CN101307756B - 火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法 - Google Patents

火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法 Download PDF

Info

Publication number
CN101307756B
CN101307756B CN2008100553593A CN200810055359A CN101307756B CN 101307756 B CN101307756 B CN 101307756B CN 2008100553593 A CN2008100553593 A CN 2008100553593A CN 200810055359 A CN200810055359 A CN 200810055359A CN 101307756 B CN101307756 B CN 101307756B
Authority
CN
China
Prior art keywords
drum
unit
water pump
feed water
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008100553593A
Other languages
English (en)
Other versions
CN101307756A (zh
Inventor
彭钢
高志存
徐新航
刘永红
张洪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Original Assignee
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Priority to CN2008100553593A priority Critical patent/CN101307756B/zh
Publication of CN101307756A publication Critical patent/CN101307756A/zh
Application granted granted Critical
Publication of CN101307756B publication Critical patent/CN101307756B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

本发明涉及一种火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法,本发法包括下述三步:(1)给水泵跳闸快减负荷时锅炉汽包允许亏水量的确定;(2)快减负荷最小开始时间t1的确定;(3)快速减负荷最小持续发生时间t2的确定。本发明的有益效果是本方法可对给水泵RUNBACK的可行性进行测定和评估;提高给水泵RUNBACK的成功率,提高机组的安全运行水平。

Description

火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法
技术领域
本发明专利涉及火力发电机组辅机故障(跳闸)、机组快减负荷(以下简称RUNBACK)时(给水泵跳闸工况),机组能否安全运行的一种测定方法。适用于大型发电机组的自动控制和保护系统。
技术背景
大型机组的汽包锅炉在实际运行中,水位过高、过低都会导致恶性事故的发生,为保证机组的安全运行,对锅炉汽包水位控制具有严格的要求。尽管国内、外对许多机组的给水泵RUNBACK工况进行了实验和分析,但大型机组在给水泵发生RUNBACK工况时经常发生汽包水位过低而造成机组跳闸事故。对于600MW的大型机组,在一台组水泵跳闸时,即使备用泵联启,也很难及时地调整汽泵、电荷的负荷分配,造成短时间内上水严重不足。所以对给水泵RUNBACK的可行性进行测定,以便采用有针对性的自动控制策略,对保证机组的安全运行,具有重要的意义。
发明内容
本发明所要解决的技术问题是提供大型机组给水泵RUNBACK工况时,机组能否安全运行的一种火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法。
本发明解决其技术问题所采用的技术方案:
火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法,其特征在于:
(1)给水泵跳闸快减负荷时锅炉汽包允许亏水量的确定:
a、从汽包正常水位至其下-250mm处的汽包容积V的确定:
v≈0.25L.r
式中:v:从汽包正常水位至其下-250mm处的汽包容积,单位为m3;汽包正常水位即0mm水位为锅筒中心线下100mm处;
L:锅筒的筒身直段长度,单位为m;
r:锅筒内径,单位为m;
b、汽包允许亏水量Δm的确定:
式中 Δm = v / r = 0.25 L · r 1.855
式中:Δm汽包允许亏水量,单位为kg;
v:当额定工况时的汽包压力为Pb=18.2MPa时,对应的饱和水比容,v=0.001855m3/kg;
(2)快减负荷最小开始时间t1的确定:
t 1 = 2 Δm - t ′ ( Q max - Q 0 ) 2 Q 0 - Q max
式中:t1:从给水泵快减负荷发生时刻到汽包水位降至-250mm处的时间,即快减负荷最小开始时间,单位为s;
t′:未跳闸给水泵升速时间,单位为s;
Q0:一台给水泵初始流量,单位为t/s;
Qmax:未跳闸给水泵最大出力,单位t/s;
(3)快速减负荷最小持续发生时间t2的确定:
t 2 = b 2 t 1 + 2 aΔm 2 ab
其中:a=G0-Qmax
      b=Qmax-Gmin
式中:t2:汽包水位由-250mm处回升到汽包水正常水位的时间,即块减负荷最小持续发生时间;
G0:初始主蒸汽流量,单位t/s;
Gmin:最小主蒸汽流量,单位t/s。
本发明的理论根据是依据物质平衡原理,即锅炉的蒸发量、给水泵最大出力时所提供的给水流量、锅炉汽包在机组安全范围内所能提供的蓄水量三者之间的平衡关系。
本发明的有益效果是本方法可对给水泵RUNBACK的可行性进行测定和评估;确定了降负荷量最小开始时间、RUNBACK最小持续发生时间;本方法可以作为给水泵RUNBACB工况出现后汽轮机控制系统负荷降速率(最大降速率)的理论依据,同时也作为锅炉热负荷降速率的重要参考,以便从机组控制角度增加控制策略的针对性和有效性,提高给水泵RUNBACK的成功率,以提高机组的安全运行水平。
具体实施方式
按照上述发明内容部分中的技术方案操作即可完成。

Claims (1)

1.火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法,其特征在于:
(1)给水泵跳闸快减负荷时锅炉汽包允许亏水量的确定:a、从汽包正常水位至其下-250mm处的汽包容积V的确定:
V≈0.25L.r
式中:V:从汽包正常水位至其下-250mm处的汽包容积,单位为m3;汽包正常水位即0mm水位为锅筒中心线下100mm处;
L:锅筒的筒身直段长度,单位为m;
r:锅筒内径,单位为m;
b、汽包允许亏水量Δm的确定:
式中 Δm = v / r = 0.25 L · r 1.855
式中:Δm汽包允许亏水量,单位为kg;
v:当额定工况时的汽包压力为Pb=18.2MPa时,对应的饱和水比容,v=0.001855m3/kg;
(2)快减负荷最小开始时间t1的确定:
t 1 = 2 Δm - t ′ ( Q max - Q 0 ) 2 Q 0 - Q max
式中:t1:从给水泵快减负荷发生时刻到汽包水位降至-250mm处的时间,即快减负荷最小开始时间,单位为s;
t′:未跳闸给水泵升速时间,单位为s;
Q0:一台给水泵初始流量,单位为t/s;
Qmax:未跳闸给水泵最大出力,单位t/s;
(3)快速减负荷最小持续发生时间t2的确定:
t 2 = b 2 t 1 + 2 aΔm 2 ab
其中:a=G0-Qmax
b=Qmax-Gmin
式中:t2:汽包水位由-250mm处回升到汽包水正常水位的时间,即快减负荷最小持续发生时间;
G0:初始主蒸汽流量,单位t/s;
Gmin:最小主蒸汽流量,单位t/s。
CN2008100553593A 2008-07-08 2008-07-08 火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法 Active CN101307756B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100553593A CN101307756B (zh) 2008-07-08 2008-07-08 火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100553593A CN101307756B (zh) 2008-07-08 2008-07-08 火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法

Publications (2)

Publication Number Publication Date
CN101307756A CN101307756A (zh) 2008-11-19
CN101307756B true CN101307756B (zh) 2010-06-16

Family

ID=40124369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100553593A Active CN101307756B (zh) 2008-07-08 2008-07-08 火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法

Country Status (1)

Country Link
CN (1) CN101307756B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226513B (zh) * 2011-05-24 2013-04-10 山东电力研究院 一种超临界机组单侧辅机故障优化控制方法
CN103925590B (zh) * 2014-04-17 2016-02-24 广东电网公司电力科学研究院 发电机组快速减负荷过程中给水控稳方法
CN105258106B (zh) * 2015-11-04 2017-07-14 中国神华能源股份有限公司 一种不同单元制机组间给水泵共享的负荷快减系统及方法
CN114811570B (zh) * 2022-04-20 2023-06-13 华北电力科学研究院有限责任公司 适用于燃煤机组的高加解列故障减负荷方法及装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87100366A (zh) * 1987-01-24 1987-07-29 刘增良 硅整流发电机不解体故障检测的方法及实施的装置
CN1124847A (zh) * 1994-04-13 1996-06-19 佳能株式会社 故障检测方法、故障检测装置及使用该装置的发电系统
CN1606658A (zh) * 2001-07-31 2005-04-13 艾劳埃斯·乌本 风力发电设备的预警系统
CN1782672A (zh) * 2004-08-25 2006-06-07 西门子共同研究公司 改善发电设备故障检测的方法和装置
CN1924595A (zh) * 2006-09-20 2007-03-07 重庆大学 基于虚拟仪器技术的气体绝缘组合电器在线监测方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87100366A (zh) * 1987-01-24 1987-07-29 刘增良 硅整流发电机不解体故障检测的方法及实施的装置
CN1124847A (zh) * 1994-04-13 1996-06-19 佳能株式会社 故障检测方法、故障检测装置及使用该装置的发电系统
CN1606658A (zh) * 2001-07-31 2005-04-13 艾劳埃斯·乌本 风力发电设备的预警系统
CN1782672A (zh) * 2004-08-25 2006-06-07 西门子共同研究公司 改善发电设备故障检测的方法和装置
CN1924595A (zh) * 2006-09-20 2007-03-07 重庆大学 基于虚拟仪器技术的气体绝缘组合电器在线监测方法

Also Published As

Publication number Publication date
CN101307756A (zh) 2008-11-19

Similar Documents

Publication Publication Date Title
CN101307756B (zh) 火力发电机组辅机故障快减负荷给水泵跳闸工况可行性测定方法
CN111535879B (zh) 一种燃气-蒸汽联合循环机组旁路系统控制方法
CN102226513B (zh) 一种超临界机组单侧辅机故障优化控制方法
CN103791485B (zh) 一种火电机组给水系统优化控制方法
US7614233B2 (en) Operation method of nuclear power plant
CN101639703B (zh) 过热蒸汽温度的控制方法
JP5727951B2 (ja) 蒸気供給システム及び蒸気供給システムの制御方法
CN108954283B (zh) 超临界或超超临界机组湿态转干态过程自动控制的方法
CN107590586B (zh) 核电厂非核蒸汽冲转瞬态试验控制方法及控制装置
CN111255529A (zh) 供热切缸机组运行时快速响应自动发电控制系统及方法
CN109974028B (zh) 一种660mw超临界燃煤机组停机不停炉的优化方法
CN209369880U (zh) 一种核电机组压水堆超温保护系统
CN111058902A (zh) 一种基于工业汽机异步发电的节能系统和节能控制方法
CN211851929U (zh) 供热切缸机组运行时快速响应自动发电控制系统
GB1456297A (en) Method of operating a nuclear power plant during periods of decreased reactivity
CN102620278A (zh) 锅炉给水流量的控制方法及装置
CN110207080A (zh) 一种pta装置的蒸汽互供控制系统
CN105258106B (zh) 一种不同单元制机组间给水泵共享的负荷快减系统及方法
KR101631417B1 (ko) 발전소 터빈의 종합 감시를 위한 화면 표시 방법
Peet et al. Development and application of a dynamic simulation model for a drum type boiler with turbine bypass system
CN208073572U (zh) 一种基于调频旁路的电网调频系统
CN205841931U (zh) 一种气缸液压缸双重压紧装置
CN113707349B (zh) 一种cpr1000机组主蒸汽管线泄漏测量方法及装置
KR200178497Y1 (ko) 스토커식 소각설비의 폐열보일러 증기드럼 자동수위조절장치
KR860000760B1 (ko) 가압수형 원자로의 급수 제어 시스템 및 방법

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hebei Electric Power Construction & Adjustment Research Institute

Assignor: Hebei Electric Power Research Institute

Contract record no.: 2011130000005

Denomination of invention: Thermoelectric generating set auxiliary machinery fault fast-reducing load feed water pump trip behavior feasibility determination method

Granted publication date: 20100616

License type: Exclusive License

Open date: 20081119

Record date: 20110105

ASS Succession or assignment of patent right

Owner name: HEBEI ELECTRIC POWER CORPORATION ELECTRIC POWER RE

Free format text: FORMER OWNER: HEBEI ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20121219

Owner name: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POW

Effective date: 20121219

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121219

Address after: 050021 No. 238 South Sports street, Yuhua Road, Hebei, Shijiazhuang

Patentee after: Electric Power Research Institute of Hebei Electric Power Corporation

Patentee after: State Grid Corporation of China

Patentee after: Hebei Electric Power Construction & Adjustment Research Institute

Address before: 050021 Hebei city of Shijiazhuang Province Sports South Street No. 238 Hebei Electric Power Research Institute

Patentee before: Hebei Electric Power Research Institute