CN101280558A - 以电厂水渣为砂垫层的软土地基预压排水加固方法 - Google Patents
以电厂水渣为砂垫层的软土地基预压排水加固方法 Download PDFInfo
- Publication number
- CN101280558A CN101280558A CNA2008100532741A CN200810053274A CN101280558A CN 101280558 A CN101280558 A CN 101280558A CN A2008100532741 A CNA2008100532741 A CN A2008100532741A CN 200810053274 A CN200810053274 A CN 200810053274A CN 101280558 A CN101280558 A CN 101280558A
- Authority
- CN
- China
- Prior art keywords
- grain slag
- slag layer
- soft soil
- preloading
- power plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种以电厂水渣为砂垫层的软土地基预压排水加固方法,属于软土基的加固技术。该方法包括以下过程:在软土地基中布置插入排水板,然后在软土地基表面铺设水渣层;再于水渣层上布设集水管;在集水管上面再铺设水渣层,将集水管掩埋;当采用真空预压排水加固时,将集水管与射流真空泵相连,保持真空压力和固结时间,排出软土地基中水分增加其强度;当采用堆载预压排水加固时,在水渣层上以压力级差逐级施加堆载压力,排出软土地基中部分水分,增加其强度。本发明的优点在于,它为电厂水渣废弃物的利用开辟一条新途径,创造了经济价值。加固后的软土地基,地基承载力可达到60~80kPa。
Description
技术领域
本发明涉及一种以电厂水渣为砂垫层的软土地基预压排水加固方法,属于软土基的加固技术。
背景技术
水渣是火力发电厂生产过程中的一种工业废弃物,其化学成分与同时形成的粉煤灰相同。其颗粒的粒径为0.10~0.30mm,其中粒径大于0.25mm的颗粒含量大于50%,粒度属于中粗砂范围。
目前,对于建在软土地基上的火力发电厂产生的水渣废弃物利用途径,主要是筑路。然而随着道路的日益通畅,水渣利用量日益减少,堆积量日益增大,已经构成了对当地环境的污染源。
围海造陆是节约土地的途径之一,其中需要大量的砂料作为软土地基预压(包括真空预压和堆载预压)的砂垫层,对于砂料匮乏地区,其造地价格是较高的,要高出20%左右。
我们河北国华发电厂地处滩淤,属于砂料匮乏地区,针对用砂和无砂这样的矛盾,以及寻求开发水渣废弃物新的利用途径,我们与有关的科研单位联合对水渣的一些性能进行测试,获知了它具有良好的抗压性和渗透性,与砂料性能相近,完全可代替砂料作为砂垫层用于土体的排水加固。
发明内容
本发明的目的在于提供一种以电厂水渣为砂垫层的软土地基预压排水加固方法,该方法施工过程以电厂水渣代替砂料,做到了变废为宝,保护了环境,创造了经济价值。
本发明是通过以下技术方案加以实现的,一种以电厂水渣为砂垫层的软土地基预压排水加固方法,所述的水渣,它的粒度属于中粗砂范围;在自然状态下的含水率为70%-80%,快剪指标:角度为26.8°,粘结力为11.25kPa,固结快剪指标:角度为29.5°,粘结力为5.5kPa;渗透系数:以南-55型检测仪检测为3.2×10-3cm/sec,以TST-70型检测仪检测为4.8×10-3cm/sec,以该水渣为砂垫层的软土地基预压排水加固,其特征在于包括以下过程:
1.在软土地基中布置插入排水板,然后在软土地基表面铺设厚度为10~20cm的水渣层;
2.在水渣层上布设集水管;
3.在集水管上面再铺设厚度为20~30cm的水渣层,将集水管掩埋;
4.当采用真空预压排水加固时,将集水管与射流真空泵相连,使真空压力保持在80~90kPa,固结时间为90~95天,使软土地基中水分部分排出,增加其强度;当采用堆载预压排水加固时,在水渣层上以压力级差为10~20kPa逐级施加堆载压力,使软土地基中水分部分排出,增加其强度。
本发明的优点在于,施工过程无需特殊要求,它为电厂水渣废弃物的利用开辟一条新途径,这不但做到了保护环境,而且实现了变废为宝,创造了经济价值。以该方法加固后的软土地基,,即可达到60~80kPa的地基承载力。本发明已经在黄骅发电厂三期场地工程陆域形成及地基处理工程中得到实际应用,取得了重大的经济效益和社会效益。
附图说明
图1为实现本发明过程的装置示意图。
图中:1为排水板、2为槽体、3为密封膜、4为水渣层、5为排水管、6为射流真空泵。
图2为向淤泥中插排水板施工的照片。
图3为在水渣层上布设集水管施工的照片。
图4为用射流泵施加真空压力排水加固施工的照片。
图5为用载荷压力排水加固施工的照片。
具体实施方式
一.结合附图对本发明的以真空预压排水加固加以详细说明:
1.将含水率为80%的淤泥填入装在尺寸为1.5mx1.5mx1.5m的槽中,淤泥土样厚度为1.2m;为增加排水速度,在淤泥土样中插入排水板(PVD)至淤泥土样底部,排水板宽10cm,厚度为0.45cm,间距为10cm,该施工过程如图2所示;
2.在淤泥土样表面铺设10cm水渣作为砂垫层的一部分;
3.在水渣层上布设集水管,集水管为直径为6cm,该施工过程如图3所示;
4.在集水管上面再铺设厚度为20cm的水渣层将集水管理埋设其中;
5.用塑料薄膜将淤泥土样及水渣砂垫层密封,将集水管路引导到薄膜外,并与射流泵相连接,该施工过程如图4所示;
6.射流泵产生的真空压力通过集水管路传递到待加固的淤泥中,其中的部分水分通过排水板和集水管路排出,使淤泥土体的含水率降低,强度增加,该施工过程如图5所示;
真空预压过程结束后,通过用载荷板检验测试土体的承载力来检验加固效果。检验结果:通过96小时的真空预压,淤泥土体中的含水率由80%降到37%,地基土的十字板强度由试验加固前的1kPa增加到30kPa,通过载荷试验测试淤泥土体的地基承载力达到80kPa,达到了地基加固的目的。
二.结合附图对本发明的以施加堆载预压排水加固加以详细说明:
施加堆载预压排水加固如图4所示,该过程的步骤1~5与真空预压排水加固方法的步骤1~5相同,第6步骤是在水渣砂垫层上以不同的压力级差和堆载时间进行施加堆载预压,分别是:堆载为10kPa、堆载时间为35天;堆载为15kPa、堆载时间为25天;堆载为15kPa、堆载时间为20天;堆载为20kPa、堆载时间为20天;堆载为20kPa、堆载时间为20天五个逐级施加堆载压力过程,该过程完成后,通过用载荷板检验测试土体的承载力来检验加固效果。检验结果:通过96小时的真空预压,淤泥土体中的含水率由80%降到37%,地基土的十字板强度由试验加固前的1kPa增加到30kPa,通过载荷试验测试淤泥土体的地基承载力达到80kPa,达到了地基加固的目的。
Claims (1)
1.一种以电厂水渣为砂垫层的软土地基预压排水加固方法,所述的水渣,它的粒度属于中粗砂范围;在自然状态下的含水率为70%-80%,快剪指标:角度为26.8°,粘结力为11.25kPa,固结快剪指标:角度为29.5°,粘结力为5.5kPa;渗透系数:以南-55型检测仪检测为3.2×10-3cm/sec,以TST-70型检测仪检测为4.8×10-3cm/sec,以该水渣为砂垫层的软土地基预压排水加固,其特征在于包括以下过程:
1)在软土地基中布置插入排水板,然后在软土地基表面铺设厚度为10~20cm的水渣层;
2)在水渣层上布设集水管;
3)在集水管上面再铺设厚度为20~30cm的水渣层,将集水管掩埋;
4)当采用真空预压排水加固时,将集水管与射流真空泵相连,使真空压力保持在80~90kPa,固结时间为90~95天,使软土地基中水分部分排出,增加其强度;当采用堆载预压排水加固时,在水渣层上以压力级差为10~20kPa逐级施加堆载压力,使软土地基中水分部分排出,增加其强度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100532741A CN101280558A (zh) | 2008-05-28 | 2008-05-28 | 以电厂水渣为砂垫层的软土地基预压排水加固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100532741A CN101280558A (zh) | 2008-05-28 | 2008-05-28 | 以电厂水渣为砂垫层的软土地基预压排水加固方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101280558A true CN101280558A (zh) | 2008-10-08 |
Family
ID=40013214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008100532741A Pending CN101280558A (zh) | 2008-05-28 | 2008-05-28 | 以电厂水渣为砂垫层的软土地基预压排水加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101280558A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101831895A (zh) * | 2010-03-18 | 2010-09-15 | 天津市市政工程设计研究院 | 基于地基承载力确定软土地基填埋场地基处理方式的方法 |
CN105158138A (zh) * | 2015-08-05 | 2015-12-16 | 宁波大学 | 一种土体透气性检测装置 |
-
2008
- 2008-05-28 CN CNA2008100532741A patent/CN101280558A/zh active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101831895A (zh) * | 2010-03-18 | 2010-09-15 | 天津市市政工程设计研究院 | 基于地基承载力确定软土地基填埋场地基处理方式的方法 |
CN101831895B (zh) * | 2010-03-18 | 2011-05-04 | 天津市市政工程设计研究院 | 基于地基承载力确定软土地基填埋场地基处理方式的方法 |
CN105158138A (zh) * | 2015-08-05 | 2015-12-16 | 宁波大学 | 一种土体透气性检测装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103031836B (zh) | 一种在新吹填淤泥地基上快速修筑道路的方法 | |
CN102733371B (zh) | 一种密闭直抽分段式真空预压地基处理方法 | |
CN102926376B (zh) | 一种围海造地区域软土地基处理方法 | |
CN101718089A (zh) | 联合真空预压法地基处理施工方法 | |
CN102926378A (zh) | 导电复合真空软土加固预压方法 | |
CN101148873A (zh) | 一种复合真空预压软土地基加固方法 | |
CN102322054B (zh) | 超软土浅表层间歇性强抽排水结合短期晾晒的处理方法 | |
CN102776877A (zh) | 超软土地基梯级真空排水固结方法 | |
CN103074883A (zh) | 主动式堆载预压联合加固地基法 | |
CN106836435A (zh) | 地下水自然回灌的硬路面施工方法 | |
CN103541421A (zh) | 一种新型雨水截水及渗排一体化系统 | |
CN205637041U (zh) | 适用于海绵城市建设的砂石渗井 | |
CN101280558A (zh) | 以电厂水渣为砂垫层的软土地基预压排水加固方法 | |
CN103774516A (zh) | 软基挖方路基的底基层稳定处理方法 | |
Hornich et al. | Landslides in Styria in 2009 | |
CN102116021A (zh) | 一种真空横向排水软地基处理方法 | |
CN204919528U (zh) | 用于检测真空预压过程中加固效果的出膜结构 | |
CN206308775U (zh) | 一种雨水渗管结构 | |
Zhang et al. | Discussion on the design of water blocking and drainage limit of water-rich mountain tunnel in ecologically fragile area | |
CN202658595U (zh) | 真空纵向排水装置 | |
CN102140793A (zh) | 滤管踩入式真空排水加固超软土技术方法 | |
CN107083729A (zh) | 一种蓄透水模块及其制作方法 | |
CN202925540U (zh) | 一种围海造地区域软土地基处理装置的布设结构 | |
Dong | Influence of vertical drains on improving dredged mud by vacuum consolidation method | |
Zhou et al. | Research on the ecological protection mechanism and applied of expansive soil slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20081008 |