CN101265914B - 两相流潜水泵疏浚系统中加压站最优数量的确定方法 - Google Patents

两相流潜水泵疏浚系统中加压站最优数量的确定方法 Download PDF

Info

Publication number
CN101265914B
CN101265914B CN2008100975326A CN200810097532A CN101265914B CN 101265914 B CN101265914 B CN 101265914B CN 2008100975326 A CN2008100975326 A CN 2008100975326A CN 200810097532 A CN200810097532 A CN 200810097532A CN 101265914 B CN101265914 B CN 101265914B
Authority
CN
China
Prior art keywords
pump
dredging
pressurizing point
compression
rho
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100975326A
Other languages
English (en)
Other versions
CN101265914A (zh
Inventor
王天成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU XIAOER ELECTROMECHANICAL DESIGN CO Ltd
Original Assignee
HANGZHOU XIAOER ELECTROMECHANICAL DESIGN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU XIAOER ELECTROMECHANICAL DESIGN CO Ltd filed Critical HANGZHOU XIAOER ELECTROMECHANICAL DESIGN CO Ltd
Priority to CN2008100975326A priority Critical patent/CN101265914B/zh
Publication of CN101265914A publication Critical patent/CN101265914A/zh
Application granted granted Critical
Publication of CN101265914B publication Critical patent/CN101265914B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

本发明公开了两相流潜水泵疏浚系统中加压站最优数量的确定方法,适用于江河湖泊的疏浚及远距离输沙,利用建立的数学模型计算出疏浚系统输送泥浆所需的总扬程Hf,然后根据疏浚平台上的潜水泵和加压站的泵的性能参数,确定所需加压站的最优个数,确定的依据是:如果H0≥Hf,则不选用加压站;如果H0<Hf≤H0+H1,则选用一个加压站;如果H0+H1<Hf≤H0+H1+H2,则选用两个加压站;以此类推。其中,H0为疏浚平台上的潜水泵在转速为980转/min的扬程,H1为一号加压站的泵在转速为980转/min的扬程,H2为二号加压站的泵在转速为980转/min的扬程。该方法改变了以往只能根据施工经验和施工惯例来大致确定加压站个数的方法,使疏浚系统得到优化运行,提高了系统的效率,节约了输沙能耗,具有显著的经济效益。

Description

两相流潜水泵疏浚系统中加压站最优数量的确定方法
技术领域
本发明属于水利疏浚工程领域,特别涉及两相流潜水泵疏浚系统中加压站最优数量的确定方法。
背景技术
由于水土流失,我国大部分地区的河流、湖泊、水库淤积严重,为确保防洪安全,必须定期对河道、湖床或水库进行疏浚。目前用于疏浚江河湖泊的装置主要有简易吸泥船、挖泥船、冲挖机组、两相流潜水泵等,其中,利用两相流潜水泵进行水力抽沙,是最常采用且快捷有效的方法。疏浚而产生的大量泥沙往往由于场地限制或环境保护的要求,要运送到适当的地点存放,也可以用于放淤固堤、填充洼地。在利用潜水泵抽沙抽沙的同时,利用管道将泥沙远距离输送到适当地点,是目前最常采用的方法。
中国专利CN2668704Y公开了一种用于抽送黄河泥沙的泥沙抽送装置,如图1所示,主要包括平台5、泥浆泵6、主管路9和配电盘、变频调速柜等。中国专利CN2675748Y公开了一种用于黄河泥沙远距离输送的加压装置,如图2所示,该装置主要包括变频调速柜14、电动机15和泥浆泵17组成。目前,利用类似前述的泥沙抽送和加压装置组成的两相流潜水泵疏浚系统,已广泛应用于江河湖泊的疏浚工程。
两相流潜水泵疏浚系统主要包括平台、主管路和加压站三大部分。平台上一般有若干台两相流潜水泵并联抽沙,根据泥浆输送的距离和扬程的要求,一般需要若干个加压泵站串联增压,加压站主要由变频调速柜、电动机和泥浆泵组成,加压站均采用闭式加压方式,即加压泵的进出口直接联接在泥浆管路上。该系统由于效率高,效益好,使用寿命长,运行稳定可靠,在黄河放淤固堤和江河、湖泊等水力挖沙疏浚工程中发挥了重要作用,收到了显著的经济效益和社会效益。
目前,在布置两相流潜水泵疏浚系统时,只能根据施工经验和施工惯例来大致确定加压站的个数,往往导致系统的效率较低,输沙能耗较高。为了进一步提高两相流潜水泵疏浚系统的效益,有必要对系统进行优化运行,以提高系统的运行效益。由于两相流潜水泵疏浚系统在各工地上的运行条件如泥浆的管路输送距离、泥沙粒度、管道直径、管道材质(钢管或工程塑料管)等各不相同,故在系统的泵组上配备了变频调速器,但满足同样输送条件,各泵之间可以有不同的转速配合。而泵之间不同的转速配合所消耗的能量不同。系统运行优化的目的,是要精确确定泵的数量,并找出泵之间最佳的工作配合,使系统输送同样的泥沙耗能最小。其中,如何精确确定加压站的最优数量,是系统优化的关键技术向题之一,也是技术难题。
发明内容
技术问题:考虑各泵的流量-扬程关系和管道的种类、直径,以及泥沙颗粒和输送距离等主要影响因素,通过大量的现场试验和理论推导,提供一种精确确定加压站最优数量的方法。
技术方案:两相流潜水泵疏浚系统中加压站最优数量的确定方法,每个加压站由变频调速柜、电动机和泥浆泵组成,所述加压站均采用闭式加压方式,相互之间相隔一定间距布置,根据疏浚系统输送泥浆所需的总扬程的要求,以及疏浚平台上的潜水泵和加压站的泵的性能参数,确定加压站的个数,确定的方法是:
如果H0≥Hf,则不选用加压站;
如果H0<Hf≤H0+H1,则选用一个加压站;
如果H0+H1<Hf≤H0+H1+H2,则选用两个加压站;
以此类推;
其中,Hf为疏浚系统输送泥浆所需的总扬程,H0为疏浚平台潜水泵在转速为980转/min的扬程,H1为一号加压站泵在转速为980转/min的扬程,H2为二号加压站泵的在转速为980转/min的扬程,其中H0、H1和H2都转换为抽送浆体时的米水柱表示。
Hf=L×im+h0                    (1-1)
i m = α ρ m ρ i 0 + 11 μ s C v ( ρ s - ρ m ρ ) v t V - - - ( 1 - 2 )
i 0 = λ V 2 2 gD - - - ( 1 - 3 )
v t = 54.5 ( ρ s - ρ μ ) d s 2 - - - ( 1 - 4 )
Cv=(1-ε)Cvd                   (1-5)
1 λ = - 21 g [ Ks 3.89 D + 5.58 Re 0.9 ] - - - ( 1 - 6 )
式中:L为管道长度,im为泥浆管路的水力坡度;h0为管道进出口高差;i0为清水管道的水力坡度;ρ,ρs和ρm分别为清水、泥沙和泥浆的密度;Cv为浆体的体积浓度,Cvd为泥沙的当量体积浓度(亦称毛体积浓度),即抽送到目的地后自然堆积的泥沙的体积占泥浆总体积的百分比,ε为自然堆积的泥沙的孔隙率,ε=0.5;V为浆体管道中的平均速度;vt为泥沙的自由沉降末速,ds为泥沙平均粒径,μ=0.01泊(相当于t=20℃);μs为管底推移质颗粒与管道底部摩擦系数,μs=0.37~0.75,α为修正系数,通过现场试验得到α=1.225;D为管路内径;g为重力加速度;λ为管路的摩阻系数;Re为雷诺数,Ks为管道的当量粗糙度,钢管的当量粗糙度取Ks=0.05mm,对于超高分子量聚乙烯管,Ks=0.02mm。
给定管道材质、直径D、长度L、进出口高差h0、泥浆当量体积浓度Cvd和流量Q,引用式(1-1)~(1-6),即可算出疏浚系统输送泥浆所需的总扬程,继而确定加压站的最优数量。
本发明通过大量现场试验和理论推导,建立了能够精确计算疏浚系统输送泥浆所需的总扬程的数学模型,提供了利用所述数学模型确定加压站的最优个数的方法,改变了以往只能根据施工经验和施工惯例来大致确定加压站个数的方法,使两相流潜水泵疏浚系统得到优化运行,提高了系统的效率,节约了输沙能耗,该方法不仅可用于江河湖泊的疏浚,而且可以应用于固粒的管道输送,具有显著的经济效益。
附图说明
附图1为两相流潜水泵疏浚系统的疏浚平台示意图。
附图2为两相流潜水泵疏浚系统的加压泵站示意图。
附图3为两相流潜水泵疏浚系统的整体布置示意图。
具体实施方式
如附图3所示,两相流潜水泵疏浚系统主要包括疏浚平台、主管路和加压站三大部分。图3中A表示疏浚平台,B表示第一号加压站,C表示第二号加压站,E表示堤坝剖面,D表示主管路出口,Q表示泥浆流量,L1表示第一号加压站距疏浚平台的距离,L2表示第一号加压站距第二号加压站的距离,L3表示第二号加压站距管路出口的距离。平台上有若干台两相流潜水泵并联抽沙,图中1、2、3分别表示其中的一台潜水泵,根据实际情况亦可用4台泵并联或2台泵并联运行。如图1所示,平台上的附属设备有移船卷扬机4、主平台5、泥浆泵6、胶管7、三通管8、主管路9、检测阀10、电控机房11、龙门架12、电动卷扬机13和配电盘、变频调速柜等。三台并联泥浆泵6的出口通过φ150mm的耐压胶管7与主管路9相连。主管路9通常用厚3mm的钢板滚压焊接而成,直径D=350mm,最大承压能力为0.5Mpa。亦有用φ400mm和φ300mm的钢管,目前在施工中已经开始用φ350mm的超高分子量聚乙烯管(下面简称P管),P管的承压能力为0.7Mpa。
根据泥浆输送的距离和扬程的要求,一般需要若干个加压泵站串联增压,如图2所示,加压站主要由变频调速柜14、电动机15和泥浆泵17组成,附属设备有机泵联接底座16、进水管路18、进口压力传感器19、出水管路20和出口压力传感器21。加压站均采用闭式加压方式,即加压泵的进出口直接联接在泥浆管路上。考虑到管道的承压能力,加压泵不能布置在一起,必须相隔一定间距。为了达到系统运行优化的目的,应当用数量尽可能少的加压站满足长距离输沙要求,以提高加压泵站的使用效率,使系统输送同样的泥沙耗能最小。
根据疏浚系统输送泥浆所需的总扬程的要求,以及疏浚平台上的潜水泵和加压站的泵的性能参数,确定加压泵站的个数,确定的依据是:
如果H0≥Hf,则不选用加压站;
如果H0<Hf≤H0+H1,则选用一个加压站;
如果H0+H1<Hf≤H0+H1+H2,则选用两个加压站;
以此类推;
其中,Hf为疏浚系统输送泥浆所需的总扬程,H0为疏浚平台潜水泵在转速为980转/min的扬程,H1为一号加压站泵在转速为980转/min的扬程,H2为二号加压站泵的在转速为980转/min的扬程,其中H0、H1和H2都转换为抽送浆体时的米水柱表示。
其中,疏浚系统输送泥浆所需的总扬程Hf不同于输送清水时的扬程,影响因素非常复杂,主要包括管道材质、管道长度和管径、泥浆浓度、泥沙平均粒径、泥浆流量。
Hf=L×im+h0                    (1-1)
i m = α ρ m ρ i 0 + 11 μ s C v ( ρ s - ρ m ρ ) v t V - - - ( 1 - 2 )
i 0 = λ V 2 2 gD - - - ( 1 - 3 )
v t = 54.5 ( ρ s - ρ μ ) d s 2 - - - ( 1 - 4 )
Cv=(1-ε)Cvd                   (1-5)
1 λ = - 21 g [ Ks 3.89 D + 5.58 Re 0.9 ] - - - ( 1 - 6 )
式中:L为管道长度,im为泥浆管路的水力坡度;h0为管道进出口高差;i0为清水管道的水力坡度;ρ,ρs和ρm分别为清水,泥沙和泥浆的密度;Cv为浆体的体积浓度,Cvd为泥沙的当量体积浓度(亦称毛体积浓度),即抽送到目的地后自然堆积的泥沙的体积占泥浆总体积的百分比,ε为自然堆积的泥沙的孔隙率,ε=0.5;V为浆体管道中的平均速度;vt为泥沙的自由沉降末速,ds为泥沙平均粒径,μ=0.01泊(相当于t=20℃);μs为管底推移质颗粒与管道底部摩擦系数,μs=0.37~0.75,本实施方式中取μs=0.55;α为修正系数,通过现场试验得到α=1.225;D为管路内径;g为重力加速度;λ为管路的摩阻系数;Re为雷诺数,Ks为管道的当量粗糙度,钢管的当量粗糙度取Ks=0.05mm,对于超高分子量聚乙烯管,Ks=0.02mm。
通过现场测量,得到管道材质、内径D、长度L、进出口高差h0、泥浆当量体积浓度Cvd和泥浆流量Q,而H0、H1和H2在潜水泵生产厂家提供的资料里能够查到,引用公式(1-1)~(1-6),即可算出疏浚系统输送泥浆所需的总扬程Hf,继而确定加压站的最优数量。

Claims (1)

1.两相流潜水泵疏浚系统中加压站最优数量的确定方法,所述疏浚系统主要包括疏浚平台、主管路和加压站,系统中的每个加压站主要由变频调速柜、电动机和泥浆泵组成,其特征在于:所述加压站均采用闭式加压方式,并且相互之间相隔一定间距布置,根据疏浚系统输送泥浆所需的总扬程的要求,以及疏浚平台上的潜水泵和加压站的泵的性能参数,确定所需加压站的个数:
如果H0≥Hf,则不选用加压站;
如果H0<Hf≤H0+H1,则选用一个加压站;
如果H0+H1<Hf≤H0+H1+H2,则选用两个加压站;
以此类推;
其中,Hf为疏浚系统输送泥浆所需的总扬程,H0为疏浚平台上的潜水泵在转速为980转/min的扬程,H1为一号加压站的泵在转速为980转/min的扬程,H2为二号加压站的泵在转速为980转/min的扬程;其中H0、H1和H2都转换为抽送浆体时的米水柱表示,
Hf=L×im+h0     (1-1)
i m = α ρ m ρ i 0 + 11 μ s C v ( ρ s - ρ m ρ ) v t V - - - ( 1 - 2 )
i 0 = λV 2 2 gD - - - ( 1 - 3 )
v t = 54.5 ( ρ s - ρ μ ) d s 2 - - - ( 1 - 4 )
Cv=(1-ε)Cvd    (1-5)
1 λ = - 21 g [ Ks 3.89 D + 5.58 Re 0.9 ] - - - ( 1 - 6 )
式中:L为管道长度,im为泥浆管路的水力坡度;h0为管道进出口高差;i0为清水管道的水力坡度;ρ,ρs和ρm分别为清水,泥沙和泥浆的密度;Cv为浆体的体积浓度,Cvd为泥沙的当量体积浓度,即抽送到目的地后自然堆积的泥沙的体积占泥浆总体积的百分比,ε为自然堆积的泥沙的孔隙率,ε=0.5;V为浆体管道中的平均速度;vt为泥沙的自由沉降末速,ds为泥沙平均粒径,μ=0.01泊;μs为管底推移质颗粒与管道底部摩擦系数,μs=0.37~0.75;α为修正系数,取α=1.225;D为管路内径;g为重力加速度;λ为管路的摩阻系数;Re为雷诺数;Ks为管道的当量粗糙度,钢管的当量粗糙度取Ks=0.05mm,对于超高分子量聚乙烯管,Ks=0.02mm。
CN2008100975326A 2008-05-12 2008-05-12 两相流潜水泵疏浚系统中加压站最优数量的确定方法 Expired - Fee Related CN101265914B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100975326A CN101265914B (zh) 2008-05-12 2008-05-12 两相流潜水泵疏浚系统中加压站最优数量的确定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100975326A CN101265914B (zh) 2008-05-12 2008-05-12 两相流潜水泵疏浚系统中加压站最优数量的确定方法

Publications (2)

Publication Number Publication Date
CN101265914A CN101265914A (zh) 2008-09-17
CN101265914B true CN101265914B (zh) 2010-06-02

Family

ID=39988533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100975326A Expired - Fee Related CN101265914B (zh) 2008-05-12 2008-05-12 两相流潜水泵疏浚系统中加压站最优数量的确定方法

Country Status (1)

Country Link
CN (1) CN101265914B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106709153B (zh) * 2016-11-29 2019-08-09 中国农业大学 一种泵站前池扬沙率的确定方法
CN106777558B (zh) * 2016-11-29 2019-08-09 中国农业大学 一种泵站引渠及前池水体泥沙参考浓度的确定方法
SG10201907366PA (en) * 2018-09-17 2020-04-29 Sulzer Management Ag Multiphase pump

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1062572A (zh) * 1991-08-01 1992-07-08 张善仿 疏浚多沙河流的新技术
CN2401715Y (zh) * 1999-12-21 2000-10-18 山东电泵股份有限公司 砂污潜水泵
GB2372520A (en) * 2001-02-26 2002-08-28 Michael John Wilkinson Removal of silt from a fluid course, using a venturi pump
WO2005033422A2 (fr) * 2003-10-03 2005-04-14 Michel Poteur Procede de devasement sans consommation d'eau ni pollution notables
CN1851161A (zh) * 2006-05-11 2006-10-25 上海交通大学 永久性局部水底吸泥清淤的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1062572A (zh) * 1991-08-01 1992-07-08 张善仿 疏浚多沙河流的新技术
CN2401715Y (zh) * 1999-12-21 2000-10-18 山东电泵股份有限公司 砂污潜水泵
GB2372520A (en) * 2001-02-26 2002-08-28 Michael John Wilkinson Removal of silt from a fluid course, using a venturi pump
WO2005033422A2 (fr) * 2003-10-03 2005-04-14 Michel Poteur Procede de devasement sans consommation d'eau ni pollution notables
CN1851161A (zh) * 2006-05-11 2006-10-25 上海交通大学 永久性局部水底吸泥清淤的方法

Also Published As

Publication number Publication date
CN101265914A (zh) 2008-09-17

Similar Documents

Publication Publication Date Title
CN1256531C (zh) 管道穿越河流施工方法
CN102767156B (zh) 模袋充淤泥掺固化剂筑堤方法
CN101265914B (zh) 两相流潜水泵疏浚系统中加压站最优数量的确定方法
CN202828007U (zh) 深水中吸力锚的安装设备
CN105696640A (zh) 用于建筑工程填方疏浚泥添料搅拌机械及其施工方法
CN101265913B (zh) 两相流潜水泵疏浚系统所需总扬程的确定方法
CN113673179A (zh) 一种长距离泥浆管道输送动态模型及应用
CN204570663U (zh) 吹填区吹填土均质沉积排放装置
CN106120825A (zh) 利用小型绞吸挖泥船打设充填袋围堰的施工系统及方法
CN100582487C (zh) 两相流潜水泵疏浚系统中加压站位置范围的确定方法
CN102261101B (zh) 大型接力泵船的装备方法
Wang et al. Study on Conveying Properties of Coarse Sand by Field Large-scale Dredging Pipeline and Long-distance Transportation Scheme
CN112413229B (zh) 一种用于长距离顶管的触变泥浆减阻优化施工方法
CN102312801A (zh) 固体势能装置、势能运输装置、势能运输方法
CN102191783A (zh) 一种通过挖泥船进行污泥清淤的装置
CN1587771A (zh) 聚乙烯塑料管道长距离深水越江施工方法
CN204238282U (zh) 用于建筑工程填方疏浚泥添料搅拌机械
CN106480919A (zh) 一种长排距串联接力船系统
CN2289834Y (zh) 液压开槽埋膜机
CN105672389A (zh) 用于建筑工程填方疏浚泥添料搅拌机械及其施工方法
CN206090592U (zh) 利用小型绞吸挖泥船打设充填袋围堰的施工系统
CN112376641A (zh) 一种水库深水淤积物清理方法
Wei et al. Research on Relay Pump and Pipeline Layout Optimization Technology for Ultra-long-distance Slurry Transportation of the Xiaomiaohong Dredging Project
CN202055278U (zh) 一种通过挖泥船进行污泥清淤的装置
CN111125863B (zh) 一种淤泥质土的水力冲挖制浆配比方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100602

Termination date: 20110512