at difference, and varying environment is determined the pre-control dangerous point, and is configured in the task program, makes site work execute the pre-control analysis.System adopts flow process and Working Procedure Controlling to guarantee that security process does not leak item.System's cure shedule and expertise test process wizard and result identification and prompting automatically ensure that quality inspection reaches expert's level.
System adopts the method for segmentation module and taskings to handle the relation of unified standard and adaptation site work varying environment condition.At protective device model and function diversity; by segmenting minimum check operation module; according to kind of inspection and varying environment condition; under the safety rigid frame; use Templated mode; the configuration field test flow process and the contents of a project make up each operation module and form job task, satisfy the requirement of work for inspection actual conditions for dirigibility.

Claims (3)

1. relay protection inspection standardization operation and management system; it is characterized in that: comprise higher management main website and site work substation; adopt the two platform structures of web main website end and site work end; the main website end is provided with the standard management module; the operation end is provided with the standardized work platform; finish assigning of inspection task and uploading of test figure by the data sync function between two platforms; realize the unification of centralized management and distribution operation, form incorporate relay protection inspection management and executive system.
2. kind require 1 described relay protection inspection standardization operation and management system according to power, it is characterized in that: described higher management main website comprises following functional module:
1) task module: task that management system is assigned and operation, realize that the field personnel removes the configuration operation of on-the-spot preceding relevant preliminary work.And remind the task arrangement of the equipment that expires by deciding the school cycle management.
2) machine account module: management secondary device machine account, up-to-date fixed value list, apparatus information such as protection philosophy figure, secondary connection diagram, its data can be passed through the external system data importing, safeguard by native system.
3) operation configuration module: formulate different normal processs by dissimilar equipment, and the help informations such as technical standard of operation, providing unified operation or work standard to the operating personnel, the operating process of normative operation improves the job safety reliability.
4) system management module: by the purpose that user and authority reach reasonable distribution personnel work is set, and safeguard that the safety of main station system self normally moves.
3. relay protection inspection standardization operation according to claim 1 and management system is characterized in that: described site work substation comprises following functional module:
1) operation configuration download module: line model operation; after the login system; client will be downloaded the operational data that had before configured by web, comprise unit type, software version; fixed value list; defect information, protection philosophy figure, secondary connection diagram; there is historical peace to arrange card, downloads historical the peace simultaneously and arrange card.
2) peace arranges report to formulate module: have historical peace to arrange card, the history peace of directly calling download is arranged card, if there is not historical peace to arrange card, then historical peace of hand filling arranges the card, system's preservation to pacify to arrange card.
3) Analysis about Dangerous Point and pre-control prompting module: some danger before the operation are reminded one by one, improved the operating personnel and watch out for.
4) job step process module: the work flow according to formulating, instruct the operating personnel to carry out operation, prevent lacuna, prevent maloperation, form Operation Log simultaneously.
5) data recording field module: test figure is carried out record, and data are recorded in local data base, to 5) data check automatically, deviation data are reminded.
6) help function module: in the operation process, the operation that the operating personnel can call download helps, and comprises expert opinion, technical standard, and the contact method of some equipment vendors.
7) test report module: after operation is finished, generate test report automatically
8) transmission module on the work data: upload the peace of having filled in and arrange card, test figure and debugging report.
CN2008101235827A 2008-07-09 2008-07-09 Relay protection inspection standardization operation and management system Active CN101320268B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101235827A CN101320268B (en) 2008-07-09 2008-07-09 Relay protection inspection standardization operation and management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101235827A CN101320268B (en) 2008-07-09 2008-07-09 Relay protection inspection standardization operation and management system

Publications (2)

Publication Number Publication Date
CN101320268A true CN101320268A (en) 2008-12-10
CN101320268B CN101320268B (en) 2011-05-25

Family

ID=40180351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101235827A Active CN101320268B (en) 2008-07-09 2008-07-09 Relay protection inspection standardization operation and management system

Country Status (1)

Country Link
CN (1) CN101320268B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101776734B (en) * 2010-01-15 2013-08-21 江苏方天电力技术有限公司 Description method of automatic inspection of relay protection device
CN103368264A (en) * 2013-07-22 2013-10-23 国家电网公司 Safety operation detecting platform of substation relay protection room
CN104113565A (en) * 2013-04-18 2014-10-22 鸿富锦精密工业(深圳)有限公司 Data interaction method and system
CN104808084A (en) * 2015-04-08 2015-07-29 南京能云电力科技有限公司 Relaying protection testing device control standardization structuring method
CN106168784A (en) * 2016-08-31 2016-11-30 许继集团有限公司 A kind of protective relaying device operation is changed processing method and controls device
CN106356850A (en) * 2016-11-04 2017-01-25 广东电网有限责任公司电力调度控制中心 Safety and stability control device fault offline control strategy model generation method
CN111461634A (en) * 2019-01-21 2020-07-28 北京昊恩星美科技有限公司 Standardized regulation management system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101776734B (en) * 2010-01-15 2013-08-21 江苏方天电力技术有限公司 Description method of automatic inspection of relay protection device
CN104113565A (en) * 2013-04-18 2014-10-22 鸿富锦精密工业(深圳)有限公司 Data interaction method and system
CN103368264A (en) * 2013-07-22 2013-10-23 国家电网公司 Safety operation detecting platform of substation relay protection room
CN103368264B (en) * 2013-07-22 2015-10-21 国家电网公司 Inspection platform is transported safely in a kind of substation relay protection room
CN104808084A (en) * 2015-04-08 2015-07-29 南京能云电力科技有限公司 Relaying protection testing device control standardization structuring method
CN106168784A (en) * 2016-08-31 2016-11-30 许继集团有限公司 A kind of protective relaying device operation is changed processing method and controls device
CN106356850A (en) * 2016-11-04 2017-01-25 广东电网有限责任公司电力调度控制中心 Safety and stability control device fault offline control strategy model generation method
CN106356850B (en) * 2016-11-04 2019-05-14 广东电网有限责任公司电力调度控制中心 The generation method of safety and stability control device failure Off-line control Policy model
CN111461634A (en) * 2019-01-21 2020-07-28 北京昊恩星美科技有限公司 Standardized regulation management system

Also Published As

Publication number Publication date
CN101320268B (en) 2011-05-25

Similar Documents

Publication Publication Date Title
CN101320268B (en) Relay protection inspection standardization operation and management system
CN107734042B (en) Low-cost remote debugging system and method
CN107390636B (en) Operation monitoring method, maintenance method and system for numerical control equipment
CN105988401B (en) Method, arithmetic unit, subscriber unit and the system of electrical equipment parametrization
CN102024181B (en) Artificial intelligence maintenance system and method
CN102332690B (en) Electric power netting safe running temporary ground wire Tracking monitoring system
CN108701277B (en) Method for crane installation
CN106230903A (en) Air conditioning unit solution lock control method and system
CN101789160B (en) Spacing false-entering prevention system for intelligent video transformer substation
KR101874098B1 (en) DlAGNOSTIC AND MANAGING METHOD OF NEW RENEWABLE ENERGY APPATUS USING MOBILE DEVICE AND THE SYSTEM THEREOF
CN107666179B (en) Method and system for updating information of power distribution automation graph-model interaction point table
CN103269130A (en) Method for remotely confirming remote-control operation of transformer station
CN104765316A (en) Technology of adopting intelligent terminals as human-computer interface of industrial equipment control
CN111431994A (en) Secondary equipment remote operation and maintenance whole-process supervision method and system
CN108859041B (en) Intelligent control system and control method of injection molding equipment
CN114548929A (en) On-site inspection monitoring method and system
KR100775940B1 (en) The manufacturing execution data input output module to manage manufactuing execution
CN114418426A (en) Electric power operation picture operation data structuring method and device and storage medium
US7225168B2 (en) Method and system for providing a service on demand
JP5030528B2 (en) Operation and maintenance management device
CN101477342B (en) Collection device type oriented interval data acquisition method
CN111637955A (en) Remote assistance method of weighing down filling machine
CN106200581A (en) Lean intelligence Andon engine
CN101719634A (en) Substation patrolling, checking and recording management system
JP2004348548A (en) Control system and method for serving maintenance of the same system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: THE ELECTRIC POWER SCIENCE RESEARCH INSTITUTE OF J

Free format text: FORMER OWNER: JIANGOU PROVINCIAL POWER TEST INST CO., LTD.

Effective date: 20121023

Owner name: JIANGSU FANGTIAN POWER TECHNOLOGY CO., LTD. JIANGS

Free format text: FORMER OWNER: JIANGSU FANGTIAN POWER TECHNOLOGY CO., LTD.

Effective date: 20121023

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210029 NANJING, JIANGSU PROVINCE TO: 210036 NANJING, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20121023

Address after: 210036 Fenghuang West Street, Jiangsu, Nanjing, China, No. 243

Patentee after: Electric Power Research Institute of Jiangsu Electric Power Company

Patentee after: Jiangsu Fangtian Power Technology Co., Ltd.

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 210029 No. 243 Fenghuang West Street, Su Yuan mansion, Jiangsu, Nanjing

Patentee before: Jiangou Provincial Power Test Inst Co., Ltd.

Patentee before: Jiangsu Fangtian Power Technology Co., Ltd.