CN101246217B CN2008100694750A CN200810069475A CN101246217B CN 101246217 B CN101246217 B CN 101246217B CN 2008100694750 A CN2008100694750 A CN 2008100694750A CN 200810069475 A CN200810069475 A CN 200810069475A CN 101246217 B CN101246217 B CN 101246217B
Authority
CN
China
Prior art keywords
real time
data
stress
theta
crag body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100694750A
Other languages
Chinese (zh)
Other versions
CN101246217A (en
Inventor
陈洪凯
唐红梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2008100694750A priority Critical patent/CN101246217B/en
Publication of CN101246217A publication Critical patent/CN101246217A/en
Application granted granted Critical
Publication of CN101246217B publication Critical patent/CN101246217B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a dangerous rock masses collapse damage pre-alarming instrument and pre-alarming method thereof, the stress acquisition device of pre-alarming instrument includes at least two stress detectors, each stress detector is respectively connected to the signal input end of the data real time analyzing and processing device through stress signal transmission line; the data real time analyzing and processing device process stress signal transmitted from stress detector, calculates the stability coefficient of collapse source dangerous rock masses, and determines safety state of tested object, when the safety state of the tested object comes up to the pre-alarming level, the data real time analyzing and processing device sends control signal to the alarming device, the alarming device sends various alarm signals; the invention is used for real time monitoring dangerous rock collapse and safety states of important bridge, tunnel, underground project and other constructions, and conducts a real-time pre-alarm of disaster.

Description

Dangerous rock falling calamity early-warning apparatus and method for early warning thereof
Technical field
The present invention relates to disaster monitoring source of early warning field, especially relate to a kind of dangerous rock falling calamity early-warning apparatus and method for early warning thereof.
Background technology
Because China is the country on mountain more than, the crag avalanche is seriously threatening the safety of China's hillman life, the main line of communication and urban construction as a kind of main hazards.For example, only Chongqing is domestic in the reservoir area of Three Gorges just exists place surplus the crag 4000 that collapse hazard easily takes place, and amounts to more than 50000 crag body, the safety of life and property that is threatening more than 80 ten thousand people; Xichang, Sichuan Province to Lugu Lake tourism highway is along the line have 2000 surplus place's collapse hazard; Collapse hazard point in place's surplus Sichuan-Tibet highway Sichuan section exists 3200.China causes the nearly 1000 people injures and deaths because of collapse hazard every year, and the collapse hazard that occurred in stockaded village, the east of Sichuan Gaoyang, national highway 318 line Hubei as 2007 is buried passenger vehicle, causes full car 36 people's death then and there! The control of crag collapse hazard more and more is subjected to government and the people's of all circles close attention, and still, the basis of China's crag research at present is extremely weak, and research lacks systematicness, control lacks specific aim, validity.Artificial on-site land survey is still leaned in strick precaution early warning work to the crag collapse hazard at present basically, then survey data is taken back the indoor processing of studying, and provides evaluation result at last and feeds back to relevant department.Yet, crag often develops quite rapid by unstability to the process that avalanche takes place, the collection of personal monitoring's delay of response, data does not possess real-time, does not have the effect of effective strick precaution collapse hazard in most cases, and the tragedy that the avalanche of crag unstability causes calamity happens occasionally.Equally, in the production and construction practice, need too its sensitive part is carried out monitoring early warning and safety for buildings such as important bridge, tunnel, house and structures, to avoid causing irremediable loss for people's lives and properties because of disaster such as toppling over or cave in.Therefore, the monitoring and the real-time early warning of various avalanche disasters are badly in need of a kind of monitoring and warning equipment that possesses real-time and validity.
Summary of the invention
In view of this, the purpose of this invention is to provide a kind of dangerous rock falling calamity early-warning apparatus, improve the real-time and the validity of crag collapse hazard early warning.
For reaching above purpose, dangerous rock falling calamity early-warning apparatus of the present invention by the following technical solutions:
Dangerous rock falling calamity early-warning apparatus of the present invention, comprise stress harvester, data in real time APU and warning device, described data in real time APU comprises signal input part, mode setting device and data processing controller, is preset with data in real time analysis and processing program, crag body tensile strength K in the data processing controller ICConnect segment length a with crag body master control architecture face 0Described stress harvester comprises that quantity is no less than two taseometer and is respectively applied for test tension and shear stress, taseometer is laid in crag body tension zone, avalanche source, and taseometer is connected to the signal input part of described data in real time APU respectively by the stress signal line; The data in real time analysis and processing program of described data processing controller is according to the stress signal of signal input part, mode state signal and the crag body tensile strength K that mode setting device is set IC, crag body master control architecture face connects segment length a 0Judge the residing safe condition of tested crag body, when different warning level that tested crag body safe condition reaches that the data in real time analysis and processing program sets, the data in real time APU sends different early warning control signals and gives described warning device, and described warning device sends different caution signals according to the early warning control signal.
Further, described mode setting device comprises the manual input mode selector switch, manually imports button, lithology preference pattern switch and lithology selection key;
Further, the quantity of described taseometer is 10, taseometer is laid in crag body tension zone, avalanche source respectively, 5 taseometer test tensions, all the other 5 taseometer test shear stress, described data in real time analyzing and processing is provided with 10 signal input parts, and signal input part is corresponding one by one with taseometer;
Further, the signal input part of described stress signal line and described data in real time APU adopts the socket connected mode, when the stress signal line when socket is extracted, warning device directly sends corresponding alerting signal;
Further, described taseometer requires: the stress test scope is not less than 100Mpa, and the stress criterion error is not more than 10PPm, and operating ambient temperature is between-10 ℃~80 ℃.
Further, described warning device comprises loudspeaker and warning light.
Another object of the present invention provides the method that adopts described dangerous rock falling calamity early-warning apparatus to carry out the dangerous rock falling calamity early warning, may further comprise the steps:
A. determine crag body tensile strength K IC
Embody a sampling from avalanche source crag, the fracture toughness of test crag body intact rock, with this fracture toughness as crag body tensile strength K IC
Perhaps with the existing statistical value of the relevant tensile strength of sandstone, limestone, muddy limestone, grouan, Irish touchstone and marble respectively as various lithology crag body tensile strength K IC
With crag body tensile strength K ICDefault to the storage space of data processing controller;
B. measure and determine that avalanche source crag body master control architecture face connects segment length a 0, and with a 0Default to the storage space of data processing controller;
C. lay taseometer in avalanche source crag body tension zone, select the mode of operation of dangerous rock falling calamity early-warning apparatus according to mode setting device;
D. the data in real time APU is gathered tensile stress sigma that taseometer transmits and the numerical value of shear stress τ in real time;
E. the data in real time APU is by following formula calculating strength variable K 1, K 2And k 0:
K 1 = 1.12 σ π a 0 ,
K 2 = 1.12 τ π a 0 ,
k 0=(K 1/K 2) 2
F. the data in real time APU calculates avalanche source crag body rock rift direction angle θ by following formula 0:
θ 0 = arccos [ 3 + k 0 2 + 8 k 0 k 0 + 9 ] ;
G. the data in real time APU calculates k by following formula 1~k 8Totally eight parameters:
k 1 = cos θ 0 2 , k 2 = 1 2 [ ( 3 cos θ 0 - 1 ) sin θ 0 2 - 3 sin θ 0 cos θ 0 2 ] , k 3 = k 1 2 + k 7 2 k 4 = k 6 2 + k 8 2 , k 5=2(k 1k 6+k 7k 8), k 6 = 1 2 [ 3 sin θ 0 cos θ 0 2 + ( 3 cos θ 0 - 1 ) sin θ 0 2 ] k 7 = sin θ 0 cos θ 0 2 , k 8 = ( 3 cos θ 0 - 1 ) cos θ 0 2 ;
H. the data in real time APU calculates avalanche source crag body breaking factor K by following formula e:
K e = 1 2 [ k 1 K 1 + k 2 K 2 + k 3 K 1 2 + k 4 K 2 2 + k 5 K 1 K 2 ] ;
I. the data in real time APU is calculated the stability factor of avalanche source crag body by following formula:
F s = K IC K e ;
J. the data in real time APU is according to determining the residing safe condition of tested crag body by following judgement and sending corresponding early warning control signal and give warning device:
Work as F s〉=1.20 o'clock, tested avalanche source crag body totally was in a safe condition;
As 1.05≤F s<1.20 o'clock, tested avalanche source crag body totally was in the basic security state;
As 0.98≤F s<1.05 o'clock, tested avalanche source crag body totally was in critical collapse state;
Work as f s<0.98 o'clock, tested avalanche source crag body totally was in collapse state.
Further, in the c step, lay 5 taseometer test tensions, simultaneously, data in real time APU in the d step is gathered the mean value of stress data of 3 taseometers of stress numerical maximum in real time, as the numerical value of the real-time tensile stress sigma of avalanche source tension zone rock; In the c step, also lay 5 taseometer test shear stress in addition, simultaneously, the data in real time APU in the d step is got the wherein mean value of the stress data of 3 taseometers of stress numerical maximum, as the numerical value of the real-time shear stress τ of avalanche source tension zone rock.
The invention has the beneficial effects as follows: the present invention measures crag body tension and shear stress numerical value in real time by the scene and goes out a rational crag body stability factor through what computing drew, whether fall into rational safe condition scope by the value of judging this stability factor, thereby determine the safe condition of tested crag body, the present invention meets the genesis mechanism of the disaster of crag body avalanche more to the analyzing and processing of crag body stress data, thereby can improve the accuracy that crag body safe condition is estimated, thereby improved the validity of crag avalanche early warning; Data in real time analysis and processing program of the present invention combines with dangerous rock falling calamity early-warning apparatus hardware device of the present invention, can be in real time from the collection in worksite stress data, carry out analyzing and processing by the data processing controller analyzing and processing, judge the safe condition of monitored crag body quickly and accurately, and send corresponding safe condition caution signal, thereby reach the real-time that improves the early warning of crag collapse hazard, improve the purpose of the validity of crag collapse hazard early warning.
Description of drawings
Fig. 1 is the electric schematic block diagram of dangerous rock falling calamity early-warning apparatus of the present invention;
Fig. 2 is the synoptic diagram of the mainframe box of dangerous rock falling calamity early-warning apparatus of the present invention;
Embodiment
Below in conjunction with drawings and Examples early-warning apparatus of the present invention is further described, as shown in Figure 1 and Figure 2:
Fig. 1 is the electric schematic block diagram of dangerous rock falling calamity early-warning apparatus of the present invention, and dangerous rock falling calamity early-warning apparatus of the present invention comprises stress harvester, data in real time APU and warning device three parts; Wherein, stress harvester adopts taseometer 1, the data in real time APU comprises signal input part 2, mode setting device 4 and data processing controller 3, warning device adopts loudspeaker 5 and warning light 6, wherein, signal input part 2, mode setting device 4, data processing controller 3, loudspeaker 5, warning light 6 and one are in order to include in a mainframe box 8 for data processing controller 3 and warning device direct current power source supplying power 7.Be preset with data in real time analysis and processing program, crag body tensile strength K in the data processing controller 3 ICConnect segment length a with crag body master control architecture face 0Described stress harvester comprises 10 taseometers, and taseometer is laid in crag body tension zone, avalanche source, and taseometer is connected to the signal input part 2 of described data in real time APU respectively by the stress signal line; The data in real time analysis and processing program of described data processing controller 3 is according to the stress signal of signal input part 2, mode state signal and the crag body tensile strength K that mode setting device 4 is set IC, crag body master control architecture face connects segment length a 0Judge the residing safe condition of tested crag body, when different warning level that tested crag body safe condition reaches that the data in real time analysis and processing program sets, the data in real time APU sends different alarm control signals and comprises loudspeaker 5 and warning light 6 for described warning device, and loudspeaker 5 sends different caution signals with warning light 6 according to alarm control signal.The data processing controller 3 of present embodiment adopts single-chip microcomputer.
Figure 2 shows that the synoptic diagram of the mainframe box 8 of dangerous rock falling calamity early-warning apparatus of the present invention, when the dangerous rock falling calamity early-warning apparatus of present embodiment is used to monitor the crag avalanche of side, traffic main artery, mainframe box 8 is placed in the stable position contiguous with the crag body, 10 taseometers 1 are laid in crag body tension zone, avalanche source respectively, 5 test tensions, all the other 5 test shear stress, described data in real time analyzing and processing is provided with 10 signal input parts 2, each signal input part 2 adopts the jack form, each signal input part 2 connects a jack, all jacks concentrate the side that is arranged on mainframe box 8 to form socket 19, signal input part is corresponding one by one with taseometer, and each signal input part 2 links to each other with taseometer 1 by socket 19.The specification of taseometer 1: the stress test scope is not less than 100Mpa, and the stress criterion error is not more than 10PPm, and operating ambient temperature is between-10 ℃~80 ℃.The signal input part of stress signal line and described data in real time APU adopts socket 19 to carry out, and when the stress signal line was extracted from socket 19, warning device directly sent corresponding alerting signal according to the instruction of data processing controller 3; Described mode setting device 4 comprises manual input mode selector switch 11, manually imports button 13, lithology preference pattern switch 10 and lithology selection key 15, also is provided with lithology display window 14 and tensile strength display window 12 in addition.The front of mainframe box 8 also is provided with power switch 9, power light 16, and warning light 6 is arranged on 17 places, signal lamp position, mainframe box 8 front, and loudspeaker 5 is arranged on mainframe box 8 side loudspeakers 18 places, position are set.
When making early-warning apparatus of the present invention, to preset crag body tensile strength K in the data processing controller 3 IC, crag body master control architecture face connects segment length a 0With the data in real time analysis and processing program.
At first to determine crag body tensile strength K IC
Embody a sampling from avalanche source crag, by Fatigue Cracking Test test crag body intact rock, with this fracture toughness as crag body tensile strength K ICPerhaps, with the existing statistical value of the relevant tensile strength of sandstone, limestone, muddy limestone, grouan, Irish touchstone and marble respectively as various lithology crag body tensile strength K IC
Then, adopt transit or tape measure field measurement to determine that avalanche source crag body master control architecture face connects segment length a 0
Determine crag body tensile strength K ICConnect segment length a with crag body master control architecture face 0After, with K ICAnd a 0Default in the storage unit of data processing controller 3.Then, the data in real time analysis and processing program of organized data processing controller, and this program is defaulted in the storage unit of data processing controller 3, after data processing controller powered up, guiding moved this program automatically.
Above-mentioned data in real time analysis and processing program comprises following analyzing and processing process:
A. tensile stress sigma and shear stress τ signal that real-time received signal input end 2 transmits; Get the wherein mean value of the stress data of three taseometers 3 of stress numerical maximum, as the real-time tensile stress sigma of avalanche source tension zone rock; Get the wherein mean value of the stress data of three taseometers 3 of stress numerical maximum, as the real-time shear stress τ of avalanche source tension zone rock;
B. read a that defaults in data processing controller 3 storage unit 0Numerical value, and by following formula calculating strength variable K 1, K 2And k 0:
K 1 = 1.12 σ π a 0 ,
K 2 = 1.12 τ π a 0 ,
k 0=(K 1/K 2) 2
C. calculate avalanche source crag body rock rift direction angle θ by following formula 0:
θ 0 = arccos [ 3 + k 0 2 + 8 k 0 k 0 + 9 ] ;
D. calculate k by following formula 1~k 8Totally eight parameters:
k 1 = cos θ 0 2 , k 2 = 1 2 [ ( 3 cos θ 0 - 1 ) sin θ 0 2 - 3 sin θ 0 cos θ 0 2 ] , k 3 = k 1 2 + k 7 2 k 4 = k 6 2 + k 8 2 , k 5=2(k 1k 6+k 7k 8), k 6 = 1 2 [ 3 sin θ 0 cos θ 0 2 + ( 3 cos θ 0 - 1 ) sin θ 0 2 ] k 7 = sin θ 0 cos θ 0 2 , k 8 = ( 3 cos θ 0 - 1 ) cos θ 0 2 ;
E. calculate avalanche source crag body breaking factor K by following formula e:
K e = 1 2 [ k 1 K 1 + k 2 K 2 + k 3 K 1 2 + k 4 K 2 2 + k 5 K 1 K 2 ] ;
F. according to the different mode of the setting of mode setting device 4, read the K that defaults in data processing controller 3 storage unit ICNumerical value, and calculate the stability factor F of avalanche source crag body by following formula s:
F s = K IC K e ;
G. according to the stability factor F of avalanche source crag body sThe real-time numerical value situation of falling following different numerical ranges judge the residing safe condition of tested crag body:
Work as F s〉=1.20 o'clock, tested avalanche source crag body totally was in a safe condition;
As 1.05≤F s<1.20 o'clock, tested avalanche source crag body totally was in the basic security state;
As 0.98≤F s<1.05 o'clock, tested avalanche source crag body totally was in critical collapse state;
Work as F s<0.98 o'clock, tested avalanche source crag body totally was in collapse state;
H. according to the judgement of g step to sending different steering orders, control described loudspeaker 5 and send different warning signal signals with warning light 6;
I. when signal input part 2 signal deletions, warning device directly sends corresponding alerting signal.
When using the dangerous rock falling calamity early-warning apparatus of present embodiment, mainframe box 8 to be placed in the stable position contiguous with the crag body, adopt the strain rosette method that 10 taseometers 1 are laid in crag body tension zone, avalanche source respectively, 5 test tensions, all the other 5 test shear stress.
Dangerous rock falling calamity early-warning apparatus of the present invention and method for early warning thereof can also be used for the monitoring early warning and safety of buildings sensitive parts such as bridge, house, tunnel, guarantee the people life property safety, possess suitable practicality equally; But, determine tensile strength K ICThe time, need to experimentize according to the concrete buildings material that constitutes.
Explanation is at last, above embodiment is only unrestricted in order to technical scheme of the present invention to be described, the modification that those of ordinary skills make technical scheme of the present invention or be equal to replacement, only otherwise break away from the spirit and scope of technical solution of the present invention, all should be encompassed in the middle of the claim scope of the present invention.

Claims (8)

1. dangerous rock falling calamity early-warning apparatus, comprise stress harvester, data in real time APU and warning device, it is characterized in that: described data in real time APU comprises signal input part, mode setting device and data processing controller, is preset with data in real time analysis and processing program, crag body tensile strength K in this data processing controller ICConnect segment length a with crag body master control architecture face 0Described stress harvester comprises that quantity is no less than two taseometer and is respectively applied for test tension and shear stress, taseometer is laid in crag body tension zone, avalanche source, and taseometer is connected to the signal input part of described data in real time APU respectively by the stress signal line; The data in real time analysis and processing program of described data processing controller is according to the stress signal of signal input part, mode state signal and the crag body tensile strength K that mode setting device is set IC, crag body master control architecture face connects segment length a 0Judge the residing safe condition of tested crag body, when different warning level that tested crag body safe condition reaches that the data in real time analysis and processing program sets, the data in real time APU sends different early warning control signals and gives described warning device, and described warning device sends different caution signals according to the early warning control signal.
2. dangerous rock falling calamity early-warning apparatus according to claim 1 is characterised in that: described mode setting device comprises the manual input mode selector switch, manually imports button, lithology preference pattern switch and lithology selection key.
3. dangerous rock falling calamity early-warning apparatus according to claim 2, be characterised in that: the quantity of described taseometer is 10, taseometer is laid in crag body tension zone, avalanche source respectively, 5 taseometer test tensions, all the other 5 taseometer test shear stress, described data in real time analyzing and processing is provided with 10 signal input parts, and signal input part is corresponding one by one with taseometer.
4. dangerous rock falling calamity early-warning apparatus according to claim 3, be characterised in that: the signal input part of described stress signal line and described data in real time APU adopts the socket connected mode, when the stress signal line when socket is extracted, warning device directly sends corresponding alerting signal.
5. dangerous rock falling calamity early-warning apparatus according to claim 4 is characterised in that: described taseometer requires: the stress test scope is not less than 100Mpa, and the stress criterion error is not more than 10PPm, and operating ambient temperature is between-10 ℃~80 ℃.
6. dangerous rock falling calamity early-warning apparatus according to claim 5 is characterised in that: described warning device comprises loudspeaker and warning light.
7. adopt the method that the described dangerous rock falling calamity early-warning apparatus of arbitrary claim carries out the dangerous rock falling calamity early warning among the claim 1-6, may further comprise the steps:
A. determine crag body tensile strength K IC
Embody a sampling from avalanche source crag, the fracture toughness of test crag body intact rock, with this fracture toughness as crag body tensile strength K IC
Perhaps with the existing statistical value of the relevant tensile strength of sandstone, limestone, muddy limestone, grouan, Irish touchstone and marble respectively as various lithology crag body tensile strength K IC
With crag body tensile strength K ICDefault to the storage space of data processing controller;
B. measure and determine that avalanche source crag body master control architecture face connects segment length a 0, and with a 0Default to the storage space of data processing controller;
C. lay taseometer in avalanche source crag body tension zone, select the mode of operation of dangerous rock falling calamity early-warning apparatus according to mode setting device;
D. the data in real time APU is gathered tensile stress sigma that taseometer transmits and the numerical value of shear stress τ in real time;
E. the data in real time APU is by following formula calculating strength variable K 1, K 2And K 0:
K 1 = 1.12 σ π a 0 ,
K 2 = 1.12 τ π a 0 ,
k 0 = ( K 1 / K 2 ) 2 ;
F. the data in real time APU calculates avalanche source crag body rock rift direction angle θ by following formula 0:
θ 0 = arccos [ 3 + k 0 2 + 8 k 0 k 0 + 9 ] ;
G. the data in real time APU calculates k by following formula 1~k 8Totally eight parameters:
k 1 = cos θ 0 2 , k 2 = 1 2 [ ( 3 cos θ 0 - 1 ) sin θ 0 2 - 3 sin θ 0 cos θ 0 2 ] , k 3 = k 1 2 + k 7 2
k 4 = k 6 2 + k 8 2 , k 5 = 2 ( k 1 k 6 + k 7 k 8 ) , k 6 = 1 2 [ 3 sin θ 0 cos θ 0 2 + ( 3 cos θ 0 - 1 ) sin θ 0 2 ]
k 7 = sin θ 0 cos θ 0 2 , k 8 = ( 3 cos θ 0 - 1 ) cos θ 0 2 ;
H. the data in real time APU calculates avalanche source crag body breaking factor K by following formula e:
K e = 1 2 [ k 1 K 1 + k 2 K 2 + k 3 K 1 2 + k 4 K 2 2 + k 5 K 1 K 2 ] ;
I. the data in real time APU is calculated the stability factor of avalanche source crag body by following formula:
F s = K IC K e ;
J. the data in real time APU is according to determining the residing safe condition of tested crag body by following judgement and sending corresponding early warning control signal and give warning device:
Work as F s〉=1.20 o'clock, tested avalanche source crag body totally was in a safe condition;
As 1.05≤F s<1.20 o'clock, tested avalanche source crag body totally was in the basic security state;
As 0.98≤F s<1.05 o'clock, tested avalanche source crag body totally was in critical collapse state;
Work as F s<0.98 o'clock, tested avalanche source crag body totally was in collapse state.
8. method of carrying out the dangerous rock falling calamity early warning according to claim 7, it is characterized in that: in the c step, lay 5 taseometer test tensions, simultaneously, data in real time APU in the d step is gathered the mean value of stress data of 3 taseometers of stress numerical maximum in real time, as the numerical value of the real-time tensile stress sigma of avalanche source tension zone rock; In the c step, also lay 5 taseometer test shear stress in addition, simultaneously, the data in real time APU in the d step is got the wherein mean value of the stress data of 3 taseometers of stress numerical maximum, as the numerical value of the real-time shear stress τ of avalanche source tension zone rock.
CN2008100694750A 2008-03-17 2008-03-17 Dangerous rock falling calamity early warning instrument and method thereof Expired - Fee Related CN101246217B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100694750A CN101246217B (en) 2008-03-17 2008-03-17 Dangerous rock falling calamity early warning instrument and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100694750A CN101246217B (en) 2008-03-17 2008-03-17 Dangerous rock falling calamity early warning instrument and method thereof

Publications (2)

Publication Number Publication Date
CN101246217A CN101246217A (en) 2008-08-20
CN101246217B true CN101246217B (en) 2010-06-02

Family

ID=39946784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100694750A Expired - Fee Related CN101246217B (en) 2008-03-17 2008-03-17 Dangerous rock falling calamity early warning instrument and method thereof

Country Status (1)

Country Link
CN (1) CN101246217B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109668541A (en) * 2018-12-21 2019-04-23 交通运输部公路科学研究所 A kind of monitoring method for toppling over type collapse hazard

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012009827A1 (en) * 2010-07-21 2012-01-26 中国矿业大学(北京) Earthquake disaster early-warning and forecasting method and system thereof
CN102280007A (en) * 2011-01-25 2011-12-14 交通运输部公路科学研究院 Net type collapse disaster monitoring and prewarning system
CN103033140B (en) * 2012-12-24 2016-05-11 吉林大学 A kind of device that utilizes the avalanche of laser displacement sensor monitoring Dangerous Rock Body
CN103063169B (en) * 2012-12-24 2016-02-24 吉林大学 A kind of device utilizing the avalanche of monitoring ultrasonic Dangerous Rock Body
CN103093041B (en) * 2013-01-08 2015-12-23 东北大学 Engineering rock mass non-through structure face identifies and defining method
CN104332025B (en) * 2014-11-19 2017-08-18 江西西菱轨道交通技术发展有限公司 One kind is by the accurate monitoring and alarming system of protection face
CN104462855B (en) * 2014-12-29 2018-11-16 中国石油天然气集团公司 A kind of method and apparatus of underground structure monitoring data processing and analysis
CN106198924B (en) * 2016-06-27 2018-04-20 重庆大学 Precarious rock mass monitoring system and its methods of risk assessment based on adaptive frequency acquisition
CN106443784A (en) * 2016-10-20 2017-02-22 山东科技大学 Fault zone rock burst dangerousness monitoring method
CN106373368A (en) * 2016-11-16 2017-02-01 天津市万众科技发展有限公司 Collapse prewarning system based on WiFi technology
CN109472067B (en) * 2018-10-24 2022-08-26 交通运输部公路科学研究所 Method for judging toppling type collapse
CN109765297A (en) * 2019-01-03 2019-05-17 北京科技大学 A kind of avalanche early warning method based on the identification of separation failure omen
CN112525327B (en) * 2020-11-30 2021-11-02 北京中关村智连安全科学研究院有限公司 Early warning method for rock mass collapse based on variation coefficient time domain dynamics index
CN112560135B (en) * 2020-11-30 2021-10-01 北京中关村智连安全科学研究院有限公司 Rock mass collapse early warning method based on impact energy index
CN113724512A (en) * 2021-08-27 2021-11-30 江苏尤特斯新技术有限公司 Holographic traffic signal lamp system
CN115311822B (en) * 2022-10-11 2023-01-24 西南交通大学 Underground construction Cheng Ouge geological disaster early warning method and related equipment
CN116543018B (en) * 2023-05-08 2023-12-19 重庆市二零八地质环境研究院有限公司 High-steep dangerous rock collapse movement analysis method based on video feature point dynamic tracking

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4004268A (en) * 1975-02-06 1977-01-18 Teledyne Industries, Inc. In-line stress/strain detector
EP1175551A1 (en) * 1999-04-01 2002-01-30 Tachus AG Method and device for determining a previous state of stress for tunneling
CN2510865Y (en) * 2001-12-13 2002-09-11 中国矿业大学 Electromagnetic radiating monitoring apparatus for coal petrography dynamic disaster
CN2665723Y (en) * 2003-09-24 2004-12-22 成都理工学院 Real-time monitoring and alarming device for landslide
CN2724019Y (en) * 2004-08-13 2005-09-07 武汉科技大学 Earthquake and land slide monitor system based on sound transmitting
CN1948998A (en) * 2006-11-08 2007-04-18 梁富泉 Multifunctional earthquake detecting and fore casting apparatus
CN101118687A (en) * 2007-07-16 2008-02-06 中国矿业大学(北京) System and method for real time remote wireless monitoring slope landslide

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4004268A (en) * 1975-02-06 1977-01-18 Teledyne Industries, Inc. In-line stress/strain detector
EP1175551A1 (en) * 1999-04-01 2002-01-30 Tachus AG Method and device for determining a previous state of stress for tunneling
CN2510865Y (en) * 2001-12-13 2002-09-11 中国矿业大学 Electromagnetic radiating monitoring apparatus for coal petrography dynamic disaster
CN2665723Y (en) * 2003-09-24 2004-12-22 成都理工学院 Real-time monitoring and alarming device for landslide
CN2724019Y (en) * 2004-08-13 2005-09-07 武汉科技大学 Earthquake and land slide monitor system based on sound transmitting
CN1948998A (en) * 2006-11-08 2007-04-18 梁富泉 Multifunctional earthquake detecting and fore casting apparatus
CN101118687A (en) * 2007-07-16 2008-02-06 中国矿业大学(北京) System and method for real time remote wireless monitoring slope landslide

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
蒋廷耀,王尚庆,马凯.三峡库区滑坡监测信息平台的设计和实现.舰船电子工程27 4.2007,27(4),172-175.
蒋廷耀,王尚庆,马凯.三峡库区滑坡监测信息平台的设计和实现.舰船电子工程27 4.2007,27(4),172-175. *
陈洪凯,唐红梅,王蓉.三峡库区危岩稳定性计算方法及应用.岩石力学与工程学报23 4.2004,23(4),614-619.
陈洪凯,唐红梅,王蓉.三峡库区危岩稳定性计算方法及应用.岩石力学与工程学报23 4.2004,23(4),614-619. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109668541A (en) * 2018-12-21 2019-04-23 交通运输部公路科学研究所 A kind of monitoring method for toppling over type collapse hazard
CN109668541B (en) * 2018-12-21 2020-12-01 交通运输部公路科学研究所 Method for monitoring collapse disaster

Also Published As

Publication number Publication date
CN101246217A (en) 2008-08-20

Similar Documents

Publication Publication Date Title
CN101246217B (en) Dangerous rock falling calamity early warning instrument and method thereof
CN108510112B (en) Mine disaster prediction and early warning method combining field monitoring and numerical simulation
CN205334690U (en) Timely alarm device of highway side slope danger rock mass landslide disaster
CN105257339B (en) The multi-parameter integrated monitoring and pre-alarming method of driving face
RU2567878C2 (en) Method to predict hazard of coal and gas discharge by means of combination of various information
RU2630334C2 (en) System of dynamic controlling roof-based separation based on fiber grating and method of preliminary alert
CN111426373A (en) Dangerous rock body collapse real-time early warning system and method based on multiple monitoring indexes
US20200011176A1 (en) Vibration and strain monitoring method for key positions of tunnel boring machine
CN104083841B (en) It is a kind of for mine and the fire prevention and control system and method for underground pipe network
CN101363824A (en) Device for real time monitoring mine roof rock formation or concrete structure stability
CN107559046A (en) Coal mine down-hole tunnel deformation, air quantity and gas density comprehensive monitoring early warning system
CN106840265A (en) A kind of scaffold safety pre-warning system
CN101763713A (en) Landslide early warning system and method adopting soil resistance measurement
CN103277137A (en) Forecasting method for gas outburst of tunneling coal roadway
CN208183704U (en) The safety pre-warning system in tunnel portal slope construction stage
CN113962837A (en) Mine geotechnical engineering monitoring and evaluation emergency feedback system and method
CN211740385U (en) Dangerous rock body collapse real-time early warning system based on multiple monitoring indexes
CN106958458B (en) A method of monitoring fall of ground hidden danger
CN205823340U (en) A kind of digitized beam tube fire monitoring system
CN107747966A (en) A kind of high slope builds monitoring early-warning system
CN205477749U (en) Colliery anti -counterfeiting pushes up early warning device based on laser detection technology
CN106050307A (en) Spontaneous emission portable tunnel construction safe early-warning system and method
CN107237619A (en) A kind of outburst prediction index coal powder quantity of bore fast accurate intelligent measurement method
CN210268562U (en) Digital display roof separation layer displacement alarm
CN211877102U (en) High-ground-temperature tunnel environment real-time early warning and long-term monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model