CN101231040B - Wind power central air-conditioning method - Google Patents

Wind power central air-conditioning method Download PDF

Info

Publication number
CN101231040B
CN101231040B CN2006100223255A CN200610022325A CN101231040B CN 101231040 B CN101231040 B CN 101231040B CN 2006100223255 A CN2006100223255 A CN 2006100223255A CN 200610022325 A CN200610022325 A CN 200610022325A CN 101231040 B CN101231040 B CN 101231040B
Authority
CN
China
Prior art keywords
air
wind
temperature
compressed air
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2006100223255A
Other languages
Chinese (zh)
Other versions
CN101231040A (en
Inventor
邸慧民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luo Rui
Original Assignee
骆芮
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 骆芮 filed Critical 骆芮
Priority to CN2006100223255A priority Critical patent/CN101231040B/en
Publication of CN101231040A publication Critical patent/CN101231040A/en
Application granted granted Critical
Publication of CN101231040B publication Critical patent/CN101231040B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Abstract

The invention relates to a wind central air conditioning method, especially a wind turbine group arranged at an air port for manufacturing compressed air. An air transmitting pipe collects the compressed air manufactured by the wind turbine group, and then transmits to an air storage tank for storing; an air cleaner purifies the compressed air in the air storage tank; an air feeding pipe transmits the air to an underground circulation tube; the circulation tube cycles the clean air; through the reverse temperature cycle in the earth and on the earth surface, the temperature of the air in the circulation tube is transformed elementarily; a boiler further processes the air after being transformed elementarily to reach the temperature required by people. A central air supply piping system transmits cool or warm wind to a branch air channel, and the air channel transmits the cool or warm wind to an exhaust blower for exhausting. The wind central air conditioning uses a spot of conventional source of energy to supplement, and transmits clean cool air containing negative oxygen particles on alpine to the room in summer as well as the warm, moist and fresh air on the ocean to the room in winter.

Description

The method of wind-force central air-conditioning
Technical field
The present invention designs a kind of wind-force central air-conditioning method, relate to specifically a kind of produce compressed air by wind mill group after, by the gas pipeline system compressed air delivery is stored to air accumulator, air accumulator is sent compressed air to air purifier by pipeline when needing to use, air purifier with air cleaning after, compressed air delivery after will purifying by gas pipeline circulates in underground air circulation duct system, by the underground temperature opposite with ground, after circulation pipe tentatively circulates air adjusting, be delivered in the boiler, the air that boiler will tentatively be regulated is heated after the refrigeration, be transported to each bar through central wind conveying pipe road system and prop up the wind conveying pipe road, a wind conveying pipe road is delivered to changes in temperature wind in the exhaust blower and is arranged to indoor wind-force central air-conditioning method of carrying out air conditioning.
Background technology
At present, along with going deep into of the paces of the quickening of Chinese Urbanization and new countryside construction, China people change to comfort type life style from life style simply having adequate food and clothing, and are more and more higher to the requirement of health to temperature comfort in the living facilities and air.Existing air conditioning mode mainly contains central air-conditioning (central heating) each door type air-conditioning modes such as (individual heatings); The energy that adopts mainly contains coal, electricity, natural gas, oil equal energy source form.Existing air-conditioning need cause the serious environmental pollution with a large amount of fossil energies such as coal electricity when system wind, system temperature.It is indoor because there is not fresh air to add to that people live in air-conditioned room for a long time, just original room air is modulated, and be that the people suffers from air conditioner disease easily.The wind-force central air-conditioning utilizes geothermal energy, underground thermostat layer energy, and thermal gradient energy and space thermal gradient energy equal energy source is cold and hot poor under water, and the fresh air of being produced by wind mill group carries above cold and hot difference and can regulate indoor temperature in the chamber of being transported to.Geothermal energy can be used compressed air heating back by air circulation duct as warm braw such as the wind-force central air conditioner system; Also the cold air that contains negative oxygen particle clean on the summer high mountain can be transported to indoorly, can transmit fresh air warm and moist on the ocean winter.The wind-force central air conditioner system is a kind of wind energy air-conditioning method of cleaning.
Summary of the invention
The technical problem to be solved in the present invention is to overcome the deficiency that prior art exists, providing a kind of compressed air that wind mill group is produced to collect to transfer in the air accumulator through pipeline stores, when using, needs compressed air delivery is delivered air in the underground circulation pipe by pipeline after with air cleaning in the air purifier by pipeline, air circulates in underground circulation pipe, air with underground " cool in summer and warm in winter " in cyclic process tentatively converts the temperature opposite with ground to, after again air being delivered in the boiler secondary heating refrigeration, boiler is delivered to each bar with the cold and heat air that is fit to through central wind conveying pipe road system and is propped up the wind conveying pipe road, and a wind conveying pipe is delivered to changes in temperature wind in the exhaust blower and arranged to the indoor wind-force air-conditioning method that carries out air conditioning.
Wind-force central air-conditioning method of the present invention is achieved by the following technical programs: the present invention is made up of wind mill group, appendix, air accumulator, air purifier, snorkel, circulation pipe, boiler, central wind conveying pipe road, a wind conveying pipe road and exhaust blower device, and described wind-force air-conditioning method is rapid just like the bottom;
A) the wind power collecting switch process converts wind energy to compressed air by the wind mill group that is arranged on the place, air port;
B) transmission storing step appendix compressed air that wind mill group is produced is collected and is transferred in the air accumulator;
C) purifying step is delivered in the air purifier by air accumulator output compressed air, and compressed air is carried out purified treatment;
D) input modulation step by snorkel with compressed air delivery to being arranged in the underground air;
E) the temperature modulation step, is carried out the compressed air circulation to be delivered in the boiler after the temperature transition by opposite temperature on underground and the ground by air, and boiler is done further heating refrigeration with air and handled;
F) cold and heat air boiler sent by the central air supply pipeline of allocation step is sent in each air supply duct;
G) the output step is delivered to exhaust blower by an air supply duct with cold and heat air, and exhaust blower is discharged changes in temperature wind.
Wind-force central air-conditioning method of the present invention compared with prior art has following beneficial effect: the combination of wind mill group of the present invention and gas pipeline, can make unit in the zone of broadness, collect wind energy and produce compressed air, the compressed air that gas pipeline will be produced is collected together and is delivered in the air accumulator and stores, air accumulator in use delivery air after air purifier is handled, tentatively changing with the air of underground opposite temperature on the ground, so just can reduce heat energy consumption when freezing of boiler by the circulation of underground circulating line.The wind-force central air conditioner system can be saved a large amount of electric energy, and people also can breathe the fresh air in the Nature simultaneously, can not suffer from air conditioner disease.
Description of drawings
Wind-force central air-conditioning method of the present invention has following accompanying drawing:
Be wind-force central air-conditioning method structural representation of the present invention described in the figure;
Wherein, 1, is wind energy conversion system; 2, be appendix; 3, be air accumulator; 4, be air purifier; 5, be snorkel; 6, be circulation pipe; 7, be boiler; 8, be central wind conveying pipe road; 9 wind conveying pipe roads; 10, be exhaust blower.
The specific embodiment
Below in conjunction with drawings and Examples technical solution of the present invention is further described.
As described in Figure.Wind-force central air-conditioning method of the present invention is made up of wind mill group 1, appendix 2, air accumulator 3, air purifier 4, snorkel 5, circulation pipe 6, boiler 7, central air supply pipeline 8, an air supply duct 9 and exhaust blower 10, and described air-conditioning method has the following steps:
A) the wind power collecting switch process converts wind energy to compressed air by the wind mill group 1 that is arranged on air port place;
B) transmission storing step appendix 2 compressed air that wind mill group 1 is produced is collected and is transferred in the air accumulator 3;
C) purifying step to air purifier 4, is carried out purified treatment with compressed air by air accumulator 3 output compressed air;
D) input modulation step by snorkel 5 with compressed air delivery to being arranged in the underground air 6;
E) the temperature modulation step, is carried out the compressed air circulation to be delivered in the boiler 7 after the temperature transition by opposite temperature on underground and the ground by air 6, and boiler 7 is done further heating refrigeration with air and handled;
F) cold and heat air boiler 7 sent by central air supply pipeline 8 of allocation step is sent in each air supply duct 9;
G) the output step is delivered to exhaust blower 10 by an air supply duct 9 with cold and heat air, and exhaust blower 10 is discharged changes in temperature wind.
Embodiment.
As shown in the figure.Present embodiment is a wind-force central air-conditioning method, produce compressed air by the wind mill group 1 that is arranged on the place, air port, be sent in the air accumulator 3 after the compressed air that appendix 2 is produced wind mill group 1 is collected and store, after air accumulator 3 purifies compressed air delivery to the air purifier 4 in use, by snorkel 5 air is delivered in the underground circulation pipe 6, the natural air that circulation pipe 6 is produced wind mill group 1 circulates, by circulation underground and the opposite temperature in ground, air themperature in the circulation pipe 6 is tentatively changed, air after boiler 7 will tentatively be changed is done further processing, to reach the temperature that people need.Central air supply pipeline 8 is delivered to changes in temperature wind in the branch wind pipe road 9, and branch wind pipe road 9 is delivered to changes in temperature wind and is expelled to the indoor adjustment of carrying out in the exhaust blower 10.

Claims (1)

1. wind-force central air-conditioning method, the wind-force central air-conditioning is made up of wind mill group (1), appendix (2), air accumulator (3), air purifier (4), snorkel (5), air (6), boiler (7), central air supply pipeline (8), an air supply duct (9), exhaust blower (10), and it is characterized in that: described wind-force central air-conditioning method has the following steps:
A) wind power collecting switch process: utilize wind energy to produce compressed air by the wind mill group (1) that is arranged on the place, air port;
B) transmission storing step: the compressed air that appendix (2) is produced wind mill group (1) is collected and is transferred in the air accumulator (3);
C) purifying step: to air purifier (4), compressed air is carried out purified treatment by air accumulator (3) output compressed air;
D) input modulation step: by snorkel (5) with compressed air delivery to being arranged in the underground air (6);
E) temperature modulation step:, by opposite temperature on underground and the ground compressed air circulation is carried out being delivered in the boiler (7) after the temperature inversion by air (6), boiler (7) is sent after with the air modulation;
F) allocation step: the cold and heat air of boiler (7) being sent by central air supply pipeline (8) is sent in each air supply duct (9);
G) output step: by an air supply duct (9) cold and heat air is delivered to exhaust blower (10), exhaust blower (10) is discharged changes in temperature wind.
CN2006100223255A 2006-11-22 2006-11-22 Wind power central air-conditioning method Expired - Fee Related CN101231040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2006100223255A CN101231040B (en) 2006-11-22 2006-11-22 Wind power central air-conditioning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2006100223255A CN101231040B (en) 2006-11-22 2006-11-22 Wind power central air-conditioning method

Publications (2)

Publication Number Publication Date
CN101231040A CN101231040A (en) 2008-07-30
CN101231040B true CN101231040B (en) 2011-08-10

Family

ID=39897707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006100223255A Expired - Fee Related CN101231040B (en) 2006-11-22 2006-11-22 Wind power central air-conditioning method

Country Status (1)

Country Link
CN (1) CN101231040B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225860A (en) * 2013-05-14 2013-07-31 廖立军 Forest air and terrestrial heat air conditioner

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082697A (en) * 1992-08-05 1994-02-23 北京市西城区新开通用试验厂 Household wind cooling compressor
JP2002147337A (en) * 2000-08-28 2002-05-22 Mayekawa Mfg Co Ltd Windmill-driven heat pump and windmill-driven refrigerating system
CN1439806A (en) * 2003-04-04 2003-09-03 丁树文 Method and device for utilizing natural energy source in scattered live environment
DE10352023A1 (en) * 2003-11-07 2005-06-16 Rittal Rcs Communication Systems Gmbh & Co. Kg Air conditioning system with heat exchangers for cooling heat sources and units for effectively conveying a heat carrier between heat exchangers
JP2005180237A (en) * 2003-12-17 2005-07-07 Kenkichi Sato Wind power generation device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082697A (en) * 1992-08-05 1994-02-23 北京市西城区新开通用试验厂 Household wind cooling compressor
JP2002147337A (en) * 2000-08-28 2002-05-22 Mayekawa Mfg Co Ltd Windmill-driven heat pump and windmill-driven refrigerating system
CN1439806A (en) * 2003-04-04 2003-09-03 丁树文 Method and device for utilizing natural energy source in scattered live environment
DE10352023A1 (en) * 2003-11-07 2005-06-16 Rittal Rcs Communication Systems Gmbh & Co. Kg Air conditioning system with heat exchangers for cooling heat sources and units for effectively conveying a heat carrier between heat exchangers
JP2005180237A (en) * 2003-12-17 2005-07-07 Kenkichi Sato Wind power generation device

Also Published As

Publication number Publication date
CN101231040A (en) 2008-07-30

Similar Documents

Publication Publication Date Title
CN101603715B (en) Ground source heat pump air-conditioning system and air processing method thereof
CN101403521B (en) Solar energy absorption type refrigeration and ground source heat pump coupling combined supplying system
WO2016155600A1 (en) Method and device for improving air-conditioning system applying all-weather solar energy heat supply
CN205351809U (en) Changes in temperature circulation system for house
CN101900387A (en) Novel geothermal energy solar central air conditioner system
CN201569099U (en) Novel air-conditioning system for top plate of capillary tube of ground source heat pump
CN102032632A (en) Novel energy resource air conditioning mode and system
CN201575542U (en) Self-contained dehumidification air conditioner of external-melt ice-thermal-storage humidity conditioning and underground water temperature regulation
CN106857110A (en) A kind of agricultural greenhouse plant seasonal comprehensive temperature control system and temperature control method
CN106016825A (en) Solar and air source heat pump dual heat source tri-generation system
CN102087038A (en) Independent dehumidification air conditioning method and device for adjusting humidity by using external ice-melting cold storage and adjusting temperature by using underground water
CN101140090A (en) Door type water intermediary cooling and warming air conditioner device
CN203131962U (en) Solar ground source heating device
CN201429169Y (en) Solar energy type seawater source heat pump system
CN101231040B (en) Wind power central air-conditioning method
CN206420096U (en) A kind of air heat energy collection system
CN105783153A (en) System based on ground temperature structure ratio/hybrid air pump/multi-pipe temperature taking/water penetration purification
CN202868844U (en) Modularized radiation heat transfer terminal and waste heat recovery radiation pipe network heat pump system
CN203442992U (en) Underground-water circulating geothermal air-conditioning system
CN102538064A (en) Air energy heat pump and solar energy complementary type hot water device
CN206328300U (en) A kind of energy compensation device of sludge treating system
CN201218633Y (en) Solar energy-accumulation and energy-exchange dual-effect air conditioner
CN210292432U (en) Distributed energy supply system based on heat pump technology
CN203848366U (en) Solar air combination heat supply system for village and small town houses
CN207674658U (en) A kind of air-conditioning system of solar energy auxiliary heating

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: LUO RUI

Free format text: FORMER OWNER: DI HUIMIN

Effective date: 20091023

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20091023

Address after: Room 4, building 77, 1106 Changjiang Road, Xining, Qinghai, China

Applicant after: Luo Rui

Address before: Room 6, unit 7, Zhongnan pass, Xining, Qinghai,

Applicant before: Di Huimin

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110810

Termination date: 20111122