CN101122124A - 钢板排桩护堤疏河方法 - Google Patents
钢板排桩护堤疏河方法 Download PDFInfo
- Publication number
- CN101122124A CN101122124A CNA2007100710231A CN200710071023A CN101122124A CN 101122124 A CN101122124 A CN 101122124A CN A2007100710231 A CNA2007100710231 A CN A2007100710231A CN 200710071023 A CN200710071023 A CN 200710071023A CN 101122124 A CN101122124 A CN 101122124A
- Authority
- CN
- China
- Prior art keywords
- river
- main stem
- steel plate
- main
- silt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Revetment (AREA)
Abstract
本发明是一种钢板排桩护堤疏河方法,旨在提供一种能够对河水流量大,流速高,河水中夹带泥沙多的河道进行疏浚的方法。它是在主河槽的两侧面插入成排直立铺开的钢板,河水在钢板限制的主河槽内冲刷和掏挖主河槽底部的泥沙,并将泥沙引向下游,让主河槽底面下降;当主河槽底面下降到钢板的下部时,再将成排平铺的钢板继续往下插入,让河水继续冲刷和掏挖主河槽底部的泥沙,按上述方法反复作业,将主河槽底面逐步降低并扩大主河槽的容量。该方法可以有效的对河水中夹带着大量泥沙的河道进行治理,防止河道的洪水泛滥,可保证沿河区域的经济发展和居民安居乐业,具有较广的推广和应用价值。
Description
技术领域
本发明涉及一种水利疏浚和治理河道的方法,更具体的说是用钢板作排桩,让水流冲刷和掏挖主河槽底部淤积的泥沙,达到护堤和疏通河道,降低主河槽面的方法。
背景技术:
世界上许多河流由于地理环境的因素,河水会中夹带着大量的泥沙,泥沙在河水流过的河床内滞留和淤积,使河床越来越高。我国的黄河是世界上泥沙最多的河流,历来被认为是黄河治理的难题。几千年来,中华民族在惠受黄河滋育的同时,也饱受了黄河洪水泥沙所带来的灾难。黄河水少、沙多。黄河的泥沙输送所造成的河道淤积,则对人口积聚、经济发展的黄河中下游及两岸地区构成了严重的威胁,成为黄河下游河床高悬、堤防决口、洪灾泛滥的主要原因,成为人们不希望发生而又难以控制的自然灾害。黄河的泥沙问题,黄河中下游河道的淤积问题,是黄河治理开发中最重要的问题之一,在黄河治理历史上,因没有很好地估计和处理黄河泥沙问题而得到的教训是非常深刻和惨痛的。几千年来中华民族为此付出了惨痛的代价,至今还没有一种很好的治理方法,还在探索之中。在全球许多国家和地区也存在有类似情况。
发明内容
本发明的目的是提供一种能够对河水流量不均匀,流速缓,河水中夹带泥沙多的河道进行疏浚,逐步降低主河槽底面并扩大主河槽的容量,而采用钢板排桩护堤疏河的方法。
为了达到上述目的,本发明是通过下述技术方案来实现的:它是在主河槽的两侧面插入成排直立铺开的钢板,河水在钢板限制的主河槽内冲刷和掏挖主河槽底部的泥沙,并将泥沙引向下游,让主河槽底面下降;当主河槽底面下降到钢板的下部时,再将成排平铺的钢板继续往下插入,让河水继续冲刷和掏挖主河槽底部的泥沙,按上述方法反复作业,将主河槽底面逐步降低并扩大主河槽的容量。
根据上述方案来疏浚河道和降低主河槽底面,具有以下优点:
1、在平时水流量小时,可强制河水的流向,形成主河槽,集中水力掏走泥沙。
2、在水流量大时可稳定主河槽河水的流向,避免河水流向变动,形成斜河或横河,而直接冲击堤岸,造成险情。
3、利用此法输送泥沙用水量小,水力集中可提高水力的冲刷效果。
4、可定向排洪、纳沙,并可预先设定泥沙的填筑区域,达到定向填沙的效果。
5、逐年降低钢板排桩的深度,主河槽逐年降低后,也使多年积高的河床面全面降低。
6、对在使用中损坏的钢板可分片抽换,降低维修和使用的成本。
7、利用水的自然冲刷和运沙特性,达到主河槽底面逐步降低、扩大主河槽的容量、护堤和固堤的目的,运作成本低。
8、因河道控制于人力之下,防止河道的洪水泛滥,可保证沿河区域的经济发展和居民安居乐业。
附图说明
图1是河道断面插有钢板排桩的施工状态图;
图2是钢板排桩排列的局部放大视图;
图3是一块钢板排桩的俯视图;
图4是两块钢板排桩用启口连接的结构示意图;
图5是图2在A区的局部放大图(已拆去右边的连接件);
图6是图5的左视图。
其中:1、主河槽;2、河床面;3、堤岸;4、河水;5、钢板;6、波纹;7、启口;8、连接孔;9、连接件;10、主河槽底部。
具体实施方式
下面结合附图和实施例对本发明作进一步的描述。
图1是河道断面插有钢板排桩的施工状态图。从图中看出,一般的河道中间是下凹的主河槽1,主河槽1的两边是河床面2,河床面2上是堤岸3,河水4在堤岸3内流动。在枯水期,河水4一般在主河槽1内流动。为方便施工可选择在枯水期施工。施工时,它是在主河槽1的两侧面插入成排直立铺开的钢板5如图2所示。所用的钢板5上制有与插入方向垂直的波纹6如图3所示,以提高钢板5的刚度也便于插入主河槽1的泥沙内。同时为了提高各钢板5之间的整体性,在相邻钢板5的侧面制有相互拼接的启口7如图4所示,另外在近钢板两侧面的顶部制有连接孔8,连接件9通过连接孔8将相邻钢板5连接在一起如图5、图6所示。
在使用中,河水4在钢板5限制的主河槽1内冲刷和掏挖主河槽底部10的泥沙,并将泥沙引向下游直至大海,让主河槽1底面下降;当主河槽1底面下降到钢板5的下部时,再将成排平铺的钢板5逐一继续往下插入,让河水4继续冲刷和掏挖主河槽底部10的泥沙。按上述方法反复作业,将主河槽1底面逐步降低并扩大主河槽1的容量,达到疏浚河道、清除淤积在主河槽底部10泥沙的目的。
此方法对河水流量大的河道,在河道上游筑闸蓄水,当在下游河水流量小时开闸放水,稳定河水流量来冲刷和掏挖主河槽底部的泥沙,为长期水力冲刷创造条件。因此,该方法具有较广的推广和应用价值。
Claims (5)
1.钢板排桩护堤疏河方法,其特征是在主河槽的两侧面插入成排直立铺开的钢板,河水在钢板限制的主河槽内冲刷和掏挖主河槽底部的泥沙,并将泥沙引向下游,让主河槽底面下降;当主河槽底面下降到钢板的下部时,再将成排平铺的钢板继续往下插入,让河水继续冲刷和掏挖主河槽底部的泥沙,按上述方法反复作业,将主河槽底面逐步降低并扩大主河槽的容量。
2.根据权利要求1所述的钢板排桩护堤疏河方法,其特征在于所述的钢板上制有与插入方向垂直的波纹。
3.根据权利要求1所述的钢板排桩护堤疏河方法,其特征在于在相邻钢板的侧面制有相互拼接的启口。
4.根据权利要求1所述的钢板排桩护堤疏河方法,其特征在于在近钢板两侧面的顶部制有连接孔,连接件通过连接孔将相邻钢板连接在一起。
5.根据权利要求1所述的钢板排桩护堤疏河方法,其特征是对河水流量大的河道,在河道上游筑闸蓄水,当在下游河水流量小时开闸放水,稳定河水流量来冲刷和掏挖主河槽底部的泥沙。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007100710231A CN101122124A (zh) | 2007-08-27 | 2007-08-27 | 钢板排桩护堤疏河方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007100710231A CN101122124A (zh) | 2007-08-27 | 2007-08-27 | 钢板排桩护堤疏河方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101122124A true CN101122124A (zh) | 2008-02-13 |
Family
ID=39084607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007100710231A Pending CN101122124A (zh) | 2007-08-27 | 2007-08-27 | 钢板排桩护堤疏河方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101122124A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102121240A (zh) * | 2010-12-23 | 2011-07-13 | 倪既民 | 可移可调江河自流冲淤导流板 |
CN112854138A (zh) * | 2021-01-09 | 2021-05-28 | 中铁广州工程局集团有限公司 | 一种既有河道改道施工方法 |
CN112962513A (zh) * | 2021-01-25 | 2021-06-15 | 中铁五局集团第四工程有限责任公司 | 一种河道疏浚方法 |
CN113202057A (zh) * | 2021-05-17 | 2021-08-03 | 中国人民解放军陆军工程大学 | 一种栈桥与钢板桩相结合的快速大堤决口封堵施工方法 |
-
2007
- 2007-08-27 CN CNA2007100710231A patent/CN101122124A/zh active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102121240A (zh) * | 2010-12-23 | 2011-07-13 | 倪既民 | 可移可调江河自流冲淤导流板 |
CN102121240B (zh) * | 2010-12-23 | 2016-03-16 | 倪既民 | 可移可调江河自流冲淤导流板 |
CN112854138A (zh) * | 2021-01-09 | 2021-05-28 | 中铁广州工程局集团有限公司 | 一种既有河道改道施工方法 |
CN112854138B (zh) * | 2021-01-09 | 2022-07-08 | 中铁广州工程局集团有限公司 | 一种既有河道改道施工方法 |
CN112962513A (zh) * | 2021-01-25 | 2021-06-15 | 中铁五局集团第四工程有限责任公司 | 一种河道疏浚方法 |
CN112962513B (zh) * | 2021-01-25 | 2023-02-28 | 中铁五局集团第四工程有限责任公司 | 一种河道疏浚方法 |
CN113202057A (zh) * | 2021-05-17 | 2021-08-03 | 中国人民解放军陆军工程大学 | 一种栈桥与钢板桩相结合的快速大堤决口封堵施工方法 |
CN113202057B (zh) * | 2021-05-17 | 2022-04-15 | 中国人民解放军陆军工程大学 | 一种栈桥与钢板桩相结合的快速大堤决口封堵施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102733351B (zh) | 一种治理江河入海口方法 | |
CN203782664U (zh) | 一种砂性土地基水闸的防冲结构 | |
CN101122124A (zh) | 钢板排桩护堤疏河方法 | |
CN106400744A (zh) | 一种预防河道冲刷的边坡综合治理结构及其施工方法 | |
CN100347377C (zh) | 一种模袋排帘及其江河崩岸防治方法 | |
CN113006108B (zh) | 一种膜袋砂围堰施工方法 | |
CN107700434B (zh) | 一种拱形格栅式钢筋混凝土泥石流拦挡坝及其建筑方法 | |
CN212533945U (zh) | 河流边滩鱼类栖息地结构 | |
CN101705668B (zh) | 可在动水中修建的壅水水工建筑物结构及其施工方法 | |
CN208604552U (zh) | 用于复杂地质条件下的桩林坝 | |
CN215165198U (zh) | 一种用于强涌潮区域顺堤围堰的护脚构造 | |
KR101170789B1 (ko) | 친환경 복합 사방댐 | |
CN212200477U (zh) | 一种拦河堰闸抗冲沉井群及包含该沉井群的连接结构 | |
CN106930242A (zh) | 桩基溢流坝与铅丝石笼护坦 | |
CN102121240A (zh) | 可移可调江河自流冲淤导流板 | |
CN108677880B (zh) | 用于复杂地质条件下的桩林坝 | |
KR20120005503U (ko) | 세굴방지 블록 | |
CN111549723A (zh) | 河流边滩鱼类栖息地结构及其构建方法 | |
CN106049371B (zh) | 一种蓄泥沙水坝及其防止土流失的方法 | |
TW201016930A (en) | Regulation method for river with the function of protecting bridge pier and dike, and with the function of forming sand and stone collecting specific area | |
CN205134266U (zh) | 一种大库盘水库淤滩冲沙结构 | |
Nielsen et al. | Submerged groynes for beach stabilisation | |
CN218540592U (zh) | 一种水利水电工程施工导流结构 | |
CN217053257U (zh) | 一种拦河闸基础结构 | |
CN215211162U (zh) | 一种干地施工的隔流建筑物结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20080213 |