CN101134207A - Processing method of the hot rolling arrived material convexity in the computing of cold rolled sheet shape initialization - Google Patents
Processing method of the hot rolling arrived material convexity in the computing of cold rolled sheet shape initialization Download PDFInfo
- Publication number
- CN101134207A CN101134207A CNA2006100305062A CN200610030506A CN101134207A CN 101134207 A CN101134207 A CN 101134207A CN A2006100305062 A CNA2006100305062 A CN A2006100305062A CN 200610030506 A CN200610030506 A CN 200610030506A CN 101134207 A CN101134207 A CN 101134207A
- Authority
- CN
- China
- Prior art keywords
- convexity
- calculating
- cold
- band steel
- strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The present invention relates to shape control method for cold rolled steel strip, and discloses method of treating convexity degree of the hot rolled material in the cold rolled steel strip shape setting and calculating. The treating method includes compensating calculation based on the sectional convexity degree data from hot rolling to eliminate the error caused by post step, and calculating the current convexity degree as the input condition for the accurate pre-calculation and post-calculation of roller bending force based on the current steel strip rolling position. The present invention can realize accurate setting in the whole length of steel strip without need of complicated and costly convexity degree measuring instrument in front of the cold rolling mill, and has saving in investment and lowered cost.
Description
(1) technical field
The present invention relates to the board-shape control method of cold-strip steel, relate in particular to the processing method of incoming hot rolled slab convexity in the cold rolled sheet shape initialization calculating.
(2) background technology
During hot rolling, for making band steel stable smooth operation, band steel cross section keeps certain convexity always.The hot rolling convexity that the hot rolling cooling rolls generally is controlled at 0~60 μ m, and the DI material is 0~40 μ m.When cold rolling, must on the principle basis of equal proportion convexity, consider the plate shape of band steel, load roll gap shape and supplied materials section configuration are complementary, could guarantee that unit outlet belt plate shape is good.In reality was cold rolling, when the supplied materials convexity changed, fixed as-rolled condition will change, thereby plate shape is changed.Therefore, in order to guarantee plate shape, must adjust the control device of plate shape in real time according to the convexity of supplied materials.
In the control of actual plate shape, methods such as inclination, roller, roll shifting, subregion cooling all are effective plate shape control devices.Wherein roller is important, a real-time control device of plate shape, can change effective convexity of roll, thus the percentage elongation cross direction profiles that changes the shape of load roll gap and roll back band steel.When being with steel to be about to enter cold-rolling mill for one, computer system can start time plate shape precomputation earlier, and calculating can guarantee parameters such as the smooth bending roller force of producing of this band steel, roll shifting amount; And when the band steel enters milling train and produces, can regularly start the back again calculates, according to present actual measurement roll-force, tension force, band steel inlet/outlet thickness and the roll crown (being actual roll shape) that calculates, by calculating the plate shape under the present case, calculate the roller regulated quantity and send to automatic control system and realize best plate shape to adjust bending roller force.
These plate shapes are calculated need use an important parameters: the supplied materials convexity.Because the metal lateral flow is very little in the cold-rolled process, almost can ignore, therefore must carry out intermesh determination and could guarantee that the outlet belt plate shape is good, referring to Fig. 1 according to the principle of equal proportion convexity.That is:
Wherein: C
h=h
c-h
e, C
H=H
c-H
e, h and H are respectively the average thickness of outlet and inlet.
As can be seen from the above equation, the supplied materials convexity is set to calculate to whole plate shape and is had crucial effects.Therefore accurately grasping the supplied materials convexity is accurately to set the prerequisite of calculating.
But the convexity of incoming hot rolled slab is not changeless, can fluctuate in certain scope according to process conditions, material situation and the equipment situation of hot rolling.
For solving the accuracy problem of cold rolled sheet shape initialization, obtain supplied materials convexity accurately, the general at present average convexity of transmitting hot-strip from L3 of adopting presets the input value of calculating as plate shape, referring to Fig. 2.But this method has a lot of limitations in actual applications, because the convexity of a hot-strip is inequality from taking the lead to magnetic tape trailer, a band steel is in the operation of rolling, and the convexity on the total length direction fluctuates.This just must cause to set and calculate on the total length direction of a band steel, sometimes may be accurate, inaccurate sometimes.This is feasible for precomputation, because an operation instruction value is just calculated in precomputation earlier; But calculate for the back, its result will control in real time to production, only improperly work as with average convexity, average convexity can not reflect the actual convexity of band steel current location, can cause the load calculated roll gap inaccurate, and then make the bending roller force of calculating can't realize the ideal of exit plate shape is controlled.
At this situation, the processing method that occurs is to set up the convex measuring instrument at the milling train inlet at present, the supplied materials convexity of actual measurement milling train inlet, for example Japanese Nippon Steel patent " the sheet material board-shape control method in the cold-rolled process " (JP2005118840), and then the computing that feedovers, realize the FEEDFORWARD CONTROL of bending roller force, for example day intrinsic safety river motor patent " the plate shape autocontrol method on the cold-rolling mill width " (JP2004154830), referring to Fig. 3.But this method needs extra enhancement measuring instrument, and this instrument measurement position is many, costs an arm and a leg, and safeguards complexity, the cost height.
(3) summary of the invention
The object of the present invention is to provide the processing method of incoming hot rolled slab convexity in a kind of cold rolled sheet shape initialization calculating, this processing method is that the incoming hot rolled slab convexity is reasonably handled, making the hot-strip convexity input value of calculating behind the bending roller force is the convexity of current physical location, makes that bending roller force result of calculation is accurate.
The present invention is achieved in that the processing method of incoming hot rolled slab convexity in a kind of cold rolled sheet shape initialization calculating, it is characterized in that:
The 1st goes on foot, and utilizes the measurement data of hot rolling profile gauge, offers the n of band steel on the total length direction convex value that every needs advance cold-rolling mill;
The 2nd step compensated calculating to n convex value and eliminates the error that preceding operation causes, and the compensating gage point counting is four parts: rewind calculating, crop calculating, straightening compensation and side cut compensation;
The 2.1st step, rewind calculating, coil of strip convexity data are inverted, promptly take the lead to become magnetic tape trailer, magnetic tape trailer becomes takes the lead;
In the 2.2nd step, crop calculates, and some meters length of excision coil of strip head make that c1 is a resection length, and t1 is a total length, and then the coil of strip convexity behind the crop should be:
The 2.3rd step, the straightening compensation, making the percentage elongation of straightening machine is e, supposes that the band steel evenly extends on width, then convexity becomes:
In the 2.4th step, the compensation of cutting edge makes that monotropic side cut amount is cs, and strip width is w, and then convexity becomes:
The 3rd step, according to the rolling position of band steel, to calculate current convexity size and offer precomputation and back calculating as initial conditions, the hot-strip convexity input value that bending roller force precomputation and back are calculated is the convexity of current physical location;
In the 3.1st step, precomputation when the precomputation of each coil of strip, is got first convexity c[1] as initial parameter;
The 3.2nd goes on foot, and back calculating when back calculating starts bending roller force calculating at every turn, according to the hot rolling inlet convexity of this band of position steel of position judgment of being with steel in the present cold-rolling mill, is calculated with this convexity; The convexity that calculates is the convex value of band steel at cold-rolling mill inlet, i.e. the convex value of first frame inlet, and the inlet convexity of all the other frames can be taken into account the influence of plate shape according to equal proportion convexity principle and calculate.
Being implemented as follows of the strip profile value of described cold-rolling mill inlet:
The entrance velocity of order band steel is v, and the time interval of last computation and this calculating is dt, defines a static variable r1, is used to write down the rolling length of this band steel,
(1) gives the r1 assignment
Calculate if there is new band steel to carry out the back, promptly new band steel enters cold-rolling mill,
rl=0.0
Otherwise, rl=rl+v * dt
(2) obtain this position between any two convex measuring points:
X is one and gets the maximum integer i that is less than or equal to x greater than 0 floating number, and then this position is positioned at that (i is i+1) between two convex measuring points;
(3) obtain the strip profile of this position
Because the supplied materials convexity slowly changes in the longitudinal direction, can suppose (i, i+1) convexity between two convex measuring points is linear change, so the convexity of this position is:
Cr is the convex value of band steel at the cold-rolling mill inlet, the i.e. convex value of first frame inlet.
A described n measurement point is equally distributed, and n is measured convex value is 30.
The present invention transmits the segmentation convexity data of coming according to hot rolling, calculate the error that the preceding operation of elimination causes by compensation, rolling position according to the band steel, calculate current convexity size and offer precomputation and back calculating as initial conditions, the hot-strip convexity input value that bending roller force precomputation and back are calculated is the convexity of current physical location, make that bending roller force result of calculation is accurate, reach the purpose of on band steel total length, accurately setting.
Compared with prior art, main feature of the present invention is to obtain the initial conditions that revised actual convexity is calculated as bending roller force according to supplied materials current length position calculation, the section configuration of load calculated roll gap and supplied materials is complementary, thereby guarantees according to the plate shape of this bending roller force control good.And complicated, expensive convex measuring instrument need be installed before cold-rolling mill, and saved investment, reduced cost.
(4) description of drawings
The invention will be further described below in conjunction with the drawings and specific embodiments.
Fig. 1 is the schematic diagram of equal proportion convexity;
Fig. 2 is existing average convexity transmission method schematic diagram;
Fig. 3 is existing actual measurement convexity feed forward control method schematic diagram;
Fig. 4 is an incoming hot rolled slab convex measuring value distribution map of the present invention (n=30);
Fig. 5 transmits for convexity segmentation of the present invention and adds compensation computational methods schematic diagram;
Fig. 6 is the curve map of embodiment strip profile.
(5) specific embodiment
The present invention utilizes the measurement data of hot rolling profile gauge, carries out certain data and handles, and is delivered to cold rollingly by L3, and calculating for cold rolling setting provides suction parameter accurately.Because the convex measuring instrument of complexity, precision is housed behind the finishing mill of hot rolling, be used to carry out real-time convex measuring to realize the convexity closed-loop control.
The processing method of incoming hot rolled slab convexity the steps include: during a kind of cold rolled sheet shape initialization calculated
The 1st goes on foot, and utilizes the measurement data of hot rolling profile gauge, offers the n of band steel on the total length direction convex value that every needs advance cold-rolling mill; This n value along take the lead to the distribution situation of magnetic tape trailer as shown in Figure 4, be equally distributed along this n of band steel length direction measurement point, n measurement convex value is 30.
The 2nd step, n convex value compensated calculating eliminate the error that preceding operation causes, though, on pickling and cold continuous rolling production line, will be subjected to the influence of operations such as crop, straightening, pickling, side cut when hot rolling is measured because the position of n convex measuring value of a band steel is accurately; The compensating gage point counting is four parts: rewind calculating, crop calculating, straightening compensation and the compensation of cutting edge; Referring to Fig. 5
The 2.1st step, rewind calculating, because of the magnetic tape trailer of incoming hot rolled slab is cold rolling taking the lead, coil of strip convexity data need be inverted, promptly take the lead to become magnetic tape trailer, magnetic tape trailer becomes takes the lead;
Known incoming hot rolled slab length L, n along its length (supposition n is 30) strip profile value is kept at array c[30] in, array dimension is 30;
Array tc[30 in the middle of setting up], make following assignment:
tc[i]=c[30-i]
Back substitution then:
c[i]=tc[i];
In the 2.2nd step, crop calculates, and when rolling up on cold rolling, some meters length of topping, therefore will deduct this part length in convexity is calculated; Make that c1 is a resection length, t1 is a total length, and then the coil of strip convexity behind the crop should be:
The 2.3rd step, the straightening compensation, the straightening machine before the pickling generally has 1% to 3% percentage elongation, also can change strip profile, therefore needs compensation to calculate; Making the percentage elongation of straightening machine is e, supposes that the band steel evenly extends on width, and then convexity becomes:
The 2.4th step, the compensation of cutting edge, most of coil of strip needs to cut edge before rolling and handles, and therefore also needs the compensation of cutting edge; Make that monotropic side cut amount is cs, strip width is w, and then convexity becomes:
The 3rd step, according to the rolling position of band steel, to calculate current convexity size and offer precomputation and back calculating as initial conditions, the hot-strip convexity input value that bending roller force precomputation and back are calculated is the convexity of current physical location;
In the 3.1st step, precomputation when the precomputation of each coil of strip, is got first convexity c[1] as initial parameter;
The 3.2nd goes on foot, and back calculating when back calculating starts bending roller force calculating at every turn, according to the hot rolling inlet convexity of this band of position steel of position judgment of being with steel in the present cold-rolling mill, is calculated with this convexity; The convexity that calculates is the convex value of band steel at cold-rolling mill inlet, i.e. the convex value of first frame inlet, and the inlet convexity of all the other frames can be taken into account the influence of plate shape according to equal proportion convexity principle and calculate.
Being implemented as follows of the strip profile value of cold-rolling mill inlet:
The entrance velocity of order band steel is v, and the time interval of last computation and this calculating is dt, defines a static variable r1, is used to write down the rolling length of this band steel,
(1) gives the r1 assignment
Calculate if there is new band steel to carry out the back, promptly new band steel enters cold-rolling mill,
rl=0.0
Otherwise, rl=rl+v * dt
(2) obtain this position between any two convex measuring points:
X is one and gets the maximum integer i that is less than or equal to x greater than 0 floating number, and then this position is positioned at that (i is i+1) between two convex measuring points;
(3) obtain the strip profile of this position
Because the supplied materials convexity slowly changes in the longitudinal direction, can suppose (i, i+1) convexity between two convex measuring points is linear change, so the convexity of this position is:
Cr is the convex value of band steel at the cold-rolling mill inlet, the i.e. convex value of first frame inlet.
Embodiment
In certain cold continuous rolling three electric transformation project, the supplied materials convexity of bending roller force model is handled by the present invention, can realize the automatic setting of bending roller force, and plate shape is all right.
The example that convexity is handled is as follows:
It is as shown in table 1 to suppose that convexity numerical value is measured in hot rolling;
Table 1
40.00 | 42.39 | 44.20 | 44.98 | 44.54 | 42.99 | 40.70 | 38.24 | 36.216 | 35.11 |
35.20 | 36.47 | 38.60 | 41.07 | 43.28 | 44.69 | 44.94 | 43.99 | 42.06 | 39.62 |
37.27 | 35.60 | 35.00 | 35.62 | 37.31 | 39.66 | 42.10 | 44.01 | 44.95 | 44.67 |
Suppose coil of strip length overall 500m, crop 10m.Straightening extends 3%, strip width 800mm, and one-sided side cut 20mm, the strip profile after then calculating through compensation becomes table 2, and the curve map of strip profile is referring to Fig. 6.
When being rolled down to 320m,
Then Ci Shi rolling position tables look-up 2 between the 19th and the 20th; The actual convexity of this moment is:
If only adopt the average convexity 40.52 of supplied materials, then be with the error that produces according to conventional method:
As seen adopt method of the present invention can improve plate shape setting accuracy greatly.
Table 2
The position | Initial data | Rewind calculating | Crop calculates | The straightening compensation | Cut edge and compensate |
1 | 40.00 | 44.67 | 44.68 | 43.37 | 39.15 |
2 | 42.39 | 44.95 | 44.93 | 43.62 | 39.37 |
3 | 44.20 | 44.01 | 43.97 | 42.69 | 38.53 |
4 | 44.98 | 42.10 | 42.06 | 40.83 | 36.85 |
5 | 44.54 | 39.66 | 39.62 | 38.47 | 34.71 |
6 | 42.99 | 37.31 | 37.28 | 36.20 | 32.67 |
7 | 40.70 | 35.62 | 35.61 | 34.57 | 31.20 |
8 | 38.24 | 35.00 | 35.01 | 33.99 | 30.68 |
9 | 36.21 | 35.60 | 35.62 | 34.59 | 31.21 |
10 | 35.11 | 37.27 | 37.30 | 36.22 | 32.69 |
11 | 35.20 | 39.62 | 39.65 | 38.50 | 34.74 |
12 | 36.47 | 42.06 | 42.08 | 40.86 | 36.87 |
13 | 38.60 | 43.99 | 44.00 | 42.72 | 38.55 |
14 | 41.07 | 44.94 | 44.94 | 43.63 | 39.37 |
15 | 43.28 | 44.69 | 44.67 | 43.37 | 39.14 |
16 | 44.69 | 43.28 | 43.26 | 42.00 | 37.90 |
17 | 44.94 | 41.07 | 41.05 | 39.85 | 35.97 |
18 | 43.99 | 38.60 | 38.58 | 37.46 | 33.81 |
19 | 42.06 | 36.47 | 36.46 | 35.40 | 31.95 |
20 | 39.62 | 35.20 | 35.20 | 34.17 | 30.84 |
21 | 37.27 | 35.11 | 35.12 | 34.09 | 30.77 |
22 | 35.60 | 36.21 | 36.22 | 35.17 | 31.74 |
23 | 35.00 | 38.24 | 38.25 | 37.14 | 33.52 |
24 | 35.62 | 40.70 | 40.71 | 39.52 | 35.67 |
25 | 37.31 | 42.99 | 43.00 | 41.74 | 37.67 |
26 | 39.66 | 44.54 | 44.54 | 43.24 | 39.03 |
27 | 42.10 | 44.98 | 44.98 | 43.67 | 39.41 |
28 | 44.01 | 44.20 | 44.20 | 42.91 | 38.73 |
29 | 44.95 | 42.39 | 42.39 | 41.15 | 37.14 |
30 | 44.67 | 40.00 | 40.00 | 38.83 | 35.05 |
On average | 40.52 | 40.52 | 40.51 | 39.33 | 35.50 |
Claims (3)
1. the processing method of incoming hot rolled slab convexity during a cold rolled sheet shape initialization calculates is characterized in that:
The 1st goes on foot, and utilizes the measurement data of hot rolling profile gauge, offers the n of band steel on the total length direction convex value that every needs advance cold-rolling mill;
The 2nd step compensated calculating to n convex value and eliminates the error that preceding operation causes, and the compensating gage point counting is four parts: rewind calculating, crop calculating, straightening compensation and side cut compensation;
The 2.1st step, rewind calculating, coil of strip convexity data are inverted, promptly take the lead to become magnetic tape trailer, magnetic tape trailer becomes takes the lead;
In the 2.2nd step, crop calculates, and some meters length of excision coil of strip head make that cl is a resection length, and tl is a total length, and then the coil of strip convexity behind the crop should be:
The 2.3rd step, the straightening compensation, making the percentage elongation of straightening machine is e, supposes that the band steel evenly extends on width, then convexity becomes:
In the 2.4th step, the compensation of cutting edge makes that monotropic side cut amount is cs, and strip width is w, and then convexity becomes:
The 3rd step, according to the rolling position of band steel, to calculate current convexity size and offer precomputation and back calculating as initial conditions, the hot-strip convexity input value that bending roller force precomputation and back are calculated is the convexity of current physical location;
In the 3.1st step, precomputation when the precomputation of each coil of strip, is got first convexity c[1] as initial parameter;
The 3.2nd goes on foot, and back calculating when back calculating starts bending roller force calculating at every turn, according to the hot rolling inlet convexity of this band of position steel of position judgment of being with steel in the present cold-rolling mill, is calculated with this convexity; The convexity that calculates is the convex value of band steel at cold-rolling mill inlet, i.e. the convex value of first frame inlet, and the inlet convexity of all the other frames can be taken into account the influence of plate shape according to equal proportion convexity principle and calculate.
2. the processing method of incoming hot rolled slab convexity during cold rolled sheet shape initialization according to claim 1 calculates is characterized in that: being implemented as follows of the strip profile value of cold-rolling mill inlet:
The entrance velocity of order band steel is v, and the time interval of last computation and this calculating is dt, defines a static variable rl, is used to write down the rolling length of this band steel;
(1) gives the rl assignment
Calculate if there is new band steel to carry out the back, promptly new band steel enters cold-rolling mill,
rl=0.0
Otherwise, rl=rl+v * dt
(2) obtain this position between any two convex measuring points:
X is one and gets the maximum integer i that is less than or equal to x greater than 0 floating number, and then this position is positioned at that (i is i+1) between two convex measuring points;
(3) obtain the strip profile of this position
Because the supplied materials convexity slowly changes in the longitudinal direction, can suppose (i, i+1) convexity between two convex measuring points is linear change, so the convexity of this position is:
Cr is the convex value of band steel at the cold-rolling mill inlet, the i.e. convex value of first frame inlet.
3. the processing method of incoming hot rolled slab convexity during cold rolled sheet shape initialization according to claim 1 calculates, it is characterized in that: n measurement point is equally distributed, n is measured convex value is 30.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100305062A CN100534655C (en) | 2006-08-28 | 2006-08-28 | Processing method of the hot rolling arrived material convexity in the computing of cold rolled sheet shape initialization |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100305062A CN100534655C (en) | 2006-08-28 | 2006-08-28 | Processing method of the hot rolling arrived material convexity in the computing of cold rolled sheet shape initialization |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101134207A true CN101134207A (en) | 2008-03-05 |
CN100534655C CN100534655C (en) | 2009-09-02 |
Family
ID=39158650
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100305062A Active CN100534655C (en) | 2006-08-28 | 2006-08-28 | Processing method of the hot rolling arrived material convexity in the computing of cold rolled sheet shape initialization |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100534655C (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101890435A (en) * | 2010-07-20 | 2010-11-24 | 江苏省沙钢钢铁研究院有限公司 | Method for automatically controlling convexity and/or wedge of hot rolled in series type rolling machine and system thereof |
CN102366764A (en) * | 2011-09-13 | 2012-03-07 | 中冶南方工程技术有限公司 | Processing method for reducing order of measured value of cold-rolled steel strip shape measuring signal |
CN102366759A (en) * | 2011-09-13 | 2012-03-07 | 中冶南方工程技术有限公司 | Sectional type guaranteed cost shape control method for cold-rolled steel strips |
CN102527736A (en) * | 2012-01-06 | 2012-07-04 | 中冶南方工程技术有限公司 | Method for confirming reeling radius of cold-rolled steel strip |
CN102645920A (en) * | 2012-04-11 | 2012-08-22 | 燕山大学 | Plate shape reproduction and analysis method suitable for cold continuous rolling machine set |
CN101966535B (en) * | 2009-07-28 | 2012-11-14 | 宝山钢铁股份有限公司 | Cold rolling strip shape forward control setting method based on incoming material plate profile |
CN102861771A (en) * | 2012-09-29 | 2013-01-09 | 鞍钢股份有限公司 | Differential roll bending method of working roll and used for controlling nonsymmetrical flatness defects |
CN101920268B (en) * | 2009-06-09 | 2013-04-03 | 鞍钢股份有限公司 | Method for processing measured value for controlling shape of plates in cold-rolling mill |
CN102029294B (en) * | 2009-09-28 | 2013-06-19 | 宝山钢铁股份有限公司 | Control method of lateral thick difference of cold-rolling strip steels |
CN103203369A (en) * | 2013-03-26 | 2013-07-17 | 鞍钢股份有限公司 | Plate shape control method of hot rolled high-strength thin strip steel |
CN103272855A (en) * | 2013-06-13 | 2013-09-04 | 北京首钢自动化信息技术有限公司 | Method for improving precision of thickness of inlet of rolling mill during preset model calculation |
CN103691744A (en) * | 2012-09-27 | 2014-04-02 | 上海梅山钢铁股份有限公司 | Predication method for dynamic tail-escaping amount of strip steel |
CN104368607A (en) * | 2014-09-09 | 2015-02-25 | 河北钢铁股份有限公司邯郸分公司 | Online cold-rolled sheet shape recording and transmitting method for CVC cold rolling mill |
CN106475421A (en) * | 2016-09-30 | 2017-03-08 | 首钢总公司 | A kind of control method of middle base supplied materials convexity and device |
CN106825069A (en) * | 2017-03-22 | 2017-06-13 | 宁波宝新不锈钢有限公司 | A kind of cold-strip steel high accuracy plate shape surface roughness on-line intelligence control method |
CN106944483A (en) * | 2017-03-22 | 2017-07-14 | 宁波宝新不锈钢有限公司 | A kind of measurement control method of reversing cold mill band transverse gage Distribution Value |
CN108273852A (en) * | 2018-01-19 | 2018-07-13 | 山东钢铁集团日照有限公司 | A kind of sectionalized adjustment method of finish rolling plate shape |
CN111752233A (en) * | 2019-03-28 | 2020-10-09 | 宝山钢铁股份有限公司 | Method for assigning production process data to length position of strip steel |
CN112007959A (en) * | 2019-05-30 | 2020-12-01 | 上海梅山钢铁股份有限公司 | Control method for improving plate shape of free rolling strip steel |
-
2006
- 2006-08-28 CN CNB2006100305062A patent/CN100534655C/en active Active
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101920268B (en) * | 2009-06-09 | 2013-04-03 | 鞍钢股份有限公司 | Method for processing measured value for controlling shape of plates in cold-rolling mill |
CN101966535B (en) * | 2009-07-28 | 2012-11-14 | 宝山钢铁股份有限公司 | Cold rolling strip shape forward control setting method based on incoming material plate profile |
CN102029294B (en) * | 2009-09-28 | 2013-06-19 | 宝山钢铁股份有限公司 | Control method of lateral thick difference of cold-rolling strip steels |
CN101890435B (en) * | 2010-07-20 | 2012-12-12 | 江苏省沙钢钢铁研究院有限公司 | Method for automatically controlling convexity and/or wedge of hot rolled in series type rolling machine and system thereof |
CN101890435A (en) * | 2010-07-20 | 2010-11-24 | 江苏省沙钢钢铁研究院有限公司 | Method for automatically controlling convexity and/or wedge of hot rolled in series type rolling machine and system thereof |
CN102366764B (en) * | 2011-09-13 | 2013-11-20 | 中冶南方工程技术有限公司 | Processing method for reducing order of measured value of cold-rolled steel strip shape measuring signal |
CN102366759A (en) * | 2011-09-13 | 2012-03-07 | 中冶南方工程技术有限公司 | Sectional type guaranteed cost shape control method for cold-rolled steel strips |
CN102366764A (en) * | 2011-09-13 | 2012-03-07 | 中冶南方工程技术有限公司 | Processing method for reducing order of measured value of cold-rolled steel strip shape measuring signal |
CN102366759B (en) * | 2011-09-13 | 2013-09-18 | 中冶南方工程技术有限公司 | Sectional type guaranteed cost shape control method for cold-rolled steel strips |
CN102527736A (en) * | 2012-01-06 | 2012-07-04 | 中冶南方工程技术有限公司 | Method for confirming reeling radius of cold-rolled steel strip |
CN102645920A (en) * | 2012-04-11 | 2012-08-22 | 燕山大学 | Plate shape reproduction and analysis method suitable for cold continuous rolling machine set |
CN103691744B (en) * | 2012-09-27 | 2016-04-13 | 上海梅山钢铁股份有限公司 | Tail amount forecasting procedure dynamically thrown by a kind of band steel |
CN103691744A (en) * | 2012-09-27 | 2014-04-02 | 上海梅山钢铁股份有限公司 | Predication method for dynamic tail-escaping amount of strip steel |
CN102861771A (en) * | 2012-09-29 | 2013-01-09 | 鞍钢股份有限公司 | Differential roll bending method of working roll and used for controlling nonsymmetrical flatness defects |
CN102861771B (en) * | 2012-09-29 | 2014-11-05 | 鞍钢股份有限公司 | Differential roll bending method of working roll and used for controlling nonsymmetrical flatness defects |
CN103203369A (en) * | 2013-03-26 | 2013-07-17 | 鞍钢股份有限公司 | Plate shape control method of hot rolled high-strength thin strip steel |
CN103272855A (en) * | 2013-06-13 | 2013-09-04 | 北京首钢自动化信息技术有限公司 | Method for improving precision of thickness of inlet of rolling mill during preset model calculation |
CN103272855B (en) * | 2013-06-13 | 2015-11-18 | 北京首钢自动化信息技术有限公司 | A kind of method improving inlet of rolling mill thickness and precision in preset model calculates |
CN104368607A (en) * | 2014-09-09 | 2015-02-25 | 河北钢铁股份有限公司邯郸分公司 | Online cold-rolled sheet shape recording and transmitting method for CVC cold rolling mill |
CN104368607B (en) * | 2014-09-09 | 2016-03-30 | 河北钢铁股份有限公司邯郸分公司 | A kind of online record, transmission cold rolled sheet shape method adapting to CVC cold mill complex |
CN106475421A (en) * | 2016-09-30 | 2017-03-08 | 首钢总公司 | A kind of control method of middle base supplied materials convexity and device |
CN106475421B (en) * | 2016-09-30 | 2019-02-22 | 首钢集团有限公司 | A kind of control method and device of intermediate base supplied materials convexity |
CN106944483A (en) * | 2017-03-22 | 2017-07-14 | 宁波宝新不锈钢有限公司 | A kind of measurement control method of reversing cold mill band transverse gage Distribution Value |
CN106825069B (en) * | 2017-03-22 | 2018-07-17 | 宁波宝新不锈钢有限公司 | A kind of cold-strip steel high precision plates shape surface roughness on-line intelligence control method |
CN106825069A (en) * | 2017-03-22 | 2017-06-13 | 宁波宝新不锈钢有限公司 | A kind of cold-strip steel high accuracy plate shape surface roughness on-line intelligence control method |
CN108273852A (en) * | 2018-01-19 | 2018-07-13 | 山东钢铁集团日照有限公司 | A kind of sectionalized adjustment method of finish rolling plate shape |
CN108273852B (en) * | 2018-01-19 | 2019-08-06 | 山东钢铁集团日照有限公司 | A kind of sectionalized adjustment method of finish rolling plate shape |
CN111752233A (en) * | 2019-03-28 | 2020-10-09 | 宝山钢铁股份有限公司 | Method for assigning production process data to length position of strip steel |
CN112007959A (en) * | 2019-05-30 | 2020-12-01 | 上海梅山钢铁股份有限公司 | Control method for improving plate shape of free rolling strip steel |
CN112007959B (en) * | 2019-05-30 | 2022-03-11 | 上海梅山钢铁股份有限公司 | Control method for improving plate shape of free rolling strip steel |
Also Published As
Publication number | Publication date |
---|---|
CN100534655C (en) | 2009-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101134207A (en) | Processing method of the hot rolling arrived material convexity in the computing of cold rolled sheet shape initialization | |
CN101683659B (en) | Integrated control method of cold-rolling strip steel flatness and lateral thickness difference | |
CN103286142B (en) | Dynamical roll gap compensation method during a kind of cold continuous rolling dynamic variable specification | |
CN104942019B (en) | A kind of cold rolling of strip steel process Automatic control method of width | |
US8185232B2 (en) | Learning method of rolling load prediction for hot rolling | |
CN101934292B (en) | Automatic control method for camber and wedge of hot rolled strip roughing mill | |
CN102189117B (en) | Cold rolled steel strip straightness feedforward control method based on transverse performance detection | |
CN101745549B (en) | Method for controlling steel feeding temperature of band steel of hot strip mill | |
CN104162549B (en) | The autocontrol method of rougher of hot strip mill machine breakdown bar camber and system | |
CN103433295A (en) | Method for controlling convexity of single-rack double-coiler aluminum hot mill | |
DE3036997A1 (en) | METHOD FOR CONTROLLING AND REGULATING THE TEMPERATURE OF A WORKPIECE DURING ROLLING IN A HOT-ROLLING MILL | |
CN102363159B (en) | Thickness control method for single precision cold-rolled sheet thickness measuring system | |
US7293440B2 (en) | Method of setting/controlling wedge in plate material rolling | |
CN104324948A (en) | Method for controlling width of rolled piece in rough rolling process of hot continuous rolling | |
KR950001805B1 (en) | Process for edge drop control in cold rolling | |
CN104923568B (en) | A kind of control method for preventing thin strip cold rolling process broken belt | |
EP0391658B1 (en) | Wet skin-pass rolling method | |
CN102909223A (en) | Edge shape control method | |
JP2002126813A (en) | Method for setting up draft leveling in plate rolling | |
CN101927268A (en) | Method for controlling thickness of tandem cold-rolled striped steel | |
CN108971236A (en) | A kind of draught pressure forecast method of hot continuous rolling composite strip | |
EP1322433B1 (en) | Sheet width control method in hot rolling | |
RU2189875C2 (en) | Device for automatic control of strip flatness | |
JPS6277110A (en) | Dimension and shape straightening apparatus for hot rolling steel plate | |
KR100953620B1 (en) | The apparatus and method for preventing a pinched tail supression in hot strip |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |