CN101298975B - Emulsifying explosive loading trolley - Google Patents

Emulsifying explosive loading trolley Download PDF

Info

Publication number
CN101298975B
CN101298975B CN2008100280882A CN200810028088A CN101298975B CN 101298975 B CN101298975 B CN 101298975B CN 2008100280882 A CN2008100280882 A CN 2008100280882A CN 200810028088 A CN200810028088 A CN 200810028088A CN 101298975 B CN101298975 B CN 101298975B
Authority
CN
China
Prior art keywords
big arm
water
control system
hydraulic
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100280882A
Other languages
Chinese (zh)
Other versions
CN101298975A (en
Inventor
姚曙
蓝瑜康
唐金琼
曹胜祥
叶子强
罗富寿
黄自华
何乃战
李华南
吴广怀
林思敏
曹南山
吴永贵
黄伟建
林海
钟瑞明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fankou Lead Zinc Mine of Shenzhen Zhongjin Lingnan Nonfemet Co Ltd
Original Assignee
Fankou Lead Zinc Mine of Shenzhen Zhongjin Lingnan Nonfemet Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fankou Lead Zinc Mine of Shenzhen Zhongjin Lingnan Nonfemet Co Ltd filed Critical Fankou Lead Zinc Mine of Shenzhen Zhongjin Lingnan Nonfemet Co Ltd
Priority to CN2008100280882A priority Critical patent/CN101298975B/en
Publication of CN101298975A publication Critical patent/CN101298975A/en
Application granted granted Critical
Publication of CN101298975B publication Critical patent/CN101298975B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)

Abstract

The invention relates to an emulsification detonator charging trolley, including a working main arm hydraulic pressure control system and an emulsification detonator charging system, wherein the working main arm hydraulic pressure control system includes a hydraulic pressure gear pump, a scale valve set, an operation valve set, a safety valve and a hydraulic pressure meter. The hydraulic pressure gear pump builds a pressure oul feeding hydraulic pressure system; the scale valve set is arranged on the frame which hydraulically or manually operates the working main arm and performs the flux distribution and pressure adjustment to the hydraulic pressure oil; the operation valve set is arranged on the working nacelle which mainly uses the leading oil pressure control scale valve to operate the working main arm. The grain detonator charging trolley is changed into the emulsification detonator charging trolley, which solves the idle problem of the NT30/NBB 150 charging trolley with low cost, to be used again.

Description

Emulsifying explosive loading trolley
[technical field]
The invention belongs to the mine mechanism field, relate to a kind of emulsifying explosive loading trolley that is used for the mining of down-hole, mine.
[background technology]
Existing NT30/NBB150 grain powder powder charge chassis is long service life; Fault rate is high; When the stope blasting charge of down-hole, often need two NT30/NBB150 grain powder powder charge chassis be reached stope, a powder charge; Another is subsequent use, can adorn at the appointed time and ignite to guarantee explosive.Because down-hole, mine Panel upward Medium-length Hole Mechanized Mining mechanized mining must all use emulsion, NT30/NBB150 grain powder powder charge chassis will be stopped using idle.Stipulate according to national Explosives Order: emulsion must be ignited in 8 hours; Otherwise nature may take place ignite security incident; If existing emulsifying explosive loading trolley breaks down in powder charge process; Can not guarantee that emulsion adorned and ignite in 8 hours, with affects safety production.Therefore, select for use a chassis condition preferably NT30/NBB150 grain powder powder charge chassis it is transformed, be transformed into emulsifying explosive loading trolley, only need about 1,000,000 yuans.Therefore; NT30/NBB150 grain powder powder charge chassis is transformed into emulsifying explosive loading trolley not only can saves the fund (about more than 400 ten thousand yuans) of buying new emulsifying explosive loading trolley; Can also solve the idle problem of NT30/NBB150 grain powder powder charge chassis; It is returned to normal condition, put into production, guarantee carrying out smoothly of mine production.
[summary of the invention]
In order to overcome the above-mentioned shortcoming of prior art, the present invention provides a kind of emulsifying explosive loading trolley that can reduce cost of manufacture, can guarantee safe production again.
The technical solution adopted for the present invention to solve the technical problems is: a kind of emulsifying explosive loading trolley; Comprise big arm hydraulic control system of work and emulsified detonator loading system; The big arm hydraulic control system of said work comprises hydraulic gear pump, proportioning valve group, operating valve set, safety valve and hydraulic instrument, and it is that build-up pressure oil is supplied with hydraulic system that hydraulic gear pump mainly acts on; The proportioning valve group is installed on the vehicle frame, and its effect mainly is hydraulic control or the big arm of manual operation work and hydraulic oil carried out assignment of traffic, pressure adjustment; Operating valve set is installed on the work hanging basket, and its effect mainly is to utilize guide oil hydraulic control system proportioning valve group to move the big arm of operation element.
The operating cylinder of the big arm hydraulic control system of said work is installed on the vehicle frame; Operating cylinder comprises that hanging basket balancing cylinder, hanging basket pitching oil cylinder, big arm telescopic oil cylinder, big arm stretch oscillating oil cylinder and big arm hoist cylinder, and above-mentioned operating cylinder passing ratio valve group, operation valve group and overflow valve and mekydro pump power respectively links.
Said hydraulic gear pump work system pressure is set up through overflow valve, and through two position three-way valve adjustment operating cylinder into and out of oil.
Said emulsified detonator loading system comprises medicinal cupping, Teat pipette, hydraulic control system, electric control system, water system and pencil; Water system comprises water tank and water pump; Water in the water tank is delivered to the water filling ring through water pump, and water system communicates with pencil through the water filling ring.
Said medicinal cupping carries out powder charge through Teat pipette to pencil.
Said water pump provides power by the water pump oil motor, and Teat pipette provides power by the Teat pipette oil motor, and water pump oil motor and Teat pipette oil motor passing ratio valve group and operation valve group and hydraulic system power link.
Said electric control system is that manual change-over switch is in top when powder charge on hanging basket, depresses the powder charge switch; Whole charge controlling system gets electric, and time relay normally opened contact is closed, the hypotony switch closure; The hypertonia switch breaks off; This moment, automatically controlled or manual proportioning valve group got electronic work, started Teat pipette and water pump, can carry out powder charge
The invention has the beneficial effects as follows: utilize grain powder powder charge chassis to repack emulsifying explosive loading trolley into; Its cost of manufacture is low, has solved the idle problem of NT30/NBB150 powder charge chassis, and it is returned to normal condition; Put into production, guarantee carrying out smoothly of mine production; Simultaneously, the present invention designs according to the condition of work of down-hole, mine, and operation is practical, and is safe and reliable to operation.
[description of drawings]
Fig. 1 is a hydraulic control system structural representation according to the invention;
Fig. 2 is a powder charge systematic square frame structural representation according to the invention;
Fig. 3 is an electric control system sketch map according to the invention.
[specific embodiment]
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Referring to Fig. 1, Fig. 2 and Fig. 3; A kind of emulsifying explosive loading trolley; Comprise big arm hydraulic control system of work and emulsified detonator loading system; Whole work system pressure can be set up through overflow valve 3, and the proportioning valve group is installed on the vehicle frame, and its effect mainly is hydraulic control or the big arm of manual operation work and hydraulic oil carried out assignment of traffic, pressure adjustment; Operating valve set 6 is installed on the work hanging basket, and its effect mainly is to utilize 5 actions of guide oil hydraulic control system proportioning valve group to reach the big arm of operation element.Therefore, when operating personnel need carry out the exercises operation to the big arm of working on the ground, can handle proportioning valve group 5 its action tanks of change and achieve the goal into and out of oil; When powder charge need be operated the big arm of working on operating personnel are working hanging basket, can two position three-way valve 4 be in shown position, utilize the operating valve set 6 hydraulic control proportioning valve groups 5 on the hanging basket to achieve the goal then.So the big arm hydraulic system of newly working has realized that operating personnel can operate big arm on the ground or on the work hanging basket.The action of big arm of working realizes through the operating cylinder that is installed on the vehicle frame respectively; Operating cylinder comprises hanging basket balancing cylinder 7, hanging basket pitching oil cylinder 8, big arm telescopic oil cylinder 9, arm is stretched oscillating oil cylinder 10 and big arm hoist cylinder 10 greatly; Above-mentioned operating cylinder passing ratio valve group 5, operation valve group 6 and overflow valve 3 respectively links with hydraulic gear pump 1 power, in the fuel tank 2 hydraulic oil is housed.
The powder charge system control sytsem mainly comprises hydraulic control system and electric control system, and as shown in Figures 2 and 3, hydraulic control system mainly is to control the powder charge system on the ground, and electric control system mainly is a control powder charge system on hanging basket.Medicinal cupping 14 bottom medicine outlets are cut transformation cooperate to adapt to the installation of helicoidal pump, Teat pipette 15 adopts helicoidal pump, and makes medicinal cupping 14 access covers, and the medicine in the medicinal cupping 14 is delivered in the pencil 20 through Teat pipette 15, and Teat pipette 21 provides power by Teat pipette oil motor 22; Simultaneously; Use the water tank 16 of thickness, open the ball valve 17 of water tank 16, filter through filter 18 then as a 250L of 5mm corrosion resistant plate making; Water is after filtering delivered to water in the water filling ring 19 through water pump 18 then; At last water is sent in the pencil 20, water pump 18 provides power by water pump oil motor 22, and the effect of water system is that lubricated pencil 20 inwalls are to reduce pumping resistance; During work, pour emulsion into medicinal cupping 14 after, start powder charge pump 15 and water pump 18 simultaneously, regulate the confluent of feed speed and the water pump 18 of Teat pipette 15, pencil 20 is inserted carry out charging work bottom the big gun holes then.In the powder charge process, if reasons such as pencil 20 obstructions cause the extruding of pipeline explosive, when pumping pressure strengthens, the safety valve film breaks, explosive flows out from safety valve, should shut down the processing great question this moment and could continue to use.After powder charge is accomplished in all big gun holes, must remove the remaining explosive in the pencil 20: let water pump 18 work independently, the water of discharging in the water filling ring 19 can be removed the remaining explosive in the pencil 20.Water pump oil motor 22 links with hydraulic system power with Teat pipette oil motor 21 passing ratio valve groups and operation valve group 6.When the powder charge system does not work, two position three-way valve 4 handles are placed top, main hydraulic oil flows back to main fuel tank 1; When needs powder charge system works, two position three-way valve 4 handles are placed the bottom, main hydraulic oil is supplied with work system (work big arm and powder charge system), and hydraulic oil arrives automatically controlled or manual proportioning valve group 5.During powder charge, depress the proportioning valve operating grip of control Teat pipette oil motor 21 and water pump oil motor 22 on the ground, start Teat pipette 14 and water pump 18 simultaneously, can carry out charging work this moment; On hanging basket, during powder charge, then control with the electrical system on the hanging basket; But the speed of powder charge speed passing ratio valve group 5 adjustment powder charge pumps 14 is set up.
The electric control system course of work is: during powder charge, manual change-over switch 23 is in top, depresses the powder charge switch on hanging basket; Whole charge controlling system gets electric, and the time relay 24 normally opened contacts are closed, hypotony switch 25 closures; Hypertonia switch 26 breaks off; This moment, automatically controlled or manual proportioning valve group 5 got electronic work, started Teat pipette 14 and water pump 18, can carry out powder charge.If in the powder charge process, the powder charge loine pressure is too high or too low, and this moment, hypertonia switch 26 or hypotony switch 25 will make start-up circuit break off (disconnect cause sees that the pressure alarm red light shows), closed Teat pipette 14 and stopped powder charge with water pump 18.As continue to carry out again after powder charge need be fixed a breakdown.
The installation of the prevention electrostatic system in the installation of equipment: powder charge process is because the friction of explosive and pencil 20 can produce static; Therefore; Something must be done to eliminates; Be the importing the earth that guarantees that all static on the vehicle can be smooth, safe; Must adopt the cable of good conductivity to connect to each pin joint on the vehicle, and in central hinged place with the conduction connecting line of a cable (cable trailer connects the corrosion resistant plate of a good conductivity), with the static that produces in the elimination powder charge process as vehicle and the earth; Simultaneously, must check and corrosion resistant plate is placed underground the connection situation of each pin joint cable before the powder charge, just can carry out powder charge.

Claims (3)

1. emulsifying explosive loading trolley; Comprise big arm hydraulic control system of work and emulsified detonator loading system; It is characterized in that: the big arm hydraulic control system of said work comprises hydraulic gear pump, proportioning valve group, operating valve set, safety valve and hydraulic instrument, and it is that build-up pressure oil is supplied with hydraulic system that hydraulic gear pump mainly acts on; The proportioning valve group is installed on the vehicle frame, and its effect mainly is hydraulic control or the big arm of manual operation work and hydraulic oil carried out assignment of traffic, pressure adjustment; Operating valve set is installed in that its effect mainly is to utilize guide oil hydraulic control system proportioning valve group to move the big arm of operation element on the work hanging basket;
Said emulsified detonator loading system comprises medicinal cupping, Teat pipette, hydraulic control system, electric control system, water system and pencil; Water system comprises water tank and water pump; Water in the water tank is delivered to the water filling ring through water pump, and water system communicates with pencil through the water filling ring.
2. emulsifying explosive loading trolley as claimed in claim 1; It is characterized in that: the operating cylinder of the big arm hydraulic control system of said work is installed on the vehicle frame; Operating cylinder comprises that hanging basket balancing cylinder, hanging basket pitching oil cylinder, big arm telescopic oil cylinder, big arm stretch oscillating oil cylinder and big arm hoist cylinder, and above-mentioned operating cylinder passing ratio valve group, operating valve set and overflow valve and mekydro pump power respectively links.
3. emulsifying explosive loading trolley as claimed in claim 1 is characterized in that: said medicinal cupping carries out powder charge through Teat pipette to pencil.
CN2008100280882A 2008-05-10 2008-05-10 Emulsifying explosive loading trolley Expired - Fee Related CN101298975B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100280882A CN101298975B (en) 2008-05-10 2008-05-10 Emulsifying explosive loading trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100280882A CN101298975B (en) 2008-05-10 2008-05-10 Emulsifying explosive loading trolley

Publications (2)

Publication Number Publication Date
CN101298975A CN101298975A (en) 2008-11-05
CN101298975B true CN101298975B (en) 2012-07-25

Family

ID=40078875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100280882A Expired - Fee Related CN101298975B (en) 2008-05-10 2008-05-10 Emulsifying explosive loading trolley

Country Status (1)

Country Link
CN (1) CN101298975B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103159574A (en) * 2011-12-19 2013-06-19 薛世忠 Water ring injection device
CN102829676B (en) * 2012-08-27 2014-08-13 东莞市银通机械科技有限公司 Gunpowder pressing system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4195548A (en) * 1977-01-03 1980-04-01 Clay Robert B Blasting slurry pump truck
CN2204798Y (en) * 1994-10-18 1995-08-09 萍乡矿务局火工机械厂 Emulsion explosive loader
CN1222230A (en) * 1996-06-19 1999-07-07 戴诺-诺贝尔有限公司 System for pneumatic delivery of emulsion explosives
CN1310332A (en) * 2000-02-17 2001-08-29 戴诺·诺贝尔公司 Transmission of emulsion explosive material through ultra size diaphragm pump
CN2526318Y (en) * 2002-01-15 2002-12-18 杭州强立机械有限公司 Machine for filling powder emulsified explosive

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4195548A (en) * 1977-01-03 1980-04-01 Clay Robert B Blasting slurry pump truck
CN2204798Y (en) * 1994-10-18 1995-08-09 萍乡矿务局火工机械厂 Emulsion explosive loader
CN1222230A (en) * 1996-06-19 1999-07-07 戴诺-诺贝尔有限公司 System for pneumatic delivery of emulsion explosives
CN1310332A (en) * 2000-02-17 2001-08-29 戴诺·诺贝尔公司 Transmission of emulsion explosive material through ultra size diaphragm pump
CN2526318Y (en) * 2002-01-15 2002-12-18 杭州强立机械有限公司 Machine for filling powder emulsified explosive

Also Published As

Publication number Publication date
CN101298975A (en) 2008-11-05

Similar Documents

Publication Publication Date Title
CN206889376U (en) A kind of aerial work platform hydraulic control system with hydraulic accumulation energy
CN101968334A (en) Underground in-situ emulsified explosive mixed charging vehicle
CN204436361U (en) A kind of underground coal mine Hydraulic fracturing pressure flow quantity intelligent adjusting device
CN203496984U (en) Underground wheeled vehicle emergency steering system
CN101298975B (en) Emulsifying explosive loading trolley
CN103440962A (en) Intelligent on-line oil filling vehicle for transformer and oil filling method
WO2021101754A1 (en) Electrically actuated valves for manifold trailers or skids
CN116533856A (en) Waste mineral oil vehicle and waste mineral oil treatment operation system
CN201125155Y (en) Big diameter liquid loading and unloading arm destage loading control system
CN108505973B (en) Closed cleaning environment-friendly recycling integrated automatic control system
CN106015123A (en) Pressure relief control method for energy accumulator of mining dump truck
CN203329240U (en) Modularization movable fire protecting device suitable for multiple platforms
RU173061U1 (en) MIXING CHARGING MACHINE
CN102583521B (en) Oil supply equipment for heating furnace
CN212337251U (en) Casing pipe under-pressure medicine adding device
CN104805880A (en) Self-lifting counterweight excavator
CN205447828U (en) Remote control sprays ignition
CN202559318U (en) Floating matter emptying device of sluice gate
CN212003263U (en) Control system for intelligent underground coal mine storage
CN210258175U (en) Auxiliary power source system of wrecker and wrecker
CN203173397U (en) Belt-broken protective device of belt conveyer
CN204233646U (en) A kind of can the bus rapid transit fire extinguishing system of independent operating
CN105289928B (en) A kind of greasing hydraulic control unit
CN101829627A (en) Integrated hydraulic driven dual-shaft moving mill feed trolley
CN203035158U (en) Remote hydraulic well opening and closing device for oil and gas well head emergency rescue

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

CF01 Termination of patent right due to non-payment of annual fee