Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of novel structure, the reliable arch broken equipment for hoisting bin that is suitable for, to overcome prior art for bulk, the easy bonding unfavorable deficiency of material result of use.
The present invention constitutes like this: at feed bin (7) top actuating device (2) is set, actuating device (2) by chain (3) with prevent that holding together support (6) is connected, prevent holding together support (6) inside feed bin (7).
At the outside cover (1) of installing of actuating device (2).
Actuating device (2) is by motor (9), two shaft conic reducers (10), (11), worm gear screw mandrel reductor (12), frame (8) is formed, the axle of motor (9) connects with the input shaft of two shaft conic reducers (10), two output shafts of two shaft conic reducers (10) connect with the input shaft of two shaft conic reducers (11) of two same models respectively again, and each output shaft of these two two shaft conic reducers (11) respectively connects a worm gear screw mandrel reductor (12); Motor (9), two shaft conic reducers (10), (11), worm gear screw mandrel reductor (12) is installed on the frame (8).
Motor (9), two shaft conic reducers (10), (11) all adopt coupler to link between the worm gear screw mandrel reductor (12).The moment of torsion of motor (9) output is delivered on four worm gear screw mandrel reductors (12) equably, forms self-locking simultaneously.
The screw mandrel bottom of worm gear screw mandrel reductor (12) is connected with chain (3), and this chain (3) bottom is connected with pilot bar (5).
On feed bin (7) top cover orienting sleeve (4) is arranged, pilot bar (5) passes orienting sleeve (4).
The line of four worm gear screw mandrel reductors (12) is a rectangle, prevents that the plane projection shape of holding together support (6) also is rectangle.
Before each blanking, motor (9) is rotated in the forward, and pulling is severally prevented holding together support (6) move a segment distance vertically upward under the effect of pilot bar (5) and orienting sleeve (4) with what chain (3) connected, and the drive material is fluffy.The contrarotation of broken arch rear motor (9) drives and prevents holding together support (6) operation downwards.At this moment, though material is fluffy, owing to himself gravity reason falling, will prevents holding together the preceding position of support (6) motion and fill out, institute drops on material top in case hold together support (6), and chain (3) is lax.During bin (7) blanking, prevent holding together the impact that support (6) is discharged along with self gravitation and material, fall back to initial condition, chain (3) is dragged tightly again, wait for action next time.
Compared with prior art, novel structure of the present invention, safe and reliable is applicable to bulk, easy bonding solid material, and can be directly installed on the existing feed bin top of transforming of needing.
The specific embodiment
Embodiments of the invention: core of the present invention is an actuating device 2, it is to constitute like this: the axle of motor 9 connects with the input shaft of two shaft conic reducers 10, two output shafts of this retarder connect with the input shaft of two shaft conic reducers 11 of two same models respectively again, each output shaft of these two two shaft conic reducers 11 respectively connects a worm gear screw mandrel reductor 12, and makes the line of these four worm gear screw mandrel reductors 12 be a rectangle.These mechanisms all are installed on the frame 8 of steel structure.All axles all adopt coupler to link in the actuating device 2.So, the moment of torsion of motor 9 outputs is delivered on four worm gear screw mandrel reductors 12 equably, can form self-locking simultaneously.In cover 1 of actuating device 2 outside installations,, protective effect dustproof to play; The screw mandrel bottom of four worm gear screw mandrel reductors 12 on it connects several supports 6 of preventing holding together with chain 3.Prevent holding together the number of support 6 according to feed bin 7 sizes that are suitable for, structure and material properties decision.At four tangent planes of feed bin 7 top cover upper screw rod projections place welding is annular arrangement orienting sleeve 4, respectively connects a cylinder rigidity pilot bar 5 longer slightly than stroke on the chain 3 of this position.Pilot bar 5 diameters are more smaller than orienting sleeve 4 internal diameters, so that pass also activity freely.