CN101239691A - Sling for EAF furnace body - Google Patents

Sling for EAF furnace body Download PDF

Info

Publication number
CN101239691A
CN101239691A CNA2008100139485A CN200810013948A CN101239691A CN 101239691 A CN101239691 A CN 101239691A CN A2008100139485 A CNA2008100139485 A CN A2008100139485A CN 200810013948 A CN200810013948 A CN 200810013948A CN 101239691 A CN101239691 A CN 101239691A
Authority
CN
China
Prior art keywords
eaf
heater
rope
hanger
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100139485A
Other languages
Chinese (zh)
Inventor
张广富
王傲松
魏佑凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG GUANGFU GROUP CO Ltd
Original Assignee
SHANDONG GUANGFU GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG GUANGFU GROUP CO Ltd filed Critical SHANDONG GUANGFU GROUP CO Ltd
Priority to CNA2008100139485A priority Critical patent/CN101239691A/en
Publication of CN101239691A publication Critical patent/CN101239691A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention provides an EAF hanger for furnace body, including a hanging body, showing ''H'' shaped radial case, the top of the hanger main beam out-of-center is set with a ring; the lower symmetrical four ends of the hanger are set with a lower ring respectively, the lower ring interior is connected with a balancing wheel by hinge pin, one ends of the balancing wheel and the rope are connected. When the invention is used on the top of the EAF, the travelling crane descends, when pushing the rope to liftinglug to contact with the protecting cover, the travelling crane ascends, when the furnace falls off furnace platform locating stud, transporting to the appointed repair position. By the same token, new EAF body is transported to exchange, the hanging transportation of the EAF body is realized. The advantages of the invention has a simple structure, convenient operating use, better synchronicity, lifting centre of gravity of the hanger and the centre of gravity of the body are superposition, and also has a better wholly mechanical property, furthest avoiding the extruding of the rope and the body water pipeline when hanging the body. Further, the invention also reduces labor intensity and shortens operation time.

Description

EAF body of heater suspender
Technical field
The present invention relates to a kind of suspender, especially a kind of EAF body of heater suspender.
Background technology
EAF (arc furnace) stove and accessory has advantages such as smelting special steel, developing new product variety, thereby is widely used.And the EAF stove causes the loss of refractory material owing to the aggressive action of molten steel, slag in smelting process, on average just needs to change a body of heater less than 300 stoves.
Two ways that driving lifts are adopted in the replacing of present domestic high capacity EAF body of heater mostly, its method is the two ends that hang sling respectively with two drivings, according to the non-equilibrium state of body of heater, adjust the balance of body of heater with the lifting altitude difference of two drivings in the handling body of heater process.The shortcoming of its method is that poor synchronization, duty cycle are long.The method that the producer that also has adopts two steel wire cable pockets to hang is changed body of heater, sees Fig. 1, the shortcoming steel wire cable discontinuity equalization of this method and the balance of body of heater, body of heater difficulty in place.Not only steel wire cable and upper of furnace body can produce and hit pressure, and working strength of workers is big, and duty cycle is long.
Summary of the invention
The present invention is for overcoming above-mentioned the deficiencies in the prior art, and a kind of simple in structure, easy for operation, EAF body of heater suspender that synchronism is good is provided.
The objective of the invention is to adopt following technical proposals to realize: a kind of EAF body of heater suspender, comprise and hang body, the described body that hangs is for being the radial casing of " H " type, and the off-center place, girder top of hanging body is provided with upper lift ring; Four ends of hanging body bottom symmetry are respectively equipped with lower lift ring, are connected with balance wheel by bearing pin in the lower lift ring, and balance wheel is connected with an end of rope.
The axial line of described lower lift ring with hang the body axial line one 45~47 ° β angle arranged.
The other end of described rope is provided with anti-sharp object and squeezes the protecting sleeve of hindering, and it not only plays the effect of protection steel wire cable, and brings convenience and safety to operation.
Described body, upper lift ring and the lower lift ring assembly welding of hanging becomes an integral body, and is respectively equipped with floor on it, strengthened single-piece rigidity.
As the present invention during with EAF (arc furnace) the body of heater top arrive to need changed, driving descends, after a end that rope has a protecting jacket arrives the hanger position of body of heater, after rope pushed hanger and protecting jacket contacts, driving is risen, and after body of heater breaks away from the table locating dowel pin, transports to the repair location of appointment.Then arrive new EAF (arc furnace) body of heater top and descend, after a end that rope has a protecting jacket arrives the hanger position of body of heater, after rope pushed hanger and protecting jacket contacts by driving, driving is risen, be transported to the table top, after body of heater is aimed at the table locating dowel pin, fall to placing the tram.By aforesaid operations, the present invention can realize the handling of EAF (arc furnace) body of heater.Because the suspender of this body of heater is the radial box of " H " type, therefore when the handling body of heater, suspender can not contact with the cooling water pipe of body of heater, can avoid the squeeze and destroy to the cooling water pipe of body of heater.
Advantage of the present invention be simple in structure, easy for operation, synchronism is good, crane lifting center of gravity overlaps with the body of heater center of gravity, the whole mechanical property of suspender is good, can avoid the extruding of rope itself and body of heater water pipe when the handling body of heater to greatest extent.And reduce labour intensity and shorten production time.
Description of drawings
Fig. 1 is a steel wire cable embodiment scheme drawing;
Fig. 2 is a structural representation of the present invention;
Fig. 3 is the embodiments of the invention scheme drawing;
Wherein 1. hang body, 2. upper lift ring, 3. lower lift ring, 4. rope, 5. balance wheel, 6. bearing pin, 7. protecting jacket, 8. hanger, 9. body of heater.
The specific embodiment
The present invention is further described below in conjunction with drawings and Examples.
Among Fig. 2, Fig. 3, hang body 1 for being the radial casing of " H " type.The off-center place, girder top of hanging body 1 is provided with upper lift ring 2; Four ends of hanging body 1 bottom symmetry are respectively equipped with lower lift ring 3; be connected with balance wheel 5 by bearing pin 6 in the lower lift ring 3; balance wheel 5 is connected with an end of rope 4; the other end of rope 4 is provided with anti-sharp object and squeezes the protecting sleeve 7 of hindering; it not only plays the effect of protection steel wire cable 4, and brings convenience and safety to operation.
The axial line of lower lift ring 3 has one 45~47 ° β angle with the axial line that hangs body 1.
Hang body, upper lift ring and lower lift ring assembly welding and become an integral body, and be respectively equipped with floor on it, strengthened single-piece rigidity.
On technology, use explanation below with reference to Fig. 3 for the present invention:
When the present invention needs EAF (arc furnace) body of heater 1 top of replacing with arrival, driving descends, after a end that rope 4 has a protecting jacket 7 arrives hanger 8 positions of body of heater 9, after rope 4 pushed hanger 8 and protecting jacket 7 contacts, driving is risen, after body of heater 9 breaks away from the table locating dowel pin, transport to the repair location of appointment.Then arriving new EAF (arc furnace) body of heater 1 top by driving descends, after a end that rope 4 has a protecting jacket 7 arrives hanger 8 positions of body of heater 9, after rope 4 pushed hanger 8 and protecting jacket 7 contacts, driving is risen, be transported to the table top, after body of heater is aimed at the table locating dowel pin, fall to placing the tram.By aforesaid operations, the present invention can realize the handling of EAF (arc furnace) body of heater 9.Because the suspender 1 of this body of heater 9 is the radial box of " H " type, therefore when handling body of heater 9, suspender 1 can not contact with the cooling water pipe of body of heater 9, can avoid the squeeze and destroy to the cooling water pipe of body of heater 9.

Claims (4)

1. an EAF body of heater suspender comprises and hangs body, it is characterized in that: hang body for being the radial casing of " H " type, the off-center place, girder top of hanging body is provided with upper lift ring; Four ends of hanging body bottom symmetry are respectively equipped with lower lift ring, are connected with balance wheel by bearing pin in the lower lift ring, and balance wheel is connected with an end of rope.
2. EAF body of heater suspender according to claim 1 is characterized in that: the axial line of described lower lift ring with hang the body axial line one 45~47 ° β angle arranged.
3. EAF body of heater suspender according to claim 1 is characterized in that: the other end of described rope is provided with anti-sharp object and squeezes the protecting sleeve of hindering.
4. EAF body of heater suspender according to claim 1 is characterized in that: described body, upper lift ring and the lower lift ring assembly welding of hanging becomes an integral body, and is respectively equipped with floor on it.
CNA2008100139485A 2008-01-22 2008-01-22 Sling for EAF furnace body Pending CN101239691A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100139485A CN101239691A (en) 2008-01-22 2008-01-22 Sling for EAF furnace body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100139485A CN101239691A (en) 2008-01-22 2008-01-22 Sling for EAF furnace body

Publications (1)

Publication Number Publication Date
CN101239691A true CN101239691A (en) 2008-08-13

Family

ID=39931594

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100139485A Pending CN101239691A (en) 2008-01-22 2008-01-22 Sling for EAF furnace body

Country Status (1)

Country Link
CN (1) CN101239691A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102295228A (en) * 2011-08-17 2011-12-28 天津市建工工程总承包有限公司 Steel sling for steel column
CN106115460A (en) * 2016-08-17 2016-11-16 湖北三江航天红阳机电有限公司 A kind of revolving body boom hoisting and method
CN112279063A (en) * 2020-10-20 2021-01-29 中国十七冶集团有限公司 Adjustable beam plate hoisting protection device and installation method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102295228A (en) * 2011-08-17 2011-12-28 天津市建工工程总承包有限公司 Steel sling for steel column
CN102295228B (en) * 2011-08-17 2013-05-29 天津市建工工程总承包有限公司 Steel sling for steel column
CN106115460A (en) * 2016-08-17 2016-11-16 湖北三江航天红阳机电有限公司 A kind of revolving body boom hoisting and method
CN112279063A (en) * 2020-10-20 2021-01-29 中国十七冶集团有限公司 Adjustable beam plate hoisting protection device and installation method

Similar Documents

Publication Publication Date Title
CN201169490Y (en) Electric arc furnace body sling
CN203740389U (en) Self-discharging work bin
CN101239691A (en) Sling for EAF furnace body
CN110241285A (en) Converter mouth petticoat pipe more changing device, replacement structure and replacing options
CN201264862Y (en) Hoisting apparatus for thin wall vessel
CN203877726U (en) Multi-hoisting-point hoisting beam for turning over and hoisting equipment
CN201395468Y (en) Slag pan hanger
CN206088741U (en) Hoist of safe handling converter sublance
CN201777796U (en) Omnibearing hoisting device in blast furnace hearth
CN208696293U (en) A kind of pushing off the slag teapot packet and its skimming device
CN213622863U (en) Converter backing ring hoisting device
CN202625608U (en) Double-hook three-in-one lifting device for electric-arc furnace cover, upper furnace shell and lower furnace shell
CN203306914U (en) Steel ladle hoisting device
CN201857211U (en) Large-size product lifting appliance for upper-charging chemical vapor deposition furnace
CN201068461Y (en) Stainless steel revolving furnace
CN202316989U (en) Suspended anode casting structure and suspended travelling casting frame
CN202358831U (en) Clamp for crucible
CN105197763A (en) Steel plate lifting appliance
CN101259525A (en) Large-scale hot-metal bottle
CN203865833U (en) Sling for mixing drum
CN202836183U (en) Molten pool smelting furnace
CN203781632U (en) Semi-automatic loading and unloading sling for billet steel
CN205061329U (en) Lifting tool for steel plate
CN204324689U (en) Blast furnace cooling stave changes hoisting tool special
CN203843158U (en) Steel ladle baking device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080813