CN101312525A - Three-dimensional display monitoring system and method for wharf equipment - Google Patents

Three-dimensional display monitoring system and method for wharf equipment Download PDF

Info

Publication number
CN101312525A
CN101312525A CNA2008100394633A CN200810039463A CN101312525A CN 101312525 A CN101312525 A CN 101312525A CN A2008100394633 A CNA2008100394633 A CN A2008100394633A CN 200810039463 A CN200810039463 A CN 200810039463A CN 101312525 A CN101312525 A CN 101312525A
Authority
CN
China
Prior art keywords
opengl
device model
display
dimensional display
file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100394633A
Other languages
Chinese (zh)
Inventor
吴翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenhua Port Machinery Co Ltd
Original Assignee
Shanghai Zhenhua Port Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenhua Port Machinery Co Ltd filed Critical Shanghai Zhenhua Port Machinery Co Ltd
Priority to CNA2008100394633A priority Critical patent/CN101312525A/en
Publication of CN101312525A publication Critical patent/CN101312525A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Processing Or Creating Images (AREA)

Abstract

The invention discloses a three-dimension display monitoring system of dock device and a method. The method comprises: converting a device model document into a 3DS format device model document to be converted into an OpenGL top point data array and an OpenGL display list of relative devices, adopting an OpenGL matrix conversion function to process matrix conversion of the device model to drive the device model. The invention adopts three-dimension modeling technique and OpenGL display technique, to display the working condition of the dock device via the three-dimension model, thereby effectively improving display effect and display process, to realize real-time monitoring display on the whole dock yard, working area panoramic field and each device. The on-site user only needs a display, a mouser and a net wire to display and monitor all devices real-timely in the dock stack yard, to improve operation simplicity and flexibility.

Description

A kind of three-dimensional display monitoring system of pier facilities and method
Technical field
The present invention relates to the automatic dock field, more particularly, relate to a kind of three-dimensional display monitoring system and method for pier facilities.
Background technology
The equipment of automatic dock will carry out the work such as lifting that dock container has been finished in exercises, in order to grasp the working condition of equipment, just need monitor equipment.
Present monitoring work mainly is to monitor with camera, a plurality of cameras are installed in each different position to realize monitoring work, but the shortcoming of such monitor mode is the cost height, in addition because camera belongs to flimsy parts, so the failure rate that causes this monitor mode is than higher.
So a kind of new monitor mode need be provided, this monitor mode should equally with camera realize three-dimensional and real-time monitoring, and cost and failure rate are lower.
OpenGL is a 3D API (application programming interfaces), and it is open graphic package interface, and English full name is " Open Graphics Library ", and OpenGL is cross-platform international computer industrial standard application programming interfaces.The three-dimensional applications software that utilizes OpenGL to develop is mainly used in fields such as building, product design, medical science, geoscience, fluid mechanics, CAD design, analogue simulation, 3d gaming, OpenGL has become present 3-D graphic exploitation standard, is to be engaged in the developing instrument that the technical staff institute of 3-D graphic development must grasp.Graphics technology based on OpenGL can realize above-mentioned solid and real-time monitoring, and cost and failure rate are lower.
Summary of the invention
The present invention aims to provide a kind of three-dimensional display monitoring system and method for pier facilities, and this system and method is realized the real-time monitoring of pier facilities by three-dimensional modeling and dimension display technologies.
On the one hand, the invention provides a kind of three-dimensional display method for supervising of pier facilities, may further comprise the steps:
A. set up the 3DMAX device model file of pier facilities, this 3DMAX device model file is converted to 3DS formating equipment model file;
B. read the data message of 3DS formating equipment model file and be translated into OpenGL summit array;
C. form according to the OpenGL number of vertex and build the OpenGL display list that is equipped with model;
D. create the transformation matrix of device model, carry out the matrixing of device model according to OpenGL matrixing function, the driving arrangement model is made corresponding actions.
3DMAX device model file among the described step a is the real time data file of pier facilities.
The transformation matrix of the device model in the described steps d comprises the transformation matrix of the parts that can realize different actions in the equipment.
Described step b comprises and sets up Mathematical Modeling that described Mathematical Modeling reads the data message of 3DS formating equipment model file and is translated into OpenGL summit array.
File conversion among the described step a realizes by three-dimensional graphics software.
The OpenGL display list is suitable to show by calling OpenGL graphical display function among the described step c.
The data message of the 3DS formating equipment model file that reads among the described step b comprises apex coordinate, texture coordinate, normal vector coordinate, illumination and material model data information.
On the other hand, the invention provides a kind of three-dimensional display monitoring system of pier facilities, comprising:
Database is in order to the storage associated data files;
Converting unit, the equipment with described database and harbour is connected respectively, and the real-time 3DMAX device model file of generated code head apparatus also is converted into 3DS formating equipment model file and is stored in described database;
The display monitoring unit, be connected with described database, read the data message of 3DS formating equipment model file and be translated into OpenGL summit array, create the OpenGL display list of device model, and the transformation matrix of creating device model, according to the matrixing of OpenGL matrixing function realization device model, the driving arrangement model is made corresponding actions.
The transformation matrix of the device model in the described display monitoring unit comprises the transformation matrix of the parts that can realize different actions in the equipment.
By three-dimensional graphics software the 3DMAX device model file is converted to 3DS formating equipment model file in the described converting unit.
The data message of described 3DS formating equipment model file comprises apex coordinate, texture coordinate, normal vector coordinate, illumination and material model data information.
Adopt the three-dimensional display monitoring system and the method for a kind of pier facilities of the present invention, owing to adopted three-dimensional modeling and introduced the OpenGL Display Technique, the working condition of the equipment of harbour is shown by threedimensional model, effectively raise display effect and progress displaying, also be convenient to whole pier storage yard or operating area panorama and each equipment are carried out real-time monitoring display; What the present invention only needed to be correlated with equipment just is connected and can have realized display monitoring, so just shortened the cycle of installing, reduced the cost of installing, increased the flexibility of real-time monitoring, can be used as the supplementary means of video monitoring, also can independently monitor, the site operation personnel only needs a display, mouse, netting twine can reach real-time display monitoring to all devices operation situation in the pier storage yard, has increased the simplicity and the flexibility of operation greatly.
Description of drawings
Fig. 1 shows the principle process schematic diagram of three-dimensional display method for supervising of the present invention;
Fig. 2 shows the schematic diagram of three-dimensional display monitoring system of the present invention.
Embodiment
Before the explanation execution mode, introduce the several notions in the graphics earlier:
1, OpenGL (open graphic package interface);
OpenGL (open graphic package interface) is at SGI, SUN, Microsoft, DEC is under the advocating of the famous Computer Companies in the Duo Jia world such as IBM and Intel, a kind of 3-D graphic routine interface of associating release, it can be integrated into UNIX, and the above version of Windows95 is in the window systems such as above version of WindowsNT3.51 and Xwindow, be a kind of and hardware, a series of API (application programming interfaces) that window system and operating system are relatively independent.It comprises more than 120 graph function, and the developer can utilize these functions to draw out three-dimensional scence true to nature, and the benefit of its maximum is stable performance, can cross-platformly use, and has good transplantability.Because OpenGL is the bottom shape library of 3D figure, the geometry entity pel is not provided, can not be directly in order to describe scene, still, by some conversion programs, the model file that can easily some 3D graphic design softwares be made converts the summit array of OpenGL to and uses for it.At present at CAD/CAM, virtual reality, military affairs, space flight, fields such as geological prospecting have obtained using widely.
2,3DS file;
The 3DS file is the graphic file under the 3DMAX software, in showing, often be used to (it is read) based on the OpenGL 3-D graphic, the 3DS file is formed (inlaying sub-piece in the bulk) by many (chunk), a piece is made up of block message and blocks of data, block message is again by the ID (sign of two byte longs of piece, as 4D4D) and the length of piece (four bytes, in fact just the offset word joint number of next piece) form.Each piece is a hierarchical structure, when therefore each in reading the 3ds file led " piece " and son " piece " thereof, obtain corresponding data message according to corresponding son " piece " ID, thereby finally obtain the data such as apex coordinate, texture coordinate, normal vector coordinate, illumination information, material of device model file.
On the one hand, the invention provides a kind of three-dimensional display method for supervising of pier facilities, this method cooperates the equipment scheduling control system of harbour to realize the three-dimensional display monitoring, and with reference to shown in Figure 1, this method 100 comprises:
102. the threedimensional model file is converted into the 3DS formatted file.
At first set up the 3DMAX device model file of pier facilities, with three-dimensional drawing software this 3DMAX device model file is converted to the device model file of 3DS form again, to make things convenient for data analysis; Here, the 3DMAX device model file is the real time data file of pier facilities, and promptly the Programmable Logic Controller of pier facilities (PLC) transmits the exercise data of equipment in real time, upgrades described device model file according to real-time exercise data.The equipment scheduling control system of harbour has the external interface of each device model, the absolute coordinate information of each device model file data in simulated environment is provided, and the mapping relations of absolute coordinate information in the actual environment and the device model Coordinate Conversion in the simulated environment, the real-time device exercise data that receives so just can be reflected to described device model file.
104. be converted into OpenGL summit array.
The data message of the 3DS formating equipment model file in the read step 102 also is translated into OpenGL summit array.When realizing this step, need set up one and set up Mathematical Modeling (programmed algorithm), Mathematical Modeling reads the data message of 3DS formating equipment model file and is translated into OpenGL summit array, and the data message of the GDS formating equipment model file that reads comprises the data messages such as apex coordinate, texture coordinate, normal vector coordinate, illumination and material of device model.
106. create the OpenGL display list of device model.
Form the OpenGL display list that construction is equipped with model according to the OpenGL number of vertex, so-called OpenGL display list be exactly one group of preliminary election store wait until after the function statement called, when calling this display list with regard to in-order execution function wherein, and cooperate the OpenGL graphical display function that calls to show, just reached the effect of relevant device models show.
108. realize the matrixing of device model, move with the driving arrangement model.
Create the transformation matrix of device model, this transformation matrix comprises the transformation matrix of each parts of equipment integral transformation matrix and the different actions of needs realization, transmit the exercise data of the equipment that comes in real time according to the Programmable Logic Controller (PLC) of pier facilities, the equipment scheduling control system of harbour is shone upon the device model coordinate that is converted in the simulated environment with the absolute coordinate of equipment in actual environment, the action that is about to equipment in the stockyard is converted to the action of equipment in the simulated environment in real time, carry out the matrixing of relevant device model according to OpenGL matrixing function again, because each transformation matrix has all been represented the action of a class, so and then driven device model and move.
On the other hand, the invention provides a kind of three-dimensional display monitoring system 200 of pier facilities, referring to Fig. 2:
Database 20 is in order to the storage associated data files;
Converting unit 10 is connected with described database 20 and pier facilities 40 respectively, and the real-time 3DMAX device model file of generated code head apparatus 40 also is converted into 3DS formating equipment model file by three-dimensional graphics software and is stored in the described database 20;
Display monitoring unit 30, be connected with described database 20, read the data message of 3DS formating equipment model file and be translated into OpenGL summit array, create the OpenGL display list of device model, and the transformation matrix (comprising the transformation matrix of each parts that can realize different actions in the equipment) of creating device model, according to the matrixing of OpenGL matrixing function realization device model, the driving arrangement model is made corresponding actions.
The data message of the 3DS formating equipment model file that described display monitoring unit 30 reads comprises apex coordinate, texture coordinate, normal vector coordinate, illumination and material model data information.
The operation principle of the concrete workflow of the three-dimensional display monitoring system 200 of a kind of pier facilities provided by the invention and the three-dimensional display method for supervising 100 of pier facilities is identical with idiographic flow or similar, so do not repeat them here.
Those of ordinary skill in the art will be appreciated that, above embodiment is used for illustrating the present invention, and be not to be used as limitation of the invention, as long as in connotation scope of the present invention, all will drop on claim scope of the present invention to variation, the modification of the above embodiment.

Claims (11)

1. the three-dimensional display method for supervising of pier facilities is characterized in that, may further comprise the steps:
A. set up the 3DMAX device model file of pier facilities, this 3DMAX device model file is converted to 3DS formating equipment model file;
B. read the data message of 3DS formating equipment model file and be translated into OpenGL summit array;
C. form according to the OpenGL number of vertex and build the OpenGL display list that is equipped with model;
D. create the transformation matrix of device model, carry out the matrixing of device model according to OpenGL matrixing function, the driving arrangement model is made corresponding actions.
2. three-dimensional display method for supervising as claimed in claim 1 is characterized in that, the 3DMAX device model file among the described step a is the real time data file of pier facilities.
3. three-dimensional display method for supervising as claimed in claim 1 or 2 is characterized in that, the transformation matrix of the device model in the described steps d comprises the transformation matrix of the parts that can realize different actions in the equipment.
4. three-dimensional display method for supervising as claimed in claim 3 is characterized in that, described step b comprises and set up Mathematical Modeling that described Mathematical Modeling reads the data message of 3DS formating equipment model file and is translated into OpenGL summit array.
5. three-dimensional display method for supervising as claimed in claim 4 is characterized in that, the file conversion among the described step a realizes by three-dimensional graphics software.
6. three-dimensional display method for supervising as claimed in claim 5 is characterized in that, the OpenGL display list is suitable to show by calling OpenGL graphical display function among the described step c.
7, three-dimensional display method for supervising as claimed in claim 1 is characterized in that, the data message of the 3DS formating equipment model file that reads among the described step b comprises apex coordinate, texture coordinate, normal vector coordinate, illumination and material model data information.
8. the three-dimensional display monitoring system of pier facilities is characterized in that, comprising:
Database is in order to the storage associated data files;
Converting unit, the equipment with described database and harbour is connected respectively, and the real-time 3DMAX device model file of generated code head apparatus also is converted into 3DS formating equipment model file and is stored in described database;
The display monitoring unit, be connected with described database, read the data message of 3DS formating equipment model file and be translated into OpenGL summit array, create the OpenGL display list of device model, and the transformation matrix of creating device model, according to the matrixing of OpenGL matrixing function realization device model, the driving arrangement model is made corresponding actions.
9. three-dimensional display monitoring system as claimed in claim 8 is characterized in that, the transformation matrix of the device model in the described display monitoring unit comprises the transformation matrix of the parts that can realize different actions in the equipment.
10. three-dimensional display monitoring system as claimed in claim 9 is characterized in that, by three-dimensional graphics software the 3DMAX device model file is converted to 3DS formating equipment model file in the described converting unit.
11. three-dimensional display monitoring system as claimed in claim 8 is characterized in that, the data message of described 3DS formating equipment model file comprises apex coordinate, texture coordinate, normal vector coordinate, illumination and material model data information.
CNA2008100394633A 2008-06-24 2008-06-24 Three-dimensional display monitoring system and method for wharf equipment Pending CN101312525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100394633A CN101312525A (en) 2008-06-24 2008-06-24 Three-dimensional display monitoring system and method for wharf equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100394633A CN101312525A (en) 2008-06-24 2008-06-24 Three-dimensional display monitoring system and method for wharf equipment

Publications (1)

Publication Number Publication Date
CN101312525A true CN101312525A (en) 2008-11-26

Family

ID=40100922

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100394633A Pending CN101312525A (en) 2008-06-24 2008-06-24 Three-dimensional display monitoring system and method for wharf equipment

Country Status (1)

Country Link
CN (1) CN101312525A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102270219A (en) * 2011-06-14 2011-12-07 北京空间飞行器总体设计部 Construction method for Mars detector component-level virtual model machine library
CN103369192A (en) * 2012-03-31 2013-10-23 深圳市振华微电子有限公司 Method and device for Full-hardware splicing of multichannel video images
CN104794252A (en) * 2014-01-17 2015-07-22 中国石油集团工程设计有限责任公司 Three-dimensional model data processing method and electronic terminal
CN104851128A (en) * 2015-05-19 2015-08-19 北京控制工程研究所 Format conversion method for 3DS model file loading through OSG three-dimensional engine
CN105023290A (en) * 2014-04-28 2015-11-04 南京冠图信息科技有限公司 3D scenery modeling visualization method and system based on AutoCAD platform
CN108846164A (en) * 2018-05-23 2018-11-20 中国人民解放军63920部队 Show the method for visualizing and visualization device of spacecraft characteristic event
CN108873830A (en) * 2018-05-31 2018-11-23 华中科技大学 A kind of production scene online data collection analysis and failure prediction system
CN110058913A (en) * 2019-03-25 2019-07-26 中国航空无线电电子研究所 Show list managing method
CN111142470A (en) * 2019-12-31 2020-05-12 连云港新东方国际货柜码头有限公司 Automatic analog control system for wharf equipment and fault detection method
CN111797521A (en) * 2020-06-29 2020-10-20 西安精雕精密机械工程有限公司 Three-dimensional simulation debugging and monitoring method for automatic production line
CN116310143A (en) * 2023-05-08 2023-06-23 南方电网数字电网研究院有限公司 Three-dimensional model construction method, device, equipment and storage medium
CN116975990A (en) * 2023-09-25 2023-10-31 中交第四航务工程勘察设计院有限公司 Management method and system for three-dimensional model of oil-gas chemical engineering wharf

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102270219A (en) * 2011-06-14 2011-12-07 北京空间飞行器总体设计部 Construction method for Mars detector component-level virtual model machine library
CN103369192A (en) * 2012-03-31 2013-10-23 深圳市振华微电子有限公司 Method and device for Full-hardware splicing of multichannel video images
CN104794252A (en) * 2014-01-17 2015-07-22 中国石油集团工程设计有限责任公司 Three-dimensional model data processing method and electronic terminal
CN105023290A (en) * 2014-04-28 2015-11-04 南京冠图信息科技有限公司 3D scenery modeling visualization method and system based on AutoCAD platform
CN105023290B (en) * 2014-04-28 2018-10-09 南京冠图信息科技有限公司 Method for visualizing and system are modeled based on AutoCAD platform three-dimensional scenics
CN104851128A (en) * 2015-05-19 2015-08-19 北京控制工程研究所 Format conversion method for 3DS model file loading through OSG three-dimensional engine
CN104851128B (en) * 2015-05-19 2018-04-27 北京控制工程研究所 A kind of format conversion method of OSG d engines loading 3DS model files
CN108846164B (en) * 2018-05-23 2022-06-07 中国人民解放军63920部队 Visualization method and visualization device for displaying spacecraft characteristic events
CN108846164A (en) * 2018-05-23 2018-11-20 中国人民解放军63920部队 Show the method for visualizing and visualization device of spacecraft characteristic event
CN108873830A (en) * 2018-05-31 2018-11-23 华中科技大学 A kind of production scene online data collection analysis and failure prediction system
CN110058913B (en) * 2019-03-25 2022-05-20 中国航空无线电电子研究所 Display list management method
CN110058913A (en) * 2019-03-25 2019-07-26 中国航空无线电电子研究所 Show list managing method
CN111142470A (en) * 2019-12-31 2020-05-12 连云港新东方国际货柜码头有限公司 Automatic analog control system for wharf equipment and fault detection method
CN111797521A (en) * 2020-06-29 2020-10-20 西安精雕精密机械工程有限公司 Three-dimensional simulation debugging and monitoring method for automatic production line
CN111797521B (en) * 2020-06-29 2024-03-15 西安精雕精密机械工程有限公司 Three-dimensional simulation debugging and monitoring method for automatic production line
CN116310143A (en) * 2023-05-08 2023-06-23 南方电网数字电网研究院有限公司 Three-dimensional model construction method, device, equipment and storage medium
CN116310143B (en) * 2023-05-08 2023-10-31 南方电网数字电网研究院有限公司 Three-dimensional model construction method, device, equipment and storage medium
CN116975990A (en) * 2023-09-25 2023-10-31 中交第四航务工程勘察设计院有限公司 Management method and system for three-dimensional model of oil-gas chemical engineering wharf
CN116975990B (en) * 2023-09-25 2024-01-09 中交第四航务工程勘察设计院有限公司 Management method and system for three-dimensional model of oil-gas chemical engineering wharf

Similar Documents

Publication Publication Date Title
CN101312525A (en) Three-dimensional display monitoring system and method for wharf equipment
Govindaraju et al. Interactive collision detection between deformable models using chromatic decomposition
CN102508644A (en) 3D (three-dimensional) user interface graphics engine framework
CN104484522A (en) Method for building robot simulation drilling system based on reality scene
KR100782974B1 (en) Method for embodying 3d animation based on motion capture
WO2005111939A2 (en) Model 3d construction application program interface
CN101785031A (en) Systems and methods for selectively imaging objects in a display of multiple three-dimensional data-objects
CN1763784A (en) Three-dimensional scene real-time drafting framework and drafting method
CN103984720A (en) Tile map establishment method and device based on OpenGL (open graphics library)
CN109989751A (en) A kind of cross-platform long-range real time kinematics tracking system of three machine of fully mechanized mining and method
Li et al. A low-complexity method for authoring an interactive virtual maintenance training system of hydroelectric generating equipment
CN102157016A (en) IDL based method for three-dimensionally visualizing medical images
US20030011604A1 (en) Method and apparatus for capturing and viewing a sequence of 3-D images
Raposo et al. Environ: integrating VR and CAD in engineering projects
Kamat et al. Scene graph and frame update algorithms for smooth and scalable 3D visualization of simulated construction operations
Würfel et al. Natural Phenomena as Metaphors for Visualization of Trend Data in Interactive Software Maps.
WO2023209563A1 (en) Machine learning for generative geometric modelling
CN115546416A (en) Web-based lightweight 3D visualization method and system
CN103093496B (en) A kind of graphics Simulation method and system
CN115100387A (en) Three-dimensional scene efficient visual editing method and equipment based on digital twins
CN107728984A (en) A kind of virtual reality picture display control program
CN113551677A (en) Method for relocating a robot and related product
US9286716B2 (en) 3D graphics UI affordances based on behind-the-scenes simulation
Koliha et al. Towards online visualization and interactive monitoring of real-time CFD simulations on commodity hardware
Severa et al. New tools for 3D HMI development in Java

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081126