CN101275459A - 控制井中的流 - Google Patents

控制井中的流 Download PDF

Info

Publication number
CN101275459A
CN101275459A CNA2008100862582A CN200810086258A CN101275459A CN 101275459 A CN101275459 A CN 101275459A CN A2008100862582 A CNA2008100862582 A CN A2008100862582A CN 200810086258 A CN200810086258 A CN 200810086258A CN 101275459 A CN101275459 A CN 101275459A
Authority
CN
China
Prior art keywords
stream
well
ratio
action
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100862582A
Other languages
English (en)
Other versions
CN101275459B (zh
Inventor
加里·M·欧迪埃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prad Research and Development Ltd
Original Assignee
Prad Research and Development Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prad Research and Development Ltd filed Critical Prad Research and Development Ltd
Publication of CN101275459A publication Critical patent/CN101275459A/zh
Application granted granted Critical
Publication of CN101275459B publication Critical patent/CN101275459B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • E21B43/38Arrangements for separating materials produced by the well in the well
    • E21B43/385Arrangements for separating materials produced by the well in the well by reinjecting the separated materials into an earth formation in the same well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/08Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Flow Control (AREA)
  • Communication Control (AREA)
  • Pipeline Systems (AREA)

Abstract

一种技术包括在井中和井中的井下提供设备,调节提供到该设备的流的比率。

Description

控制井中的流
技术领域
本发明通常涉及控制井中的流。
背景技术
在井下环境中,存在许多涉及控制流的应用。例如,典型的井下完井可包括油/水分离器,其接收生产的井产流体混合物,并将混合物分成相应的水和油流。该水流可被重新引导入井中,并且为此目的,井下系统可被设计用于通常建立水被引导回井中的速度的目的。
控制井下环境中的流的传统方法涉及使用有损设备,诸如节流口或其它节流装置。例如,使用基于井下液力参数随着时间的流逝相对恒定的假设的简单液力计算,可确定经过设备的流动通路的尺寸。然而,当液力系统的一部分的压力和/或流特征改变时,由于计算的尺寸不再正确,整个流平衡可被扰乱。
因此,存在对控制井中的流的更好方法的持续需求。
发明内容
在本发明的实施例中,可与井一起使用的技术包括提供井下设备,并调节提供到设备的流的比率。
在本发明的另一实施例中,可与井一起使用的系统包括连通通路,其位于井中以接受流。系统的控制器调节流的比率。
通过下述附图、说明书和权利要求,本发明的其它方面和优点将变得明显。
附图说明
图1是显示根据本发明实施例的控制井中流的技术的流程框图;
图2是根据本发明实施例的系统的示意图,调节由单一输入流产生的井中流。
图3是根据本发明实施例的系统的示意图,调节由多输入流产生的井中流。
图4是显示根据本发明实施例的基于文氏管流分离控制器的示意图。
图5是显示根据本发明实施例的基于机械反馈的流分离控制器的示意图。
图6是根据本发明实施例的井的示意图。
具体实施方式
根据这里描述的本发明的实施例,井中环境中的流通过调节流的比率控制。因此,这种方法克服了传统的井下液力系统的挑战,其中:基于假设井下流速、压力等不发生变化,设计节流口尺寸和其它液压参数。更具体地说,参照图1,根据本发明的一些实施例的技术10可包括:在井中提供(方框14)液压系统,其包括连通通路以连通流。该流的比率经调节(方框16)以便比率相对恒定,并且对液压系统中的压力和/或流变化不敏感。
作为更具体的实例,图2显示了系统30,以根据本发明的一些实施例调节井中的流。该系统30包括两个交叉联接的液压流控制子系统,其调节根据入口流40产生的出口流60和70。更具体地说,入口流40(通过导管34连通)被分成两个中间流42和46,分别通过导管44和48连通到流控制器50(用于中间流46的流控制器50a,和用于中间流42的流控制器50b)。利用流控制器50b的中间流42的控制产生出口流60;并且利用流控制器50a的中间流46的控制产生出口流70。
流传感器54a和54b分别被联接以感应流46和42,并在另一流通路中提供对流控制器50的正反馈。采用这种方式,基于由流传感器54b感应的出口流60,流控制器50a控制出口流70。类似地,基于由流传感器54a感应的出口流70,流控制器50b控制出口流60。由于由这种控制方案提供的正反馈,响应感应出口流60中的增加,流控制器50a增加出口流70。类似地,响应感应出口流70中增加,流控制器50b增加了出口流60。
虽然图2显示了与单个入口流一起使用的控制方案,根据本发明的其它实施例,类似的控制方案可用于控制由平行入口流产生的流的比率。更具体地说,图3显示了根据本发明的一些实施例的这种系统76的实施例。如图3所示,该系统76接收平行入口流78。该系统76例如可包含无源(被动)设备74,调节响应平行入口流78产生的结果出口流80,以便:出口流80的比率相对恒定。因此,对于两个出口流Q1和Q2,系统76通常保持如下关系:Q1/Q2=k,                公式1其中:“k”表示常量。
作为更具体的实例,根据本发明的一些实施例,被动(无源)设备74(参见图3)可以是文氏管或孔板机构。作为一个实例,图4显示了根据本发明的一些实施例的被动、基于文氏管的流分离控制器100。参照图4,流分离控制器100在入口105处接收单一入口流104(对于这个实例)。该入口流104流经文氏管110的主流通路,以在出口107处产生相应的出口流108。该文氏管110包括吸力入口115,其响应经文氏管110的主流通路的流,施加相对活塞120的吸力。由经文氏管110的主流通路的流导致的吸力导致活塞120以对抗由弹簧140施加并打开经流通路117的流的相反力。接着,该流通路117与入口105连通。因此,对于经文氏管110的给定流,经通路117的流体连通打开,以在流分配器100的另一出口131处产生相应的出口流。当出口流108增加时,这导致在吸力管线115处吸力的相应增加,以进一步打开通路117,以进一步增加出口流130。因此,该流分离控制器100提供正反馈,用于调节出口流108和130的比率到相对恒定的目的。
应该指出:该流分离控制器100在图4显示,并且在这里描述,仅为了描述根据本发明的一些实施例的无源流分配器或流分离控制器的目的,其可用于井下环境中。根据本发明的其它实施例,可使用其它被动(无源)或非无源流分离控制器。
参照图5,作为另一实例,根据本发明的一些实施例,系统150使用两种容积式(positive displacement)设备160,用于调节两种出口流180的比率的目的。通常,容积式设备160每个包括翼片或涡轮,其响应接收的入口流152旋转。由于容积式设备160之间的机械联接170,通过来自其它设备160的正反馈,移位设备的旋转部分地受控。因此,经容积式设备160之一的增加流导致在另一容积式设备160中流的相应增加。
在这里公开的流控制器系统可以具有许多井下应用。作为特定实例,根据本发明的一些实施例,流控制系统可用于井下油和水分离的目的。该基本原理是通过将一定比例水从混合物分离并将水再喷射进入井下处置区域的设备,取得产出流体(油/水混合物,典型地具有80+%的水)并泵送产出流体。作为更具体的实例,图6显示了井200,其包括根据本发明的一些实施例的流分离控制器244。
如图6所示,井200包括位于下部封隔器240和水处理区260下方的生产区220,水处理区260位于下部封隔器240与上部封隔器241之间。井200的泵222接收生产井流体混合物221,其包括油和水。根据本发明的一些实施例,该泵222生产输出流230,经过进入可以是水力旋流器的油/水分离器234。该水力旋流器234产生两种流:水流和油流。
没有油和水流的比率的合适调节,会出现几个问题。例如,如果水生产的量增加超过期望,水被重新喷射入处理区260的速度(比率)必须增加,以避免将水采到井200的表面。如果水生产明显小于预期,油可能被喷射进入这个处理区260。因此,通过控制油和水流的比率,水去除的效率和油生产过程得以最大化。
如图6所示,流分离控制器244产生水流270,其经导管250连通进入处理区260;和经导管或生产套管215,流分离控制器244也产生油流217到表面。
总之,流分离控制器的总目标在于在井下环境中将流分离比率保持在某一恒定比率。该流分离控制器感应流或压力的变化,并响应以保持流分离比率。这种布置以与设计液压系统形成对比:基于假设(但可能不准确)的流分离的模型;使用有损节流口以强制某种流分离;或将设备放置在使水去除最大化的系统中。后面的方法可能比使用流分离控制更复杂,由于这种方法可能需要用于水的传感器和对流速控制阀的反馈。
当在井下环境中使用流分离控制器时,出现了几个实际问题,既有普通的也有具体应用。该设备是无源的(即,不需要外部能量)。因此,为了影响流分离,必须进行工作,并且这由流测量设备中的损失引起(如果使用文氏管,能够较小),并且在必须节流的流控制器更是这样(如作为典型的部分关闭阀显著)。该设备必须取得的控制越多,损失就越大。因此,抑制反压力梯度的明显流分离将产生经过设备的最高压降。
该流分离控制器可具有运动部件,以限制流,并且因此,井下环境固体的存在可能出现挑战,并且可能排除容积式流控制器。由于经过流传感器和流控制器的流速较高,固体还可能是液力类型流控制器的问题。通常,使用几米每秒(m/s)的流速,以取得液压反馈中充分的液压力。流速的上边界可能受到诸如腐蚀和高流量抑制运动部件的势能等因素限制。
根据流控制器的CD对比流速特征,该设备可具有有限动态范围,但单个设备可能能够覆盖10∶1范围的流分离和流之一的下游压力的变化。
其它挑战可源于使用油/水分离器下游的流分离控制器,它可以是重力类型、水力旋流器或旋转旋流器。首先,关于两个分离流的压力可以不必相同,并且第二,两个流的密度可能不同。不同入口压力可能在用于管线的一条或两条中的流控制器的设计中被补偿,或者如果差较小,作为流控制器中的补偿,或作为压力管线中的有损设备(例如固定节流口)。
使用液压控制器涉及具有与密度的平方根成比例的性能的流传感器。因此,一条或两条管线的密度的不同和变化影响了控制,但如果存在初始液体属性的一些知识,初始设置点可建立以实现最初的条件,并且平方根减小了对这种效果的灵敏性。在这种配置中,富油管线的流传感器作用于富水管线的流控制器,并且反之亦然,所以存在两条管线之间的密度差的复合作用。
虽然本发明已关于有限数目的实施例进行了描述,本领域的技术人员利用这种公开,将从中认识到许多修改和变化。期望的是:所附权利要求覆盖所有这些修改和变动,由于落入本发明的真实精神和范围。

Claims (18)

1.一种方法,包括以下步骤:
将井下设备提供到井中以接受流;和
调节井中的流的比率。
2.根据权利要求1所述的方法,其中调节的动作包括:
将流分配器提供在井中。
3.根据权利要求1所述的方法,其中调节的动作包括:
将流的比率调节成相对恒定。
4.根据权利要求1所述的方法,其中调节的动作包括:
调节流的比率,以便所述比率实质独立于调节发生点的下游的压力。
5.根据权利要求1所述的方法,其中调节的动作包括:
从单个输入流产生所述流。
6.根据权利要求1所述的方法,其中调节流的比率的动作包括:
基于多个输入流调节比率。
7.根据权利要求1所述的方法,其中提供的动作包括:
提供至少一个水力旋流器以接受所述流的至少一个。
8.根据权利要求1所述的方法,其中提供的动作包括:
提供导管以将所述流中的至少一个连通到井的表面。
9.根据权利要求1所述的方法,其中提供的动作包括:
提供至少一个导管以将所示流中的至少一个喷射进入井内。
10.根据权利要求1所述的方法,其中所述流由流体分离器提供。
11.一种可与井一起使用的系统,包括:
连通通路,位于井中以连通流;和
控制器,以调节所述流的比率。
12.根据权利要求11所述的系统,其中:所述控制器包括流分配器。
13.根据权利要求11所述的系统,其中:所述连通通路的至少一条将所述流的至少一个连通到井的表面。
14.根据权利要求11所述的系统,进一步包括:
井下设备,以将所述流的至少一个提供到控制器。
15.根据权利要求14所述的系统,其中:所述井下设备适合将至少两个流提供到井下设备。
16.根据权利要求11所述的系统,其中:所述调节器包括机械操作器以调节所述流的比率。
17.根据权利要求11所述的系统,其中:所述控制器包括文氏管,以调节所述流的比率。
18.根据权利要求11所述的系统,其中:所述连通通路包括:
第一连通通路,将从所述井产生的井产流体连通到所述井的表面;和
第二连通通路,将从所述井产生的水连通返回进入所述井。
CN200810086258.2A 2007-03-27 2008-03-24 控制井中的流 Expired - Fee Related CN101275459B (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/691,576 US8291979B2 (en) 2007-03-27 2007-03-27 Controlling flows in a well
US11/691,576 2007-03-27

Publications (2)

Publication Number Publication Date
CN101275459A true CN101275459A (zh) 2008-10-01
CN101275459B CN101275459B (zh) 2014-06-18

Family

ID=39186604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810086258.2A Expired - Fee Related CN101275459B (zh) 2007-03-27 2008-03-24 控制井中的流

Country Status (5)

Country Link
US (1) US8291979B2 (zh)
CN (1) CN101275459B (zh)
GB (1) GB2448018B (zh)
NO (1) NO336880B1 (zh)
RU (1) RU2456437C2 (zh)

Families Citing this family (66)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006015277A1 (en) * 2004-07-30 2006-02-09 Baker Hughes Incorporated Downhole inflow control device with shut-off feature
US7647975B2 (en) 2006-03-17 2010-01-19 Schlumberger Technology Corporation Gas lift valve assembly
US8096351B2 (en) 2007-10-19 2012-01-17 Baker Hughes Incorporated Water sensing adaptable in-flow control device and method of use
US7942206B2 (en) 2007-10-12 2011-05-17 Baker Hughes Incorporated In-flow control device utilizing a water sensitive media
US8312931B2 (en) 2007-10-12 2012-11-20 Baker Hughes Incorporated Flow restriction device
US7784543B2 (en) 2007-10-19 2010-08-31 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7775277B2 (en) 2007-10-19 2010-08-17 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US8069921B2 (en) 2007-10-19 2011-12-06 Baker Hughes Incorporated Adjustable flow control devices for use in hydrocarbon production
US8544548B2 (en) 2007-10-19 2013-10-01 Baker Hughes Incorporated Water dissolvable materials for activating inflow control devices that control flow of subsurface fluids
US20090101354A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Water Sensing Devices and Methods Utilizing Same to Control Flow of Subsurface Fluids
US7891430B2 (en) * 2007-10-19 2011-02-22 Baker Hughes Incorporated Water control device using electromagnetics
US7918272B2 (en) 2007-10-19 2011-04-05 Baker Hughes Incorporated Permeable medium flow control devices for use in hydrocarbon production
US7913755B2 (en) 2007-10-19 2011-03-29 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7789139B2 (en) 2007-10-19 2010-09-07 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7793714B2 (en) 2007-10-19 2010-09-14 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7775271B2 (en) 2007-10-19 2010-08-17 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7913765B2 (en) 2007-10-19 2011-03-29 Baker Hughes Incorporated Water absorbing or dissolving materials used as an in-flow control device and method of use
US7918275B2 (en) 2007-11-27 2011-04-05 Baker Hughes Incorporated Water sensitive adaptive inflow control using couette flow to actuate a valve
US7597150B2 (en) * 2008-02-01 2009-10-06 Baker Hughes Incorporated Water sensitive adaptive inflow control using cavitations to actuate a valve
US8839849B2 (en) 2008-03-18 2014-09-23 Baker Hughes Incorporated Water sensitive variable counterweight device driven by osmosis
US7992637B2 (en) 2008-04-02 2011-08-09 Baker Hughes Incorporated Reverse flow in-flow control device
US8931570B2 (en) 2008-05-08 2015-01-13 Baker Hughes Incorporated Reactive in-flow control device for subterranean wellbores
US8171999B2 (en) 2008-05-13 2012-05-08 Baker Huges Incorporated Downhole flow control device and method
US8555958B2 (en) 2008-05-13 2013-10-15 Baker Hughes Incorporated Pipeless steam assisted gravity drainage system and method
US7789152B2 (en) 2008-05-13 2010-09-07 Baker Hughes Incorporated Plug protection system and method
US7762341B2 (en) * 2008-05-13 2010-07-27 Baker Hughes Incorporated Flow control device utilizing a reactive media
US8113292B2 (en) 2008-05-13 2012-02-14 Baker Hughes Incorporated Strokable liner hanger and method
NO332541B1 (no) * 2008-07-10 2012-10-15 Aker Subsea As Fremgangsmåte for å kontrollere en undervanns syklonseparator
GB2466457B (en) * 2008-12-19 2011-11-16 Schlumberger Holdings Rotating flow meter
US8132624B2 (en) 2009-06-02 2012-03-13 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US8151881B2 (en) 2009-06-02 2012-04-10 Baker Hughes Incorporated Permeability flow balancing within integral screen joints
US8056627B2 (en) 2009-06-02 2011-11-15 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US8893809B2 (en) 2009-07-02 2014-11-25 Baker Hughes Incorporated Flow control device with one or more retrievable elements and related methods
US8550166B2 (en) 2009-07-21 2013-10-08 Baker Hughes Incorporated Self-adjusting in-flow control device
US8235128B2 (en) 2009-08-18 2012-08-07 Halliburton Energy Services, Inc. Flow path control based on fluid characteristics to thereby variably resist flow in a subterranean well
US8893804B2 (en) 2009-08-18 2014-11-25 Halliburton Energy Services, Inc. Alternating flow resistance increases and decreases for propagating pressure pulses in a subterranean well
US8276669B2 (en) 2010-06-02 2012-10-02 Halliburton Energy Services, Inc. Variable flow resistance system with circulation inducing structure therein to variably resist flow in a subterranean well
US9109423B2 (en) 2009-08-18 2015-08-18 Halliburton Energy Services, Inc. Apparatus for autonomous downhole fluid selection with pathway dependent resistance system
US9016371B2 (en) 2009-09-04 2015-04-28 Baker Hughes Incorporated Flow rate dependent flow control device and methods for using same in a wellbore
US8708050B2 (en) 2010-04-29 2014-04-29 Halliburton Energy Services, Inc. Method and apparatus for controlling fluid flow using movable flow diverter assembly
WO2012005889A1 (en) * 2010-06-30 2012-01-12 Schlumberger Canada Limited Downhole oil-water-solids separation
US8430130B2 (en) 2010-09-10 2013-04-30 Halliburton Energy Services, Inc. Series configured variable flow restrictors for use in a subterranean well
US8851180B2 (en) 2010-09-14 2014-10-07 Halliburton Energy Services, Inc. Self-releasing plug for use in a subterranean well
MY164163A (en) 2011-04-08 2017-11-30 Halliburton Energy Services Inc Method and apparatus for controlling fluid flow in an autonomous valve using a sticky switch
US8678035B2 (en) 2011-04-11 2014-03-25 Halliburton Energy Services, Inc. Selectively variable flow restrictor for use in a subterranean well
AU2011380525B2 (en) 2011-10-31 2015-11-19 Halliburton Energy Services, Inc Autonomus fluid control device having a movable valve plate for downhole fluid selection
BR112014010371B1 (pt) 2011-10-31 2020-12-15 Halliburton Energy Services, Inc. Aparelho para controlar o fluxo de fluido de forma autônoma em um poço subterrâneo e método para controlar o fluxo do fluido em um poço subterrâneo
US8739880B2 (en) * 2011-11-07 2014-06-03 Halliburton Energy Services, P.C. Fluid discrimination for use with a subterranean well
US9506320B2 (en) 2011-11-07 2016-11-29 Halliburton Energy Services, Inc. Variable flow resistance for use with a subterranean well
CN111206903A (zh) * 2011-11-07 2020-05-29 哈利伯顿能源服务公司 与地下井一起使用的流体辨别
US8684094B2 (en) 2011-11-14 2014-04-01 Halliburton Energy Services, Inc. Preventing flow of undesired fluid through a variable flow resistance system in a well
US9404349B2 (en) 2012-10-22 2016-08-02 Halliburton Energy Services, Inc. Autonomous fluid control system having a fluid diode
US9127526B2 (en) 2012-12-03 2015-09-08 Halliburton Energy Services, Inc. Fast pressure protection system and method
US9695654B2 (en) 2012-12-03 2017-07-04 Halliburton Energy Services, Inc. Wellhead flowback control system and method
GB2530416B (en) * 2013-03-29 2019-12-25 Schlumberger Holdings Optimum flow control valve setting system and procedure
US10309381B2 (en) * 2013-12-23 2019-06-04 Baker Hughes, A Ge Company, Llc Downhole motor driven reciprocating well pump
US11047207B2 (en) 2015-12-30 2021-06-29 Halliburton Energy Services, Inc. Controlling the sensitivity of a valve by adjusting a gap
WO2019027467A1 (en) 2017-08-03 2019-02-07 Halliburton Energy Services, Inc. AUTONOMOUS INPUT FLOW CONTROL DEVICE WITH FLUID SELECTOR FOR USE IN MOLDING
MX2021007541A (es) 2018-12-20 2021-10-13 Haven Tech Solutions Llc Aparato y método para la separación gas-líquido de un fluido multifásico.
US10478753B1 (en) 2018-12-20 2019-11-19 CH International Equipment Ltd. Apparatus and method for treatment of hydraulic fracturing fluid during hydraulic fracturing
CN109736760A (zh) * 2019-01-18 2019-05-10 大庆中联信实石油科技开发有限公司 一种注水井智能注水装置、注水系统及其注入方法
US11441395B2 (en) 2019-05-16 2022-09-13 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling
US11326423B2 (en) * 2019-05-16 2022-05-10 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings
US11499423B2 (en) 2019-05-16 2022-11-15 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration
US11821289B2 (en) 2019-11-18 2023-11-21 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis
CN111236900B (zh) * 2020-01-08 2021-11-05 西南石油大学 一种油田注水井井口回流系统及方法

Family Cites Families (78)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2002195A (en) * 1934-10-18 1935-05-21 Charles L Trout Scarf pin and holder
US2246811A (en) 1937-05-22 1941-06-24 Herbert C Otis Well flowing device
US2658457A (en) 1950-12-15 1953-11-10 Dixon T Harbison Well pump
US2822048A (en) * 1956-06-04 1958-02-04 Exxon Research Engineering Co Permanent well completion apparatus
GB1067112A (en) 1965-02-26 1967-05-03 Taylor Woodrow Internat Ltd Improvements in or relating to dock fender structures
US3410217A (en) 1967-04-25 1968-11-12 Kelley Kork Liquid control for gas wells
US3559740A (en) 1969-04-11 1971-02-02 Pan American Petroleum Corp Method and apparatus for use with hydraulic pump in multiple completion well bore
USRE28588E (en) * 1970-11-23 1975-10-28 Well cross-over apparatus for selective communication of flow passages in a well installation
EG17602A (en) 1984-11-28 1990-03-30 Carroll Noel Oil processing apparatus
US4738313A (en) 1987-02-20 1988-04-19 Delta-X Corporation Gas lift optimization
GB8915994D0 (en) 1989-07-12 1989-08-31 Schlumberger Ind Ltd Vortex flowmeters
US4937946A (en) 1989-11-24 1990-07-03 Steinhoff Alvin C Masonry line stretcher
US5128052A (en) * 1991-01-15 1992-07-07 Bullock Philip W Wellbore liquid recovery apparatus and method
US5456837A (en) 1994-04-13 1995-10-10 Centre For Frontier Engineering Research Institute Multiple cyclone apparatus for downhole cyclone oil/water separation
CA2428056C (en) 1994-04-13 2006-11-21 Centre For Engineering Research, Inc. Method of downhole cyclone oil/water separation and apparatus for the same
SE9500810D0 (sv) 1995-03-07 1995-03-07 Perstorp Flooring Ab Golvplatta
US5996690A (en) * 1995-06-06 1999-12-07 Baker Hughes Incorporated Apparatus for controlling and monitoring a downhole oil/water separator
US5560737A (en) * 1995-08-15 1996-10-01 New Jersey Institute Of Technology Pneumatic fracturing and multicomponent injection enhancement of in situ bioremediation
WO1997008459A1 (en) 1995-08-30 1997-03-06 Baker Hughes Incorporated An improved electrical submersible pump and methods for enhanced utilization of electrical submersible pumps in the completion and production of wellbores
US6732801B2 (en) * 1996-03-11 2004-05-11 Schlumberger Technology Corporation Apparatus and method for completing a junction of plural wellbores
US5730871A (en) 1996-06-03 1998-03-24 Camco International, Inc. Downhole fluid separation system
US6033567A (en) 1996-06-03 2000-03-07 Camco International, Inc. Downhole fluid separation system incorporating a drive-through separator and method for separating wellbore fluids
EP1279795B1 (en) 1996-08-15 2008-05-14 Schlumberger Technology Corporation Variable orifice gas lift valve for high flow rates with detachable power source and method of using
US5971004A (en) 1996-08-15 1999-10-26 Camco International Inc. Variable orifice gas lift valve assembly for high flow rates with detachable power source and method of using same
US6082452A (en) 1996-09-27 2000-07-04 Baker Hughes, Ltd. Oil separation and pumping systems
US5693225A (en) 1996-10-02 1997-12-02 Camco International Inc. Downhole fluid separation system
WO1998020233A2 (en) 1996-11-07 1998-05-14 Baker Hughes Limited Fluid separation and reinjection systems for oil wells
US5961841A (en) 1996-12-19 1999-10-05 Camco International Inc. Downhole fluid separation system
NO321386B1 (no) 1997-03-19 2006-05-02 Norsk Hydro As Fremgangsmate og anordning for separering av et fluid omfattende flere fluidkomponenter, fortrinnsvis separering av et bronnfluid i forbindelse med et ror for produksjon av hydrokarboner/vann
GB9713960D0 (en) 1997-07-03 1997-09-10 Schlumberger Ltd Separation of oil-well fluid mixtures
US5937946A (en) 1998-04-08 1999-08-17 Streetman; Foy Apparatus and method for enhancing fluid and gas flow in a well
US6196312B1 (en) 1998-04-28 2001-03-06 Quinn's Oilfield Supply Ltd. Dual pump gravity separation system
US6659184B1 (en) 1998-07-15 2003-12-09 Welldynamics, Inc. Multi-line back pressure control system
US6158714A (en) 1998-09-14 2000-12-12 Baker Hughes Incorporated Adjustable orifice valve
CA2247838C (en) 1998-09-25 2007-09-18 Pancanadian Petroleum Limited Downhole oil/water separation system with solids separation
US6367547B1 (en) 1999-04-16 2002-04-09 Halliburton Energy Services, Inc. Downhole separator for use in a subterranean well and method
US6357525B1 (en) 1999-04-22 2002-03-19 Schlumberger Technology Corporation Method and apparatus for testing a well
US6283204B1 (en) 1999-09-10 2001-09-04 Atlantic Richfield Company Oil and gas production with downhole separation and reinjection of gas
US6668935B1 (en) 1999-09-24 2003-12-30 Schlumberger Technology Corporation Valve for use in wells
EP1224379A1 (en) 1999-10-28 2002-07-24 Halliburton Energy Services, Inc. Flow control apparatus for use in a subterranean well
GB2358202A (en) 2000-01-12 2001-07-18 Mentor Subsea Tech Serv Inc Methods for boosting hydrocarbon production
BR0000183A (pt) 2000-01-27 2001-10-02 Petroleo Brasileira S A Petrob Separador de gás dotado de controle automático de nìvel
NO311814B1 (no) 2000-02-23 2002-01-28 Abb Research Ltd Anordning og fremgangsmate for utvinning av olje
US6336504B1 (en) 2000-03-03 2002-01-08 Pancanadian Petroleum Limited Downhole separation and injection of produced water in naturally flowing or gas-lifted hydrocarbon wells
US6336503B1 (en) 2000-03-03 2002-01-08 Pancanadian Petroleum Limited Downhole separation of produced water in hydrocarbon wells, and simultaneous downhole injection of separated water and surface water
FR2808456B1 (fr) 2000-05-03 2003-02-14 Schlumberger Services Petrol Separateur par gravite pour effluents multiphasiques
US6394183B1 (en) 2000-07-25 2002-05-28 Schlumberger Technology Corporation System and method for removing solid particulates from a pumped wellbore fluid
GB0021284D0 (en) 2000-08-30 2000-10-18 Schlumberger Evaluation & Prod Compositional simulation using a new streamline method
GB0022411D0 (en) 2000-09-13 2000-11-01 Weir Pumps Ltd Downhole gas/water separtion and re-injection
AU2002214008A1 (en) 2000-10-13 2002-04-22 Schlumberger Technology, B.V. Methods and apparatus for separating fluids
US6415864B1 (en) 2000-11-30 2002-07-09 Schlumberger Technology Corporation System and method for separately producing water and oil from a reservoir
GB0109616D0 (en) 2001-04-19 2001-06-06 Schlumberger Holdings Down-hole apparatus and method for separating a fluid from a mixture of fluids
US6644412B2 (en) 2001-04-25 2003-11-11 Weatherford/Lamb, Inc. Flow control apparatus for use in a wellbore
GB2376488B (en) 2001-06-12 2004-05-12 Schlumberger Holdings Flow control regulation method and apparatus
US20020195250A1 (en) 2001-06-20 2002-12-26 Underdown David R. System and method for separation of hydrocarbons and contaminants using redundant membrane separators
EP1352679A1 (en) 2002-04-08 2003-10-15 Cooper Cameron Corporation Separator
US6672387B2 (en) 2002-06-03 2004-01-06 Conocophillips Company Oil and gas production with downhole separation and reinjection of gas
US7055598B2 (en) 2002-08-26 2006-06-06 Halliburton Energy Services, Inc. Fluid flow control device and method for use of same
US6761215B2 (en) 2002-09-06 2004-07-13 James Eric Morrison Downhole separator and method
GB2396170B (en) 2002-12-14 2007-06-06 Schlumberger Holdings System and method for wellbore communication
US20050087336A1 (en) 2003-10-24 2005-04-28 Surjaatmadja Jim B. Orbital downhole separator
WO2005103447A1 (en) 2004-04-26 2005-11-03 Axsia Serck Baker Limited Improvements in and relating to well head separators
CN2718217Y (zh) * 2004-07-30 2005-08-17 中国石化集团中原石油勘探局钻井工程技术研究院 石油钻具旁通安全阀
US7823635B2 (en) 2004-08-23 2010-11-02 Halliburton Energy Services, Inc. Downhole oil and water separator and method
CA2581136C (en) 2004-09-20 2010-03-23 Trican Well Service Ltd. Gas separator
CA2591309C (en) 2004-12-21 2012-11-27 Shell Canada Limited Controlling the flow of a multiphase fluid from a well
WO2006085870A1 (en) 2005-02-08 2006-08-17 Welldynamics, Inc. Flow regulator for use in a subterranean well
US7559361B2 (en) * 2005-07-14 2009-07-14 Star Oil Tools, Inc. Downhole force generator
US7565305B2 (en) 2005-09-26 2009-07-21 Schlumberger Technology Corp. Apparatus and method to estimate the value of a work process and determine gaps in current and desired states
RU2291291C1 (ru) 2005-10-21 2007-01-10 ОАО "Татнефть" им. В.Д. Шашина Скважинный сепаратор
RU2290505C1 (ru) 2005-12-06 2006-12-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Скважинная установка для разделения нефти и воды
WO2007096316A1 (en) 2006-02-20 2007-08-30 Shell Internationale Research Maatschappij B.V. In-line separator
RU57813U1 (ru) 2006-06-01 2006-10-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Устройство для добычи нефти из обводненного продуктивного пласта
US7828058B2 (en) 2007-03-27 2010-11-09 Schlumberger Technology Corporation Monitoring and automatic control of operating parameters for a downhole oil/water separation system
US8006757B2 (en) 2007-08-30 2011-08-30 Schlumberger Technology Corporation Flow control system and method for downhole oil-water processing
US7814976B2 (en) 2007-08-30 2010-10-19 Schlumberger Technology Corporation Flow control device and method for a downhole oil-water separator
GB2462738B (en) 2007-08-30 2010-07-07 Schlumberger Holdings Flow control device and method for a downhole oil-water separator
US8162060B2 (en) 2008-10-22 2012-04-24 Eagle Gas Lift, LLC. Gas-lift valve and method of use

Also Published As

Publication number Publication date
US8291979B2 (en) 2012-10-23
CN101275459B (zh) 2014-06-18
RU2008111645A (ru) 2009-10-10
GB2448018B (en) 2011-11-16
US20080236839A1 (en) 2008-10-02
RU2456437C2 (ru) 2012-07-20
GB2448018A (en) 2008-10-01
NO20081447L (no) 2008-09-29
NO336880B1 (no) 2015-11-23
GB0801721D0 (en) 2008-03-05

Similar Documents

Publication Publication Date Title
CN101275459A (zh) 控制井中的流
KR102366868B1 (ko) 다중 석탄층 독립형 가스함유시스템 압력제어 단일펌프식 배수 가스채굴 장치 및 배수 가스채굴 방법
CN104594855B (zh) 页岩气高压排采集成橇装装置及其排采工艺和安装方法
CN103823424A (zh) 一种调节自动化采油系统游梁式抽油机冲次的方法
CN103335834A (zh) 一种节流阀口性能试验装置
CN1823230A (zh) 用于控制至少两个液压消耗设备的控制布置和方法
CN103018047A (zh) 一种发动机台架试验装置及发动机水温控制装置
CN103412483B (zh) 一种海上平台注采的无模型梯度优化控制方法及模拟装置
CN104776971A (zh) 一种气流携液携砂可视化实验装置
CN103438931B (zh) 湿蒸汽流量干度一体化测量装置及测量方法
CN207336466U (zh) 一种引黄滴灌灌水器堵塞室内模拟与检测系统
CN105068582B (zh) 基于dcs的高位集水冷却塔水位维持控制方法
CN206830573U (zh) 一种多功能液压试验装置
CN104832475A (zh) 半主动式升沉补偿装置主动补偿部分液压控制系统
CN104500481A (zh) 负载敏感控制系统及其控制方法和具有该系统的液压设备
CN202432603U (zh) 一种集中供暖水力平衡系统
CN204666329U (zh) 一种气流携液携砂可视化实验装置
CN105545718B (zh) 一种流量和压力双重控制的流体加压装置和方法
CN1916428A (zh) 泵控泵压流双控自动注水方法
CN101033683A (zh) 一种热力采油注汽工艺
RU2520119C1 (ru) Система поддержания пластового давления
CN213235027U (zh) 一种平衡罐泡沫液加入控制装置
CN108301819B (zh) 一种天然气井口计量节流一体化装置
CN104930021B (zh) 一种液压油冲洗装置
CN210178681U (zh) 一种阻尼可调的液压马达的执行器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140618

Termination date: 20170324